J-FY20 Monthly Summary Report-Jul 2020.pdf

PDF 2 MB Posted

Attached to
Aerial Targets III FY23 Federal contract opportunity
Solicitation number
FA489021CPKCA
Issued by
Department of the Air Force Air Combat Command

About this file

This pre-solicitation notice seeks industry feedback for aircraft and target drone maintenance, range instrumentation system operations and maintenance, and support services at Tyndall Air Force Base, Florida and Holloman Air Force Base, New Mexico. Periodic deployments to the Utah Test and Training Range and other continental United States locations may be required. The Air Combat Command Acquisition and Management Integration Center will issue this solicitation for the Aerial Targets III contract providing maintenance, operations, and support services for aerial targets and range systems. Services include full-scale and sub-scale aerial target maintenance and operations, range instrumentation system operations and maintenance, and associated support functions.

View the file

Other files for this federal contract opportunity

Other files attached to Aerial Targets III FY23, newest first.
File Type Posted
FA489021R0012 Tyndall Site Visit Instructions 7Jul21.docx DOCX document
Workload Sppt Data AGE Periodic Inspect and Maint.xlsx XLSX spreadsheet
F-IMDS Man-Hr Summary Ex MDC Manhour Summary HAFB 2020.txt TXT text file
A-IMDS Man-Hr Summary Ex MDC Manhour Summary TAFB 2018.txt TXT text file
K-FY20 Monthly Summary Report-Aug 2020.pdf PDF
E-FY20 Monthly Summary Report-Feb 2020.pdf PDF
L2-FY19 Monthly Summary Report-Sept 2019 v2.pdf PDF
K-FY19 Monthly Summary Report-Aug 2019.pdf PDF
I-FY19 Monthly Summary Report-Jun 2019.pdf PDF
F-FY19 Monthly Summary Report-Mar 2019.pdf PDF
E-FY19 Monthly Summary Report-Feb 2019.pdf PDF
A-FY19 Monthly Summary Report-Oct 2018 rev2.pdf PDF
Sortie Recap FY20.xlsx XLSX spreadsheet
Sortie Recap FY19.xlsx XLSX spreadsheet
IMDS Job Master List Data TPS-75 RADAR JML.txt TXT text file
C-FY21 Monthly Summary Report-Dec 2020.pdf PDF
A-FY21 Monthly Summary Report-Oct 2020.pdf PDF
L-FY20 Monthly Summary Report-Sept 2020.pdf PDF
H-FY20 Monthly Summary Report-May 2020.pdf PDF
D-FY20 Monthly Summary Report-Jan 2020.pdf PDF
B-FY20 Monthly Summary Report-Nov 2019.pdf PDF
J-FY19 Monthly Summary Report-Jul 2019.pdf PDF
G1-FY19 Monthly Summary Report-Apr 2019.pdf PDF
FY21 Flying Schedule Data.xlsx XLSX spreadsheet
FY20 Flying Schedule Data.xlsx XLSX spreadsheet
I-FY20 Monthly Summary Report-Jun 2020.pdf PDF
C-FY19 Monthly Summary Report-Dec 2018.pdf PDF
Workload Sppt Data RIS Sites (Pics Notes).xlsx XLSX spreadsheet
Workload Sppt Data QF-16 TCTO Status.xlsx XLSX spreadsheet
Sortie Recap FY21.xlsx XLSX spreadsheet
D-IMDS Man-Hr Summary Ex MDC Manhour Summary HAFB 2019.txt TXT text file
B-IMDS Man-Hr Summary Ex MDC Manhour Summary HAFB 2018.txt TXT text file
IMDS Job Master List Data SSAT JML 24May2021.txt TXT text file
D-FY21 Monthly Summary Report-Jan 2021.pdf PDF
C-FY20 Monthly Summary Report-Dec 2019.pdf PDF
H-FY19 Monthly Summary Report-May 2019.pdf PDF
CBA FA489015C0018 HMN 9Apr21-30Apr24 (pg 22 REDACTED).pdf PDF
Draft AT PWS App D GFE 1Jun21.docx DOCX document
SAM Posting of Draft RFP 1Jul21.docx DOCX document
CBA FA489015C0018 TYN 29Jul19-30Apr22 (pg 36 REDACTED).pdf PDF
Draft AT PWS App G GFV 1Jun21.docx DOCX document
Draft AT PWS App C Pubs-Forms 1Jun21.docx DOCX document
draft SOL FA489021R0012 1Jul21 1530.pdf PDF
Draft AT PWS App F List of Illustrations 1Jun21.doc DOC document
Draft AT PWS App E GFF 1Jun21.docx DOCX document
Draft AT PWS App B CDRL List 1Jun21.docx DOCX document
Draft AT PWS App A Definitions 1Jun21.doc DOC document
Draft AT PWS FA489021R0012 (Basic) 1Jun21 wTrack Changes.docx DOCX document
Reponses to Industry Questions (FINAL 1Jun21).docx DOCX document
AT III FY23 DRAFT PWS 9Dec20.docx DOCX document
Show all 50

Aerial Targets III FY23 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AERIAL TARGETS MONTHLY SUMMARY JULY 2020

Unclassified Page 1 of 42 Distribution: A

Aerial Targets Monthly Contract Summary Report – CDRL A001

Contract Number FA4890-15-C-0018

1 – 31 July 2020

Prepared for:

Acquisition Management and Integration Center

Langley AFB, Virginia

Prepared by:

PAE Aviation and Technical Services, LLC

1001 Florida Avenue

Tyndall AFB, Florida

David Olson

Program Manager

Aerial Targets Program

UNCLASSIFIED

Distribution Limitation: A

Unclassified Page 2 of 42

TABLE OF CONTENTS

Tab 1A – FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL

Tab 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM

Tab 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL

Tab 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M

Tab 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA) METRICS

Tab 5 – TECHNICAL REPORT STATUS

Tab 6 – QUALITY CONTROL (QC) SUMMARY REPORT

Tab 7 – RIS MAINTENANCE ANALYSIS REQUESTS

Tab 8 – FACILITIES OPEN WORK REQUESTS

Tab 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS

Unclassified Page 3 of 42

TAB 1A – FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL

1. SORTIES SCHEDULED:

Note: Off-station sorties reported in this summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.

2. MISSIONS FLOWN:

QF-16 NULLO:

Mission Symbol Mission Project Supported # Missions FYTD

O5ZZ AIM-9X AIM-9X 5

All O5ZZ 5

Sub Total 5 19

QF-16 MANNED:

Mission Symbol Mission Project Supported # Missions

All O3ZZ 0 3

O5ZZ AIM-9X AIM-9X 4

O5ZZ Combat Sentry Combat Sentry 7

O5ZZ JATM JATM 2

All O5ZZ 13 155

O6ZZ AIM-9X AIM-9X 2

O6ZZ Combat Sentry Combat Sentry 4

O6ZZ CT O&M 39

O6ZZ Cross Country O&M 4

All O6ZZ 49 446

O8ZZ CT O&M 1

O8ZZ SAFE O&M 4

All O8ZZ 5 10

Sub Total 67 614

Grand Total 72 633

QF-16 JUL 20 FYTD

Scheduled 92 841

Canceled 18 105

Successful Flown 72 629

Ground Aborts 5 57

Air Aborts 0 4

Total Flown 72 633

Unclassified Page 4 of 42

3. TOTAL HOURS FLOWN:

Mission Symbol Hours FYTD

O5ZZ 3.6 12.8

Sub Total 3.6 12.8

Hours FYTD

O3ZZ 0.0 4.7

O5ZZ 23.3 249.7

O6ZZ 56.6 567.4

O8ZZ 6.1 12.8

Sub Total 86.0 834.6

Grand Total 89.6 847.4

4. MISSIONS CANCELED:

Date

MDS

AF#

Msn

Sym

Mission

Reason

7 Jul QF-16C 48 O6ZZ CT Weather

10 Jul QF-16C 51 O5ZZ JATM Project

13 Jul QF-16C 62 O8ZZ SAFE ATC

14 Jul QF-16A 42 O5ZZ AIM-9X ATC

14 Jul QF-16C 48 O5ZZ CT Weather

14 Jul QF-16C 29 O5ZZ CT Weather

14 Jul QF-16C 47 O5ZZ CT Weather

15 Jul QF-16C 48 O5ZZ DACT Weather

15 Jul QF-16C 22 O5ZZ DACT Weather

16 Jul QF-16C 48 O5ZZ Combat Sentry Weather

16 Jul QF-16C 52 O5ZZ Chase Weather

16 Jul QF-16C 31 O5ZZ AIM-9X Weather

21 Jul QF-16C 51 O5ZZ CT Ops

27 Jul QF-16C 62 O6ZZ FCS Weather

27 Jul QF-16C 53 O6ZZ CT Weather

29 Jul QF-16C 49 O6ZZ CT Ops

31 Jul QF-16A 40 O5ZZ AIM-9X Project

31 Jul QF-16C 47 O5ZZ Chase Project

5. ABORTS – GROUND AND AIR:

Date Type

Abort

MDS AF

Msn

Sym

Mission Reason

2 Jul GAB QF-16C 56 O6ZZ SAFE CADC

Unclassified Page 5 of 42 Distribution: A

14 Jul GAB QF-16C 48 O5ZZ CT FLCS (Spare Avail Not Used)

14 Jul GAB QF-16C 29 O5ZZ CT FTIT Gauge

20 Jul GAB QF-16C 68 O8ZZ SAFE Engine Fault

27 Jul GAB QF-16C 50 O6ZZ Chase Centerline Fuel Tank Read Zero

6. MAINTENANCE AND LOGISTICS PROBLEMS:

a. Maintenance:

(1) QF-16:

(a) AF056 Awaiting SAFE

(b) AF068 Awaiting SAFE

(c) AF059 Acceptance INW

(d) AF065 Acceptance INW

(e) AF069 Acceptance INW

(f) AF066 Acceptance INW

(2) AGE/Support Vehicles:

(a) QF-16 AGE and Support/Test Equipment

1. Procurement of AGE equipment, support/test equipment is continuing.

(b) Stock listed and commercially procured AGE maintenance equipment and tool purchasing in work.

b. Logistics:

(1) Long lead-time (MICAP) on F-16A components is negatively affecting the ability to generate aircraft.

(2) Post Hurricane Michael supply needs are being met via Tyndall AFB and Eglin AFB.

Delays in processing/receiving parts are continual.

(3) IMDS Cloud Migration

(a) Major slowdown in normal processing with near total stoppages for several days.

(b) Resulting in extreme difficulty to properly document/track inspections, time changes, including safety-of-flight issues, parts tracking and debriefing procedures.

(c) Designed and implemented numerous locally designed tracking tools to track data and other issues until IMDS is fully restored.

Unclassified Page 6 of 42

7. WASHES:

a. Washes Accomplished in July 2020:

WEEK ENDING AF#

30 Day: 3 July Data not available due to IMDS Cloud issues

10 July Data not available due to IMDS Cloud issues

17 July Data not available due to IMDS Cloud issues

24 July Data not available due to IMDS Cloud issues

31 July Data not available due to IMDS Cloud issues

a. Washes Not Accomplished & Reasons:

Data not available due to IMDS Cloud issues

c. Wash Schedule for August 2020:

WEEK ENDING AF#

30 Day: 7 August 060, 035, 030

14 August 049, 047, 068, 062, 022, 027, 040

21 August 048, 026, 024, 031, 050, 021, 029

28 August 052, 056, 054, 065, 051

31 August 053

8. REPEAT/RECURRING DISCREPANCIES:

Date MDS AF# R/R Discrepancy Corrective Action

None

9. RECOMMENDATIONS: Negative this report period.

10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.

Unclassified Page 7 of 42

TAB 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM

Note: Off-station sorties reported in this monthly summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.

All O5ZZ NULLO F-35 HOT 1 1

Sub Total

All O3ZZ HILL AFB Full Paint 2 10

All O4ZZ 0

O5ZZ F-35 Dress F-.35 2

O5ZZ F-35 Chase F-35 1

O5ZZ Patriot Army 6

All O5ZZ 9 58

O6ZZ C/T Training 12

O6ZZ Red Air Training 2

All O6ZZ 14 171

All O8ZZ 1

Grand Total 26 241

05ZZ 0.9 0.9

NULLO sub Total

Hours FYTD

O3ZZ 3.4 17.4

O4ZZ 0.0 0.0

QF-16 JUL 20 FYTD

Scheduled 30 264

Canceled 4 22

Successful Flown 26 241

Ground Aborts 0 17

Air Aborts 0 1

Total Flown 26 242

Unclassified Page 8 of 42 Distribution: A

O5ZZ 14.4 94.7

O6ZZ 19.5 253.9

O8ZZ 0.0 1.3

Sub Total 38.2 368.2

Grand Total 38.2 368.2

Date MDS AF# Msn

Mission Reason

8 Jul QF-16C 055 O5ZZ F-35 Chase Project

8 Jul QF-16C 008 O5ZZ F-35 Hot Project

15 Jul QF-16C 055 O5ZZ C/T Ops

15 Jul QF-16C 044 O5ZZ C/T Ops

Date Type

Abort

MDS AF# Msn

Sym

Negative this report

a. Maintenance: We were without AF028 the entire month due to replacement engine needed. It has been ordered and repairs are in work on the replacement engine at the CRF.

b. Logistics: New Items: Negative this report period.

7. WASHES:

Washes Accomplished: QF012

Washes Not Accomplished & Reasons:

QF028 – F-1 Cavity Fuel Leak

Date MDS AF# R/R Discrepancy Corrective Action

Negative this report

9. RECOMMENDATIONS: Negative this report period.

10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.

Unclassified Page 9 of 42

TAB 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL

Note: Off-station sorties reported in this monthly summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.

BQM-167A

Symbol

Mission Project Supported #

Missions

FYTD

O5ZZ F-15 OFP/ CTF F-15 OFP/ CTF 0 2

O5ZZ AFSAT APS AFSAT APS 1 1

O5ZZ APS TEST APS Test 0 1

O5ZZ F16 Cruise Missile Defense

Test

F16 Cruise Missile Defense

Test

0 1

O5ZZ AMRAAM SIP AMRAAM SIP 1 5

O5ZZ AIM 9X AIM 9X 0 5

O5ZZ AMR PHS4 AMR PHS4 0 1

O5ZZ WSEP WSEP 9 47

Total 11 63

BQM-167A

O5ZZ 7.8 49.5

Total 7.8 49.5

Date

MDS

Tail #

Msn Sym

Reason

2 Jul BQM167A O5ZZ AFSAT APS Project

14 Jul BQM167A O5ZZ WSEP Project

15 Jul BQM167A O5ZZ WSEP Project

15 Jul BQM167A O5ZZ WSEP Project

BQM-167A JUL 20 FYTD

Scheduled 21 112

Canceled 10 48

Successful Flown 9 61

Ground Aborts 0 3

Air Aborts 1 1

Total Flown 11 63

Unclassified Page 10 of 42 Distribution: A

16 Jul BQM167A O5ZZ WSEP Project

16 Jul BQM167A O5ZZ WSEP Project

17 Jul BQM167A O5ZZ WSEP Project

22 Jul BQM167A O5ZZ WSEP Project

23 Jul BQM167A O5ZZ WSEP Project

30 Jul BQM167A O5ZZ AMRAAM SIP Project

Date Type Abort MDS Tail# Msn

16 Jul BQM167A 17-0604 O5ZZ WSEP Uncommanded engine shutdown

a. Hurricane damage to building 256’s roof continues to impact Mx activity and available storage space due to the amount of water intrusion into the hangar. Maintenance time is lost to cleaning it up after any rain. Temporary Mx facilities have been erected, but are awaiting a floor covering change-out before they can be moved into.

b. Minor adjustments to the established Forward Supply point continue, but there are presently no new or major impacts to target generation.

c. The three temporary facilities for SSAT Mx and the two for the chute shop have been identified as “Not safe for Mx personnel during a 5 MILE LIGHTNING LIGHT” and will require evacuation during this entire period. PAE has engaged the 53 WEG leadership for possible alternatives that would negate the need to leave the facilities. Additionally, we have asked for a location to be identified for Mx to go to during this time.

d. We have been notified that all 5 tents (chute shop x 2 and SSAT Mx x 3) will have to be moved. Locations for them are still in discussion.

7. CORROSION CONTROL INSPECTION:

a. Launch Pad Corrosion Control Maintenance: Routine corrosion control is being accomplished on all applicable support equipment.

b. Launch Rail Gantry systems 1, 2, 5, & 6 are showing signs of severe corrosion (they were installed in 1975). Presently, they are all serviceable. However, their replacements should be programmed / considered in the near future. NOTE: Gantries on rails 3 & 4 are newer and will not require replacement any time soon.

Unclassified Page 11 of 42

Date MDS Tail# R/R Discrepancy Corrective Action

None

9. RECOMMENDATIONS: None

10. SPECIAL PROJECTS: None

Unclassified Page 12 of 42 Distribution: A

TAB 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M

1. Tellabs Switch and Data/Comm. Operational Availability:

Tellabs Switch: 100% Available

Data/Comm. Circuits: 100% Available

2. Mission Availability:

GRDCS: 100% Available

RCS: 100% Available

Access Net: 100% Available

Mission Video: 100% Available

TPS-75 Radar: Scheduled Available Non-Charge Not Available

Missions 38 35.05 0 2.95

Hours 94.75 87.25 0 7.50

Overall Availability: 92.08% Available ((Available + Non-Charge)/Scheduled)

0%

20%

40%

60%

80%

100%

Tellabs Switch Data/Comm

July 100% 100%

12 month avg 100% 100%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90%

100%

GRDCS RCS AccessNet TPS-75 Mission Video

July 100% 100% 100% 92.1% 100.0%

12 month avg 100% 100% 100% 99.3% 100%

Unclassified Page 13 of 42 Distribution: A

3. Summary of Mission Maintenance Actions:

a. 17 July 2020:

Troubleshot DLS S/N 098 (from E-9 048) to faulty R/T Unit resulting in unit decommission; Reference RIS 201560101.

Configured DLS S/N 123 for aircraft installation and performed bench check and site calibration at RWS; unit delivered to E-9 crew for installation in tail number 048.

b. 22 July 2020: Performed bench checks on DLSr S/N 019 and found no data throughput resulting in RMA request for repair at MSI.

c. 24 July 2020: Performed self-calibration on 915 DTS S/N 002.

4. RIS Scheduled Maintenance Summary:

a. GRDCS:

1) Due within 45 Days:

Monthly Console Checks, by 31 August 2020

2) Due within 90 Days:

Data Link Subsystem Annual Checks:

SITE DATE DUE S/N Test Type

SUBE 02 Sep 2020 025 Annual

SUBW 02 Sep 2020 032 6 Month

DEPOT 07 Sep 2020 054 6 Month

D3 15 Sep 2020 016 6 Month

PCB 15 Sep 2020 027 6 Month

RWER 17 Sep 2020 031 6 Month

Depot 17 Sep 2020 033 6 Month

SHELL 22 Sep 2020 035 6 Month

CARRABELLE 22 Sep 2020 036 6 Month

1801 ISC1 16 Oct 2020 078 Annual

Unclassified Page 14 of 42

b. TPS-75 Radar: Accomplished this month and due within 45 Days.

JOB Completed or due from3/30/2020 until 5/29/2020 JST REOCCUR Next Due EQUIP #

/0

/2

/0

/2

/0

/2

/0

/2

/0

/2

/0

/2

/0

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/3

/2

/3

/2

/0

/2

/0

/2

/0

/2

/0

/2

/0

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/3

/2 0 0 = Job Forecast

/ = Partially C/W

1 = C/W

ANTENNA TIEDOWN STRAPS AND JACKPAD INSPECTION 24 DAILY RE035 1 0 0 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1

DAILY PERFORMANCE INSPECTION 24 DAILY RE035 1 0 0 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P3-2TPS75-6WC-1

UPX 37 DAILY SYSTEM CHECKS - SER # A0109 266 DAILY REA09 0 0 0 0 0 0 2UPX37-1 TBL 4-1

UPX 37 DAILY SYSTEM CHECKS - SER # C0126 266 DAILY REA26 1 0 0 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2UPX37-1 TBL 4-1

3N1 DAILY PERFORMANCE CHECK 301 DAILY C60A3 1 0 0 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-177-1 TABLE 2-1

2N1 DAILY PERFORMANCE CHECK 326 DAILY C84B2 1 0 0 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1

DISPLAY CONSOLE TURN ON/OFF 1301 DAILY RE035 1 0 0 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UYQ27-26WC-1

UPA 59 DAILY PREVENTATIVE MAINTENANCE 1308 DAILY RE035 1 0 0 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UPA59-1-1 & 2

WEATHER/ECM PERFORMANCE ROUTINE 2 7 DAY 8/3/20 RE035 1 1 1 1 0 0 0 31P3-2TPS75-6WC-1

RADAR/SIF SYSTEM TEST PERFORMANCE 50 7 DAY 8/3/20 RE035 1 1 1 1 0 0 0 31P3-2TPS75-6WC-1

I-F RECEIVER PERFORMANCE ROUTINE 51 7 DAY 8/3/20 RE035 1 1 1 1 0 0 0 31P3-2TPS75-6WC-1

HEIGHT PERFORMANCE ROUTINE 73 7 DAY 8/3/20 RE035 1 1 1 1 0 0 0 31P3-2TPS75-6WC-1

CLUTTER MAPPING PERFORMANCE ROUTINE 74 7 DAY 8/3/20 RE035 1 1 1 1 0 0 0 31P3-2TPS75-6WC-1

COMMUNICATIONS PERFORMANCE ROUTINE 273 7 DAY 8/3/20 RE035 1 1 1 1 0 0 0 31P3-2TPS75-6WC-1

POWER SUPPLY TEST PERFORMANCE ROUTINE 273 7 DAY 8/3/20 RE035 1 1 1 1 0 0 0 31P3-2TPS75-6WC-1

DISPLAY CONSOLE WEEKLY INSPECTION 1303 7 DAY 8/7/20 RE035 1 1 1 0 0 0 31P1-2UYQ27-26WC-1

ANTENNA/RECEIVER INTERFACE TEST PERFORMANCE ROUTINE 550 14 DAY 8/5/20 RE035 1 0 0 31P3-2TPS75-6WC-1

SYSTEM ORIENTATION PERFORMANCE CHECK 993 14 DAY 8/3/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1

AFRADES HEIGHT EVALUATION 999 14 DAY 8/5/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1

AFRADES BEACON PERFORMANCE 1038 14 DAY 8/5/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1

AFRADES CLUTTER ANALYSIS 1041 14 DAY 8/5/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1

AUTO SEQUENCER TEST 1207 14 DAY 8/7/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1

HEAT EXCHANGER SERVICING 1270 14 DAY 8/3/20 RE035 1 1 0 35E4-177-1 TABLE 2-1

SHELTER CLEANING AND INSPECTION SERVICING 1271 14 DAY 8/14/20 RE035 1 1 1 0 35E4-177-1 TABLE 2-1

COMPRESSOR DEHYDRATOR ON/OFF RATIOS 304 28 DAY 8/14/20 RE035 1 0 31P3-2TPS75-6WC-1

FREQ GENERATOR COHO REF OUTPUT CHECK 1241 28 DAY 8/14/20 RE035 1 0 31P3-2TPS75-6WC-1

FREQ GENERATOR IF TEST TARGET AMPLITUDE CHECK 1245 28 DAY 8/14/20 RE035 1 0 31P3-2TPS75-6WC-1

ANTENNA PEDESTAL AND LEVELING JACK INSPECTION 1250 28 DAY 7/28/20 RE035 1 0 31P3-2TPS75-6WC-1

RF AND SLIP RING TEST 1253 28 DAY 8/3/20 RE035 1 0 0 31P3-2TPS75-6WC-1

MDS/FAR TEST 1254 28 DAY 8/3/20 RE035 1 0 0 31P3-2TPS75-6WC-1

AFRADES TILT SENSOR PERFORMANCE 1255 28 DAY 8/3/20 RE035 1 0 0 31P3-2TPS75-6WC-1

ANTENNA ASSEMBLY CLEANING AND INSPECTION SERVICING 1272 28 DAY 8/25/20 RE035 1 0 31P3-2TPS75-6WC-1

SHELTER CORROSION CONTROL INSPECTION AND SERVICING 1273 28 DAY 8/7/20 RE035 1 0 31P3-2TPS75-6WC-1

ANTENNA CORROSION CONTROL INSPECTION AND SERVICING 1274 28 DAY 8/25/20 RE035 1 0 31P3-2TPS75-6WC-1

ANTENNA POWER SUPPLY ENCLOSURE AIR FILTER CLEANING 1274 28 DAY 8/25/20 RE035 1 0 31P3-2TPS75-6WC-1

COMPRESSOR- DEHYDRATOR ASSEMBLY RELIEF VALVE SERVICING 1276 28 DAY 8/13/20 RE035 1 0 31P3-2TPS75-6WC-1

ANTENNA BULL GEAR LUBRICATION 1279 28 DAY 8/24/20 RE035 1 0 31P3-2TPS75-6WC-1

ANTENNA DRIVE MOTOR GEARBOX OIL LEVEL CHECK 1280 28 DAY 8/3/20 RE035 1 0 0 31P3-2TPS75-6WC-1

TUSK ASSEMBLY, JACKSCREW, AND ANTENNA YOKE LUBRICATION 1281 28 DAY 8/24/20 RE035 1 0 31P3-2TPS75-6WC-1

DISPLAY CONSOLE INSPECTION AND CLEANING 1304 28 DAY 8/7/20 RE035 1 0 31P3-2TPS75-6WC-1

3N1 MONTHLY PERFORMANCE CHECK 323 MONTHLY 8/6/20 C60A3 1 0 35E4-177-1 TABLE 2-1

Unclassified Page 15 of 42

2N1 MONTHLY PERFORMANCE CHECK 329 MONTHLY 8/6/20 C84B2 1 0 35E4-178-1 TABLE 2-1

UPX 37 QUARTERLY INSPECTION - SER # A0109 283 84 DAY 9/21/20 REA09 2UPX37-1 TBL 4-1

UPX 37 QUARTERLY INSPECTION - SER # C0126 283 84 DAY 9/21/20 REA26 2UPX37-1 TBL 4-1

TRANSMITTER OIL BREAKDOWN TEST & FILAMENT INTERRUPT CHECK PROCEDURE 1256 84 DAY 9/24/20 RE035 1 31P3-2TPS75-6WC-1

STORAGE TWYSTRON PUMP DOWN 1257 84 DAY 9/8/20 RE035 31P3-2TPS75-6WC-1

MODIFIED BEARING LUBRICATION 1282 84 DAY 8/24/20 RE035 0 31P3-2TPS75-6WC-1

ANTENNA LEG ASSEMBLY INSPECTION 1283 84 DAY 9/14/20 RE035 31P3-2TPS75-6WC-1

PROCESSOR RACK INSPECTION AND CLEANING 1285 84 DAY 9/17/20 RE035 31P3-2TPS75-6WC-1

MODULAR INTERFACE GROUP INSPECTION AND CLEANING 1289 84 DAY 9/9/20 RE035 31P3-2TPS75-6WC-1

UPX 37 SEMIANNUAL INSPECTION - SER # A0109 294 168 DAY 12/14/20 REA09 2UPX37-1 TBL 4-1

UPX 37 SEMIANNUAL INSPECTION - SER # C0126 294 168 DAY 12/14/20 REA26 2UPX37-1 TBL 4-1

TRANSMITTER LIQUID COOLANT SERVICING 1290 168 DAY 9/8/20 RE035 31P3-2TPS75-6WC-1

PPI CIRCUIT CARD INSPECTION AND CLEANING 1291 168 DAY 1/14/21 RE035 1 31P3-2TPS75-6WC-1

CONTROL MONITOR INSPECTION AND CLEANING 1292 168 DAY 1/1/21 RE035 1 31P3-2TPS75-6WC-1

ANTENNA AND SHELTER JACKS LUBRICATION 1293 168 DAY 12/16/20 RE035 1 31P3-2TPS75-6WC-1

UPA 59 PREVENTATIVE MAINTENANCE 1309 168 DAY 6/23/20 RE035 31P1-2UPA59-1-1 & 2

ANTENNA DRIVE MOTOR GEARBOX SERVICE 1294 336 DAY 7/29/20 RE035 0 31P3-2TPS75-6WC-1

PROCESSOR RACK AND CIRCUIT CARD INSPECTION AND CLEANING 1295 336 DAY 7/1/21 RE035 1 31P3-2TPS75-6WC-1

INTERROGATOR CIRCUIT CARD INSPECTION AND CLEANING 1297 336 DAY 6/29/21 RE035 1 31P3-2TPS75-6WC-1

DESICCANT CARTRIDGE REPLACEMENT 1298 336 DAY 1/14/21 RE035 31P3-2TPS75-6WC-1

CONTROL MONITOR INSPECTION, CLEANING, AND LUBE 1299 336 DAY 6/21/21 RE035 1 31P3-2TPS75-6WC-1

HIGH VOLTAGE INSULATED GLOVES TEST SET #1 367 365 DAY 5/8/21 RE035 AFI 91-203, 812.8

HIGH VOLTAGE INSULATED GLOVES TEST SET #2 396 365 DAY 5/3/21 RE035 AFI 91-203, 812.8

ANNUAL HISTORICAL RECORDS REVIEW 1320 365 DAY 2/6/21 RE035 00-20-1 PARA 10.7.4

ANNUAL FACILITY GROUNDS INSPECTION 1322 365 DAY 12/14/20 RE035

MIL-HDBK-419A PARA 2.3.1,

31-10-24 Appx B

TX HOIST 1323 365 DAY 12/9/20 RE035 31P3-2TPS75-6 Chpt 2 Sec 1

ANT & SHELTER LIFT HARDWARE INSPECTION BY NDI/ TX HOIST 68 365 DAY 12/30/00 RE035 31P3-2TPS75-6 Chpt 2 Sec 1

ANTENNA TIEDOWN STRAPS INSPECT AND REPLACE ALL 1324 720 DAY 1/28/21 RE035 31P3-2TPS75-6

INSPECT AND REPLACE ALL HYDRAULIC HOSES 1325 60 MONTH 06/06/23 RE035 31P3-2TPS75-6

5. Maintenance and Logistics Problems:

With the dissolution of the sole repair vendor for the proprietary DLS Receiver/Transmitter units, the current cache of four spare units are all that are available. Some DLSr units have been delivered, and are being used on a limited basis. The remaining DLSr delivery date is a moving target, with an anticipated delivery of August 2020.

a. Top Five Report:

b. Long Lead Report:

6. Gulf Range Tower Conditions:

a. Tower for Site RWN:

Hurricane Michael brought down tower containing this antenna.

Temporary tower installed and working well.

Contracts were awarded September 2019 for replacement of this tower.

Temporary tower moved in order for permanent replacement tower to be erected in the original location. Survey was completed, and temporary tower is running at new location.

b. Tower for Site RWW:

Hurricane Michael brought down tower containing this antenna.

Temporary tower installed and working well.

Contracts were awarded September 2019 month for replacement of this tower.

Temporary tower moved in order for permanent replacement tower to be erected in the original location. Survey was completed, and temporary tower is running at new location.

c. Tower for Site APPL:

Hurricane Michael brought down tower containing this antenna.

d. All other towers fully functional.

Top 5 Parts Ordered

NSN Part Number Nomenclature End Item Remarks

5935-00-013-9857 SMD604346-2 BACKSHELL RADAR Est Due 27 Nov 21

6840-01-309-3890 32901 INSECT REPELLENT RADAR Rec'd 28 Jul 20

5970-00-955-9976 MIL-I-46852 TAPE SHOPUSE Rec'd 20 Jul 20

6850-00-851-8725 10043943-90 DESICCANT RADAR Rec'd 28 Jul 20

6850-00-290-0042 MIL-D-3716 DESICCANT RADAR Rec'd 20 Jul 20

Top 5 Parts With Longest Lead Time

Date Ordered NSN Part Number Nomenclature QTY End Item Remarks

19-Jun-18 8010-00-490-7650 MIL-L-81352 LACQUER 1 RADAR Est Due11 Feb 21

15-Jan-19 7920-00-823-9773 AA1432 TOWEL UTILITY 4 SHOPUSE Est Due 19 Oct 20

16-Oct-19 6625-01-571-1592 N9912A-104/230 SIGNAL ANALYZER 1 EQUIPMENT Est Due 18 Feb 21

10-Dec-19 6625-01-344-9277 SMR27 SIGNAL GENERATOR 2 EQUIPMENT Est Due 31 Dec 20

16-Jul-20 5935-00-013-9857 SMD604346-2 BACKSHELL 10 RADAR Est Due 27 Nov 21

Unclassified Page 17 of 42 Distribution: A

7. Wendover Status:

a. Building 625 Control Site:

PAE continues to work infrastructure requirements per TSS requests for both a consolidated Wendover only operation and the requirements for a split configuration that would have control at Wendover and drone launches at Dugway. The 388th's contractor

JT3 will provide the WEG an estimate for their support to finish their infrastructure upgrade for the host communications system.

PAE provided locations and quantities for NIPR and SIPR drops within building 625 to aid JT3 with their estimates. Cable and jacks for phones and NIPR computers are installed between the communications room and each location within the building, so only the range infrastructure remains to be completed. The TSS is working procurement of the computers and phone instruments.

Based on the consolidated versus split operations plan, the tower needed at building 625 will be new or come from the current Wig Mountain site. The tower at 625 will support antennas for GRDCS, radios and GPS timing. The fastest and most versatile path is to purchase and install a new tower onto the newly built tower base already in place at

Wendover; a new tower would provide increased height (better coverage) at a cost of

~$20K. For either solution, additional RF cable, mounting clamps, etc. must be purchased for the move; a list of those parts was provided to the TSS, ~$6.6K.

GRDCS “New Tech” hardware and software were installed in the Wendover control site; however, the software must be updated to the newest revision in order to become operational.

On 29 April 2019, UTTR 388th personnel reported a water pipe had burst inside the wall of the mechanical room in control site building 625. The water affected several rooms including the console room and server/communications rooms. Per a report from a SPO representative from Hill, none of the WEG owned equipment was damaged and the only required repair for the operations areas is new floor coverings. The break room received more significant damage, primarily to cabinetry and carpet.

b. Launch Pad:

Compressors and power supplies must be purchased for the rails. The 82nd RAs were working this in 2018; there was a contracting hiccup, so funding short stopped the purchase.

Gantries and hoists must be purchased for the launch pad as well as a contract let to install them. PAE completed a design; the narrative for the SOW for the construction must be written before the task can go out for bids.

PAE is developing parts lists for the installation of the rails, power supplies, compressors, grounding, communications, connections for generator, etc.

Fiber equipment must be purchased and installed to provide connectivity from building

625 to the LAMS, and in turn from the LAMS to the launch pad. Much of the hardware from Dugway will be reused when maintenance activities and launch operations move from Dugway; however, several additional items will be needed due to the longer fiber cable runs.

Work continues with environmental approval contractor for the launch and maintenance areas.

Unclassified Page 18 of 42

c. LAMS Maintenance Shelter:

PAE is working a requirements document to install electrical, grounding, lightning protection, etc.

PAE is developing parts lists for the installation of a compressor, stands to mount items like fire extinguishers, eyewash, AED, etc.

PAE is working a requirements document for a secure storage area within the LAMS.

The LAMS itself was erected; however, it requires repair due to wind damage. The

WEG is working the repair effort.

d. Wendover GRDCS Sites:

The TSS is working lease efforts for the I-80 GRDCS site. This is the single most critical RF point needed to use the Wendover control whether launching from Dugway or Wendover. Site H97 is going through the environmental process. It would also be very helpful for Dugway operations with Wendover control, but it really becomes critical when launch operations move to Wendover. PAE is designing an inclusive site platform for H97.

8. GRDCS and RCS Operating Hours:

9. GRDCS and RCS Accounts Status:

10. GRDCS Accounts:

The GRDCS computers are accessed by user groups rather than by individual accounts. The users are trained for, and only granted access to, the level required to perform their assigned tasks. The three user groups and their level of access are depicted in the following chart.

Mission Support Maintenance Programming & Engineering

Administration

GRDCS 116.58 22.22 5.34 5.00

RCS 308.00 40.00 62.00 34.00

H o u rs

GRDCS (Operations) CDT (Maintenance) ROOT (Administration)

Hours 141.02 3.12 5.00

GRDCS User Accounts

Unclassified Page 19 of 42 Distribution: A

a. RCS Accounts:

The RCS computers are accessed by user groups rather than by individual accounts. The users are trained for and only granted access to the level required to perform their assigned tasks. The five user groups and their level of access are depicted in the following chart.

10. Engineering and Systems Programming Tasks:

a. Short Title: Testing and evaluation of the maximum GRDCS participant capability.

Summary: Due to the additional GRDCS hardware/software implementation of SIR 451

“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS

External Track Data” with development version 55, test flights are being supported to verify the maximum GRDCS participant capability.

Date Initiated: 24 April 2009

Completion Date (Estimated): TBD, depending on availability of mission(s).

Current Status: 85% complete.

Problems anticipated or encountered: None.

b. Short Title: Test TM connectivity with Bldg. 223 in order to evaluate the external

NDI-AIU C-Band Beacon data with Safety.

Summary: Due to the additional GRDCS hardware/software implementation of SIR 451

“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS

External Track Data” with development version 55, a connectivity test with

TM Bldg 223 is still pending to evaluate the data into GRDCS and RCS.

Date Initiated: 13 July 2009

Completion Date (Estimated): TBD, depending on TM shop and testing results.

Current Status: 0% complete.

Problems anticipated or encountered:

First test on 13 July 2009 was not successful. Bldg. 223 personnel could not start the program. More work on their side is required.

83rd 82nd ROOT USAF_Administr ator

Wetstone MSCT

Hours 28.00 30.00 22.00 44.00 352.00 352.00

RCS User Accounts

Unclassified Page 20 of 42 Distribution: A

c. Short Title: User software (increment-13, based on v60.4) installation for the QF-16 DR2

Hardware Changes (SIR 843).

Summary: In process of supporting ground and test flights for the QF-16 DR2 Hardware

Changes with Autopilot v1.7 software.

Date Initiated: 29 June 2018

Completion Date: July 2020

Current Status: Flight testing is complete at Hollowman. SIR 843 scheduled to be included in v62 software upgrade.

Problems anticipated or encountered: None at this time.

d. Short Title: Software installation of GRDCS Software V62.0 (29Mar19).

Summary: In process of supporting DT testing for v62.0 for the software upgrade.

Date Initiated: 29 March 2019

Completion Date (Estimated): TBD

Current Status: Demo Phase; Start date 28 Feb 2019 with video (SIR844) and .sml file

(SIR878). Continued on 29 May 19, with SIR 739, 822, 874, 849, 877, and 674.

Supported DT phase at Eglin 21-22 January 2020, 18-19 & 26 February 2020.

Problems anticipated or encountered: None at this time.

11. Special Projects:

a. In process of enhancing locally developed ‘safe flight script’ to handle QF-16 telemetry during the different phases of the safe flight profile (10% complete).

b. Supporting Wendover system evaluation as a first look of the new hardware (console and computer) and software to include local RF environment. (Ongoing effort at this time, no

ETA available yet).

12. ATIS Mission Support (Over-the-Horizon Airborne Relays using platform aircraft):

a. None during this reporting period.

Unclassified Page 21 of 42 Distribution: A

TAB 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA)

METRICS

1. MDSA Metrics:

a. Abort Rate: SDS Criteria FSAT/SSAT < 12%

FSAT = 5.2% (0 AAB + 5 GAB with 97 sorties flown and 0 chargeable GAB lines)

((0 / 97) + (5 / (97 + 0))) x100) (2 non-chargeable GAB lines on SAFE flights)

CADC

FLCS

FTIT gauge

Engine fault

Centerline fuel tank read zero

SSAT = 0.0% (0 AAB + 0 GAB with 11 sorties flown and 0 GAB lines)

((0 / 11) + (0 / (11 + 0))) x100) (1 non-chargeable AAB for engine failure)

b. Repeat/Recur Rate: SDS Criteria FSAT/SSAT < 7%

FSAT = 0.0% (0 Repeat + 0 Recur with 15 PRDs) ((0 / 15) x 100)

SSAT = 0.0% (0 Repeat & 0 Recur with 1 PRDs) ((0 / 1) x 100)

c. Cannibalization Rate: 5.6% (6 Canns with 108 Sorties Flown) ((6 / 108) x 100)

d. Data Integrity Error Rate: SDS Criteria - 98% of correctable errors corrected

100.0% (12 Errors with 4 Uncorrectable and 8 Corrected) (8 / (12 - 4)) (2,036 DDRs checked)

e. Break Rate = 5.6% (6 Code 3s with 108 Sorties Flown) ((6 / 108) x 100)

f. Primary Aerospace Vehicle Authorized (PAA) vs. Possessed (PP) Rate:

FSAT = 100.0% (36 assigned with 36 possessed, 50 baseline and 0 CLIN 4/6 inventory at EOM) ((36 / 36) x 100)

SSAT = 100.0% (44 PAA with 44 possessed and 0 CLIN4/6 inventory at EOM) ((44 /

44) x 100)

g. FSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%

100.0% (121 Sorties attempted with 97 successful and 24 non-chargeable non-successful) ((97 / (121 - 24)) x 100)

h. SSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%

100.0% (21 Sorties attempted with 11 successful and 10 non-chargeable non-successful) ((11 / (21 - 10)) x 100)

Unclassified Page 22 of 42

2. Maintenance and Flying Schedule Effectiveness (MSE and FSE)

a. MSE = 68.8% (522 points scheduled with 359 complied with) ((359 / 522) x 100)

b. FSE = 53.0% (108 sorties flown, with 32 sorties cancelled, 6 sortie added and 63 total

FSE deviations) (((134 - 63) / 134) x 100)) (Of the 63 chargeable deviations, 1 was attributed to maintenance.)

The main driver was 32 Cancels.

Add Lines = 6 (2 Project, 4 Ops)

Add Tails = 1 (1 Mx)

Cancels = 32 (15 Project, 11 Wx, 4 Ops, 2 ATC)

Early T/O = 8 (5 Ops, 1 Project, 2 Airspace)

Late T/O = 16 (1 Ops, 7 Project, 5 Wx, 3 Airspace)

GAB Lines = 0

3. Narratives:

Ground & Air Aborts

a. FSAT – During July, there were 5 ground aborts at Tyndall and no aborts at Holloman.

(1) There were hardly any abort trends this month. There were no aircraft with multiple aborts, there were no systems with multiples, and only one aircraft had recorded a previous abort similar to this month’s abort.

(a) That aircraft was AF029, which aborted for FTIT Gauge and had an FTIT abort in March 2018. This brings it up to 9 aborts as a QF-16, the 21st highest in the program.

(b) One of the other 4 aborting aircraft had 3 unrelated previous aborts, 2 had 1 previous abort and AF068 had none.

(2) The numerical breakouts for July were:

(a) The 5 aborts involved 5 QF-16Cs at Tyndall.

(b) All 5 aborts occurred on O&M flights, all manned.

(c) The weekly abort distribution was 2 on Mondays, 2 on a Tuesday and 1 on a

Thursday. Four aborts occurred on scheduled morning sorties and 1 on an afternoon sortie.

(d) Four sorties were lost to aborts. Two were on SAFE flights; on the other 2, a spare was available but not used because the lines were weather-cancelled.

Unclassified Page 23 of 42 Distribution: A

b. SSAT – Aircraft 17-0604 experienced an air abort for Engine Fail, ruled not chargeable to the contractor by AMIC.

Date Base AF # Reason Corrective Action

FSAT

2 Jul TAFB 56 CADC R2 CADC

14 Jul TAFB 48 FLCS R2 FLCC

14 Jul TAFB 29 FTIT gauge In work

20 Jul TAFB 68 Engine fault In work

27 Jul TAFB 50 Centerline fuel tank read 0 R2 tank

SSAT

16 July TAFB 604 Engine fail In work

TAB 5 – TECHNICAL REPORT STATUS

Negative this report period.

Unclassified Page 24 of 42 Distribution: A

TAB 6 – QUALITY CONTROL (QC) SUMMARY REPORT

1. Full-Scale - Tyndall:

a. Seventeen Quality Verification Inspections, nineteen SI, eight Personnel Evaluations, and 1

Audit were accomplished. Forty-five inspections passed. There were zero failures this period.

One minor consisting of Training Record Documentation.

b. Problem Area: None

c. PQDR/AIDRs: Seven this report period.

DR control # Date CAT Serial # Acft Noun

FA4881-20-0039 7/15/2020 PQDR QF026 Liquid Oxygen Converter

FA4881-20-0041 7/22/2020 PQDR 0108/QF056 Universal Replacement Autopilot (URAP)

d. AFTO Form 22’s: None this report period.

e. TODO: Fifty-three technical order changes and revisions were received this period.

f. Impoundments: None this report period.

g. FOD/DOP/Lost item: One this report period

2. Full-Scale - Holloman:

a. Five Quality Verification Inspections, nine Special Inspections, three audits, and five

Personnel Evaluation were accomplished. Twenty-two inspection/audits passed.

b. Problem Areas: None this report.

c. PQDRs: One this report period.

1) FA4810-19-0001 Canopy Sill Nut Channel (NULLO) PQDR

Parent FA4810-19-0005 Canopy Sill Nut Channel (NULLO) PQDR Child (Subordinate to FA4810-19-0001)

d. AFTO Form 22’s: None this report period.

e. TODO: Reviewed 66 Technical Order changes/revisions.

f. Impoundments: One this report period.

g. FOD/DOP/Lost item: None this report period.

Unclassified Page 25 of 42

3. Subscale:

a. Sixteen Quality Verification Inspections, four special inspections, and four personal evaluations. Twenty-four inspections passed. Zero fails this report period. There were two minors consisting of Forms Doc and CTK management

b. Problem Areas: None this report period.

c. PQDRs: None this report period.

d. AFTO Form 22s: None this report period.

e. TODO: Seven technical order change and revision received this period.

g. DOP/Lost Item: None this report period.

4. GRDCS - Tyndall:

a. Four personal evaluation and one special inspections were accomplished this period. Five inspections passed. Zero discrepancies this period.

b. AFTO Form 22s: None this report period.

c. PQDRs: None this report period.

d. TODO: Two technical orders change and revision this period.

e. Problem Areas: None this report period.

5. ESH - Tyndall:

a. Seven inspections this period. Seven passed. Zero discrepancies this period.

6. ESH - Holloman:

a. One was accomplished this month. Zero Failed.

Unclassified Page 26 of 42 Distribution: A

7. Publications and Forms: No contractual impacts this period. See CDRL A009, Master

Document List.

0.7

0.8

0.9

TYN HMN SSAT RIS ESH

QA Inspection Pass Rate May - July 2020

May

June

July

Unclassified Page 27 of 42 Distribution: A

TAB 7 – RIS MAINTENANCE ANALYSIS REQUESTS

1. ELECTRO-MAGNETIC INTERFERENCE (EMI):

No EMI reported this period.

2. RIS MAINTENANCE ACTIONS:

1.

RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:

183020001 CARRY OVER:

All poles holding Antenna systems at B1801 down due to Hurricane Michael.

N/A No mission impact noted.

MAINT. AREA:

RIS

START DATE:

20181029

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

DISCR. HOURS: EQUIPMENT MAKE: EQUIPMENT MODEL: EQUIPMENT S/N:

N/A N/A N/A N/A

Unclassified Page 28 of 42

RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:

183020002 CARRY OVER:

Runway West tower down due to Hurricane Michael.

Temporarily installed mobile DLS trailer at site.

No mission impact noted.

MAINT. AREA:

RIS

START DATE:

20181029

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

183020003 CARRY OVER:

Runway North tower down due to Hurricane

Michael.

Temporarily installed mobile DLS trailer at site.

No mission impact noted.

MAINT. AREA:

RIS

START DATE:

20181029

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

Unclassified Page 29 of 42 Distribution: A

RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:

183020007 CARRY OVER:

ACDS Missile and Drone, Primary and Backup antenna systems down due to Hurricane Michael.

(See RIS# 183020001)

Temporarily installed ACDS

Missile Primary and Backup antennas on Tower 1802.

Temporarily installed Drone

Primary and backup antennas on Tower B1830.

No mission impact noted.

MAINT. AREA:

RIS

START DATE:

20181029

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

183020011 CARRY OVER:

Runway west video is down due to Hurricane

Michael. (See RIS#

183020002)

N/A No mission impact noted.

MAINT. AREA:

RIS

START DATE:

20181029

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

Unclassified Page 30 of 42

190980001 CARRY OVER:

RCS MULTI (RBZ94)

took a lightning strike.

Job opened with COMM

Focal Point (283-4896).

Put GRDCS Multi in RCS

Multi’s slot.

None

MAINT. AREA:

COMM

START DATE:

20190408

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

DISCR. HOURS: BRAND: EQUIPMENT MODEL: EQUIPMENT S/N:

192120101 CARRY OVER:

GSM Transceiver

Communication Error during attempted Self-

Calibration.

IAW w/ T.O., checked all connections. Rebooted system, symptom persisted.

Reported to SPO, awaiting direction. SPO picked up unit for delivery to MSI for repair. Received repaired unit from MSI 29 July

2020. Unit pending calibration and full operational check.

None

MAINT. AREA:

DLS

START DATE:

20190731

STOP DATE:

N/A

REPAIRED BY:

D. Holmes

MAN HOURS:

N/A

COST:

N/A

N/A MSI 915 DTS 003

Unclassified Page 31 of 42

200220001 No receive on

WETSTONE GATR-A

radio (288.5).

Opened a remedy ticket.

The radio has been flagged obsolete. There are no parts available.

No mission impact noted.

MAINT. AREA:

COMM

START DATE:

20200122

STOP DATE:

20200731

REPAIRED BY:

J.TINSLEY

MAN HOURS:

0.5

COST:

N/A

4583.5 N/A N/A N/A

200220101 CARRY OVER:

60% data quality reported on DLSr at

SUBW

Performed DLSr FAT, Oscillator Calibration, and

Pulses Present tests, all tests passed except for

“PA Enable.” RMA requested from MSI.

None

MAINT. AREA:

DLS

START DATE:

20200122

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

N/A MSI DLSr 051

Unclassified Page 32 of 42

200240101 CARRY OVER:

No output reported from DLSr at RWER

No pulses present, oscillator will not calibrate, no output.

RMA requested from

MSI.

None

MAINT. AREA:

DLS

START DATE:

20200124

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

N/A MSI DLSr 030

201150001 CARRY OVER:

TriCaster will not boot.

Awaiting RMA from

NewTek.

No mission impact noted.

MAINT. AREA:

VIDEO

START DATE:

20200424

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

Unclassified Page 33 of 42

201190001 CARRY OVER:

1801 Building UPS has

Temperature alarm and cycles on and off.

Awaiting for GE tech rep to arrive for system troubleshooting.

Tech replaced parts. No fix.

No mission impact noted.

MAINT. AREA:

1801 UPS

START DATE:

20200428

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

201560101 DLS failed in flight, E-9

Tail 048.

Removed and replaced power supply resulting in good bench checks, unit failed in ground testing.

Troubleshot to faulty RT

Unit, no spares available.

Unit decommissioned. Job

Closed.

None

MAINT. AREA:

DLS

START DATE:

20200124

STOP DATE:

20200717

REPAIRED BY:

D. Holmes

MAN HOURS:

8.0

COST:

N/A

552 IBM DLS 098

Unclassified Page 34 of 42

201760001 TDF 19 interface board not recognized by computer.

Removed and replaced

RAID controller.

Operational checks good.

No mission impact noted.

MAINT. AREA:

ACS

START DATE:

20200623

STOP DATE:

20200701

REPAIRED BY:

D.CONTRERAS

MAN HOURS:

1.5

COST:

N/A

187.5 N/A N/A N/A

201880001 D3 UHF-2 has extremely weak receive audio.

The radio has been flagged obsolete. There are no parts available.

No mission impact noted.

MAINT. AREA:

COMM

START DATE:

20200706

STOP DATE:

20200731

REPAIRED BY:

N/A

MAN HOURS:

0.5

COST:

N/A

594.5 N/A N/A N/A

Unclassified Page 35 of 42 Distribution: A

RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:

201880002 Roadguard radio interface box will not power on.

Removed and replaced radio interface box with parts on hand.

Operational checks good.

No mission impact noted.

MAINT. AREA:

COMM

START DATE:

20200706

STOP DATE:

20200706

REPAIRED BY:

J.TIN/E.ROS

MAN HOURS:

1.0

COST:

N/A

0.5 N/A N/A N/A

201990001 BC3 TDF 10 lost second monitor output.

Removed and replaced video card with parts on hand.

Operational checks good.

No mission impact noted.

MAINT. AREA:

ACS

START DATE:

20200717

STOP DATE:

20200717

REPAIRED BY:

K.GIAWASHI

MAN HOURS:

2.0

COST:

N/A

2.0 N/A N/A N/A

Unclassified Page 36 of 42

202020001 ACDS Missile Left has fault in Exciter or HPA.

Removed and replaced converter at wind site.

Operational checks good.

No mission impact noted.

MAINT. AREA:

AATTCS

START DATE:

20200720

STOP DATE:

20200720

REPAIRED BY:

A.BIG/B.WIE

MAN HOURS:

4.0

COST:

$180.00

4.0 B&B 26750 N/A

202020002 DLSr at Runway West site failed to respond.

Removed and replaced

DLSr with part on hand.

Operational checks good.

No mission impact noted.

MAINT. AREA:

DLS

START DATE:

20200720

STOP DATE:

20200720

REPAIRED BY:

D.HOL/B.WIE

MAN HOURS:

3.0

COST:

N/A

3.5 N/A N/A N/A

Unclassified Page 37 of 42 Distribution: A

RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:

202040001 Received repaired

ACDS HPA from depot.

Reinstalled repaired unit.

Operational checks good.

No mission impact noted.

MAINT. AREA:

UHF DESTRUCT

START DATE:

20200722

STOP DATE:

20200722

REPAIRED BY:

A.BIG/K.GIA

MAN HOURS:

2.0

COST:

N/A

1.0 N/A N/A N/A

202040101 OPEN: No data throughput for DLSR

Test on bench with 915

DTS IAW T.O. All tests failed. RMA requested and received from MSI.

None

MAINT. AREA:

DLS

START DATE:

20200722

STOP DATE:

REPAIRED BY:

MAN HOURS:

COST:

MSI DLSR 019

Unclassified Page 38 of 42

202120001 There are multiple switch covers broken on

AATTCS consoles 1 and

3.

Removed and replaced switch covers.

Operational checks good.

No mission impact noted.

MAINT. AREA:

AATTCS

START DATE:

20200730

STOP DATE:

20200730

REPAIRED BY:

B.WIEBKE

MAN HOURS:

2.0

COST:

N/A

2.0 N/A N/A N/A

Unclassified Page 39 of 42

TAB 8 – FACILITIES OPEN WORK REQUESTS

TOP FIVE WORK REQUESTS

TOP 5

JOB NO.

BLDG WORK DESCRIPTION STATUS DATE

SUBMITTED

38912

1801 Repair raised floor in room 114. Note:

Submitted by the 81st Range Control Squadron.

CES/CEO

REVIEW

25 Jan 18

39890 239 Repair 239 above-ground storage tank CES/CENPD

REVIEW

13 Nov 19

8513 LP Gate Repair CES

REVIEW

31 Jul 19

38125

45 Pave access road/checkpoint. CES/CENPD

REVIEW

1 Apr 15

59188

Extend existing permanent static ground system inside buildings.

CES/CENM

7 Aug 13

Full Scale Facilities – Building Manager – S. Davis

JOB

NO.

BLDG WORK DESCRIPTION STATUS DATE SUBMITTED

38125 45 Pave access road/checkpoint.

CES/CENPD

REVIEW

1 Apr 15

59222 45 Roadway Improvement

CES/CENP

REVIEW

21 Nov 13

E2953 9310

Plumb emergency eyewash drain to the building exterior. Install shower pans under emergency showers in

Bays 1 and 3 and plumb to drain outside.

CES/FM

PLUMBER

AWT

SCHEDULE

11 Aug 17

38672 9310 Install 26 electrical outlets.

CES/CENP

REVIEW

24 Jan 17

G-0425 9310 Install ice maker

CES/CENPD

IN WORK

26 Jul 19

6275 98 Install two 220 outlets on west wall of main maintenance room.

CES/ALOP

SUBMITTED

21 Jul 20

G6173 9306 Hook air compressor to 220 power. CES/ALOP

SUBMITTED

15 Jul 20

G6084 9306 Secure shop equipment to floor.

CES/ALOP

SUBMITTED

9 Jul 20

Unclassified Page 40 of 42

Range Instrumentation Systems Facilities – Building Manager - R. Williams

JOB NO. BLDG WORK DESCRIPTION STATUS DATE

SUBMITTED

38912 1801 Repair raised floor in room 114. Note:

Submitted by the 81st Range Control Squadron.

CES/CEO

REVIEW

25 Jan 18

39126 9401 Paint facility. Paint samples collected by CE for Lead

Based Paint testing.

CES/ALOP

SUBMITTED

16 Aug 18

39211 9350 Replace galvanized communication tower due to

Hurricane Michael damage

CES/ALOP

SUBMITTED

13 Dec 18

39210 9349 Replace galvanized communication tower due to

Hurricane Michael damage

CES/ALOP

SUNMITTED

13 Dec 18

39209 1810 Replace galvanized communication tower due to

Hurricane Michael damage

CES/ALOP

SUBMITTED

13 Dec 18

39297 9317 R&R 20’ Tower Ladder. Reinstall LPS

(Ladder Portion Complete)

CES/ALOP

SUBMITTED

(In Progress)

10 Jan 19

39389 9401 R&R Perimeter Security Fence CES/ALOP

SUBMITTED

31 Jan 19

40127 9352 Replace 148’ communications tower. CES/ALOP

SUBMITTED

7 Jul 20

Unclassified Page 41 of 42

Sub Scale Launch Pad – Building Manager - B. Prince

JOB

NO.

BLDG WORK DESCRIPTION STATUS DATE

SUBMITTED

34672 8500 Area Paint buildings and floors. CES/CEPD

REVIEW

24 Jan 06

37441 8519 Install pavement southwest of building.

Project No. XLWU142051D

CES/CENPD

CONTRACT

15 Jun 12

59188 8519

Extend existing permanent static ground system inside buildings.

CES/CENM

REVIEW

7 Aug 13

C7092 8519 Install emergency eyewash/shower stations in the north and south bays.

CES/PLUMER

IN PROGRESS

24 Nov 15

F2434 8525

Rail #4

Repair rail #4 hoist electrical power conduit. CES/ALOP

SUBMITTED

30 Aug 18

8513 LP Gate Repair CES/CEPD

Review

30 Jul 19

G0555 8519 Overhead Light fixture repair CES

Submitted

30 Jul 19

Sub Scale Maintenance Facilities – Building Manager - D. Jacobs

JOB NO. BLDG WORK DESCRIPTION STATUS DATE

SUBMITTED

39890 239 Repair 239 above ground storage tank CES/CENPD

13 Nov 19

TAB 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS

The lack of aircraft deliveries from Boeing is impacting our overall aircraft fleet numbers as well as our ability to manage aircraft hours. Once Boeing has worked through production issues, we expect the number of aircraft deliveries will increase past the 2 deliveries/month as called out in the PWS.

This will impact PAE’s ability to meet Safe Flight time requirements and create a backlog of aircraft awaiting Safe Flights.

Unclassified Page 42 of 42

All the cleanup of failed data documentation and maintenance processes in aircraft generation from

AMARG and/or Boeing continues to fall on PAE for correction prior to SAFE flight.

Failure to receive delivery aircraft is impacting available manned flyers (Tyndall & Holloman).

Correspondingly, NULLO fleet health/quantity is becoming an issue. Expect continued movement of aircraft to and from Holloman and early De-Man of flyers to keep Tyndall’s NULLO fleet minimally populated.

Severe damage to most of our facilities is causing many workarounds and much turmoil. PAE is managing the situation the best we can. Construction of temporary facilities is almost complete and for the most part the facilities are adequate with a few workarounds.

A major concern is safely moving into temporary facilities while still complying with all AF regulations governing the safe handling and storage of explosive items. Also, we are being told all 5 of the temporary facilities (chute shop & SSAT Mx tents) will have to move. There is a major concern of meeting mission support while moving all 5 tents.