Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Construction_Cost_Estimate_Breakdown.xls

Air Force Form XLS spreadsheet 135 KB Posted

Attached to
Civil Engineering Multiple Award Construction Contract (CEMACC)
Solicitation number
FA8501-17-R-0001
Issued by

About this file

Blank Sample AF Form 3052

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
RFI__6__-_17_Feb_17.docx DOCX document
Notice_to_Offerors_Attachment_8.docx DOCX document
Copy_of_REVISED_Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Breakdown_of_work_to_be_accomplished__.xls XLS spreadsheet
CEMACC_RFI__6.docx DOCX document
RFI__5_and_Note_to_Offerors.docx DOCX document
RFI.docx DOCX document
Amendment_2_CEMACC.pdf PDF
RFI__4_Questions_and_Answers_updated_7_Feb_17.docx DOCX document
Bldg 140 Existing Mezz HVAC Unit to be demoed_01.jpg JPG image
N27_Site_Plan.pdf PDF
Lighting Panel in adjacent fabric structure.JPG JPG image
YKAA-FP0001_BLDG_140_MAIN_FLOOR.dwg DWG drawing
N27 Utility Pit_03.JPG JPG image
Bldg 140 Existing Mezz GE plug-in busway.jpg JPG image
Bldg_140_Existing_Mezz_HVAC_information.zip ZIP file
N27 Utility Pit_01.JPG JPG image
N27 Utility Pit_02.JPG JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_01.jpg JPG image
RFI__3_For_FBO_Post_27_Jan_2017.docx DOCX document
Bldg 140 Existing Mezz view looking down into Engraving Shop.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_03.jpg JPG image
Bldg 140 Existing Mezz Access Ladder.jpg JPG image
UHHZ_150376_C17_Fabric_Shelter_LAYOUT_SECTION.pdf PDF
YKAA-FP0002_BLDG_140_MEZZANINE.dwg DWG drawing
Bldg_149_Addition_existing_Electrical_Panel_HAA_and_LAA.zip ZIP file
Bldg 149 Addition existing Electrical Panel HAA.jpg JPG image
Bldg 149 Addition existing Electrical Panel HAA schedule.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_04.jpg JPG image
Bldg 149 Addition existing Electrical Panel LAA schedule.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_02.jpg JPG image
N27_Utility_Pit_Detail_Sheet_print_on_11_x_17_size_paper.pdf PDF
Lift_Station_adjacent_to_Bldg_149.tif TIF image
FA8501-17-R-0001-0001_(AMENDMENT).pdf PDF
Bldg 149 Addition existing stepdown transformer.jpg JPG image
Bldg 149 Addition existing Electrical Panel LAA.jpg JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_02.jpg JPG image
RFI_'s__2_20-Jan-2017.docx DOCX document
Atch__37_Matrix.pdf PDF
N27_Utility_Photos.zip ZIP file
Atch__22_-_Robins_Roof_Requirements_UHHZ160306_MAR2016.docx DOCX document
Sign_In_Sheet,_Site_Visit_Slides.pdf PDF
RFI__1.docx DOCX document
Bldg_149_As-Built_AutoCAD_Files.zip ZIP file
Atch__14_Wage_Determination_Highway.pdf PDF
Atch__26_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.pdf PDF
Atch__15_-_BLANK_SAMPLE_Schedule_of_Values_Template_UNLOCKED.pdf PDF
Atch__35_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__31_UHHZ_160082_Rpr_Upgrd_Locker_Room_Bldg_149_As-Built_Drawings_combined.pdf PDF
Atch__20_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover

CONSTRUCTION COST ESTIMATE BREAKDOWNPage1
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Type ReportWORK LOCATIONRobins Air Force Base
Material Tax:%Labor Burden:%*Overhead:%*Profit:%*Bid Bond%
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)
LINE
NO.ITEM - CIVIL
1.0Cover Sheet
2.0General Conditions -
3.0Civil
4.0STRUCTURAL
5.0ARCHITECTURAL
6.0PLUMBING
7.0MECHANICAL
8.0ELECTRICAL
9.0FIRE SUPPRESS ALARM
10.0OTHER
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.00.0Page1.0Mtls.
19.0
20.0$0.00$0.00
21.0OverHead$0.00
22.0SubTotal$0.00
23.0Profit$0.00
24.0Subtotal$0.00
25.0Bid Bond$0.00
26.0Grand Total$0.00
27.0

GenCond

CONSTRUCTION COST ESTIMATE BREAKDOWNPage2
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:Labor Burden:*Overhead:*Profit:2.0%*Bid Bond
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - GENERAL CONDITIONS
General Conditions
1.0General Conditions -
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page2.0$0.00$0.00
$0.00$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Civil

CONSTRUCTION COST ESTIMATE BREAKDOWNPage3
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:%Labor Burden:%*Overhead:%*Profit:%2.0%*Bid Bond%
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)SubsEquipOTHER
LINE
NO.ITEM - CIVIL
Civil
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page3.0Mtls.$0.00
$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Structural

CONSTRUCTION COST ESTIMATE BREAKDOWNPage3
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:%Labor Burden:%*Overhead:%*Profit:%2.0%*Bid Bond%
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)SubsEquipOTHER
LINE
NO.ITEM - STRUCTURAL
Structural
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page3.0Mtls.$0.00
$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Architectural

CONSTRUCTION COST ESTIMATE BREAKDOWNPage3
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:%Labor Burden:%*Overhead:%*Profit:%2.0%*Bid Bond%
(1)(2)(3)MATERIAL COSTLABOR COST(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - ARCHITECTURAL
Architectural
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page3.0Mtls.$0.00$0.00$0.00$0.00
Sales Tax$0.00Labor Burden$0.00
Subtotal$0.00Subtotal$0.00$0.00$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Plumbing

CONSTRUCTION COST ESTIMATE BREAKDOWNPage4
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:%Labor Burden:%*Overhead:%*Profit:%2.0%*Bid Bond%
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - PLUMBING
PLUMBING - 1
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page4.0$0.00$0.00
$0.00$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Mechanical

CONSTRUCTION COST ESTIMATE BREAKDOWNPage4
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:%Labor Burden:%*Overhead:%*Profit:%2.0%*Bid Bond%
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - MECHANICAL
HVAC - 1
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page4.0Mtls.$0.00$0.00
$0.00$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Electrical

CONSTRUCTION COST ESTIMATE BREAKDOWNPage4
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:Labor Burden:*Overhead:*Profit:2.0%*Bid Bond
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - ELECTRICAL
ELECTRICAL-
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page4.0Mtls.$0.00
$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Fire Suppression_Alarm

CONSTRUCTION COST ESTIMATE BREAKDOWNPage4
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:Labor Burden:*Overhead:*Profit:2.0%*Bid Bond
(1)(2)(3)MATERIAL COSTLABOR COST(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - Fire Suppression and Fire Alarm
Fire Suppression and Fire Alarm
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page4.0Mtls.$0.00
$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Other

CONSTRUCTION COST ESTIMATE BREAKDOWNPage4
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:Labor Burden:*Overhead:*Profit:2.0%*Bid Bond
(1)(2)(3)MATERIAL COSTLABOR COST(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - XXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page4.0$0.00
$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

File details come from the government source that posted it. Updated .