Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Construction_Cost_Estimate_Breakdown.xls

XLS spreadsheet 135 KB Posted

Attached to
Civil Engineering Multiple Award Construction Contract (CEMACC) Federal contract opportunity
Solicitation number
FA8501-17-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Blank Sample AF Form 3052

View the file

Other files for this federal contract opportunity

Other files attached to Civil Engineering Multiple Award Construction Contract (CEMACC), newest first.
File Type Posted
Notice_to_Offerors_Attachment_8.docx DOCX document
CEMACC_RFI__6.docx DOCX document
Amendment_2_CEMACC.pdf PDF
RFI__4_Questions_and_Answers_updated_7_Feb_17.docx DOCX document
N27 Utility Pit_01.JPG JPG image
Bldg_140_Existing_Mezz_HVAC_information.zip ZIP file
Lighting Panel in adjacent fabric structure.JPG JPG image
Bldg 140 Existing Mezz view looking down into Engraving Shop.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_03.jpg JPG image
Bldg 140 Existing Mezz Access Ladder.jpg JPG image
Bldg_149_Addition_existing_Electrical_Panel_HAA_and_LAA.zip ZIP file
YKAA-FP0002_BLDG_140_MEZZANINE.dwg DWG drawing
N27 Utility Pit_02.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_01.JPG JPG image
Lighting Panel in adjacent fabric structure.JPG JPG image
Lighting Panel in adjacent fabric structure.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_01.JPG JPG image
Bldg 149 Addition existing Electrical Panel LAA.jpg JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_02.jpg JPG image
Bldg 149 Addition existing stepdown transformer.jpg JPG image
N27_Utility_Pit_Detail_Sheet_print_on_11_x_17_size_paper.pdf PDF
Lift_Station_adjacent_to_Bldg_149.tif TIF image
FA8501-17-R-0001-0001_(AMENDMENT).pdf PDF
Bldg 140 Existing Mezz GE plug-in busway.jpg JPG image
N27_Site_Plan.pdf PDF
N27 Utility Pit_02.JPG JPG image
N27 Utility Pit_03.JPG JPG image
Atch__37_Matrix.pdf PDF
N27_Utility_Photos.zip ZIP file
Atch__22_-_Robins_Roof_Requirements_UHHZ160306_MAR2016.docx DOCX document
RFI__1.docx DOCX document
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Atch__6_-_Robins_AFB_Architectural_Compatiblity_Standards_18_Aug_2015.pdf PDF
Atch__23_-_Technical_Spec_for_ICD705_version1.2_April_23_2012.pdf PDF
Atch__5_Appendix_C.docx DOCX document
Atch__19_Tax_Liability_Form.pdf PDF
Atch__3_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__12_Wage_Determination_Buidling_CEMACC.pdf PDF
Atch__26_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.pdf PDF
Atch__16_Pricing_Sheet.xlsx XLSX spreadsheet
Atch__9__Blank_Sample_AF_Form_3064.pdf PDF
Atch__28_-_AFI_31-204_RAFB_Sup_1_Motor_Vehicle_Traffic_Supervision.pdf PDF
Atch__17_-_BLANK_SAMPLE_Dig_Permit_Form_v3.0.pdf PDF
Atch__36_UHHZ_160049_Rpr_Ren_Interior_Room_17_CMM_Lab_Bldg_140_Statement_of_Work_02NOV2016.pdf PDF
Atch__30_UHHZ_160082_Rpr_Upgrd_Locker_Room_Bldg_149_As_Built_Photos.pdf PDF
Atch__29__UHHZ_160082_Rpr_Upgrd_Locker_Room_Bldg_149_Statement_of_Work_01NOV2016.pdf PDF
Atch__35_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__20_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Show all 50

Civil Engineering Multiple Award Construction Contract (CEMACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover

CONSTRUCTION COST ESTIMATE BREAKDOWNPage1
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Type ReportWORK LOCATIONRobins Air Force Base
Material Tax:%Labor Burden:%*Overhead:%*Profit:%*Bid Bond%
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)
LINE
NO.ITEM - CIVIL
1.0Cover Sheet
2.0General Conditions -
3.0Civil
4.0STRUCTURAL
5.0ARCHITECTURAL
6.0PLUMBING
7.0MECHANICAL
8.0ELECTRICAL
9.0FIRE SUPPRESS ALARM
10.0OTHER
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.00.0Page1.0Mtls.
19.0
20.0$0.00$0.00
21.0OverHead$0.00
22.0SubTotal$0.00
23.0Profit$0.00
24.0Subtotal$0.00
25.0Bid Bond$0.00
26.0Grand Total$0.00
27.0

GenCond

CONSTRUCTION COST ESTIMATE BREAKDOWNPage2
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:Labor Burden:*Overhead:*Profit:2.0%*Bid Bond
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - GENERAL CONDITIONS
General Conditions
1.0General Conditions -
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page2.0$0.00$0.00
$0.00$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Civil

CONSTRUCTION COST ESTIMATE BREAKDOWNPage3
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:%Labor Burden:%*Overhead:%*Profit:%2.0%*Bid Bond%
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)SubsEquipOTHER
LINE
NO.ITEM - CIVIL
Civil
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page3.0Mtls.$0.00
$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Structural

CONSTRUCTION COST ESTIMATE BREAKDOWNPage3
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:%Labor Burden:%*Overhead:%*Profit:%2.0%*Bid Bond%
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)SubsEquipOTHER
LINE
NO.ITEM - STRUCTURAL
Structural
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page3.0Mtls.$0.00
$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Architectural

CONSTRUCTION COST ESTIMATE BREAKDOWNPage3
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:%Labor Burden:%*Overhead:%*Profit:%2.0%*Bid Bond%
(1)(2)(3)MATERIAL COSTLABOR COST(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - ARCHITECTURAL
Architectural
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page3.0Mtls.$0.00$0.00$0.00$0.00
Sales Tax$0.00Labor Burden$0.00
Subtotal$0.00Subtotal$0.00$0.00$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Plumbing

CONSTRUCTION COST ESTIMATE BREAKDOWNPage4
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:%Labor Burden:%*Overhead:%*Profit:%2.0%*Bid Bond%
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - PLUMBING
PLUMBING - 1
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page4.0$0.00$0.00
$0.00$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Mechanical

CONSTRUCTION COST ESTIMATE BREAKDOWNPage4
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:%Labor Burden:%*Overhead:%*Profit:%2.0%*Bid Bond%
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - MECHANICAL
HVAC - 1
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page4.0Mtls.$0.00$0.00
$0.00$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Electrical

CONSTRUCTION COST ESTIMATE BREAKDOWNPage4
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:Labor Burden:*Overhead:*Profit:2.0%*Bid Bond
(1)(2)(3)(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - ELECTRICAL
ELECTRICAL-
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page4.0Mtls.$0.00
$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Fire Suppression_Alarm

CONSTRUCTION COST ESTIMATE BREAKDOWNPage4
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:Labor Burden:*Overhead:*Profit:2.0%*Bid Bond
(1)(2)(3)MATERIAL COSTLABOR COST(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - Fire Suppression and Fire Alarm
Fire Suppression and Fire Alarm
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page4.0Mtls.$0.00
$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

Other

CONSTRUCTION COST ESTIMATE BREAKDOWNPage4
CONTRACTOR:COST ESTIMATEADDRESS*** Put Contractor's Address Here
CONTRACT FOR:
PROJECT NUMBER:UHHZ XXXXXX
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:Labor Burden:*Overhead:*Profit:2.0%*Bid Bond
(1)(2)(3)MATERIAL COSTLABOR COST(9)(10)
(4)(5)(6)(7)(8)SubsEquip
LINE
NO.ITEM - XXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
0.0Page4.0$0.00
$0.00
OverHead$0.00
SubTotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00

File details come from the government source that posted it. Updated .