Blank Sample Schedule of Values

View the file

Other files for this federal contract opportunity

Other files attached to Civil Engineering Multiple Award Construction Contract (CEMACC), newest first.
File Type Posted
Copy_of_REVISED_Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Breakdown_of_work_to_be_accomplished__.xls XLS spreadsheet
Notice_to_Offerors_Attachment_8.docx DOCX document
N27 Utility Pit_03.JPG JPG image
Bldg 149 Addition existing Electrical Panel HAA.jpg JPG image
Bldg 149 Addition existing Electrical Panel HAA schedule.jpg JPG image
N27 Utility Pit_02.JPG JPG image
YKAA-FP0001_BLDG_140_MAIN_FLOOR.dwg DWG drawing
Bldg 140 Existing Mezz HVAC Unit to be demoed_01.jpg JPG image
N27 Utility Pit_01.JPG JPG image
Bldg_140_Existing_Mezz_HVAC_information.zip ZIP file
Lighting Panel in adjacent fabric structure.JPG JPG image
Bldg 140 Existing Mezz view looking down into Engraving Shop.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_03.jpg JPG image
Bldg 140 Existing Mezz Access Ladder.jpg JPG image
Bldg_149_Addition_existing_Electrical_Panel_HAA_and_LAA.zip ZIP file
YKAA-FP0002_BLDG_140_MEZZANINE.dwg DWG drawing
N27 Utility Pit_02.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_01.JPG JPG image
Lighting Panel in adjacent fabric structure.JPG JPG image
Lighting Panel in adjacent fabric structure.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_01.JPG JPG image
Bldg 149 Addition existing Electrical Panel LAA.jpg JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_02.jpg JPG image
Atch__37_Matrix.pdf PDF
N27_Utility_Photos.zip ZIP file
Atch__22_-_Robins_Roof_Requirements_UHHZ160306_MAR2016.docx DOCX document
RFI__1.docx DOCX document
Bldg_149_As-Built_AutoCAD_Files.zip ZIP file
Atch__35_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__20_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch__2_-_Robins_BASE_FACILITY_STANDARDS_REV_23_June_14.pdf PDF
Atch__24_-_AFSC_Energy_Metering_Requirements_24_June_2016.pdf PDF
Atch__21_-_BLANK_SAMPLE_AF_Form_911_Engineering_Review_Comments.pdf PDF
Atch__32_-_Air_Force_Manual_32_1084_Civil_Engineering_Facility_Requirements.pdf PDF
Atch__27_-_BLANK_SAMPLE_AF_Form_66_SUBMITTAL_REGISTER_-_CEMACC_(INITIAL).pdf PDF
Atch__7_-_Robins_AFB_Asbestos_Management_Plan_-_January_2015.pdf PDF
Atch__10_-_BLANK_SAMPLE_AF_Form__3065.pdf PDF
Atch__14_Wage_Determination_Highway.pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Atch__6_-_Robins_AFB_Architectural_Compatiblity_Standards_18_Aug_2015.pdf PDF
Atch__23_-_Technical_Spec_for_ICD705_version1.2_April_23_2012.pdf PDF
Atch__5_Appendix_C.docx DOCX document
Atch__19_Tax_Liability_Form.pdf PDF
Atch__3_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__12_Wage_Determination_Buidling_CEMACC.pdf PDF
Atch__26_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.pdf PDF
Atch__16_Pricing_Sheet.xlsx XLSX spreadsheet
Atch__9__Blank_Sample_AF_Form_3064.pdf PDF
Show all 50

Civil Engineering Multiple Award Construction Contract (CEMACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION 01 ‐ GENERAL REQUIREMENTS

LINE NO. DESCRIPTION VALUE PERCENTAGE

1.1 Project Management $0.73 1.67%

1.2 Supervision $0.97 2.22%

1.3 Project Trailer (including deliver & return) $0.05 0.11%

1.4 Roll‐Off Dumpster $0.53 1.21%

1.5 Temporary Fence $0.53 1.21%

1.6 Bond $0.13 0.30%

1.7 Rental Equipment (Lull, Manlift, Boom Truck) $0.19 0.43%

1.8 Tools $0.19 0.43%

Division 01 Total $3.13 7.16%

DIVISION 02 ‐ EXISTING CONDITIONS

LINE NO. DESCRIPTION VALUE PERCENTAGE

2.1 Demolition Interior (Electrical) $0.88 2.01%

2.2 Demolition Interior (Mechanical) $0.32 0.73%

2.3 Demolition (Plumbing) $0.15 0.34%

2.4 Demolition (Flooring) $0.15 0.34%

2.5 Demolition (Openings) $0.88 2.01%

2.6 Demolition (Concrete) $0.88 2.01%

2.7 Demolition (Ceilings) $0.88 2.01%

2.8 Demolition (Walls) $0.55 1.26%

2.9 Demolition (Fire Suppression) $0.88 2.01%

2.10 Demolition (Fire Alarm System) $0.68 1.56%

2.11 Demolition (Communications) $0.25 0.57%

Division 02 Total $6.50 14.87%

DIVISION 03 ‐ CONCRETE

LINE NO. DESCRIPTION VALUE PERCENTAGE

3.1 Concrete Pad (Generator) $0.32 0.73%

3.2 Concrete Ceiling {Vault) $0.68 1.56%

3.3 Concrete Pad (Mechanical Yard} $0.87 1.99%

3.4 Concrete Pad (HVAC Units) $0.96 2.20%

3.5 Concrete Reinforcements $0.14 0.32%

3.6 Expansion Joints, Contraction Joinls $0.18 0.41%

3.7 Concrete Design Mix/Rebar Shop Drawings $0.10 0.23%

3.8 Concrete Testing and Reports $0.08 0.18%

Division 03 Total $3.15 7.20%

BLANK SAMPLE SCHEDULE OF VALUES

Contract No: FA8501‐XX‐X‐XXXX

Project No & Title: UHHZ XXXXXX Construct XXXXXXXXXXXXXXXXXXXXXXX

DIVISION 04 ‐ MASONRY

LINE NO. DESCRIPTION VALUE PERCENTAGE

4.1 Mechanical Yard Masonrv Wall $0.31 0.71%

4.2 Generator Pad Masonry Wall $0.65 1.49%

4.3 Infill (Front Entry Area) $0.96 2.20%

4.4 Masonry Patch Work (Roll‐up Door) $0.96 2.20%

4.5 Infill (Mechanical Louver Area) $0.20 0.46%

4.6 Vault $0.93 2.13%

Division 04 Total $4.01 9.17%

DIVISION 05 ‐ METALS

LINE NO. DESCRIPTION VALUE PERCENTAGE

5.1 Metal Stud Framing (Interior) $0.78 1.78%

5.2 Metal Stud Framing Accessories $0.12 0.27%

5.3 0.00%

Division 05 Total $0.90 2.06%

DIVISION 06 ‐ WOOD, PLASTICS, AND COMPOSITES

LINE NO. DESCRIPTION VALUE PERCENTAGE

6.1 Casework (Women's Restroom) $0.34 0.78%

6.2 Casework (Men's Restroom) $0.34 0.78%

6.3 Casework (Break Room) 0.00%

Division 06 Total $0.68 1.56%

DIVISION 07 ‐ THERMAL AND MOISTURE PROTECTION

LINE NO. DESCRIPTION VALUE PERCENTAGE

7.1 Mineral Fiber Blanket lnsulation (Interior) $0.54 1.24%

7.2 Sound Attenuation Fire Blanket in rated walls $0.14 0.32%

7.3 Rigid (Polyisocyanurate) Insulation $0.04 0.09%

Division 07 Total $0.72 1.65%

DIVISION 08 ‐ OPENINGS

LINE NO. DESCRIPTION VALUE PERCENTAGE

8.1 Steel Doors and Frames $0.03 0.07%

8.2 Prefinished Electric Insulated Overhead Coiling D $0.35 0.80%

8.3 Windows $0.39 0.89%

8.4 Door Hsrdware including door cylinders $0.21 0.48%

Division 08 Total $0.77 1.76%

DIVISION 09 ‐ FINISHES

LINE NO. DESCRIPTION VALUE PERCENTAGE

9.1 Gypsum Board and mud, tape, corner beads $0.30 0.69%

9.2 Paints and Coatings $0.11 0.25%

9.3 Epoxy Flooring $0.06 0.14%

9.4 Acoustlcal Ceiling Tile and Grid $0.16 0.37%

9.5 Porcelain Tile $0.42 0.96%

9.6 Carpet Tiles $0.73 1.67%

9.7 Vinyl Composition Tile $0.24 0.55%

9.8 Rubber Base $0.11 0.25%

Division 09 Total $1.78 4.07%

DIVISION 10 ‐ SPECIALTIES

LINE NO. DESCRIPTION VALUE PERCENTAGE

10.1 Toilet Accessories $0.15 0.34%

10.2 Interior Signage $0.86 1.97%

10.3 0.00%

Division 10 Total $1.01 2.31%

DIVISION 13 ‐ SPECIAL CONSTRUCTION

LINE NO. DESCRIPTION VALUE PERCENTAGE

13.1 Steel Deck Vault $0.55 1.26%

13.2 Steel I‐beam (Openings) $0.90 2.06%

13.3 Steel louvers (Mech Yard) $0.78 1.78%

13.4 Steel Gate (Generator) $0.58 1.33%

13.5 Steel Gate (Generator) $0.58 1.33%

13.6 Pre‐engineered Metal Building $0.75 1.72%

13.7 Pre‐engineered Metal Building Wall Roof panels $0.12 0.27%

13.8 Pre‐engineered Metal Building Accessories $0.07 0.16%

Division 13 Total $4.14 9.47%

DIVISION 21 ‐ FIRE SUPPRESSION

LINE NO. DESCRIPTION VALUE PERCENTAGE

21.1 Riser, Dbl Check Valves, Tamper & Flow Switches $0.02 0.05%

21.2 Wet Pipe Fire Sprinkler Piping $0.14 0.32%

21.3 Testing $0.78 1.78%

Division 21 Total $0.94 2.15%

DIVISION 22 ‐ PLUMBING

LINE NO. DESCRIPTION VALUE PERCENTAGE

22.1 Plumbing (Fixtures) $0.09 0.21%

22.2 Plumbing Piping& Materials $0.73 1.67%

22.3 0.00%

Division 22 Total $0.82 1.88%

DIVISION 23 ‐ HEATING, VENTILATION AND AIR CONDITIONING

LINE NO. DESCRIPTION VALUE PERCENTAGE

23.1 HVAC Air Handlers $0.11 0.25%

23.2 Acoustics Duct Silencers $0.18 0.41%

23.3 Exhaust & Supply Fans $0.35 0.80%

23.4 Boiler & Computer Room Units (CRAC) $0.58 1.33%

23.5 Variable Air Volume 0JAV) Boxes $0.74 1.69%

23.6 Fire Smoke Dampers & Louvers $0.35 0.80%

23.7 Testing, Adjusting & Balancing of HVAC Sys $0.11 0.25%

23.8 Thermal lnsulation for Mechanical Sys $0.35 0.80%

23.9 Duct Insulation $0.23 0.53%

23.10 Duct Work & Duct Work Accessories $0.50 1.14%

23.11 Diffusers, Registers & Grills $0.22 0.50%

23.12 HVAC Controls $0.70 1.60%

Division 23 Total $4.42 10.11%

DIVISION 26 ‐ ELECTRICAL

LINE NO. DESCRIPTION VALUE PERCENTAGE

26.1 Electrical Conduit, Fillings, Boxes $0.24 0.55%

26.2 Electrical Wire & Cable $0.93 2.13%

26.3 Interior Distribution Systems $0.91 2.08%

26.4 Low Voltage SwitchQear $0.23 0.53%

26.5 Switchboards & Panel Boards $0.51 1.17%

26.6 Interior lighting $0.11 0.25%

26.7 Electrical Exterior Underground $0.75 1.72%

26.8 Electric Meter $0.07 0.16%

Division 26 Total $3.68 8.42%

DIVISION 27 ‐ COMMUNICATIONS (IF REQUIRED AS A PART OF CONTRACT)

LINE NO. DESCRIPTION VALUE PERCENTAGE

27.1 Comm Piping, Fittings and Boxes $0.88 2.01%

27.2 Communications Wire $0.44 1.01%

27.3 Communications Cable Tray $0.80 1.83%

27.4 Testing $0.06 0.14%

Division 27 Total $2.18 4.99%

DIVISION 28 ‐ ELECTRONIC SAFETY AND SECURITY

LINE NO. DESCRIPTION VALUE PERCENTAGE

28.1 Fire Alarm System Conduit & Fittings $0.17 0.39%

28.2 Fire Alarm Panel and Power Boosters $0.96 2.20%

28.3 Fire Alarm Programming & Testing $0.05 0.11%

28.4 MNS Conduit and Fittings $0.47 1.08%

28.5 MNS Panels $0.40 0.91%

28.6 FA/MNS Programming & Testing $0.29 0.66%

Division 28 Total $2.34 5.35%

DIVISION 31 ‐ EARTHWORK

LINE NO. DESCRIPTION VALUE PERCENTAGE

31.1 Landscaping (Demo) $0.06 0.14%

31.2 Landscaping (Sod and Watering) $0.06 0.14%

31.3 Soii Compaction Test $0.15 0.34%

Division 31 Total $0.27 0.62%

DIVISION 32 ‐ EXTERIOR IMPROVEMENTS

LINE NO. DESCRIPTION VALUE PERCENTAGE

32.1 Bollards $0.58 1.33%

32.2 Concrete Sidewalks $0.05 0.11%

32.3 Fog Seal (Parking Lot) $0.63 1.44%

32.4 Curb Stops (Parking Lot) $0.05 0.11%

32.5 Restnping (Parking Lot) $0.29 0.66%

Division 32 Total $1.60 3.66%

DIVISION 33 ‐ UTILITIES

LINE NO. DESCRIPTION VALUE PERCENTAGE

33.1 Natural Gas $0.63 1.44%

33.2 Gas Meter $0.05 0.11%

33.3 0.00%

Division 33 Total $0.68 1.56%

CLOSE‐OUT DOCUMENTS

LINE NO. DESCRIPTION VALUE PERCENTAGE

A As‐Built Drawings 0.00%

B Warranties

C O&M Manuals (Paper Copy and CD/DVD's) 0.00%

D Roof Inspection Reports 0.00%

Close‐out Total $0.00 0.00%

BID TOTAL $43.72 100.00%