Atch__15_-_BLANK_SAMPLE_Schedule_of_Values_Template_UNLOCKED.pdf

PDF 97 KB Posted

Attached to
Civil Engineering Multiple Award Construction Contract (CEMACC)
Solicitation number
FA8501-17-R-0001
Issued by

About this file

Blank Sample Schedule of Values

View the file

Other files

File Type Posted
RFI__6__-_17_Feb_17.docx DOCX document
Notice_to_Offerors_Attachment_8.docx DOCX document
Copy_of_REVISED_Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Breakdown_of_work_to_be_accomplished__.xls XLS spreadsheet
CEMACC_RFI__6.docx DOCX document
RFI__5_and_Note_to_Offerors.docx DOCX document
RFI.docx DOCX document
Amendment_2_CEMACC.pdf PDF
RFI__4_Questions_and_Answers_updated_7_Feb_17.docx DOCX document
Bldg 140 Existing Mezz HVAC Unit to be demoed_01.jpg JPG image
N27_Site_Plan.pdf PDF
Lighting Panel in adjacent fabric structure.JPG JPG image
YKAA-FP0001_BLDG_140_MAIN_FLOOR.dwg DWG drawing
N27 Utility Pit_03.JPG JPG image
Bldg 140 Existing Mezz GE plug-in busway.jpg JPG image
Bldg_140_Existing_Mezz_HVAC_information.zip ZIP file
N27 Utility Pit_01.JPG JPG image
N27 Utility Pit_02.JPG JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_01.jpg JPG image
RFI__3_For_FBO_Post_27_Jan_2017.docx DOCX document
Bldg 140 Existing Mezz view looking down into Engraving Shop.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_03.jpg JPG image
Bldg 140 Existing Mezz Access Ladder.jpg JPG image
UHHZ_150376_C17_Fabric_Shelter_LAYOUT_SECTION.pdf PDF
YKAA-FP0002_BLDG_140_MEZZANINE.dwg DWG drawing
Bldg_149_Addition_existing_Electrical_Panel_HAA_and_LAA.zip ZIP file
Bldg 149 Addition existing Electrical Panel HAA.jpg JPG image
Bldg 149 Addition existing Electrical Panel HAA schedule.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_04.jpg JPG image
Bldg 149 Addition existing Electrical Panel LAA schedule.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_02.jpg JPG image
N27_Utility_Pit_Detail_Sheet_print_on_11_x_17_size_paper.pdf PDF
Lift_Station_adjacent_to_Bldg_149.tif TIF image
FA8501-17-R-0001-0001_(AMENDMENT).pdf PDF
Bldg 149 Addition existing stepdown transformer.jpg JPG image
Bldg 149 Addition existing Electrical Panel LAA.jpg JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_02.jpg JPG image
RFI_'s__2_20-Jan-2017.docx DOCX document
Atch__37_Matrix.pdf PDF
N27_Utility_Photos.zip ZIP file
Atch__22_-_Robins_Roof_Requirements_UHHZ160306_MAR2016.docx DOCX document
Sign_In_Sheet,_Site_Visit_Slides.pdf PDF
RFI__1.docx DOCX document
Bldg_149_As-Built_AutoCAD_Files.zip ZIP file
Atch__14_Wage_Determination_Highway.pdf PDF
Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
Atch__26_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.pdf PDF
Atch__35_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__31_UHHZ_160082_Rpr_Upgrd_Locker_Room_Bldg_149_As-Built_Drawings_combined.pdf PDF
Atch__20_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION 01 ‐ GENERAL REQUIREMENTS

LINE NO. DESCRIPTION VALUE PERCENTAGE

1.1 Project Management $0.73 1.67%

1.2 Supervision $0.97 2.22%

1.3 Project Trailer (including deliver & return) $0.05 0.11%

1.4 Roll‐Off Dumpster $0.53 1.21%

1.5 Temporary Fence $0.53 1.21%

1.6 Bond $0.13 0.30%

1.7 Rental Equipment (Lull, Manlift, Boom Truck) $0.19 0.43%

1.8 Tools $0.19 0.43%

Division 01 Total $3.13 7.16%

DIVISION 02 ‐ EXISTING CONDITIONS

LINE NO. DESCRIPTION VALUE PERCENTAGE

2.1 Demolition Interior (Electrical) $0.88 2.01%

2.2 Demolition Interior (Mechanical) $0.32 0.73%

2.3 Demolition (Plumbing) $0.15 0.34%

2.4 Demolition (Flooring) $0.15 0.34%

2.5 Demolition (Openings) $0.88 2.01%

2.6 Demolition (Concrete) $0.88 2.01%

2.7 Demolition (Ceilings) $0.88 2.01%

2.8 Demolition (Walls) $0.55 1.26%

2.9 Demolition (Fire Suppression) $0.88 2.01%

2.10 Demolition (Fire Alarm System) $0.68 1.56%

2.11 Demolition (Communications) $0.25 0.57%

Division 02 Total $6.50 14.87%

DIVISION 03 ‐ CONCRETE

LINE NO. DESCRIPTION VALUE PERCENTAGE

3.1 Concrete Pad (Generator) $0.32 0.73%

3.2 Concrete Ceiling {Vault) $0.68 1.56%

3.3 Concrete Pad (Mechanical Yard} $0.87 1.99%

3.4 Concrete Pad (HVAC Units) $0.96 2.20%

3.5 Concrete Reinforcements $0.14 0.32%

3.6 Expansion Joints, Contraction Joinls $0.18 0.41%

3.7 Concrete Design Mix/Rebar Shop Drawings $0.10 0.23%

3.8 Concrete Testing and Reports $0.08 0.18%

Division 03 Total $3.15 7.20%

BLANK SAMPLE SCHEDULE OF VALUES

Contract No: FA8501‐XX‐X‐XXXX

Project No & Title: UHHZ XXXXXX Construct XXXXXXXXXXXXXXXXXXXXXXX

DIVISION 04 ‐ MASONRY

LINE NO. DESCRIPTION VALUE PERCENTAGE

4.1 Mechanical Yard Masonrv Wall $0.31 0.71%

4.2 Generator Pad Masonry Wall $0.65 1.49%

4.3 Infill (Front Entry Area) $0.96 2.20%

4.4 Masonry Patch Work (Roll‐up Door) $0.96 2.20%

4.5 Infill (Mechanical Louver Area) $0.20 0.46%

4.6 Vault $0.93 2.13%

Division 04 Total $4.01 9.17%

DIVISION 05 ‐ METALS

LINE NO. DESCRIPTION VALUE PERCENTAGE

5.1 Metal Stud Framing (Interior) $0.78 1.78%

5.2 Metal Stud Framing Accessories $0.12 0.27%

5.3 0.00%

Division 05 Total $0.90 2.06%

DIVISION 06 ‐ WOOD, PLASTICS, AND COMPOSITES

LINE NO. DESCRIPTION VALUE PERCENTAGE

6.1 Casework (Women's Restroom) $0.34 0.78%

6.2 Casework (Men's Restroom) $0.34 0.78%

6.3 Casework (Break Room) 0.00%

Division 06 Total $0.68 1.56%

DIVISION 07 ‐ THERMAL AND MOISTURE PROTECTION

LINE NO. DESCRIPTION VALUE PERCENTAGE

7.1 Mineral Fiber Blanket lnsulation (Interior) $0.54 1.24%

7.2 Sound Attenuation Fire Blanket in rated walls $0.14 0.32%

7.3 Rigid (Polyisocyanurate) Insulation $0.04 0.09%

Division 07 Total $0.72 1.65%

DIVISION 08 ‐ OPENINGS

LINE NO. DESCRIPTION VALUE PERCENTAGE

8.1 Steel Doors and Frames $0.03 0.07%

8.2 Prefinished Electric Insulated Overhead Coiling D $0.35 0.80%

8.3 Windows $0.39 0.89%

8.4 Door Hsrdware including door cylinders $0.21 0.48%

Division 08 Total $0.77 1.76%

DIVISION 09 ‐ FINISHES

LINE NO. DESCRIPTION VALUE PERCENTAGE

9.1 Gypsum Board and mud, tape, corner beads $0.30 0.69%

9.2 Paints and Coatings $0.11 0.25%

9.3 Epoxy Flooring $0.06 0.14%

9.4 Acoustlcal Ceiling Tile and Grid $0.16 0.37%

9.5 Porcelain Tile $0.42 0.96%

9.6 Carpet Tiles $0.73 1.67%

9.7 Vinyl Composition Tile $0.24 0.55%

9.8 Rubber Base $0.11 0.25%

Division 09 Total $1.78 4.07%

DIVISION 10 ‐ SPECIALTIES

LINE NO. DESCRIPTION VALUE PERCENTAGE

10.1 Toilet Accessories $0.15 0.34%

10.2 Interior Signage $0.86 1.97%

10.3 0.00%

Division 10 Total $1.01 2.31%

DIVISION 13 ‐ SPECIAL CONSTRUCTION

LINE NO. DESCRIPTION VALUE PERCENTAGE

13.1 Steel Deck Vault $0.55 1.26%

13.2 Steel I‐beam (Openings) $0.90 2.06%

13.3 Steel louvers (Mech Yard) $0.78 1.78%

13.4 Steel Gate (Generator) $0.58 1.33%

13.5 Steel Gate (Generator) $0.58 1.33%

13.6 Pre‐engineered Metal Building $0.75 1.72%

13.7 Pre‐engineered Metal Building Wall Roof panels $0.12 0.27%

13.8 Pre‐engineered Metal Building Accessories $0.07 0.16%

Division 13 Total $4.14 9.47%

DIVISION 21 ‐ FIRE SUPPRESSION

LINE NO. DESCRIPTION VALUE PERCENTAGE

21.1 Riser, Dbl Check Valves, Tamper & Flow Switches $0.02 0.05%

21.2 Wet Pipe Fire Sprinkler Piping $0.14 0.32%

21.3 Testing $0.78 1.78%

Division 21 Total $0.94 2.15%

DIVISION 22 ‐ PLUMBING

LINE NO. DESCRIPTION VALUE PERCENTAGE

22.1 Plumbing (Fixtures) $0.09 0.21%

22.2 Plumbing Piping& Materials $0.73 1.67%

22.3 0.00%

Division 22 Total $0.82 1.88%

DIVISION 23 ‐ HEATING, VENTILATION AND AIR CONDITIONING

LINE NO. DESCRIPTION VALUE PERCENTAGE

23.1 HVAC Air Handlers $0.11 0.25%

23.2 Acoustics Duct Silencers $0.18 0.41%

23.3 Exhaust & Supply Fans $0.35 0.80%

23.4 Boiler & Computer Room Units (CRAC) $0.58 1.33%

23.5 Variable Air Volume 0JAV) Boxes $0.74 1.69%

23.6 Fire Smoke Dampers & Louvers $0.35 0.80%

23.7 Testing, Adjusting & Balancing of HVAC Sys $0.11 0.25%

23.8 Thermal lnsulation for Mechanical Sys $0.35 0.80%

23.9 Duct Insulation $0.23 0.53%

23.10 Duct Work & Duct Work Accessories $0.50 1.14%

23.11 Diffusers, Registers & Grills $0.22 0.50%

23.12 HVAC Controls $0.70 1.60%

Division 23 Total $4.42 10.11%

DIVISION 26 ‐ ELECTRICAL

LINE NO. DESCRIPTION VALUE PERCENTAGE

26.1 Electrical Conduit, Fillings, Boxes $0.24 0.55%

26.2 Electrical Wire & Cable $0.93 2.13%

26.3 Interior Distribution Systems $0.91 2.08%

26.4 Low Voltage SwitchQear $0.23 0.53%

26.5 Switchboards & Panel Boards $0.51 1.17%

26.6 Interior lighting $0.11 0.25%

26.7 Electrical Exterior Underground $0.75 1.72%

26.8 Electric Meter $0.07 0.16%

Division 26 Total $3.68 8.42%

DIVISION 27 ‐ COMMUNICATIONS (IF REQUIRED AS A PART OF CONTRACT)

LINE NO. DESCRIPTION VALUE PERCENTAGE

27.1 Comm Piping, Fittings and Boxes $0.88 2.01%

27.2 Communications Wire $0.44 1.01%

27.3 Communications Cable Tray $0.80 1.83%

27.4 Testing $0.06 0.14%

Division 27 Total $2.18 4.99%

DIVISION 28 ‐ ELECTRONIC SAFETY AND SECURITY

LINE NO. DESCRIPTION VALUE PERCENTAGE

28.1 Fire Alarm System Conduit & Fittings $0.17 0.39%

28.2 Fire Alarm Panel and Power Boosters $0.96 2.20%

28.3 Fire Alarm Programming & Testing $0.05 0.11%

28.4 MNS Conduit and Fittings $0.47 1.08%

28.5 MNS Panels $0.40 0.91%

28.6 FA/MNS Programming & Testing $0.29 0.66%

Division 28 Total $2.34 5.35%

DIVISION 31 ‐ EARTHWORK

LINE NO. DESCRIPTION VALUE PERCENTAGE

31.1 Landscaping (Demo) $0.06 0.14%

31.2 Landscaping (Sod and Watering) $0.06 0.14%

31.3 Soii Compaction Test $0.15 0.34%

Division 31 Total $0.27 0.62%

DIVISION 32 ‐ EXTERIOR IMPROVEMENTS

LINE NO. DESCRIPTION VALUE PERCENTAGE

32.1 Bollards $0.58 1.33%

32.2 Concrete Sidewalks $0.05 0.11%

32.3 Fog Seal (Parking Lot) $0.63 1.44%

32.4 Curb Stops (Parking Lot) $0.05 0.11%

32.5 Restnping (Parking Lot) $0.29 0.66%

Division 32 Total $1.60 3.66%

DIVISION 33 ‐ UTILITIES

LINE NO. DESCRIPTION VALUE PERCENTAGE

33.1 Natural Gas $0.63 1.44%

33.2 Gas Meter $0.05 0.11%

33.3 0.00%

Division 33 Total $0.68 1.56%

CLOSE‐OUT DOCUMENTS

LINE NO. DESCRIPTION VALUE PERCENTAGE

A As‐Built Drawings 0.00%

B Warranties

C O&M Manuals (Paper Copy and CD/DVD's) 0.00%

D Roof Inspection Reports 0.00%

Close‐out Total $0.00 0.00%

BID TOTAL $43.72 100.00%