RFI#6

View the file

Other files

File Type Posted
Notice_to_Offerors_Attachment_8.docx DOCX document
Copy_of_REVISED_Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Breakdown_of_work_to_be_accomplished__.xls XLS spreadsheet
CEMACC_RFI__6.docx DOCX document
RFI__5_and_Note_to_Offerors.docx DOCX document
RFI.docx DOCX document
Amendment_2_CEMACC.pdf PDF
RFI__4_Questions_and_Answers_updated_7_Feb_17.docx DOCX document
Bldg 140 Existing Mezz HVAC Unit to be demoed_01.jpg JPG image
N27_Site_Plan.pdf PDF
Lighting Panel in adjacent fabric structure.JPG JPG image
YKAA-FP0001_BLDG_140_MAIN_FLOOR.dwg DWG drawing
N27 Utility Pit_03.JPG JPG image
Bldg 140 Existing Mezz GE plug-in busway.jpg JPG image
Bldg_140_Existing_Mezz_HVAC_information.zip ZIP file
N27 Utility Pit_01.JPG JPG image
N27 Utility Pit_02.JPG JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_01.jpg JPG image
RFI__3_For_FBO_Post_27_Jan_2017.docx DOCX document
Bldg 140 Existing Mezz view looking down into Engraving Shop.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_03.jpg JPG image
Bldg 140 Existing Mezz Access Ladder.jpg JPG image
UHHZ_150376_C17_Fabric_Shelter_LAYOUT_SECTION.pdf PDF
YKAA-FP0002_BLDG_140_MEZZANINE.dwg DWG drawing
Bldg_149_Addition_existing_Electrical_Panel_HAA_and_LAA.zip ZIP file
Bldg 149 Addition existing Electrical Panel HAA.jpg JPG image
Bldg 149 Addition existing Electrical Panel HAA schedule.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_04.jpg JPG image
Bldg 149 Addition existing Electrical Panel LAA schedule.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_02.jpg JPG image
N27_Utility_Pit_Detail_Sheet_print_on_11_x_17_size_paper.pdf PDF
Lift_Station_adjacent_to_Bldg_149.tif TIF image
FA8501-17-R-0001-0001_(AMENDMENT).pdf PDF
Bldg 149 Addition existing stepdown transformer.jpg JPG image
Bldg 149 Addition existing Electrical Panel LAA.jpg JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_02.jpg JPG image
RFI_'s__2_20-Jan-2017.docx DOCX document
Atch__37_Matrix.pdf PDF
N27_Utility_Photos.zip ZIP file
Atch__22_-_Robins_Roof_Requirements_UHHZ160306_MAR2016.docx DOCX document
Sign_In_Sheet,_Site_Visit_Slides.pdf PDF
RFI__1.docx DOCX document
Bldg_149_As-Built_AutoCAD_Files.zip ZIP file
Atch__14_Wage_Determination_Highway.pdf PDF
Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
Atch__26_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.pdf PDF
Atch__15_-_BLANK_SAMPLE_Schedule_of_Values_Template_UNLOCKED.pdf PDF
Atch__35_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__31_UHHZ_160082_Rpr_Upgrd_Locker_Room_Bldg_149_As-Built_Drawings_combined.pdf PDF
Atch__20_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI #6 17 Feb 2017

Question - For each of the Demonstration Projects: what are the telecommunications requirements? We respectfully request that you provide number of outlets, jacks per outlet, existing punch down location, etc.

Answer - Please refer to CEMACC SOW paragraph 1.9.1. For UHHZ 160082 Locker Room Bldg 149, provide (1) one comm box with (2) two data ports in Locker Room on new CMU wall tying into existing comm panel and for UHHZ 160049 CMM Lab Bldg 140 provide (2) two comm boxes with (2) two data ports in new Printer space on new gypsum board wall adjacent to each printer (identified as LAN on floor plan) tying into existing comm panel.

Additional Question: Based on above answer: However we still don’t have drawings or other information to indicate the distance from the comm panel to the data ports, for both buildings 140 and 149. We need to know that distance in order to price it. The contractor that is contracted for the comms work at Robins and he was unable to price it without this distance. Can you please provide this information?

Answer: All the CEMACC IDIQ Contractor has to do is install a blank or empty (2) two data/comm port box on or in the wall with conduit extended to 1'-0" above ceiling and install a pull wire. The BASE USER places a request to have comm install and the USER pays for it on a separate contract action. The CEMACC contractor would not be responsible.