Amendment_2_CEMACC.pdf

PDF 62 KB Posted

Attached to
Civil Engineering Multiple Award Construction Contract (CEMACC) Federal contract opportunity
Solicitation number
FA8501-17-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Amendment #2

View the file

Other files for this federal contract opportunity

Other files attached to Civil Engineering Multiple Award Construction Contract (CEMACC), newest first.
File Type Posted
Copy_of_REVISED_Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Breakdown_of_work_to_be_accomplished__.xls XLS spreadsheet
Notice_to_Offerors_Attachment_8.docx DOCX document
N27 Utility Pit_03.JPG JPG image
Bldg 149 Addition existing Electrical Panel HAA.jpg JPG image
Bldg 149 Addition existing Electrical Panel HAA schedule.jpg JPG image
N27 Utility Pit_02.JPG JPG image
YKAA-FP0001_BLDG_140_MAIN_FLOOR.dwg DWG drawing
Bldg 140 Existing Mezz HVAC Unit to be demoed_01.jpg JPG image
N27 Utility Pit_01.JPG JPG image
Bldg_140_Existing_Mezz_HVAC_information.zip ZIP file
Lighting Panel in adjacent fabric structure.JPG JPG image
Bldg 140 Existing Mezz view looking down into Engraving Shop.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_03.jpg JPG image
Bldg 140 Existing Mezz Access Ladder.jpg JPG image
Bldg_149_Addition_existing_Electrical_Panel_HAA_and_LAA.zip ZIP file
YKAA-FP0002_BLDG_140_MEZZANINE.dwg DWG drawing
N27 Utility Pit_02.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_01.JPG JPG image
Lighting Panel in adjacent fabric structure.JPG JPG image
Lighting Panel in adjacent fabric structure.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_01.JPG JPG image
Bldg 149 Addition existing Electrical Panel LAA.jpg JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_02.jpg JPG image
Atch__37_Matrix.pdf PDF
N27_Utility_Photos.zip ZIP file
Atch__22_-_Robins_Roof_Requirements_UHHZ160306_MAR2016.docx DOCX document
RFI__1.docx DOCX document
Bldg_149_As-Built_AutoCAD_Files.zip ZIP file
Atch__35_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__20_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch__2_-_Robins_BASE_FACILITY_STANDARDS_REV_23_June_14.pdf PDF
Atch__24_-_AFSC_Energy_Metering_Requirements_24_June_2016.pdf PDF
Atch__21_-_BLANK_SAMPLE_AF_Form_911_Engineering_Review_Comments.pdf PDF
Atch__32_-_Air_Force_Manual_32_1084_Civil_Engineering_Facility_Requirements.pdf PDF
Atch__27_-_BLANK_SAMPLE_AF_Form_66_SUBMITTAL_REGISTER_-_CEMACC_(INITIAL).pdf PDF
Atch__7_-_Robins_AFB_Asbestos_Management_Plan_-_January_2015.pdf PDF
Atch__10_-_BLANK_SAMPLE_AF_Form__3065.pdf PDF
Atch__14_Wage_Determination_Highway.pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Atch__6_-_Robins_AFB_Architectural_Compatiblity_Standards_18_Aug_2015.pdf PDF
Atch__23_-_Technical_Spec_for_ICD705_version1.2_April_23_2012.pdf PDF
Atch__5_Appendix_C.docx DOCX document
Atch__19_Tax_Liability_Form.pdf PDF
Atch__3_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__12_Wage_Determination_Buidling_CEMACC.pdf PDF
Atch__26_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.pdf PDF
Atch__16_Pricing_Sheet.xlsx XLSX spreadsheet
Atch__9__Blank_Sample_AF_Form_3064.pdf PDF
Show all 50

Civil Engineering Multiple Award Construction Contract (CEMACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F3Q2AD6257A002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the Period of Performance for demonstration project UHHZ 150376, Construct/Install C17 Fabric Shelter. See revised clause 52.211-10.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Feb-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8501-17-R-0001

X 9B. DATED (SEE ITEM 11)

22-Dec-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Feb-2017

CODE

AFSC/PZIOC - FA8501

INFRASTRUCTURE SUPPORT

375 PERRY STREET

BLDG 255

ROBINS AFB GA 31098-1672

FA8501 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8501-17-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within To be cited at task order level** calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than . * The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

**The below is the Performance Period information for the three demonstration projects. If awarded the applicable task order will include this Performance Period.

UHHZ 150376 Cnst/Inst C17 Fabric Shelter at N‐27 Construction Performance Period: The contractor shall have all submittals (except As‐Built Drawings, Warranties, and O&M Manuals) submitted and approved within (21) calendar days after Construction Notice to Proceed (NTP). Contractor shall begin work within (7) calendar days after Construction NTP and be completed with project within (150) calendar days of Construction NTP.

UHHZ 160049 Rpr/Ren Interior Room 17 CMM Lab Bldg 140 Construction Performance Period: The contractor shall have all submittals (except As‐Built Drawings, Warranties, and O&M Manuals) submitted and approved within (21) calendar days after Construction Notice to Proceed (NTP).

Contractor shall begin work within (7) calendar days after Construction NTP and be completed with project within (153) calendar days of NTP.

UHHZ 160082 Rpr/Upgrd Existing Locker Room Bldg 149 Construction Performance Period: The contractor shall have all submittals (except As‐Built Drawings, Warranties, and O&M Manuals) submitted and approved within (21) calendar days after Construction Notice to Proceed (NTP).

Contractor shall begin work within (7) calendar days after Construction NTP and be completed with project within (153) calendar days of NTP.

(End of clause)

(End of Summary of Changes)