Atch__22_-_Robins_Roof_Requirements_UHHZ160306_MAR2016.docx

DOCX document 14 KB Posted

Attached to
Civil Engineering Multiple Award Construction Contract (CEMACC)
Solicitation number
FA8501-17-R-0001
Issued by

About this file

Attch #22 Robins Roofing Requirements

View the file

Other files

File Type Posted
Notice_to_Offerors_Attachment_8.docx DOCX document
CEMACC_RFI__6.docx DOCX document
Amendment_2_CEMACC.pdf PDF
RFI__4_Questions_and_Answers_updated_7_Feb_17.docx DOCX document
N27 Utility Pit_01.JPG JPG image
Bldg 149 Addition existing Electrical Panel LAA.jpg JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_02.jpg JPG image
Bldg 149 Addition existing stepdown transformer.jpg JPG image
N27_Utility_Pit_Detail_Sheet_print_on_11_x_17_size_paper.pdf PDF
Lift_Station_adjacent_to_Bldg_149.tif TIF image
FA8501-17-R-0001-0001_(AMENDMENT).pdf PDF
Bldg 140 Existing Mezz GE plug-in busway.jpg JPG image
N27_Site_Plan.pdf PDF
N27 Utility Pit_02.JPG JPG image
N27 Utility Pit_01.JPG JPG image
Bldg_140_Existing_Mezz_HVAC_information.zip ZIP file
Lighting Panel in adjacent fabric structure.JPG JPG image
Bldg 140 Existing Mezz view looking down into Engraving Shop.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_03.jpg JPG image
Bldg 140 Existing Mezz Access Ladder.jpg JPG image
Bldg_149_Addition_existing_Electrical_Panel_HAA_and_LAA.zip ZIP file
YKAA-FP0002_BLDG_140_MEZZANINE.dwg DWG drawing
N27 Utility Pit_02.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_01.JPG JPG image
Lighting Panel in adjacent fabric structure.JPG JPG image
Lighting Panel in adjacent fabric structure.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_03.JPG JPG image
Atch__37_Matrix.pdf PDF
N27_Utility_Photos.zip ZIP file
RFI__1.docx DOCX document
Atch__16_Pricing_Sheet.xlsx XLSX spreadsheet
Atch__9__Blank_Sample_AF_Form_3064.pdf PDF
Atch__28_-_AFI_31-204_RAFB_Sup_1_Motor_Vehicle_Traffic_Supervision.pdf PDF
Atch__17_-_BLANK_SAMPLE_Dig_Permit_Form_v3.0.pdf PDF
Atch__36_UHHZ_160049_Rpr_Ren_Interior_Room_17_CMM_Lab_Bldg_140_Statement_of_Work_02NOV2016.pdf PDF
Atch__30_UHHZ_160082_Rpr_Upgrd_Locker_Room_Bldg_149_As_Built_Photos.pdf PDF
Atch__29__UHHZ_160082_Rpr_Upgrd_Locker_Room_Bldg_149_Statement_of_Work_01NOV2016.pdf PDF
Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Atch__6_-_Robins_AFB_Architectural_Compatiblity_Standards_18_Aug_2015.pdf PDF
Atch__23_-_Technical_Spec_for_ICD705_version1.2_April_23_2012.pdf PDF
Atch__5_Appendix_C.docx DOCX document
Atch__19_Tax_Liability_Form.pdf PDF
Atch__3_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__12_Wage_Determination_Buidling_CEMACC.pdf PDF
Atch__26_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.pdf PDF
Atch__35_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__20_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Robins Roofing Requirements

UHHZ160306

Design Requirements

- ASCE 7-10 Current Edition, International Building Code, Current Edition, UFC 3-110-03, Exposure C, Robins Base Facility Standards (BFS) Engineering

- Design Architect/Engineer must derive majority of income from roof designs, uplift calculations for all wind zones, and hydraulic calculations for gutters on 100 year flood Metal Roof Types

- 3” Trapezoidal or 2” Architectural and will always require a 360 degree seam mechanically seamed

- No roof penetrations, no glue down attachment of lightning protection system, no dissimilar metal contact

- Lightning Protection System shall meet NFPA 780, UL96A most current edition, LPI 175 Single Ply

- 60 mil PVC with hot air welded seams Warranty

- 20 Year single source NDL weather tightness warranty Installer

- Must have installer trained by roofing manufacturer onsite during installation Inspections

- Manufacture’s inspection once within 3 days of starting roof and one after completion. (Minimum of 2 for fewer than 10,000 sf and 3 minimum over 10,000 sf)

- Written report must be furnished.

- COR must be present during inspection Additional Submittals

- Roofing material

- Sample warranty (before approving roof)

- Uplift calculations for wind zones, and hydraulic for gutters

- Certified installers certificate

- Inspection report

File details come from the government source that posted it. Updated .