This monthly summary report outlines operations and maintenance activities for aerial targets and range instrumentation systems at Tyndall Air Force Base, Florida and Holloman Air Force Base, New Mexico under Contract No. FA4890-15-C-0018. Key details include sorties flown with QF-16 and BQM-167 aircraft, maintenance issues, quality control findings, engineering tasks, range conditions following Hurricane Michael, and open work requests for facility repairs. Recovery from the hurricane and preparation for an upcoming sub-scale weapons separation evaluation are the contractor's priorities. The lack of new aircraft from the manufacturer is negatively impacting fleet numbers and the ability to manage flight hours.
View the file
Other files for this federal contract opportunity
Show all 50
Aerial Targets III FY23 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AERIAL TARGETS MONTHLY SUMMARY MARCH 2019
Unclassified Page 1 of 38
Distribution: A
Aerial Targets Monthly Contract Summary Report – CDRL A001
Contract Number FA4890-15-C-0018
1 – 31 March 2019
Prepared for:
Acquisition Management and Integration Center
Langley AFB, Virginia
Prepared by:
PAE Aviation and Technical Services, LLC
1311 Florida Avenue
Tyndall AFB, Florida
David Olson
Program Manager
Aerial Targets Program
UNCLASSIFIED
Distribution Limitation: A
Unclassified Page 2 of 38
Distribution: A
TABLE OF CONTENTS
Tab 1A– FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL
Tab 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM
Tab 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL
Tab 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M
Tab 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA) METRICS
Tab 5 – TECHNICAL REPORT STATUS
Tab 6 – QUALITY CONTROL (QC) SUMMARY REPORT
Tab 7 – RIS MAINTENANCE ANALYSIS REQUESTS
Tab 8 – FACILITIES OPEN WORK REQUESTS
Tab 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS
Unclassified Page 3 of 38
TAB 1A – FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL
1. SORTIES SCHEDULED:
Note: Off-station sorties reported in this summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
2. MISSIONS FLOWN:
QF-16 NULLO:
Mission Symbol Mission Project Supported # Missions FYTD
All O5ZZ 2
Sub Total 2
QF-16 MANNED:
Mission Symbol Mission Project Supported # Missions
O5ZZ Chase AIM-9X 1
O5ZZ Chase F-16 M7.2 OFP 1
O5ZZ JATM F-15 Suite 9 OFP 2
O5ZZ F-35 JOTT F-35 6
O5ZZ Tasker O&M 1
All O5ZZ 11 33
O6ZZ ACM O&M 6
O6ZZ BFM O&M 6
O6ZZ CT O&M 17
O6ZZ FCS O&M 5
O6ZZ IP O&M 1
O6ZZ SEFE O&M 1
O6ZZ XC O&M 17
All O6ZZ 53 197
O8ZZ SAFE O&M 3
All O8ZZ 3 4
Sub Total 67 234
Grand Total 67 236
QF-16 MAR 19 FYTD
Scheduled 74 304
Canceled 7 68
Successful Flown 67 236
Ground Aborts 2 16
Air Aborts 0 0
Total Flown 67 236
Unclassified Page 4 of 38
3. TOTAL HOURS FLOWN:
Mission Symbol Hours FYTD
O5ZZ 0.0 1.8
Sub Total 0.0 1.8
Hours FYTD
O5ZZ 21.0 57.8
O6ZZ 84.3 278.4
O8ZZ 3.4 4.8
Sub Total 108.7 341.0
Grand Total 108.7 342.8
4. MISSIONS CANCELED:
Date
MDS
AF#
Msn
Sym
Mission
Reason
11 Mar QF-16A 38 O8ZZ SAFE Weather
11 Mar QF-16A 39 O6ZZ DC-1 Weather
11 Mar QF-16C 41 O6ZZ IP Weather
11 Mar QF-16C 38 O6ZZ SAFE Weather
11 Mar QF-16A 39 O6ZZ DC-1 Weather
11 Mar QF-16A 41 O6ZZ IP Weather
21 Mar QF-16A 41 O6ZZ CT Ops
5. ABORTS – GROUND AND AIR:
Date Type
Abort
MDS AF
Msn
Sym
Mission Reason
12 Mar GAB QF-16A 42 O6ZZ CT Altimeter/Electrical
25 Mar GAB QF-16A 41 O6ZZ CT Fuel light
6. MAINTENANCE AND LOGISTICS PROBLEMS:
a. Maintenance:
(1) QF-16:
(a) AF040 SAFE flight due
(b) AF046 Acceptance In Work
(c) AF010 and AF036 Deman in work
Unclassified Page 5 of 38
(d) AF006 and AF018 pre de-mil in work (Hurricane Michael damage)
(2) AGE/Support Vehicles:
(a) QF-16 AGE and Support/Test Equipment
1. Procurement of AGE equipment, support/test equipment is continuing.
(b) Stock listed and commercially procured AGE maintenance equipment and tools purchasing in work.
(c) Post Hurricane Michael vehicle, equipment and GFE accountability/damage assessment continuing.
b. Logistics:
(1) Turn-in of QF-4 related AGE, support/test equipment, bench stock, operating stock and all QF-4 specific assets in work.
(2) Long lead time (MICAP) on F-16A components is negatively impacting the ability to generate aircraft.
(3) Post Hurricane Michael supply needs are being met via Tyndall AFB and Eglin AFB.
Delays in processing/receiving parts are continual.
7. WASHES:
a. Washes Accomplished in March 2019:
WEEK ENDING AF#
30 Day: 8 March 037, 034, 039
15 March 015, 031, 035, 040
22 March 038, 042, 036, 007
29 March 032, 016, 041, 010
b. Washes Not Accomplished & Reasons:
AF022 – Fuel Barn – Hurricane damage
AF033 – Fuel Barn – Hurricane damage
c. Wash Schedule for April 2019:
WEEK ENDING AF#
30 Day: 5 April 034, 039, 035
12 April 037, 040, 042, 041
19 April 007, 015, 016, 033
26 April 036, 032, 038, 010
30 April 022
Unclassified Page 6 of 38
8. REPEAT/RECURRING DISCREPANCIES:
Date MDS AF
R/R Discrepancy Corrective Action
None
9. RECOMMENDATIONS: Negative this report period.
10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.
TAB 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM
Note: Off-station sorties reported in this monthly summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
All O5ZZ
Sub Total
All O3ZZ 1
All O4ZZ 0
O5ZZ Testing 14
All O5ZZ 14 61
QF-16 FEB 19 FYTD
Scheduled 33 173
Canceled 5 13
Successful Flown 28 158
Ground Aborts 2 19
Air Aborts 0 1
Total Flown 28 159
Unclassified Page 7 of 38
Distribution: A
O6ZZ C/T Training 7
O6ZZ WITS Training 2
O6ZZ Roving Sands Training 2
O6ZZ X/C Edwards 3
All O6ZZ 14 96
Sub Total 14 143
Grand Total 28 159
O5ZZ
1.5
NULLO sub Total
Hours FYTD
O3ZZ 1.5
O4ZZ 0
O5ZZ 39.2 106.1
O6ZZ 20.4 138.9
Sub Total 59.6 246.5
Grand Total 59.6 248.0
Date MDS AF# Msn
Sym
Mission Reason
4 Mar QF-16C 024 06ZZ WITS Ops
8 Mar QF-16C 029 06ZZ Roving Sands Weather
12 Mar QF-16C 014 06ZZ CT Weather
12 Mar QF-16C 024 06ZZ CT Ops
22 Mar QF-16C 021 06ZZ XC MND
Abort
MDS AF# Msn
Sym
Mission Reason
18 Mar GAB QF-16C 029 06ZZ WITS SEC light Inop
24 Mar GAB QF-16C 024 O6ZZ EDW/testing FFP light would not come on
a. Maintenance: Negative this report period.
Unclassified Page 8 of 38
b. Logistics: New Items: Negative this report period.
7. WASHES:
(1) Washes Accomplished: Negative this report period
(2) Washes Not Accomplished & Reasons: 012 – Nullo conversion in-work
Date MDS AF
R/R Discrepancy Corrective Action
9. RECOMMENDATIONS: Negative this report period.
10. SPECIAL PROJECTS/SPECIAL INTEREST: JOTT F-35 Support Testing – 18 sorties flown
TAB 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL
Note: Off-station sorties reported in this summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
BQM-167A FEB 19 FYTD
Scheduled 20 73
Canceled 7 36
Successful Flown 13 37
Ground Aborts 0 0
Air Aborts 0 0
Total Flown 13 37
Unclassified Page 9 of 38
BQM-167A
Mission Symbol Mission Project Supported #
Missions
FYTD
O5ZZ AEGIS AEGIS 0 1
O5ZZ F16 M7 20 OFP F16 M7 20 OFP 1 1
O5ZZ F15 SUITE 9 F15 SUITE 9 2 2
O5ZZ AIM 9X AIM 9X 2 3
O5ZZ AMR PHS4 AMR PHS4 0 1
O5ZZ WSEP WSEP 8 29
Total 13 37
BQM-167A
O5ZZ 11.4 29.4
Total 11.4 29.4
Date
MDS
Tail #
Msn Sym
Mission
Reason
8 Mar BQM-167 O5ZZ WSEP Project
12 Mar BQM-167 O5ZZ WSEP Project
12 Mar BQM-167 O5ZZ WSEP Project
13 Mar BQM-167 O5ZZ WSEP Weather
13 Mar BQM-167 O5ZZ WSEP Project
14 Mar BQM-167 O5ZZ WSEP Project
15 Mar BQM-167 O5ZZ WSEP Project
Abort
MDS Tail# Msn
Sym
Mission Reason
N/A
a. The new CAD reefing line cutters continue to operate but are being damaged, and in some instances are damaging the chute bag and chute. The SPO is monitoring the situation.
Presently, all the CAD RLCs have been consumed, 120 due in mid-April. The remainder of the Roberts RLCs are being consumed with only a single RLC being installed in the Main chute.
Unclassified Page 10 of 38
Distribution: A
b. Air Data Simulator (TT-415) failures are nearing mission impact. Only 3 of 8 are operational, with 2 replacements on order and the remainder awaiting repair. Units are failing or being NRTS’d out at PMEL.
NOTE: FSAT is experiencing the same issue with an older version of this tester (TT-205) and are down to a single operational unit. Units are being NRTS’d out at PMEL.
c. Hurricane damage to building 256’s roof continues to impact Mx activity due to the amount of water intrusion into the hangar and the time it takes to clean it up after the rain. A temp
Mx facility is in work and to be erected by mid-June.
d. Post Hurricane Michael vehicle & equipment damage repairs in work with local vendors;
process is very slow.
e. Post Hurricane Michael supply and part needs are being met via both Tyndall and Eglin
AFB supply systems. However, we are encountering delays in processing/receiving, as expected. Additionally, Base Supply is limiting the quantity of items that are to be re-filled.
Many items will be moved back to KRATOS for management and delivery to the field.
7. CORROSION CONTROL INSPECTION:
a. Launch Pad Corrosion Control Maintenance: Routine corrosion control is being accomplished on all applicable support equipment.
b. 82 ATRS and 53 WEG have engaged C.E. via a 332 submittal for the replacement of building 8531 with temporary shelter.
Date MDS Tail# R/R Discrepancy Corrective Action
9. RECOMMENDATIONS: None
10. SPECIAL PROJECTS: None
Unclassified Page 11 of 38
Distribution: A
TAB 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M
1. Tellabs Switch and Data/Comm. Operational Availability:
Tellabs Switch: 100% Available
Data/Comm. Circuits: 100% Available
2. Mission Availability:
GRDCS: 100% Available
RCS: 100% Available
Access Net: 100% Available
Mission Video: 100% Available
TPS-75 Radar: Scheduled Available Non-Charge Not Available
Missions 26 22 4 0
Hours 55.75 47.75 8.00 0
Overall Availability: 100% Available ((Available + Non-Charge)/Scheduled)
0%
20%
40%
60%
80%
100%
Tellabs Switch Data/Comm
March 100% 100%
12 month avg 100% 100%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90%
100%
GRDCS RCS AccessNet TPS-75 Mission Video
March 100% 100% 100% 100.0% 100.0%
12 month avg 100% 100% 100% 99.1% 100%
Unclassified Page 12 of 38
3. Summary of Mission Maintenance Actions:
a. 19 March 2019:
Performed full bench check and oscillator calibration on DLS-r S/N 030 in preparation for installation at site Runway East (installed 22 March 2019).
Configured, addressed, and tested DLS S/N 092 as an aircraft installation in preparation for use in MUII.
b. 29 March 2019:
Performed self-calibration on 915 DTS S/N 002 and 003.
Performed calibration on GRDCS Test Set S/N 002.
4. RIS Scheduled Maintenance Summary:
a. GRDCS:
1) Due within 45 Days:
Monthly Console Checks, by 30 Apr 2019
2) Due within 90 Days:
Data Link Subsystem Annual Checks:
SITE, Type DATE DUE S/N Test Type
SSLP, DLS-r 5 APR 2019 018 Clock Cal
RWS, DLS-r 5 APR 2019 019 Clock Cal
Unclassified Page 13 of 38
a. TPS-75 Radar: Accomplished this month and due within 45 Days.
JOB Completed or due from2-1-19 until 4-1-19 JST REOCCUR Next Due EQUIP #
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/3
/1
/0
/1
/0
/1 9 0 = Job Forecast
/ = Partially C/W
1 = C/W
ANTENNA TIEDOWN STRAPS AND JACKPAD INSPECTION 24 DAILY RE035 1 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1
DAILY PERFORMANCE INSPECTION 24 DAILY RE035 1 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P3-2TPS75-6WC-1
UPX 37 DAILY SYSTEM CHECKS - SER # A0109 266 DAILY REA09 2UPX37-1 TBL 4-1
UPX 37 DAILY SYSTEM CHECKS - SER # C0126 266 DAILY REA26 1 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2UPX37-1 TBL 4-1
3N1 DAILY PERFORMANCE CHECK 301 DAILY C60A3 1 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-177-1 TABLE 2-1
2N1 DAILY PERFORMANCE CHECK 326 DAILY C84B2 1 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1
DISPLAY CONSOLE TURN ON/OFF 1301 DAILY RE035 1 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UYQ27-26WC-1
UPA 59 DAILY PREVENTATIVE MAINTENANCE 1308 DAILY RE035 1 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UPA59-1-1 & 2
WEATHER/ECM PERFORMANCE ROUTINE 2 7 DAY 4/2/19 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
RADAR/SIF SYSTEM TEST PERFORMANCE 50 7 DAY 4/2/19 RE035 1 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
I-F RECEIVER PERFORMANCE ROUTINE 51 7 DAY 4/2/19 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
HEIGHT PERFORMANCE ROUTINE 73 7 DAY 4/2/19 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
CLUTTER MAPPING PERFORMANCE ROUTINE 74 7 DAY 4/2/19 RE035 1 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
COMMUNICATIONS PERFORMANCE ROUTINE 273 7 DAY 4/1/19 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
POWER SUPPLY TEST PERFORMANCE ROUTINE 273 7 DAY 4/1/19 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
DISPLAY CONSOLE WEEKLY INSPECTION 1303 7 DAY 4/3/19 RE035 1 1 1 1 1 0 0 0 0 0 31P1-2UYQ27-26WC-1
ANTENNA/RECEIVER INTERFACE TEST PERFORMANCE ROUTINE 550 14 DAY 3/29/19 RE035 1 0 0 0 31P3-2TPS75-6WC-1
SYSTEM ORIENTATION PERFORMANCE CHECK 993 14 DAY 4/1/19 RE035 1 1 0 0 0 31P3-2TPS75-6WC-1
AFRADES HEIGHT EVALUATION 999 14 DAY 4/10/19 RE035 1 1 0 0 31P3-2TPS75-6WC-1
AFRADES BEACON PERFORMANCE 1038 14 DAY 4/10/19 RE035 1 1 0 0 31P3-2TPS75-6WC-1
AFRADES CLUTTER ANALYSIS 1041 14 DAY 4/10/19 RE035 1 1 0 0 31P3-2TPS75-6WC-1
AUTO SEQUENCER TEST 1207 14 DAY 4/9/19 RE035 1 1 31P3-2TPS75-6WC-1
HEAT EXCHANGER SERVICING 1270 14 DAY 4/1/19 RE035 1 1 0 0 0 35E4-177-1 TABLE 2-1
SHELTER CLEANING AND INSPECTION SERVICING 1271 14 DAY 4/12/19 RE035 1 1 1 0 0 35E4-177-1 TABLE 2-1
COMPRESSOR DEHYDRATOR ON/OFF RATIOS 304 28 DAY 4/22/19 RE035 1 0 31P3-2TPS75-6WC-1
FREQ GENERATOR COHO REF OUTPUT CHECK 1241 28 DAY 4/25/19 RE035 1 0 31P3-2TPS75-6WC-1
FREQ GENERATOR IF TEST TARGET AMPLITUDE CHECK 1245 28 DAY 4/25/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA PEDESTAL AND LEVELING JACK INSPECTION 1250 28 DAY 4/4/19 RE035 1 0 0 31P3-2TPS75-6WC-1
RF AND SLIP RING TEST 1253 28 DAY 4/12/19 RE035 1 0 31P3-2TPS75-6WC-1
MDS/FAR TEST 1254 28 DAY 4/12/19 RE035 1 0 31P3-2TPS75-6WC-1
AFRADES TILT SENSOR PERFORMANCE 1255 28 DAY 4/12/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA ASSEMBLY CLEANING AND INSPECTION SERVICING 1272 28 DAY 4/12/19 RE035 1 0 31P3-2TPS75-6WC-1
SHELTER CORROSION CONTROL INSPECTION AND SERVICING 1273 28 DAY 4/11/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA CORROSION CONTROL INSPECTION AND SERVICING 1274 28 DAY 4/5/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA POWER SUPPLY ENCLOSURE AIR FILTER CLEANING 1274 28 DAY 4/5/19 RE035 1 0 31P3-2TPS75-6WC-1
COMPRESSOR- DEHYDRATOR ASSEMBLY RELIEF VALVE SERVICING 1276 28 DAY 4/22/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA BULL GEAR LUBRICATION 1279 28 DAY 4/12/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA DRIVE MOTOR GEARBOX OIL LEVEL CHECK 1280 28 DAY 4/4/19 RE035 1 0 31P3-2TPS75-6WC-1
TUSK ASSEMBLY, JACKSCREW, AND ANTENNA YOKE LUBRICATION 1281 28 DAY 4/12/19 RE035 1 0 31P3-2TPS75-6WC-1
DISPLAY CONSOLE INSPECTION AND CLEANING 1304 28 DAY 4/10/19 RE035 1 0 31P3-2TPS75-6WC-1
3N1 MONTHLY PERFORMANCE CHECK 323 MONTHLY 4/9/19 C60A3 1 0 35E4-177-1 TABLE 2-1
2N1 MONTHLY PERFORMANCE CHECK 329 MONTHLY 4/9/19 C84B2 1 0 35E4-178-1 TABLE 2-1
UPX 37 QUARTERLY INSPECTION - SER # A0109 283 84 DAY 2/6/19 REA09 2UPX37-1 TBL 4-1
UPX 37 QUARTERLY INSPECTION - SER # C0126 283 84 DAY 4/5/19 REA26 0 2UPX37-1 TBL 4-1
Unclassified Page 14 of 38
TRANSMITTER OIL BREAKDOWN TEST & FILAMENT INTERRUPT CHECK PROCEDURE 1256 84 DAY 4/11/19 RE035 0 31P3-2TPS75-6WC-1
STORAGE TWYSTRON PUMP DOWN 1257 84 DAY 4/22/19 RE035 0 31P3-2TPS75-6WC-1
MODIFIED BEARING LUBRICATION 1282 84 DAY 6/7/19 RE035 1 31P3-2TPS75-6WC-1
ANTENNA LEG ASSEMBLY INSPECTION 1283 84 DAY 4/26/19 RE035 31P3-2TPS75-6WC-1
PROCESSOR RACK INSPECTION AND CLEANING 1285 84 DAY 4/29/19 RE035 0 31P3-2TPS75-6WC-1
MODULAR INTERFACE GROUP INSPECTION AND CLEANING 1289 84 DAY 4/23/19 RE035 0 31P3-2TPS75-6WC-1
UPX 37 SEMIANNUAL INSPECTION - SER # A0109 294 168 DAY 12/4/18 REA09 2UPX37-1 TBL 4-1
UPX 37 SEMIANNUAL INSPECTION - SER # C0126 294 168 DAY 6/28/19 REA26 2UPX37-1 TBL 4-1
TRANSMITTER LIQUID COOLANT SERVICING 1290 168 DAY 6/14/19 RE035 31P3-2TPS75-6WC-1
PPI CIRCUIT CARD INSPECTION AND CLEANING 1291 168 DAY 8/29/19 RE035 1 31P3-2TPS75-6WC-1
CONTROL MONITOR INSPECTION AND CLEANING 1292 168 DAY 8/14/19 RE035 31P3-2TPS75-6WC-1
ANTENNA AND SHELTER JACKS LUBRICATION 1293 168 DAY 8/12/19 RE035 31P3-2TPS75-6WC-1
UPA 59 PREVENTATIVE MAINTENANCE 1309 168 DAY 8/8/19 RE035 31P1-2UPA59-1-1 & 2
ANTENNA DRIVE MOTOR GEARBOX SERVICE 1294 336 DAY 8/29/19 RE035 31P3-2TPS75-6WC-1
PROCESSOR RACK AND CIRCUIT CARD INSPECTION AND CLEANING 1295 336 DAY 8/29/19 RE035 31P3-2TPS75-6WC-1
INTERROGATOR CIRCUIT CARD INSPECTION AND CLEANING 1297 336 DAY 8/29/19 RE035 31P3-2TPS75-6WC-1
DESICCANT CARTRIDGE REPLACEMENT 1298 336 DAY 10/4/19 RE035 31P3-2TPS75-6WC-1
CONTROL MONITOR INSPECTION, CLEANING, AND LUBE 1299 336 DAY 8/12/19 RE035 31P3-2TPS75-6WC-1
HIGH VOLTAGE INSULATED GLOVES TEST SET #1 367 365 DAY 5/28/19 RE035 AFI 91-203, 812.8
HIGH VOLTAGE INSULATED GLOVES TEST SET #2 396 365 DAY 4/25/19 RE035 0 AFI 91-203, 812.8
ANNUAL HISTORICAL RECORDS REVIEW 1320 365 DAY 2/7/20 RE035 1 00-20-1 PARA 10.7.4
ANNUAL FACILITY GROUNDS INSPECTION 1322 365 DAY 2/5/20 RE035 1
MIL-HDBK-419A PARA 2.3.1,
31-10-24 Appx B
TX HOIST 1323 365 DAY 1/9/20 RE035 31P3-2TPS75-6 Chpt 2 Sec 1
ANT & SHELTER LIFT HARDWARE INSPECTION BY NDI/ TX HOIST 68 365 DAY 12/30/00 RE035 31P3-2TPS75-6 Chpt 2 Sec 1
ANTENNA TIEDOWN STRAPS INSPECT AND REPLACE ALL 1324 720 DAY 1/28/21 RE035 31P3-2TPS75-6
INSPECT AND REPLACE ALL HYDRAULIC HOSES 1325 60 MONTH 06/06/23 RE035 31P3-2TPS75-6
5. Maintenance and Logistics Problems:
With the dissolution of the sole repair vendor for the proprietary DLS Receiver/Transmitter units, the current cache of four spare units are all that are available. Some DLSr units have been delivered, and placed at RWS (RWSR), SUBW, A10, RWE (RWER) and PCB. These are being used on a limited basis. The remaining DLSr delivery date is a moving target, with an anticipated delivery of April 2019.
a. Top Five Report:
b. Long Lead Report:
6. Gulf Range Tower Conditions:
a. Tower for Site RWN:
Hurricane Michael brought down tower containing this antenna.
Temporary tower installed and working well.
b. Tower for Site RWW:
Hurricane Michael brought down tower containing this antenna.
Temporary tower installed and working well.
c. Tower for Site B256:
Hurricane Michael brought down tower containing this antenna.
d. Tower for Site APPL:
Hurricane Michael brought down tower containing this antenna.
e. All other towers fully functional (RWE, A10, SRB, PCB, D1C, D3, CARR, SLPT, SUBE, SUBW, RWS, ISC1, ISC2).
7. Wendover Status:
a. Building 625 Control Site:
PAE reworked the infrastructure requirements per TSS request for both a consolidated
Wendover only operation and for a split configuration which would provide control at
Wendover and drone launches from Dugway. The 388th's contractor JT3 is drafting a
Top 5 Parts Ordered
NSN Part Number Nomenclature End Item Remarks
6145-00-080-9860 960254-5 SPECIAL PURPOSE CABLE GIO Rec'd 19 Mar 19
7690-01-015-9096 900915-01 CABLE MARKERS BIGGENS Rec'd 25 Mar 19
5340-01-112-5151 AA1928-2 LONG SHANK PADLOCK SHOPUSE Rec'd 20 Mar 19
8030-00-889-3535 11072502 TAPE RADAR Rec'd 27 Mar 19
7510-00-687-2664 18601 PACKING ENVELOPES SHOPUSE Rec'd 1 Mar 19
Top 5 Parts With Longest Lead Time
Date Ordered NSN Part Number Nomenclature QTY End Item Remarks
19-Nov-14 6625-01-433-2697 25284 TEST SET 1 75 RADAR Est Due 30 Aug 19
08-Jan-18 6625-01-571-1592 N99124-104 ANALYZER 1 EQUIPMENT Est Due 13 Oct 19
19-Jun-18 8010-00-490-7650 MIL-L-81352 LACQUER 1 75 RADAR Est Due 08 Jul 19
12-Sep-18 8040-01-394-3735 3145-RTV ADHESIVE 3 75 RADAR Est Due 11 May 19
02-Oct-18 9160-00-086-3734 AFC-16 EMULSIFIED OIL, DUST 1 75 RADAR Est Due 22 Feb 20
Unclassified Page 16 of 38
Distribution: A response and will provide the WEG an estimate for their support to finish their infrastructure upgrade for the host communications system. PAE will support a telecom on 11 April to discuss the 90% solution with the 388th and JT3. Another facet of the
JT3 task is installing fiber (not equipment) from 625 to the LAMS and in turn from the
LAMS to the launch pad. This won't be in use until maintenance and launch operations move but it needs to be in place well in advance of that move so the equipment can be installed and tested. PAE would install communications equipment at the maintenance and launch facilities.
PAE also provided locations and quantities for NIPR and SIPR drops within building
625 to aid JT3 with their estimates. Through previous renovation efforts the cable and jacks for the phones and NIPR computers were installed between the communications room and each location within the building so only the range infrastructure remains to be completed. The TSS is working procurement of the computers and phone instruments.
For the initial phase, the TSS is leaning towards split operations versus consolidated operations. For split operations, a new tower would be needed at building 625 to support antennas for radios and GPS as well. The original plan was to move the existing tower from Dugway to Wendover. Buying and installing the new tower at 625 would be the faster and better path (keeping the capability at both control locations). The new tower would provide more height for better coverage for radios and GRDCS at a cost of
~$20K. Either way additional RF cable, mounting clamps, etc. must be purchased for the move, a draft list of those parts was provided to the TSS, ~$6.6K. The current portable towers are not an ideal solution for permanent use at 625; they are too short and require constant pressurization to remain erect.
GRDCS hardware and software has been installed and initially tested in the control site.
b. Launch Pad:
Compressors and power supplies must be purchased for the rails. The 82nd RAs were working this in 2018; there was a contracting hiccup last year and funds short stopped the purchase.
Gantries and hoists must be purchased for the launch pad as well as a contract let to install them. PAE has the design complete; the narrative for the SOW needs to be written and then it can go out for bids.
PAE is working to develop a parts lists for the installation of the rails, power supplies, compressors, grounding, communications, connections for generator, etc. The items then require purchasing.
Purchase and install fiber equipment for connectivity from building 625 to the LAMS and in turn from the LAMS to the launch pad. Once maintenance and launch operations move from Dugway, much of the hardware will come from there. However, several additional items will need to be bought due to the longer fiber cable runs. This needs to be in place well in advance of that move so the equipment can be installed and tested.
Work continues with environmental approval contractor for the launch and maintenance areas.
Unclassified Page 17 of 38
c. LAMS Maintenance Shelter:
PAE is working a requirements document to have the electrical, grounding, lightning protection, etc. installed.
PAE is developing a parts lists for the installation of a compressor, stands to mount items like fire extinguishers, eyewash, AED, etc. Then the items need to be purchased.
PAE is working a requirements document for a secure storage area within the LAMS.
The LAMS itself has been erected; however it requires repair due to wind damage. The
WEG is working that effort.
d. Wendover GRDCS Sites:
The TSS is working lease efforts for the I-80 GRDCS site. This is the single most critical RF point needed to use the Wendover control whether launching from Dugway or Wendover. Site H97 is going through the environmental process. It would also be very helpful for Dugway operations with Wendover control, but it really becomes critical when launch operations move to Wendover.
8. GRDCS and RCS Operating Hours:
9. GRDCS and RCS Accounts Status:
a. GRDCS Accounts:
The GRDCS computers are accessed by user groups rather than by individual accounts. The users are trained for and only granted access to the level required to perform their assigned tasks. The three user groups and their level of access are depicted in the following chart.
Mission Support Maintenance Programming &
Engineering
Administration
GRDCS 113.52 12.09 10.00 6.22
RCS 294.00 33.00 37.00 21.00
H o u rs
GRDCS (Operations) CDT (Maintenance) ROOT (Administration)
Hours 126.57 9.04 6.22
GRDCS User Accounts
Unclassified Page 18 of 38
b. RCS Accounts:
The RCS computers are accessed by user groups rather than by individual accounts. The users are trained for and only granted access to the level required to perform their assigned tasks. The five user groups and their level of access are depicted in the following chart.
10. Engineering and Systems Programming Tasks:
a. Short Title: Testing and evaluation of the maximum GRDCS participant capability.
Summary: Due to the additional GRDCS hardware/software implementation of SIR 451
“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS
External Track Data” with development version 55, test flights are being supported to verify the maximum GRDCS participant capability.
Date Initiated: 24 April 2009
Completion Date (Estimated): TBD, depending on availability of mission(s).
Current Status: 85% complete.
Problems anticipated or encountered: None.
b. Short Title: Test TM connectivity with Bldg. 223 in order to evaluate the external
NDI-AIU C-Band Beacon data with Safety.
Summary: Due to the additional GRDCS hardware/software implementation of SIR 451
“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS
External Track Data” with development version 55, a connectivity test with
TM Bldg 223 is still pending to evaluate the data into GRDCS and RCS.
Date Initiated: 13 July 2009
Completion Date (Estimated): TBD, depending on TM shop and testing results.
Current Status: 0% complete.
Problems anticipated or encountered:
First test on 13 July 2009 was not successful. Bldg. 223 personnel could not start the program. More work on their side is required.
83rd 82nd Rapcon ROOT USAF_Adminis trator
Wetstone MSCT
Hours 24.00 42.50 10.00 21.00 60.00 504.00 504.00
RCS User Accounts
Unclassified Page 19 of 38
Distribution: A
c. Short Title: Installation and demonstration of DLS-r Developmental Software/Hardware.
Summary: Started DT of DLS-r user version based on GRDCS software version 59.4.
Note the DLS-r effort is continuing with Version 60 OT testing.
Date Initiated: 20 August 2015
Completion Date (Estimated): TBD
Current Status: Fielding Authorization was provided by ACC on 11 May 2017.
Problems anticipated or encountered: Units on-site need to be replaced with MCI’s production units. Some units (RWSR, RWER, SUBW, A10, and PCB) have been fielded for limited use.
d. Short Title: Software installation (Release Candidates 3 & 4) and demonstration of SIRs of GRDCS Software/Hardware Version 61.0.
Summary: In process of supporting DT for v61.0 for the hardware & software upgrade.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: DT Phase; Start date 21 Aug 2018.
Problems anticipated or encountered: None at this time.
e. Short Title: V61 Documentation Review.
Summary: In process of reviewing v61.0 hardware & software documentation.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: In review process; Start date 21August 2018.
f. Short Title: User software (increment-13, based on v60.4) installation for the QF-16 DR2
Hardware Changes (SIR 843).
Summary: In process of supporting ground and test flights for the QF-16 DR2 Hardware
Changes with Autopilot v1.7 software.
Date Initiated: 29 June 2018
Completion Date (Estimated): TBD
Current Status: Flight testing is complete at Tyndall and is presently taking place at
Holloman.
g. Short Title: Software installation of GRDCS Software/Hardware V61.0.1 (31Jan19).
Summary: In process of supporting DT for v61.0 for the hardware and software upgrade.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: DT Phase; Start date 21 August 2018.
Unclassified Page 20 of 38
h. Short Title: Software installation of GRDCS Software/Hardware V61.0.2 (20Feb19).
Summary: In process of supporting DT for v61.0 for the hardware and software upgrade.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: DT Phase; Start date 21 August 2018.
i. Short Title: Software installation of GRDCS Software V62.0 (29Mar19).
Summary: In process of supporting SIR Demos for v62.0 for the software upgrade.
Date Initiated: 29 March 2019
Completion Date (Estimated): TBD
Current Status: Demo Phase; Start date 28 Feb 2019 with video (SIR844) and .sml file
(SIR878).
11. Special Projects:
a. In process of enhancing locally developed “MapScript” program to enable recursive directory search and loading of input files. This will provide historical analysis of a ground station relative to other ground stations and drone position on the range (70% complete, pending hardware upgrades for finalization).
b. In process of enhancing locally developed ‘safe flight script’ to handle QF-16 telemetry during the different phases of the safe flight profile. Awaiting requirements from the 82
ATRS/ADO QF-16 representative (15% complete).
c. In process of creating an enhanced character-based single step CD-R writing capability for the Linux system that supports the removal of classified data from GRDCS log files (75% complete).
d. Supporting Wendover system evaluation as a first look of the new hardware (console and computer) and software to include local RF environment. (Ongoing effort at this time, no
ETA available yet).
Unclassified Page 21 of 38
Distribution: A
11. ATIS Mission Support (Over-the-Horizon Airborne Relays using platform aircraft):
a. Mission # 8280 / 15-Mar-19
Number of Aircraft Scheduled: 4
Number of Aircraft Provided: 5
Aircraft Data Quality:
Call Sign
Data Link
Rate
(DLR)
Remarks –
(Mandatory if DLR < 90% else observations of feedback)
PLT1
(Tail#486)
90%
PLT2
(Tail#481)
90%
PLT3
(Tail#487)
99%
PLT4
(Tail#485)
99%
b. Mission # 2247 / 19-Mar-19
Number of Aircraft Scheduled: 4
Number of Aircraft Provided: 5
Aircraft Data Quality:
Call Sign
Data Link
Rate
(DLR)
Remarks –
(Mandatory if DLR < 90% else observations of feedback)
PLT1
(Tail#487)
99%
PLT2
(Tail#486)
90% Was used sporadically during mission
PLT3
(Tail#481)
99%
PLT4
(Tail#485)
99%
Unclassified Page 22 of 38
Distribution: A
c. Mission # 0701 / 20-Mar-19
Number of Aircraft Scheduled: 4
Number of Aircraft Provided: 5
Aircraft Data Quality:
Call Sign
Data Link
Rate
(DLR)
Remarks –
(Mandatory if DLR < 90% else observations of feedback)
PLT1
(Tail#487)
99%
PLT2
(Tail#485)
85% 20nm south, off track
PLT3
(Tail#481)
99%
PLT4
(Tail#486)
95%
d. Mission # 0702 / 21-Mar-19
Number of Aircraft Scheduled: 4
Number of Aircraft Provided: 5
Aircraft Data Quality:
Call Sign
Data Link
Rate
(DLR)
Remarks –
(Mandatory if DLR < 90% else observations of feedback)
PLT1
(Tail#481)
99%
PLT2
(Tail#485)
90% When passed 60nm, data on the beacons would degrade.
Possible cause: interference on the ground
PLT3
(Tail#487)
99%
PLT4
(Tail#486)
90% When passed 60nm, data on the beacons would degrade.
Possible cause: interference on the ground
Unclassified Page 23 of 38
Distribution: A
TAB 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA)
METRICS
1. MDSA Metrics:
a. Abort Rate: SDS Criteria FSAT/SSAT < 12%
FSAT = 4.2% (0 AAB + 4 GAB with 95 sorties flown and 0 chargeable GAB lines)
((0 / 95) + (4 / (95 + 0))) x100)
Altimeter
SEC light inop (Holloman)
Fuel light
FFP (Holloman)
SSAT = 0.0% (0 AAB + 0 GAB with 13 sorties flown and 0 GAB lines)
((0 / 13) + (0 / (13 + 0))) x100)
b. Repeat/Recur Rate: SDS Criteria FSAT/SSAT < 7%
FSAT = 0.0% (0 Repeats + 0 Recur with 23 PRDs) ((0 / 23) x 100)
SSAT = 0.0% (0 Repeat & 0 Recur with 0 PRD) ((0 / 0) x 100)
c. Cannibalization Rate: 3.7% (4 Canns with 108 Sorties Flown) ((4 / 108) x 100)
d. Data Integrity Error Rate: SDS Criteria - 98% of correctable errors corrected
100.0% (30 Errors with 6 Uncorrectable and 24 Corrected) (24 / (30 - 6)) (2,741
DDRs checked)
e. Break Rate = 10.2% (11 Code 3s with 108 Sorties Flown) ((11 / 108) x 100)
f. Primary Aerospace Vehicle Authorized (PAA) vs. Possessed (PP) Rate:
FSAT = 100.0% (32 assigned with 32 possessed, 50 baseline and 0 CLIN 4/6 inventory at EOM) ((32 / 32) x 100)
SSAT = 100.0% (44 PAA with 44 possessed and 0 CLIN4/6 inventory at EOM) ((44 /
44) x 100)
g. FSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%
100.0% (107 Sorties attempted with 95 successful and 12 non-chargeable non-successful) ((95 / (107 - 12)) x 100)
h. SSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%
100.0% (20 Sorties attempted with 13 successful and 7 non-chargeable non-successful) ((13 / (20 - 7)) x 100)
Unclassified Page 24 of 38
2. Maintenance and Flying Schedule Effectiveness (MSE and FSE)
a. MSE = 75.2% (661 points scheduled with 497 complied with) ((497 / 661) x 100)
b. FSE = 71.4% (108 sorties flown, with 19 sorties cancelled, 1 sortie added and 36 total
FSE deviations) (((126 - 36) / 126) x 100)) (Of the 36 chargeable deviations, 5 were attributed to maintenance.)
The main drivers were 19 Cancels and 14 Late Take Offs.
Add Lines = 1 (1 Ops)
Add Tails = 0
Cancels = 19 (3 Ops, 6 Project, 9 Wx, 1 Mx)
Early T/O = 2 (2 Wx)
Late T/O = 14 (4 Mx, 2 Project, 3 Sympathy, 3 ATC, 2 Ops)
GAB Lines = 0
3. Narratives:
Ground & Air Aborts
a. FSAT – There were 4 FSAT ground aborts in March – 2 at Tyndall and 2 at Holloman.
(1) Issues with fuels were the closest thing to an abort trend this month. AF040 aborted for Fuel Light (R2 FCC) at Tyndall on 25 March, then AF024 aborted 3 days later at Holloman for FFP problems (R2 Fuel Flow Proportioner and
Hydraulic Motor).
(a) AF024 now has 9 ground aborts and 0 air aborts; none of the others were for fuel issues. Its last abort was recorded in December 2018.
(b) This was AF040’s first abort in the FSAT program; the same is true of AF038
(Altimeter/Electrical; R2 Altimeter Gauge).
(c) AF029 recorded the other abort for the month (SEC Light Inoperative; R2
Caution Panel Assembly). This brings it to 7 ground aborts and no air aborts as an FSAT. It had no previous similar aborts; its last unrelated abort occurred in
November 2018.
(2) February’s numerical breakouts were:
(a) Two of the aircraft involved were QF-16A’s and 2 were QF-16C’s.
(b) Three of this month’s aborts occurred on proficiency sorties; 1 was a customer flight.
Unclassified Page 25 of 38
Distribution: A
(c) The weekly abort distribution was 2 on Mondays, 1 on a Tuesday, and 1 on a
Thursday. All the aborts occurred on manned missions; 2 were on morning sorties and 2 were on the afternoon missions.
(3) No lines were lost to aborts this month.
b. SSAT – No SSAT aborts were recorded for March.
Date Base AF # Reason Corrective Action
FSAT
12 Mar TAFB 38 Altimeter/Electrical R2 altimeter gauge
18 Mar HAFB 29 SEC light inop R2 caution panel assembly
25 Mar TAFB 40 Fuel light R2 FCC
28 Mar HAFB 24 FFP R2 fuel flow proportioner and hydraulic motor
SSAT
TAB 5 – TECHNICAL REPORT STATUS
Negative this report period.
Unclassified Page 26 of 38
Distribution: A
TAB 6 – QUALITY CONTROL (QC) SUMMARY REPORT
1. Full-Scale - Tyndall:
a. Twenty Quality Verification Inspections, thirty-six Special Inspections, and ten Personnel
Evaluations were accomplished. Sixty-five inspections passed, one failed. There was one major failure consisting of training. There were five minor discrepancies consisting of training, scheduled maintenance, forms/documentation, post flight inspection, and housekeeping.
b. Problem Area: None
c. PQDRs: Three this report period.
(1) FA4881-19-0216 (QF040), Transmit Receive Interface Module, S/N 163.
(2) FA4881-19-0217 (QF018), Transmit Receive Interface Module, S/N 0106.
(3) FA4881-19-0218 (QF038), Radar Unit VSS, S/N 00070.
d. AFTO Form 22’s: None this report period.
e. TODO: Ninety-two technical order changes and revisions received this period.
f. Impoundments: One this report period.
(1) 19-001 (QF031/83-1146), #11 First Stage Blade nicked
g. FOD/DOP/Lost item: None this report period.
2. Full-Scale - Holloman:
a. Twelve Quality Verification Inspections, thirty Special Inspections, and six Personnel
Evaluation were accomplished. Forty-eight inspections passed, zero failed. There were zero minor discrepancies.
b. Problem Areas: None this report period.
c. PQDRs: One this report period.
(1) FA4810-19-0001, Canopy Actuator Nut Channel
d. AFTO Form 22’s: None this report period.
e. TODO: Sixty-eight technical order changes and revisions received this period.
f. Impoundments: None this report period.
Unclassified Page 27 of 38
g. FOD/DOP/Lost item: None this report period.
3. Subscale:
a. Fourteen Quality Verification Inspections, twenty-one Special Inspections and thirty
Personnel Evaluations were accomplished. Sixty-six passed, zero failed. There were two minor discrepancies found consisting of training records and documentation/forms, all have been corrected.
c. PQDRs: None this report period.
d. AFTO Form 22s: None this report period.
e. TODO: Eleven technical order change and revision received this period.
g. DOP/Lost Item: One this report period.
(1) 53WEG190301, (BQM-167A), S/N 12-0417, Two bolts lost, not recovered
4. GRDCS - Tyndall:
a. Eleven Quality Verification Inspection, five Special Inspections and zero Personnel
Evaluation were accomplished. Sixteen inspections passed, zero failed. There was one minor discrepancies consisting of SCR, corrected on the spot.
b. AFTO Form 22s: None this report period.
c. PQDRs: None this report period.
d. TODO: Zero technical order change and revision this period.
e. Problem Areas: None this report period.
5. ESH - Tyndall:
a. Ten Special Inspections were accomplished. Ten inspections passed, zero failed. There were zero minor discrepancies.
Unclassified Page 28 of 38
6. ESH - Holloman:
a. Two Special Inspection were accomplished. Two inspection passed, zero failed. There were zero minor discrepancies.
7. Publications and Forms: No contractual impacts this period. See CDRL A009, Master
Document List.
0.7
0.8
0.9
TYN HMN SSAT RIS ESH
QA Inspection Pass Rate Jan - Mar 2019
January
February
March
Unclassified Page 29 of 38
Distribution: A
TAB 7 – RIS MAINTENANCE ANALYSIS REQUESTS
1. Electro-Magnetic Interference (EMI):
During subscale mission 6676, on 19 Feb 2019, interference was observed on 915MHz. Data between building 1801 and D1C/D3 was degraded significantly. TSgt John Kingsley was notified of the interference. Mission was not aborted, and no equipment or personnel were injured or damaged. The mission parameters had to be modified to work with the interference.
2. RIS Maintenance Actions:
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
183020001 CARRY OVER:
All poles holding Antenna systems at B1801 down due to Hurricane Michael.
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
DISCR. HOURS: EQUIPMENT MAKE: EQUIPMENT MODEL: EQUIPMENT S/N:
N/A N/A N/A N/A
183020002 CARRY OVER:
Runway West tower down due to Hurricane Michael.
Temporarily installed mobile DLS trailer at site.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 30 of 38
183020003 CARRY OVER:
Runway North tower down due to Hurricane Michael.
Temporarily installed mobile DLS trailer at site.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
183020006 CARRY OVER:
B256 tower is down due to Hurricane Michael.
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 31 of 38
183020007 CARRY OVER:
ACDS Missile and Drone, Primary and Backup antenna systems down due to Hurricane Michael. (See RIS# 183020001)
Temporarily installed ACDS Missile Primary and Backup antennas on Tower 1802.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
183020008 CARRY OVER:
LMR antennas down due to Hurricane Michael.
Rerouted two antenna paths.
Temp installed two antennas.
At this time there are 4 of 5 operational LMRs.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 32 of 38
183020011 CARRY OVER:
Runway west video is down due to Hurricane Michael. (See RIS# 183020002)
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
190560001 GRDCS wind transmitter compass rose not indicating correct direction at B1801.
Replaced unit with parts on hand.
Operational checks good.
No mission impact noted.
MAINT. AREA:
GRDCS
START DATE:
20190225
STOP DATE:
20190308
REPAIRED BY:
K.G/R.G/A.B
MAN HOURS:
3.0
COST:
$1584.00
288.0 RM YOUNG 09101 33603
Unclassified Page 33 of 38
190630001 GRDCS Consoles 6 & 7 require switch over to old hardware for WSEP.
Complied with.
Operational checks good.
None
MAINT. AREA:
GRDCS
START DATE:
20190304
STOP DATE:
20190304
REPAIRED BY:
B.W/A.B
MAN HOURS:
2.0
COST:
N/A
DISCR. HOURS: BRAND: EQUIPMENT MODEL: EQUIPMENT S/N:
1.0 N/A N/A N/A
190720001 GRDCS Console 3 has broken switch guard Row 2 Column 2.
Removed and replaced switch guard with parts on hand.
Operational checks good.
None
MAINT. AREA:
GRDCS
START DATE:
20190314
STOP DATE:
20190314
REPAIRED BY:
K.G
MAN HOURS:
0.5
COST:
N/A
0.5 N/A N/A N/A
Unclassified Page 34 of 38
190770001 Launch Pad channel bank 7 in alarm state.
Removed and replaced LI3 and OIU circuit card assemblies with parts on hand.
Operational checks good.
None
MAINT. AREA:
COMM
START DATE:
20190318
STOP DATE:
20190318
REPAIRED BY:
J.T/A.B/K.G/E.R
MAN HOURS:
12.0
COST:
N/A
4.5 N/A N/A N/A
190870001 GRDCS Consoles 6 & 7 require switch over to new hardware for testing.
Complied with. None
MAINT. AREA:
GRDCS
START DATE:
20190328
STOP DATE:
20190328
REPAIRED BY:
A.B/K.G/B.W
MAN HOURS:
2.0
COST:
N/A
1.0 N/A N/A N/A
TAB 8 – FACILITIES OPEN WORK REQUESTS
Unclassified Page 35 of 38
TOP FIVE WORK REQUESTS
TOP 5
JOB NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
38912
1801 Repair raised floor in room 114. Note:
Submitted by the 81st Range Control Squadron.
CES/CEO
REVIEW
25 Jan 18
D5966
Rm 300
Install static grounding bus bar. CES/HIGH
VOLTAGE
AWT SCHEDULE
9 Nov 16
37148
Replace tiles in avionics shop. CES/ALOP
AWT-CUS PRI
4 Mar 11
38125
45 Pave access road/checkpoint. CES/CENPD
REVIEW
1 Apr 15
59188
Extend existing permanent static ground system inside buildings.
CES/CENM
REVIEW
7 Aug 13
Range Instrumentation Systems Facilities – Building Manager - R. Williams
Full Scale Facilities – Building Manager – S. Davis
JOB
NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
38125 45 Pave access road/checkpoint. CES/CENPD
REVIEW
1 Apr 15
59222 45 Roadway Improvement CES/CENP
REVIEW
21 Nov 13
E2953 9310 Plumb emergency eye wash drain to the building exterior.
Install shower pans under emergency showers in
Bays 1 and 3 and plumb to drain outside.
CES/FM
PLUMBER
AWT SCHEDULE
11 Aug 17
38672 9310 Install 26 electrical outlets. CES/CENPD
REVIEW
24 Jan 17
D5966 227
Rm 300
(AFE)
Install static grounding bus bar. CES/HIGH
VOLTAGE
AWT SCHEDULE
9 Nov 16
F0103 227
Rm 313
(Egress)
Rain water intrusion under exterior entry/exit doors. Note: submitted by the 82ATRS Facility
Manager.
CES/VERTICAL
AWT SCHEDULE
6 Jun 18
314 Convert sanding barn into an aircraft wash rack. 82 ATRS
SUBMITTED
19 Jul 18
Unclassified Page 36 of 38
Distribution: A
JOB NO. BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
9959/D3B Exterior pole lights malfunctioning.
Note: Eglin new work order system cancelled work order. Work order has not been re-submitted.
EGLIN AFB CES
SUBMITTED
25 Apr 16
38912 1801 Repair raised floor in room 114. Note:
Submitted by the 81st Range Control Squadron.
CES/CEO
REVIEW
25 Jan 2018
39126 9401 Paint facility. CES/ALOP
SUBMITTED
16 Aug 2018
39211 9350 Replace galvanized communication tower due to
Hurricane Michael damage
CES/ALOP
SUBMITTED
13 Dec 2018
39210 9349 Replace galvanized communication tower due to
Hurricane Michael damage
CES/ALOP
SUNMITTED
13 Dec 2018
39209 1810 Replace galvanized communication tower due to
Hurricane Michael damage
CES/ALOP
SUBMITTED
13 Dec 2018
39285 9352 Tower Alignment-Tensioning and LPS repair CES/ALOP
SUBMITTED
10 Jan 2019
39297 9317 R&R 20’ Tower Ladder. Reinstall LPS
(Ladder Portion Complete)
CES/ALOP
SUBMITTED
(In Progress)
10 Jan 2019
39389 9401 R&R Perimeter Security Fence CES/ALOP
SUBMITTED
31 Jan 2019
39431 9901 Comprehensive tower inspection
(St. George Island)
CES/ALOP
SUBMITTED
13 Feb 2019
39521 1801
Repair damaged ice bridge, extend/install new ice bridge to 1830 tower
CES/ALOP
SUBMITTED
12 Mar 2019
F7756 9404
Tower
Tower Obstruction Light Inop. CES/ALOP
26 Mar 2019
Sub Scale Launch Pad – Building Manager - B. Prince
JOB
NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
34672 8500 Area Paint buildings and floors. CES/CEPD
REVIEW
24 Jan 06
37441 8519 Install pavement south west of building.
Project No. XLWU142051D
CES/CENPD
CONTRACT
15 Jun 12
59188 8519
Extend existing permanent static ground system inside buildings.
CES/CENM
REVIEW
7 Aug 13
C7092 8519 Install emergency eyewash/shower stations in the north and south bays.
CES/PLUMER
IN PROGRESS
24 Nov 15
Unclassified Page 37 of 38
Distribution: A
F2434 8525
Rail #4
Repair rail #4 hoist electrical power conduit. CES/ALOP
30 Aug 18
Sub Scale Maintenance Facilities – Building Manager - D. Jacobs
JOB NO. BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
33927 256 Remove/replace separator. CES/CENPD
PROJECTS
26 Feb 04
34671 256 Paint floor/anti-slip paint. CES/CENPD
REVIEW
24 Jan 06
35352 256 Tech, pod, and office clean duct works. CES/CENPD
REVIEW
21 Jun 07
37044 256 Replace Air Handling Unit CES/CENPD
REVIEW
21 Jan 11
37148 256 Replace tiles in avionics shop. CES/ALOP
AWT-CUS PRI
4 Mar 11
C7093 256 Install two each permanent emergency eyewash / shower stations in the hangar bay.
CES/FM PLUMER
IN PROGRESS
24 Nov 15
59083 256 Upgrade Latrine CES/CENPD
CONTRACT
17 Dec 12
TAB 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS
Recovery from Hurricane Michael and preparation for a sub-scale WSEP in April are the current priorities.
The lack of aircraft deliveries from Boeing is impacting our overall aircraft fleet numbers as well as our ability to manage aircraft hours. Once Boeing has worked through production issues, we expect the number of aircraft deliveries will increase past the 2 deliveries/month as called out in the PWS.
This will impact PAE’s ability to meet Safe Flight time requirements and create a backlog of aircraft awaiting Safe Flights.
All the cleanup of failed data documentation and maintenance processes in aircraft generation from
AMARG and/or Boeing continues to fall on PAE for correction prior to SAFE flight.
Unclassified Page 38 of 38
Failure to receive delivery aircraft is impacting available Manned flyers (Tyndall & Holloman).
Correspondingly, NULLO fleet health/quantity is becoming an issue. Expect continued movement of aircraft to and from Holloman and early De-Man of flyers to keep Tyndall’s NULLO fleet minimally populated.
Severe damage to most of our facilities is causing many workarounds and much turmoil. PAE is managing the situation the best we can. Construction of temp facilities has begun with a drone storage building at subscale launch.