Section-J_02_AF_Form_66_27_Jan_17.pdf

Air Force Form Jan 27, 2017 PDF 416 KB Posted

Attached to
Construct Veterinarian Clinic Admin Annex
Solicitation number
FA5270-17-B-0005
Issued by

About this file

Attachment 2 - AF Form 66

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2 20 Jan 17

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

N

E

U

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

DIVISION 01

GENERAL REQUIREMENTS

GENERAL REQUIREMENTS 7 calender days

01 01 00 - 1.8 4 X after the

As-Built Drawings final inspection

GENERAL REQUIREMENTS 7 calender days

01 01 00 - 1.08.A. 4 X after the

Floor Plan final inspection

GENERAL REQUIREMENTS Within 14

01 01 00 - 1.16 1 calendar days

Preparation of Progress Schedules and Reports prior to starting on-site work

GENERAL REQUIREMENTS At least 40

01 01 00 - 1.27 1 calendar days

Power Outages in advance

GENERAL REQUIREMENTS 30 calendar

01 01 00 - 1.28 1 days in

Disconnection of Services advance of when it is needed

GENERAL REQUIREMENTS At least 30

01 01 00 - 1.33 X calendar days

Managing Radioactive Materials in advance bringing materials to KAB

GENERAL REQUIREMENTS When requesting

01 01 00 - 1.34 4 pre-final

DD form 1354 - DRAFT inspection

GENERAL REQUIREMENTS Within 5

01 01 00 - 1.34 4 calendar days

DD form 1354 - FINAL after final inspection

GENERAL REQUIREMENTS When requesting

01 01 00 - 1.34 4 pre-final

HVAC Identification form - DRAFT inspection

GENERAL REQUIREMENTS Within 10

01 01 00 - 1.34 4 calendar days

HVAC Identification form - FINAL after final inspection

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

AF Form 66 Page 1 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

GENERAL REQUIREMENTS Within 30

01 01 00 - 1.35 4 calendar days

RPIE Inventry List after receiving the acceptance of joint inspection

ENVIRONMENTAL PROTECTION

01 56 00 - 3.02.A.1. 4 60

Environmental Protection Plan

ENVIRONMENTAL PROTECTION

01 56 00 - 3.01.D.4 4 60

Hazardous Waste

ENVIRONMENTAL PROTECTION

01 56 00 - 3.01.D.5 4 60

Solid Waste

ENVIRONMENTAL PROTECTION

01 56 00 - 3.01.D.6 4 60

Fuel Storage Tanks

ENVIRONMENTAL PROTECTION

01 56 00 - 3.02.B.7 4 60

Historical and Cultural Resources

ENVIRONMENTAL PROTECTION

01 56 00 - 3.02.B.9 4 60

Polychlorinated Biphenyls (PCBs)

ENVIRONMENTAL PROTECTION

01 56 00 - 3.02.B.10 4 60

Asbestos

ENVIRONMENTAL PROTECTION

01 56 00 - 3.02.B.11 4 60

Lead-Based Paint

ENVIRONMENTAL PROTECTION

01 56 00 - 3.02.B.12 4 60

Spill Prevention and Response

ENVIRONMENTAL PROTECTION

01 56 00 - 3.02.C.4 4 60

Hazardous Waste as required as required as required as required

AF Form 66 Page 2 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

ENVIRONMENTAL PROTECTION

01 56 00 - 3.02.C.6 4 60

Fuel Storage Tanks

ENVIRONMENTAL PROTECTION

01 56 00 - 3.02.C.10 4 60

Asbestos

OPERATION AND MAINTENANCE DATA 7 calender days

01 78 23 - 1.01 after the

Operation and Maintenance Data final inspection

DIVISION 02

EXISTING CONDITIONS

DEMOLITION

02 41 00-1.09 4 60

Existing Condition Report

DEMOLITION

02 41 00-1.02.A 4 60

Demolition Plan

DEMOLITION

02 41 00-1.02.A 4 60

Waste Management Plan

DIVISION 03

CONCRETE

CAST-IN-PLACE ARCHTECTURAL CONCRETE No later

03 30 00-1.06.B.2 4 than 30 days

Formwork prior to start formwork

CAST-IN-PLACE ARCHTECTURAL CONCRETE

03 30 00-1.06.B.3 4 60

Reinforcing Steel

CAST-IN-PLACE ARCHTECTURAL CONCRETE

03 30 00-2.03.A 4 60

Cement as required as required

AF Form 66 Page 3 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

CAST-IN-PLACE ARCHTECTURAL CONCRETE

03 30 00-2.03.C 4 60

Aggregates

CAST-IN-PLACE ARCHTECTURAL CONCRETE

03 30 00-2.03.D 4 60

Admixture

CAST-IN-PLACE ARCHTECTURAL CONCRETE

03 30 00-2.03.E 4 60

Joint Sealants

CAST-IN-PLACE ARCHTECTURAL CONCRETE

03 30 00-2.02.3 4 60

Reinforcing Material

CAST-IN-PLACE ARCHTECTURAL CONCRETE No later

03 30 00-1.03.C, 2.02.A 4 4 than 30 days

Concrete mix design prior to start concret placement

CAST-IN-PLACE ARCHTECTURAL CONCRETE No later

03 30 00-1.06.A 4 than 30 days

Calculations prior to start formwork

CAST-IN-PLACE ARCHTECTURAL CONCRETE No later

03 30 00-1.06.A 4 than 7 days

Compressive Strength Tests after the completion of the Tests

CAST-IN-PLACE ARCHTECTURAL CONCRETE No later

03 30 00-3.07.B 4 than 7 days

Air Content after the completion of the Tests

CAST-IN-PLACE ARCHTECTURAL CONCRETE No later

03 30 00-3.08.B 4 than 7 days

Slump after the completion of the Tests

CAST-IN-PLACE ARCHTECTURAL CONCRETE

03 30 00-1.06.C.1 4 60

Curing concrete elements

CAST-IN-PLACE ARCHTECTURAL CONCRETE

03 30 00-1.06.C.2 4 60

Pumping Concrete

AF Form 66 Page 4 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

CAST-IN-PLACE ARCHTECTURAL CONCRETE

03 30 00-1.06.C.3 4 60

Form removal schedule

CAST-IN-PLACE ARCHTECTURAL CONCRETE

03 30 00-1.06.C.4 4 60

Material Safety Data Sheets

DIVISION 04

MASONRY

MASONRY

04 20 00-1.02.A 4 60

Detail Drawings

MASONRY

04 20 00-2.01.C 4 60

Portland Cement

MASONRY

04 20 00-2.05 4 60

Reinforcing Steel Bar

MASONRY

04 20 00-2.01.D 4 4 60

Hydrated Lime

MASONRY

04 20 00-1.01.C, 2.04 4 4 60

Concrete Masonry Units

DIVISION 05

METALS

STRUCTURAL STEEL

05 23 00-1.03.A 4 60

Fabrication Drawings

AF Form 66 Page 5 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

STRUCTURAL STEEL

05 23 00-2.01.A, B 4 60

Structural Steel

STRUCTURAL STEEL

05 23 00-2.01.D 4 60

Anchor Bolts and Nuts

STRUCTURAL STEEL

05 23 00-2.01.C 4 60

Hexagon Bolts and Nuts

STRUCTURAL STEEL

05 23 00-1.03.C 4 60

Welder Qualifications

MISCELLANEOUS METAL FABRICATIONS

05 50 13-1.03.A, 2.01 4 4 60

Ceiling Spandrel System

MISCELLANEOUS METAL FABRICATIONS

05 50 13-2.02 4 60

Stainless Roll Mat

DIVISION 06

FINISH CARPENTARY

FINISH CARPENTARY

06 20 00-1.02.A, 1.02.C, 2.01 4 4 4 60

Cabinets

DIVISION 07

THERMAL AND MOISTURE PROTECTION 60

BITUMINOUS DAMPPROOFING

07 11 13-2.02 4 60

Asphalt Primer

BITUMINOUS DAMPPROOFING

07 11 13-2.01 4 60

Asphalt Coating

AF Form 66 Page 6 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

MINERAL FIBER BLANKET INSULATION

07 21 16-1.02.B, 2.01 4 4 60

Fiber Glass Insulation

MINERAL FIBER BLANKET INSULATION

07 21 16-2.02 4 60

Accessories

MINERAL FIBER BLANKET INSULATION

07 21 16-2.01 4 60

Vapor Retarder

JOIT SEALANTS

07 92 00-2.01 4 4 60

Sealants

JOIT SEALANTS

07 92 00-2.02 4 60

Primers

JOIT SEALANTS

07 92 00-2.03 4 60

Bond Breakers

JOIT SEALANTS

07 92 00-2.04 4 60

Backstops

DIVISION 08

OPENINGS

STEEL DOORS AND FRAMES

08 11 13-2.01 4 4 60

Doors

STEEL DOORS AND FRAMES

08 11 13-2.03 4 4 60

Frames

STEEL DOORS AND FRAMES

08 11 13-2.02 4 4 60

Accessories

AF Form 66 Page 7 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

STEEL DOORS AND FRAMES

08 11 13-2.05 4 60

Factory-applied enamel finish

STEEL DOORS AND FRAMES

08 11 13-2.05 4 60

Color

ALUMINUM DOORS AND FRAMES

08 11 16-1.03.A, 2.01, 2.02 4 4 4 60

Doors and Fames

ALUMINUM DOORS AND FRAMES

08 11 16-1.02.A, 4 60

Structural calculations for Deflection

ALUMINUM WINDOWS AND FRAMES

08 51 13-1.03.B, 1.06, 2.02, 2.03 4 4 4 4 60

Windows and Frames

ALUMINUM WINDOWS AND FRAMES

08 51 13-1.08.E 4 60

Thermal Performance

ALUMINUM WINDOWS AND FRAMES

08 51 13-1.03.B 4 60

Structural Calculations for Deflection

DOOR HARDWARE

08 71 00-1.03 4 4 60

Hardware Schedule

DOOR HARDWARE

08 71 00- 2.01 4 60

Hardware Items

DOOR HARDWARE

08 71 00-3.01 4 60

Installation

DOOR HARDWARE Prior to

08 71 00-1.04 4 completion of

Key Bitting the Work

AF Form 66 Page 8 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

GLAZING

08 81 00-2.01 4 60

Glasses

GLAZING

08 81 00-1.02.C, 2.02 3 4 60

Glass Setting and Sealing Materials

DIVISION 09

FINISHES

SUPPORT FOR PLASTER AND GYPSUM BOARD

09 22 00-1.02.A., 2.01, 2.02 4 4 60

Metal Support System

GYPSUM BOARD

09 29 00-2.01.A 4 60

Gypsum Board

GYPSUM BOARD

84 09 29 00-2.01.C 4 60

Fasteners

GYPSUM BOARD

85 09 29 00-2.01.D 4 60

Adhesives

GYPSUM BOARD

86 09 29 00-2.01.B 4 60

Joint Treatment Materials

GYPSUM BOARD

87 09 29 00-1.02.B 4 60

Asbestos Free Materials

GYPSUM BOARD

88 09 29 00-1.02.B 4 60

Gypsum Board Installer

GYPSUM BOARD

89 09 29 00-1.02.C 4 60

Material Safety Data Sheets

AF Form 66 Page 9 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

CERAMIC TILE, QUARRY TILE, AND PAVER TILE

90 09 30 10-1.02.A 4 60

Detail Drawings

CERAMIC TILE, QUARRY TILE, AND PAVER TILE

91 09 30 10-2.01.A 4 4 4 60

Tile

CERAMIC TILE, QUARRY TILE, AND PAVER TILE

92 09 30 10-2.02 4 60

Setting-Bed

CERAMIC TILE, QUARRY TILE, AND PAVER TILE

93 09 30 10-2.04 4 4 60

Mortar, Grout, and Adhesive

ACOUSTICAL CEILINGS

94 09 51 00-1.02.A 4 60

Detail Drawings

ACOUSTICAL CEILINGS

95 09 51 00-2.01 4 4 4 60

Acoustical Ceiling Tile

ACOUSTICAL CEILINGS

96 09 51 00-2.03.A 4 60

Hangers

ACOUSTICAL CEILINGS

97 09 51 00-1.03 4 60

Ceiling Attenuation Class and Test

RESILIENT FLOORING

98 09 65 00-2.01 4 4 60

Vinyl Composition Tile

RESILIENT FLOORING

99 09 65 00-2.02 4 4 60

Sheet Vinyl Flooring

RESILIENT FLOORING

100 09 65 00-2.03 4 4 60

Wall Base

AF Form 66 Page 10 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

RESILIENT FLOORING

101 09 65 00-2.04 4 60

Adhesives

RESILIENT FLOORING

102 09 65 00-3.03 4 60

Moisture, Alkalinity and Bond Tests

RESILIENT FLOORING

103 09 65 00-3.02 4 60

Surface Preparation

RESILIENT FLOORING

104 09 65 00-3.05, 3.06 4 60

Installation

CARPET

105 09 68 00-1.02.B, 2.01 4 4 4 4 60

Carpet

CARPET

106 09 68 00-1.02.B, 2.04 4 4 60

Carpet Moldings

CARPET

107 09 68 00-1.02.B, 2.04 4 60

Moisture, Alkalinity and Bond Tests

PAINTS AND COATINGS

108 09 90 00-3.07 4 60

Piping identification

PAINTS AND COATINGS

109 09 90 00-2.01, 3.05.C 4 60

Coating

PAINTS AND COATINGS

110 09 90 00-1.02.B, 2.01 4 4 60

Manufacturer's Technical Data Sheets

PAINTS AND COATINGS

111 09 90 00-1.02.C, 1.09 4 60

Color

AF Form 66 Page 11 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

PAINTS AND COATINGS

112 09 90 00-1.03 4 4 60

Applicator's Qualifications

PAINTS AND COATINGS

113 09 90 00-1.02.E 4 60

Application instructions

PAINTS AND COATINGS

114 09 90 00-1.02.E, 3.05.B 4 60

Mixing

DIVISION 10

SPECIALITIES

EXTERIOR SIGNAGE

115 10 14 00.10-2.02 4 60

Channel Lettters

EXTERIOR SIGNAGE

116 10 14 00.10-2.02, 2.03 4 60

Color and Typeface

TOILET COMPARTMENTS

117 10 21 13-1.02.A 4 60

Fabrication Drawings

TOILET COMPARTMENTS

118 10 21 13-2.01.B 4 60

Hardware

TOILET COMPARTMENTS

119 10 21 13-2.01.B 4 60

Fittings

TOILET COMPARTMENTSS

120 10 21 13-2.01.A 4 4 60

Toilet Partitions

TOILET ACCESSORIES

121 10 28 13-1.02.A, 2.01 4 60

Finishes

AF Form 66 Page 12 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

TOILET ACCESSORIES

122 10 28 13-1.02.A, 2.02 4 60

Accessory Items

DIVISION 22

PLUMBING

PLUMBING, GENERAL PURPOSE

123 22 00 00-1.02.A, 1.02.B.10 4 4 4 60

Plumbing System

PLUMBING, GENERAL PURPOSE

124 22 00 00-2.05 4 60

Fixtures

PLUMBING, GENERAL PURPOSE

125 22 00 00-2.05.B 4 60

Flush valve water closets

PLUMBING, GENERAL PURPOSE

126 22 00 00-2.05.C 4 60

Flush valve urinals

PLUMBING, GENERAL PURPOSE

127 22 00 00-2.05.D 4 60

Wall Hung Lavatories

PLUMBING, GENERAL PURPOSE

128 22 00 00-2.05.E 4 60

Kitchen Sinks

PLUMBING, GENERAL PURPOSE

129 22 00 00-2.05.F 4 60

Service Sinks

PLUMBING, GENERAL PURPOSE

130 22 00 00-2.09 4 60

Water Heaters

PLUMBING, GENERAL PURPOSE

131 22 00 00-2.06 4 60

Backflow Prevention Assemblies

AF Form 66 Page 13 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

PLUMBING, GENERAL PURPOSE

132 22 00 00-1.02.B.9 4 60

Welding

PLUMBING, GENERAL PURPOSE No later

133 22 00 00-3.08.C, 3.08.E 4 than 7 days

Tests, Flushing and Disinfection after the completion of the Tests

PLUMBING, GENERAL PURPOSE No later

134 22 00 00-3.08.A.1 4 than 7 days

Test of Backflow Prevention Assemblies after the completion of the Tests

PLUMBING, GENERAL PURPOSE

135 22 00 00-1.02.D 4 60

Materials and Equipment

PLUMBING, GENERAL PURPOSE

136 22 00 00-1.02.D 4 60

Bolts

PLUMBING, GENERAL PURPOSE

137 22 00 00-2.0.1.A 4 60

Water-Efficient Products

PLUMBING, GENERAL PURPOSE

138 22 00 00-2.0.1.B 4 60

Energy-Efficient Water Heaterts

DIVISION 23

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

139 23 00 00-1.04.F 4 60

Detail Drawings

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

140 23 00 00-2.06.A.3 4 60

Duct Connectors

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

141 23 00 00-2.06.B 4 4 60

Manual Balancing Dampers

HEATING, VENTILATING, AND AIR CONDITIONING

AF Form 66 Page 14 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

142 23 00 00-2.06.E 4 60

Registers and Grilles

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

143 23 00 00-2.07.A.1 4 4 60

Ceiling Exhaust Fans

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

144 23 00 00-1.03.B.5 4 60

Diagrams

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS No later

145 23 00 00-1.03.C.1 4 than 7 days

Performance Tests after the completion of the Tests

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS No later

146 23 00 00-1.03.C.2 4 than 7 days

Damper Acceptance Test after the completion of the Tests

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

147 23 00 00-1.04.C and D 4 60

Ozone Depleting Substances

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

148 23 00 00-3.02 4 4 4 60

Manufacture's Installation Instructions

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS 14 days

149 23 00 00-3.09.B 4 prior to conducting

Operation and Maintenance Training the training course

AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

150 23 00 00-3.09.A 4 60

Operation and Maintenance Manuals

THERMAL INSULATION FOR MECHANICAL SYSTEMS

151 23 07 00-2.01 4 60

MICA Plates

THERMAL INSULATION FOR MECHANICAL SYSTEMS

152 23 07 00-2.03 4 60

Pipe Insulation Systems and Associated Accessories

AF Form 66 Page 15 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

THERMAL INSULATION FOR MECHANICAL SYSTEMS

153 23 07 00-2.04 4 60

Duct Insulation Systems and Associated Accessories

THERMAL INSULATION FOR MECHANICAL SYSTEMS

154 23 07 00-2.05 4 60

Equipment Insulation Systems and Associated Accessories

THERMAL INSULATION FOR MECHANICAL SYSTEMS

155 23 07 00-2.03 4 4 60

Pipe Insulation Systems

THERMAL INSULATION FOR MECHANICAL SYSTEMS

156 23 07 00-2.04 4 4 60

Duct Insulation Systems

THERMAL INSULATION FOR MECHANICAL SYSTEMS

157 23 07 00-2.05 4 4 60

Equipment Insulation Systems

THERMAL INSULATION FOR MECHANICAL SYSTEMS

158 23 07 00-1.03.C.1 4 60

Thermal Insulation

THERMAL INSULATION FOR MECHANICAL SYSTEMS

159 23 07 00-3.05.A 4 60

Display Samples

THERMAL INSULATION FOR MECHANICAL SYSTEMS

160 23 81 00.00 20-2.06.B 4 60

Field-assembled refrigerant piping

THERMAL INSULATION FOR MECHANICAL SYSTEMS

161 23 81 00.00 20-1.04.B 4 60

Control system wiring diagrams

THERMAL INSULATION FOR MECHANICAL SYSTEMS 60 except O&M Data.

162 23 81 00.00 20-2.01 4 4 No later than 7 days

Heat pumps, air to air after the completion for O&M Data

THERMAL INSULATION FOR MECHANICAL SYSTEMS 60 except O&M Data.

163 23 81 00.00 20-2.02 4 4 No later than 7 days

Air Conditioners after the completion for O&M Data

AF Form 66 Page 16 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

THERMAL INSULATION FOR MECHANICAL SYSTEMS 60 except O&M Data.

164 23 81 00.00 20-2.03 4 4 No later than 7 days

Filters after the completion for O&M Data

THERMAL INSULATION FOR MECHANICAL SYSTEMS 60 except O&M Data.

165 23 81 00.00 20-2.02.B 4 4 No later than 7 days

Thermostats after the completion for O&M Data

THERMAL INSULATION FOR MECHANICAL SYSTEMS

166 23 81 00.00 20-1.05 4 60

Refrigerant

THERMAL INSULATION FOR MECHANICAL SYSTEMS

167 23 81 00.00 20-2.06 4 4 60

Refrigerant piping and accessories

THERMAL INSULATION FOR MECHANICAL SYSTEMS

168 23 81 00.00 20-2.04 4 60

Coatings for finned tube coils

THERMAL INSULATION FOR MECHANICAL SYSTEMS

169 23 81 00.00 20-2.08.A 4 60

Salt-spray tests

THERMAL INSULATION FOR MECHANICAL SYSTEMS No later

170 23 81 00.00 20-3.07.C 4 than 7 days

Start-up and initial operational tests after the completion of the Tests

THERMAL INSULATION FOR MECHANICAL SYSTEMS No later

171 23 81 00.00 20-1.04.D 4 than 7 days

Posted operating instructions after the completion of the Work

DIVISION 26

SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

172 26 05 48.00 10-3.01 4 60

Lighting Fixtures in Buildings

THREE-PHASE PAD-MOUNTED TRANSFORMERS 60 except O&M Data.

173 26 12 19.10-1.04.A, 1.05.A, 2.02 4 4 4 No later than 7 days

Pad-mounted transformer after the completion for O&M Data

ELECTRICAL

AF Form 66 Page 17 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

THREE-PHASE PAD-MOUNTED TRANSFORMERS No later

174 26 12 19.10-3.07.A 4 than 7 days

Acceptance checks and tests after the completion of the Tests

THREE-PHASE PAD-MOUNTED TRANSFORMERS

175 26 12 19.10-2.02.B.1 4 60

Transformer Efficiencies

THREE-PHASE PAD-MOUNTED TRANSFORMERS 30 calendar

176 26 12 19.10-2.07.A 4 days before

Transformer test schedule scheduled test date

INTERIOR DISTRIBUTION SYSTEMS

177 26 20 00-1.03.A 4 60

Panelboards

INTERIOR DISTRIBUTION SYSTEMS

178 26 20 00-1.03.A 4 60

Wireways

INTERIOR DISTRIBUTION SYSTEMS

179 26 20 00-2.10.C 4 60

Circuit breakers

INTERIOR DISTRIBUTION SYSTEMS

180 26 20 00-2.08 4 60

Switches

INTERIOR DISTRIBUTION SYSTEMS

181 26 20 00-2.11 4 60

Enclosed circuit breakers

INTERIOR DISTRIBUTION SYSTEMS

182 26 20 00-2.02 4 60

Conduit

INTERIOR DISTRIBUTION SYSTEMS

183 26 20 00-2.09 4 60

Recesptacle

INTERIOR DISTRIBUTION SYSTEMS No later

184 26 20 00-3.05.B 4 than 7 days

600-volt wiring test after the completion of the Tests

AF Form 66 Page 18 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

INTERIOR DISTRIBUTION SYSTEMS No later

185 26 20 00-3.05.C 4 than 7 days

Ground-fault receptacle test after the completion of the Tests

INTERIOR DISTRIBUTION SYSTEMS No later

186 26 20 00-3.05.D 4 than 7 days

Grounding system test after the completion of the Tests

INTERIOR DISTRIBUTION SYSTEMS

187 26 20 00-1.05.A 4 60

Electrical Systems

INTERIOR LIGHTING

188 26 51 00-2.01 4 60

LED Lighting Fixtures

INTERIOR LIGHTING

189 26 51 00-2.04 4 60

Exist Signs

INTERIOR LIGHTING

190 26 51 00-2.05 4 60

Emergency lighting equipment

INTERIOR LIGHTING

191 26 51 00-2.07 4 60

Occupancy sensors

INTERIOR LIGHTING

192 26 51 00-1.06.B.3 4 60

Energy Efficiency

INTERIOR LIGHTING No later

193 26 51 00-3.03 4 than 7 days

Operating test after the completion of the Tests

INTERIOR LIGHTING

194 26 51 00-1.04.A 4 60

Lighting Control System

INTERIOR LIGHTING

195 26 51 00-1.08 4 60

Operational Service

AF Form 66 Page 19 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

DIVISION 27

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

196 27 10 00-1.06.A.1 4 60

Telecommunications and LAN drawings

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

197 27 10 00-1.06.A.2 4 60

Telecommunications Space Drawings

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

198 27 10 00-2.02 4 60

Telecommunications cabling and LAN

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

199 27 10 00-2.03.E 4 60

Patch panels

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

200 27 10 00-2.04 4 60

Telecommunications and LAN outlet/connector assemblies

BUILDING TELECOMMUNICATIONS CABLING SYSTEM No later

201 27 10 00-3.05.A 4 than 7 days

Telecommunications and LAN Cabling Testing after the completion of the Tests

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

202 27 10 00-1.06.B 4 60

Telecommunications Contractor Qualifications

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

203 27 10 00-1.06.B.2 4 60

Key Personnel Qualifications

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

204 27 10 00-1.06.B.3 4 60

Manufacturer Qualifications

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

205 27 10 00-3.05.A 4 60

Factory Reel Tests

COMMUNICATIONS

AF Form 66 Page 20 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

DIVISION 28

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

206 28 31 76-1.03.A.1 4 60

Wiring Diagrams

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

207 28 31 76-1.03.A.2 4 60

System Layout

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

208 28 31 76-1.03.A.3 4 60

As-Built Drawings

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

209 28 31 76-2.08 4 60

Manual Stations

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

210 28 31 76-2.10 4 60

Wiring and Cable

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

211 28 31 76-2.09 4 60

Notification Appliances

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

212 28 31 76-2.04 4 60

Addressable Interface Devices

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

213 28 31 76-2.05 4 60

Photoelectric Smoke Sensors

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

214 28 31 76-2.06 4 60

Heat Detectors

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

215 28 31 76-1.09.A 4 60

Qualified Fire Protection Engineer

ELECTRONIC SAFETY AND SECURITY

AF Form 66 Page 21 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

216 28 31 76-1.09.B 4 60

Supervisor

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

217 28 31 76-1.09.C 4 60

Technician

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

218 28 31 76-1.03.D 4 60

Installer

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

219 28 31 76-1.07 4 60

Operation and Maintenance (O&M) Instructions

DIVISION 31

CLEARING AND GRUBBING

220 31 11 00-2.01 4 60

Tree wound paint

EXCAVATION AND FILL No later

221 31 23 00.00 20-3.10.B.1 4 than 7 days

Fill and backfill test after the completion of the Tests

EXCAVATION AND FILL No later

222 31 23 00.00 20-3.05.B 4 than 7 days

Select material test after the completion of the Tests

EXCAVATION AND FILL No later

223 31 23 00.00 20-3.10.B.2 4 than 7 days

Density tests after the completion of the Tests

DIVISION 32

BASE COURSE FOR RIGID AND SUBBASE COURSE FOR FLEXIBLE PAVING No later

224 32 11 16.16-3.04.B.1 4 than 7 days

Gradation test after the completion of the Tests

EARTHWORK

EXTERIOR IMPROVEMENTS

AF Form 66 Page 22 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

BASE COURSE FOR RIGID AND SUBBASE COURSE FOR FLEXIBLE PAVING No later

225 32 11 16.16-2.01 4 than 7 days

Liquid limit after the completion of the Tests

BASE COURSE FOR RIGID AND SUBBASE COURSE FOR FLEXIBLE PAVING No later

226 32 11 16.16-2.01 4 than 7 days

Plasticity index after the completion of the Tests

BASE COURSE FOR RIGID AND SUBBASE COURSE FOR FLEXIBLE PAVING No later

227 32 11 16.16-2.01 4 than 7 days

Bearing ratio after the completion of the Tests

BASE COURSE FOR RIGID AND SUBBASE COURSE FOR FLEXIBLE PAVING No later

228 32 11 16.16-2.01 4 than 7 days

Percentage of wear after the completion of the Tests

BASE COURSE FOR RIGID AND SUBBASE COURSE FOR FLEXIBLE PAVING No later

229 32 11 16.16-3.04.B.4 4 than 7 days

Density tests after the completion of the Tests

GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT No later

230 32 11 24-3.05.B.1 4 than 7 days

Gradation after the completion of the Tests

GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT No later

231 32 11 24-2.01.A 4 than 7 days

Liquid limit after the completion of the Tests

GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT No later

232 32 11 24-2.01.A 4 than 7 days

Plasticity index after the completion of the Tests

GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT No later

233 32 11 24-2.01.A 4 than 7 days

California bearing ratio after the completion of the Tests

GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT No later

234 32 11 24-2.01.A 4 than 7 days

Percentage of wear after the completion of the Tests

GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT No later

235 32 11 24-3.05.B.3 4 than 7 days

Density after the completion of the Tests

AF Form 66 Page 23 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

BITUMINOUS TACK AND PRIME COATS PAVEMENT

236 32 12 10-2.01 4 60

Prime Coat

BITUMINOUS TACK AND PRIME COATS PAVEMENT

237 32 12 10-2.02 4 60

Tack Coat

HOT MIX BITUMINOUS PAVEMENT

238 32 12 17-2.03.A, 2.03.B 4 60

Job-mix formula

HOT MIX BITUMINOUS PAVEMENT

239 32 12 17-2.02 4 60

Asphalt cement binder

HOT MIX BITUMINOUS PAVEMENT

240 32 12 17-2.03 4 60

Mix design

HOT MIX BITUMINOUS PAVEMENT No later

241 32 12 17-2.04.A.2 4 than 7 days

Coarse aggregate tests after the completion of the Tests

HOT MIX BITUMINOUS PAVEMENT No later

242 32 12 17-2.04.A.2 4 than 7 days

Percent of crushed pieces in gravel after the completion of the Tests

HOT MIX BITUMINOUS PAVEMENT No later

243 32 12 17-2.04.A.3 4 than 7 days

Fine Aggregate Tests after the completion of the Tests

HOT MIX BITUMINOUS PAVEMENT No later

244 32 12 17-2.04.A.3 4 than 7 days

Specific gravity of mineral filler after the completion of the Tests

HOT MIX BITUMINOUS PAVEMENT No later

245 32 12 17-2.04.A.1 4 than 7 days

Specific gravity test of asphalt after the completion of the Tests

HOT MIX BITUMINOUS PAVEMENT No later

246 32 12 17-2.04.A.4 4 than 7 days

Bituminous mixture tests after the completion of the Tests

AF Form 66 Page 24 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

HOT MIX BITUMINOUS PAVEMENT No later

247 32 12 17-3.05.A.3 4 than 7 days

Pavement courses after the completion of the Tests

CONCRETE SIDEWALKS AND CURBS AND GUTTERS

248 32 16 13-2.01 4 60

Ready-mixed concrete

CONCRETE SIDEWALKS AND CURBS AND GUTTERS

249 32 16 13-3.04 4 60

Precast concrete curb and gutter

CONCRETE SIDEWALKS AND CURBS AND GUTTERS No later

250 32 16 13-3.07.B.3 4 than 7 days

Slump after the completion of the Tests

CONCRETE SIDEWALKS AND CURBS AND GUTTERS No later

251 32 16 13-3.07.B.2 4 than 7 days

Air Content after the completion of the Tests

CONCRETE SIDEWALKS AND CURBS AND GUTTERS No later

252 32 16 13-1.02 4 than 7 days

Compression test after the completion of the Tests

PAVEMENT MARKINGS

253 32 17 24.00 10-2.01 4 60

Traffic paint

PAVEMENT MARKINGS

254 32 17 24.00 10-1.02 4 60

Reflective media

PAVEMENT MARKINGS

255 32 17 24.00 10-1.03.A 4 60

Manufacturer's Technical Data Sheets

PAVEMENT MARKINGS

256 32 17 24.00 10-1.03.B 4 60

Manufacturer's Material Safety Data Sheets (MSDS)

CHAIN LINK FENCES AND GATES

257 32 31 13-1.03 4 4 60

Fence Assembly

AF Form 66 Page 25 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

CHAIN LINK FENCES AND GATES

258 32 31 13-2.02 4 4 60

Zinc Coating

CHAIN LINK FENCES AND GATES

259 32 31 13-2.03 4 60

Fabric

CHAIN LINK FENCES AND GATES

260 32 31 13-2.11 4 60

Stretcher Bars

CHAIN LINK FENCES AND GATES

261 32 31 13-2.14 4 60

Concrete

CHAIN LINK FENCES AND GATES

262 32 31 13-1.02, 3.11 4 60

Grounding material

SODDING No later

263 32 92 23-2.02.B 4 than 7 days

Topsoil composition tests after the completion of the Tests

SODDING

264 32 92 23-2.01.A 4 60

Nursery certification for sods

DIVISION 33

WATER DISTRIBUTION

265 33 11 00-2.01.A 4 60

Water service line piping, fittings, joints, valves, and coupling

WATER DISTRIBUTION

266 33 11 00-2.01.B.2 4 60

Tapping Sleeve

UTILITIES

AF Form 66 Page 26 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

WATER DISTRIBUTION

267 33 11 00-2.01.B.1 4 60

Corporation stops

WATER DISTRIBUTION No later

268 33 11 00-3.02.B.3 4 than 7 days

Water Quality Test after the completion of the Tests

WATER DISTRIBUTION Within 7 days

269 33 11 00-1.03.C.1 4 prior to start

Testing Laboratory of Water Quality waterquality test

SANITARY SEWERS

270 33 30 00-2.01 4 60

Pipeline Materials

SANITARY SEWERS

271 33 30 00-2.03.A 4 60

Precast Concrete Products

SANITARY SEWERS

272 33 30 00-2.03.B 4 60

Metal Items

SANITARY SEWERS

273 33 30 00-2.03.B.1 4 60

Frames and Covers

STORM DRAINAGE UTILITIES

274 33 40 00-2.01.A 4 60

Pipes

STORM DRAINAGE UTILITIES

275 33 40 00-2.02.C 4 60

Precast Concrete Products

STORM DRAINAGE UTILITIES

276 33 40 00-2.02.D 4 60

Frames, Covers, and Gratings

UNDERGROUND ELECTRICAL DISTRIBUTION

277 33 71 02-1.05.A 4 60

Precast underground structures

AF Form 66 Page 27 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

UNDERGROUND ELECTRICAL DISTRIBUTION

278 33 71 02-2.05 4 60

Medium voltage cable

UNDERGROUND ELECTRICAL DISTRIBUTION

279 33 71 02-2.07 4 60

Medium voltage cable joints

UNDERGROUND ELECTRICAL DISTRIBUTION

280 33 71 02-2.06 4 60

Medium voltage cable terminations

UNDERGROUND ELECTRICAL DISTRIBUTION

281 33 71 02-2.13 4 60

Precast concrete structures

UNDERGROUND ELECTRICAL DISTRIBUTION

282 33 71 02-2.13.A.4 4 60

Sealing Material

UNDERGROUND ELECTRICAL DISTRIBUTION

283 33 71 02-2.13 4 60

Pulling-In Irons

UNDERGROUND ELECTRICAL DISTRIBUTION

284 33 71 02-1.04 4 60

Handhole frames and covers

UNDERGROUND ELECTRICAL DISTRIBUTION

285 33 71 02-2.14 4 60

Cable supports (racks, arms and insulators)

UNDERGROUND ELECTRICAL DISTRIBUTION

286 33 71 02-2.08.A 4 60

Telecommunication Copper Cable

UNDERGROUND ELECTRICAL DISTRIBUTION

287 33 71 02-2.08.C 4 60

Telecommunication Copper Cable splices

UNDERGROUND ELECTRICAL DISTRIBUTION No later

288 33 71 02-3.18.A 4 than 7 days

Field Acceptance Checks and Tests after the completion of the Tests

AF Form 66 Page 28 of 29

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

M

B

E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

T E

S T

R E

P O

R T

S

S E

E S

P E

C

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

after NTP APPROVED DISAPPROVED

CONSTRUCT VET CLINIC ADMIN

ANNEX, KADENA AIR BASE,

OKINAWA, JAPAN

SCHEDULE OF MATERIAL SUBMITTALS

LXEZ 11-8687

TO BE COMPLETED BY PROJECT ENGINEER

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

NO. OF COPIES REQUIRED

UNDERGROUND ELECTRICAL DISTRIBUTION No later

289 33 71 02-3.03 4 than 7 days

Cable Installation Plan and Procedure after the completion of the Tests

UNDERGROUND ELECTRICAL DISTRIBUTION

290 33 71 02-2.08.A 4 60

Telecommunication Copper Cable

UNDERGROUND ELECTRICAL DISTRIBUTION

291 33 71 02-2.08.C 4 60

Telecommunication Copper Cable splices

UNDERGROUND ELECTRICAL DISTRIBUTION

292 33 71 02-1.05.B 4 60

Cable splicer/terminator

UNDERGROUND ELECTRICAL DISTRIBUTION

293 33 71 02-1.05.C 4 60

Cable Installer Qualifications

UNDERGROUND ELECTRICAL DISTRIBUTION

294 33 71 02-1.05.D 4 60

Telecommunications Contractor Qualifications

UNDERGROUND ELECTRICAL DISTRIBUTION

295 33 71 02-1.05.D 4 60

Key Personnel Qualifications

UNDERGROUND ELECTRICAL DISTRIBUTION

296 33 71 02-1.05.D 4 60

Minimum Manufacturer's Qualifications

AF Form 66 Page 29 of 29

File details come from the government source that posted it. Updated .