H-FY20 Monthly Summary Report-May 2020.pdf

PDF 2 MB Posted

Attached to
Aerial Targets III FY23 Federal contract opportunity
Solicitation number
FA489021CPKCA
Issued by
Department of the Air Force Air Combat Command

About this file

This monthly summary report describes operations and maintenance activities for aerial targets and range instrumentation systems. It provides details on full-scale and sub-scale aerial target missions at Tyndall AFB and Holloman AFB, including sorties flown, maintenance issues, quality inspections, and facilities work requests. Key metrics like abort rates, repeat discrepancies, and maintenance data are also included. The report is intended to update the prime contractor, PAE, and the Air Force on contract performance for aerial targets and range systems at the two bases under contract number FA4890-15-C-0018.

View the file

Other files for this federal contract opportunity

Other files attached to Aerial Targets III FY23, newest first.
File Type Posted
Workload Sppt Data QF-16-only Maint Rates.xlsx XLSX spreadsheet
E-IMDS Man-Hr Summary Ex MDC Manhour Summary TAFB 2020.txt TXT text file
C-IMDS Man-Hr Summary Ex MDC Manhour Summary TAFB 2019.txt TXT text file
IMDS Job Master List Data FSAT-SSAT AGE JML 24May2021.txt TXT text file
IMDS Job Master List Data FSAT JML 24May2021.txt TXT text file
E-FY21 Monthly Summary Report-Feb 2021.pdf PDF
B-FY21 Monthly Summary Report-Nov 2020.pdf PDF
J-FY20 Monthly Summary Report-Jul 2020.pdf PDF
G-FY20 Monthly Summary Report-Apr 2020.pdf PDF
F-FY20 Monthly Summary Report-Mar 2020.pdf PDF
A-FY20 Monthly Summary Report-Oct 2019.pdf PDF
L1-FY19 Monthly Summary Report-Sept 2019.pdf PDF
G2-FY19 Monthly Summary Report-Apr 2019 v2.pdf PDF
FY19 Flying Schedule Data.xlsx XLSX spreadsheet
Workload Sppt Data AGE Periodic Inspect and Maint.xlsx XLSX spreadsheet
F-IMDS Man-Hr Summary Ex MDC Manhour Summary HAFB 2020.txt TXT text file
A-IMDS Man-Hr Summary Ex MDC Manhour Summary TAFB 2018.txt TXT text file
K-FY20 Monthly Summary Report-Aug 2020.pdf PDF
E-FY20 Monthly Summary Report-Feb 2020.pdf PDF
L2-FY19 Monthly Summary Report-Sept 2019 v2.pdf PDF
K-FY19 Monthly Summary Report-Aug 2019.pdf PDF
I-FY19 Monthly Summary Report-Jun 2019.pdf PDF
F-FY19 Monthly Summary Report-Mar 2019.pdf PDF
E-FY19 Monthly Summary Report-Feb 2019.pdf PDF
A-FY19 Monthly Summary Report-Oct 2018 rev2.pdf PDF
Workload Sppt Data RIS Sites (Pics Notes).xlsx XLSX spreadsheet
Workload Sppt Data QF-16 TCTO Status.xlsx XLSX spreadsheet
Sortie Recap FY21.xlsx XLSX spreadsheet
D-IMDS Man-Hr Summary Ex MDC Manhour Summary HAFB 2019.txt TXT text file
B-IMDS Man-Hr Summary Ex MDC Manhour Summary HAFB 2018.txt TXT text file
IMDS Job Master List Data SSAT JML 24May2021.txt TXT text file
D-FY21 Monthly Summary Report-Jan 2021.pdf PDF
C-FY20 Monthly Summary Report-Dec 2019.pdf PDF
H-FY19 Monthly Summary Report-May 2019.pdf PDF
D-FY19 Monthly Summary Report-Jan 2019.pdf PDF
B-FY19 Monthly Summary Report-Nov 2018.pdf PDF
FY18 to FY20 Cumulative Flying Schedule Data.xlsx XLSX spreadsheet
Draft AT Performance Incentive-Award Fee Plan 1Jun21.docx DOCX document
Draft AT PWS App H Workforce Min Quals 1Jun21.docx DOCX document
Draft AT PWS FA489021R0012 (Basic) 1Jun21.docx DOCX document
CBA FA489015C0018 HMN 9Apr21-30Apr24 (pg 22 REDACTED).pdf PDF
Draft AT PWS App D GFE 1Jun21.docx DOCX document
SAM Posting of Draft RFP 1Jul21.docx DOCX document
Draft AT PWS App F List of Illustrations 1Jun21.doc DOC document
Draft AT PWS App E GFF 1Jun21.docx DOCX document
Draft AT PWS App B CDRL List 1Jun21.docx DOCX document
Draft AT PWS App A Definitions 1Jun21.doc DOC document
Draft AT PWS FA489021R0012 (Basic) 1Jun21 wTrack Changes.docx DOCX document
Reponses to Industry Questions (FINAL 1Jun21).docx DOCX document
AT III FY23 Sources Sought 9Dec20.docx DOCX document
Show all 50

Aerial Targets III FY23 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AERIAL TARGETS MONTHLY SUMMARY MAY 2020

Unclassified Page 1 of 42 Distribution: A

Aerial Targets Monthly Contract Summary Report – CDRL A001

Contract Number FA4890-15-C-0018

1 – 31 May 2020

Prepared for:

Acquisition Management and Integration Center

Langley AFB, Virginia

Prepared by:

PAE Aviation and Technical Services, LLC

1001 Florida Avenue

Tyndall AFB, Florida

David Olson

Program Manager

Aerial Targets Program

UNCLASSIFIED

Distribution Limitation: A

Unclassified Page 2 of 42

TABLE OF CONTENTS

Tab 1A – FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL

Tab 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM

Tab 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL

Tab 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M

Tab 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA) METRICS

Tab 5 – TECHNICAL REPORT STATUS

Tab 6 – QUALITY CONTROL (QC) SUMMARY REPORT

Tab 7 – RIS MAINTENANCE ANALYSIS REQUESTS

Tab 8 – FACILITIES OPEN WORK REQUESTS

Tab 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS

Unclassified Page 3 of 42

TAB 1A – FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL

1. SORTIES SCHEDULED:

Note: Off-station sorties reported in this summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.

2. MISSIONS FLOWN:

QF-16 NULLO:

Mission Symbol Mission Project Supported # Missions FYTD

O5ZZ JATM JATM 1

All O5ZZ 1

Sub Total 1 11

QF-16 MANNED:

Mission Symbol Mission Project Supported # Missions

O3ZZ XC O&M 1

All O3ZZ 1 3

O5ZZ JATM Chase JATM 1

O5ZZ JATM JATM 10

All O5ZZ 11 130

O6ZZ CT O&M 24

O6ZZ XC O&M 7

All O6ZZ 31 334

All O8ZZ 0 5

Sub Total 43 472

Grand Total 44 483

3. TOTAL HOURS FLOWN:

Mission Symbol Hours FYTD

O5ZZ 0.8 7.5

Sub Total 0.8 7.5

QF-16 MAY 20 FYTD

Scheduled 52 569

Canceled 8 80

Successful Flown 44 481

Ground Aborts 2 43

Air Aborts 0 2

Total Flown 44 483

Unclassified Page 4 of 42 Distribution: A

QF-16 MANNED:

Hours FYTD

O3ZZ 1.5 4.7

O5ZZ 21.9 208.1

O6ZZ 44.2 432.6

O8ZZ 0.0 6.7

Sub Total 67.6 652.1

Grand Total 68.4 659.6

4. MISSIONS CANCELED:

Date

MDS

AF#

Msn

Sym

Mission

Reason

13 May QF-16C 26 O5ZZ Chase Project

13 May QF-16C 24 O5ZZ JATM HOT Project

14 May QF-16C 26 O5ZZ Chase Project

14 May QF-16C 24 O5ZZ JATM HOT Project

15 May QF-16C 26 O5ZZ Chase Project

15 May QF-16C 24 O5ZZ JATM HOT Project

26 May QF-16C 53 O6ZZ FCS Weather

26 May QF-16C 48 O6ZZ FCS Weather

5. ABORTS – GROUND AND AIR:

Date Type

Abort

MDS AF

Msn

Sym

Mission Reason

11 May GAB QF-16C 22 O5ZZ JATM Aircraft battery fail

21 May GAB QF-16C 26 O6ZZ CT Aircraft battery fail

6. MAINTENANCE AND LOGISTICS PROBLEMS:

a. Maintenance:

(1) QF-16:

(a) AF056 Awaiting SAFE

(b) AF060 Awaiting SAFE

(c) AF062 Awaiting SAFE

(d) AF068 Awaiting SAFE

(2) AGE/Support Vehicles:

(a) QF-16 AGE and Support/Test Equipment

1. Procurement of AGE equipment, support/test equipment is continuing.

Unclassified Page 5 of 42 Distribution: A

(b) Stock listed and commercially procured AGE maintenance equipment and tool purchasing in work.

b. Logistics:

(1) Long lead-time (MICAP) on F-16A components is negatively affecting the ability to generate aircraft.

(2) Post Hurricane Michael supply needs are being met via Tyndall AFB and Eglin AFB.

Delays in processing/receiving parts are continual.

7. WASHES:

a. Washes Accomplished in May 2020:

WEEK ENDING AF#

30 Day: 8 May 024, 057, 030, 050, 054

15 May 026, 035, 040, 053, 051, 057

22 May 022, 021, 032, 027

29 May 038, 042, 048, 052, 029, 047, 062

a. Washes Not Accomplished & Reasons:

AF023 – In fuel barn for fuel cell leak

AF030 – De-man in work

AF055 – Transferred to Holloman

c. Wash Schedule for June 2020:

WEEK ENDING AF#

30 Day: 5 June 024, 050, 054

12 June 023, 056, 031, 030, 060

19 June 026, 035, 051, 053, 040

26 June 022, 021, 032, 027, 038, 042, 062

30 June 029, 048, 047, 052

8. REPEAT/RECURRING DISCREPANCIES:

Date MDS AF# R/R Discrepancy Corrective Action

None

9. RECOMMENDATIONS: Negative this report period.

10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.

Unclassified Page 6 of 42

TAB 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM

Note: Off-station sorties reported in this monthly summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.

Mission Symbol Mission Project Supported # Missions FYTD

All O5ZZ

Sub Total 0

QF-16 MANNED:

Mission Symbol Mission Project Supported # Missions FYTD

All O3ZZ 8

All O4ZZ 0

O5ZZ

All O5ZZ 45

O6ZZ C/T Training 12

O6ZZ WITS Training 3

All O6ZZ 15 136

All O8ZZ 1

Grand Total 15 190

05ZZ 0.0 0.0

NULLO sub Total

QF-16 MANNED:

Hours FYTD

O3ZZ 1.8 14.0

O4ZZ 0.0 0.0

O5ZZ 0.0 73.5

O6ZZ 21.4 202.9

QF-16 MAY 20 FYTD

Scheduled 18 209

Canceled 3 18

Successful Flown 14 190

Ground Aborts 3 16

Air Aborts 1 1

Total Flown 15 191

Unclassified Page 7 of 42 Distribution: A

O8ZZ 0.0 1.3

Sub Total 21.4 291.7

Grand Total 21.4 291.7

Date MDS AF# Msn

Sym

Mission Reason

15 May QF-16C 049 O6ZZ WITS Ops

21 May QF-16C 044 O6ZZ CT HHQ

21 May QF-16C 045 O6ZZ CT HHQ

Abort

MDS AF# Msn

Sym

Mission Reason

1 May GAB QF-16C 044 O6ZZ WITS Flight Controls

11 May GAB QF-16C 049 O6ZZ CT Engine Warning light

15 May AAB QF-16C 049 O6ZZ WITS Engine Warning light

20 May GAB QF-16C 049 O6ZZ WITS Engine Warning light

a. Maintenance: We were without AF028 the entire month due to replacement engine needed. It’s been ordered and shipment is in work. Also, the Engine Warning Light experienced by AF049 was extremely difficult to diagnose the cause and repair the aircraft due to difficulty duplicating the problem until just prior to replacement of the Engine

Warning Control Unit. The aircraft flew code 1 on 29 May 2020

b. Logistics: New Items: Negative this report period.

7. WASHES:

Washes Accomplished: AF044, AF055

Washes Not Accomplished & Reasons: AF014 – NULLO conversion in-work

AF028 – F-1 Cavity Fuel Leak

Date MDS AF# R/R Discrepancy Corrective Action

15 May

QF-16C

Engine light came on steady, then flickering

R2 5 mod/10 function caution light assembly

20 May QF-16C 049 Engine Warning Lite comes steady R2 Engine warning control unit

Unclassified Page 8 of 42

9. RECOMMENDATIONS: Negative this report period.

10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.

TAB 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL

Note: Off-station sorties reported in this summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.

BQM-167A

Mission Symbol Mission Project Supported #

Missions

FYTD

O5ZZ F-15 OFP/ CTF F-15 OFP/ CTF 0 2

O5ZZ APS TEST APS TEST 0 1

O5ZZ F16 Cruise Missile

Defense Test

F16 Cruise Missile

Defense Test

0 1

O5ZZ AMRAAM SIP AMRAAM SIP 2 4

O5ZZ AIM 9X AIM 9X 0 5

O5ZZ AMR PHS4 AMR PHS4 0 1

O5ZZ WSEP WSEP 0 27

Total 2 41

BQM-167A MAY 20 FYTD

Scheduled 4 72

Canceled 2 30

Successful Flown 2 41

Ground Aborts 0 3

Air Aborts 0 0

Total Flown 2 41

Unclassified Page 9 of 42

BQM-167A

O5ZZ 2.0 32.4

Total 2.0 32.4

Date

MDS

Tail #

Msn Sym

Mission

Reason

6 May BQM167A O5ZZ AMRAAM SIP Project

6 May BQM167A O5ZZ AMRAAM SIP Project

Abort

MDS Tail# Msn

Sym

Mission Reason

a. Hurricane damage to building 256’s roof continues to impact Mx activity and available storage space due to the amount of water intrusion into the hangar. Maintenance time is lost to cleaning it up after any rain. Temporary Mx facilities have been erected, but are awaiting a floor covering change-out before they can be moved into.

b. Minor adjustments to the established Forward Supply point continue, but there are presently no new or major impacts to target generation.

c. The three temporary facilities for SSAT Mx and the two for the chute shop have been identified as “Not safe for Mx personnel during a 5 MILE LIGHTNING LIGHT” and will require evacuation during this entire period. PAE has engaged the 53 WEG leadership for possible alternatives that would negate the need to leave the facilities. Additionally, we have asked for a location to be identified for Mx to go to during this time.

d. We have been notified that all 5 tents (chute shop x 2 and SSAT Mx x 3) will have to be moved. Locations for them are still in discussion.

7. CORROSION CONTROL INSPECTION:

a. Launch Pad Corrosion Control Maintenance: Routine corrosion control is being accomplished on all applicable support equipment.

Unclassified Page 10 of 42 Distribution: A

b. Launch Rail Gantry systems 1, 2, 5, & 6 are showing signs of severe corrosion (they were installed in 1975). Presently, they are all serviceable. However, their replacements should be programmed / considered in the near future. NOTE: Gantries on rails 3 & 4 are newer and will not require replacement any time soon.

Date MDS Tail# R/R Discrepancy Corrective Action

9. RECOMMENDATIONS: None

10. SPECIAL PROJECTS: None

Unclassified Page 11 of 42 Distribution: A

TAB 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M

1. Tellabs Switch and Data/Comm. Operational Availability:

Tellabs Switch: 100% Available

Data/Comm. Circuits: 100% Available

2. Mission Availability:

GRDCS: 100% Available

RCS: 100% Available

Access Net: 100% Available

Mission Video: 100% Available

TPS-75 Radar: Scheduled Available Non-Charge Not Available

Missions 10 9 1 0

Hours 31.00 27.00 4.00 0

Overall Availability: 100% Available ((Available + Non-Charge)/Scheduled)

0%

20%

40%

60%

80%

100%

Tellabs Switch Data/Comm

May 100% 100%

12 month avg 100% 100%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90%

100%

GRDCS RCS AccessNet TPS-75 Mission Video

May 100% 100% 100% 100.0% 100.0%

12 month avg 100% 100% 100% 100.0% 100%

Unclassified Page 12 of 42

3. Summary of Mission Maintenance Actions:

a. 11 May 2020: Performed annual inspection on DLS S/N 114 (ISC Path 2).

b. 13 May 2020: Received from PMEL and installed RF Sensor in 915 DTS S/N 002.

Performed full self-calibration on unit.

c. 14 May 2020: Received DLS S/N 124 from the Navy after AEGIS use. Performed full bench check and reconfigured unit for field use as a DLS spare.

d. 26 May 2020: Performed calibration of Legacy DLS Test Set SN 004.

4. RIS Scheduled Maintenance Summary:

a. GRDCS:

1) Due within 45 Days:

Monthly Console Checks, by 30 June 2020

2) Due within 90 Days:

Data Link Subsystem Annual Checks:

SITE DATE DUE S/N Test Type

RWEr 09 Jun 2020 031 3 Month

SUBW 09 Jun 2020 032 3 Month

D1C 17 Jun 2020 024 Annual

SUBE 18 Jun 2020 025 9 Month

RWSr 30 Jun 2020 019 6 Month

A10 30 Jun 2020 028 6 Month

DEPOT 09 Jun 2020 054 3 Month

B226 15 Jun 2020 135 Annual

Unclassified Page 13 of 42

b. TPS-75 Radar: Accomplished this month and due within 45 Days.

JOB Completed or due from3/30/2020 until 5/29/2020 JST REOCCUR Next Due EQUIP #

/0

/2

/0

/2

/0

/2

/0

/2

/0

/2

/0

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/0

/2

/0

/2

/0

/2

/0

/2

/0

/2

/0

/2

/0

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/1

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/3

/2

/0

/2

/0

/2

/0

/2

ANTENNA TIEDOWN STRAPS AND JACKPAD INSPECTION 24 DAILY RE035 0 1 1 1 1 0 1 1 1 1 1 1 1 1 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1

DAILY PERFORMANCE INSPECTION 24 DAILY RE035 0 1 1 1 1 0 1 1 1 1 1 1 1 1 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P3-2TPS75-6WC-1

UPX 37 DAILY SYSTEM CHECKS - SER # A0109 266 DAILY REA09 0 1 1 1 1 0 1 1 1 1 1 1 1 1 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2UPX37-1 TBL 4-1

UPX 37 DAILY SYSTEM CHECKS - SER # C0126 266 DAILY REA26 2UPX37-1 TBL 4-1

3N1 DAILY PERFORMANCE CHECK 301 DAILY C60A3 0 1 1 1 1 0 1 1 1 1 1 1 1 1 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-177-1 TABLE 2-1

2N1 DAILY PERFORMANCE CHECK 326 DAILY C84B2 0 1 1 1 1 0 1 1 1 1 1 1 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1

DISPLAY CONSOLE TURN ON/OFF 1301 DAILY RE035 0 1 1 1 1 0 1 1 1 1 1 1 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UYQ27-26WC-1

UPA 59 DAILY PREVENTATIVE MAINTENANCE 1308 DAILY RE035 0 1 1 1 1 0 1 1 1 1 1 1 1 1 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UPA59-1-1 & 2

WEATHER/ECM PERFORMANCE ROUTINE 2 7 DAY 6/3/20 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1

RADAR/SIF SYSTEM TEST PERFORMANCE 50 7 DAY 6/2/20 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1

I-F RECEIVER PERFORMANCE ROUTINE 51 7 DAY 6/3/20 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1

HEIGHT PERFORMANCE ROUTINE 73 7 DAY 6/2/20 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1

CLUTTER MAPPING PERFORMANCE ROUTINE 74 7 DAY 6/5/20 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1

COMMUNICATIONS PERFORMANCE ROUTINE 273 7 DAY 6/2/20 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1

POWER SUPPLY TEST PERFORMANCE ROUTINE 273 7 DAY 6/2/20 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1

DISPLAY CONSOLE WEEKLY INSPECTION 1303 7 DAY 6/5/20 RE035 1 1 1 1 0 0 0 0 0 31P1-2UYQ27-26WC-1

ANTENNA/RECEIVER INTERFACE TEST PERFORMANCE ROUTINE 550 14 DAY 6/11/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1

SYSTEM ORIENTATION PERFORMANCE CHECK 993 14 DAY 6/9/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1

AFRADES HEIGHT EVALUATION 999 14 DAY 6/9/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1

AFRADES BEACON PERFORMANCE 1038 14 DAY 6/9/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1

AFRADES CLUTTER ANALYSIS 1041 14 DAY 6/9/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1

AUTO SEQUENCER TEST 1207 14 DAY 6/9/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1

HEAT EXCHANGER SERVICING 1270 14 DAY 6/1/20 RE035 1 1 0 0 0 35E4-177-1 TABLE 2-1

SHELTER CLEANING AND INSPECTION SERVICING 1271 14 DAY 6/4/20 RE035 1 1 0 0 35E4-177-1 TABLE 2-1

COMPRESSOR DEHYDRATOR ON/OFF RATIOS 304 28 DAY 6/15/20 RE035 1 0 31P3-2TPS75-6WC-1

FREQ GENERATOR COHO REF OUTPUT CHECK 1241 28 DAY 6/16/20 RE035 1 0 31P3-2TPS75-6WC-1

FREQ GENERATOR IF TEST TARGET AMPLITUDE CHECK 1245 28 DAY 6/16/20 RE035 1 0 31P3-2TPS75-6WC-1

ANTENNA PEDESTAL AND LEVELING JACK INSPECTION 1250 28 DAY 6/2/20 RE035 1 0 31P3-2TPS75-6WC-1

RF AND SLIP RING TEST 1253 28 DAY 6/9/20 RE035 1 0 31P3-2TPS75-6WC-1

MDS/FAR TEST 1254 28 DAY 6/9/20 RE035 1 0 31P3-2TPS75-6WC-1

AFRADES TILT SENSOR PERFORMANCE 1255 28 DAY 6/9/20 RE035 1 0 31P3-2TPS75-6WC-1

ANTENNA ASSEMBLY CLEANING AND INSPECTION SERVICING 1272 28 DAY 6/18/20 RE035 1 0 31P3-2TPS75-6WC-1

0 = Job Forecast

/ = Partially C/W

1 = C/W

Unclassified Page 14 of 42

SHELTER CORROSION CONTROL INSPECTION AND SERVICING 1273 28 DAY 6/23/20 RE035 1 1 31P3-2TPS75-6WC-1

ANTENNA CORROSION CONTROL INSPECTION AND SERVICING 1274 28 DAY 6/17/20 RE035 1 0 31P3-2TPS75-6WC-1

ANTENNA POWER SUPPLY ENCLOSURE AIR FILTER CLEANING 1274 28 DAY 6/17/20 RE035 1 0 31P3-2TPS75-6WC-1

COMPRESSOR- DEHYDRATOR ASSEMBLY RELIEF VALVE SERVICING 1276 28 DAY 6/2/20 RE035 1 0 31P3-2TPS75-6WC-1

ANTENNA BULL GEAR LUBRICATION 1279 28 DAY 6/25/20 RE035 1 0 31P3-2TPS75-6WC-1

ANTENNA DRIVE MOTOR GEARBOX OIL LEVEL CHECK 1280 28 DAY 6/9/20 RE035 1 0 31P3-2TPS75-6WC-1

TUSK ASSEMBLY, JACKSCREW, AND ANTENNA YOKE LUBRICATION 1281 28 DAY 6/25/20 RE035 1 0 31P3-2TPS75-6WC-1

DISPLAY CONSOLE INSPECTION AND CLEANING 1304 28 DAY 6/12/20 RE035 1 0 31P3-2TPS75-6WC-1

3N1 MONTHLY PERFORMANCE CHECK 323 MONTHLY 6/3/20 C60A3 1 0 35E4-177-1 TABLE 2-1

2N1 MONTHLY PERFORMANCE CHECK 329 MONTHLY 6/3/20 C84B2 1 0 35E4-178-1 TABLE 2-1

UPX 37 QUARTERLY INSPECTION - SER # A0109 283 84 DAY 6/25/20 REA09 0 2UPX37-1 TBL 4-1

UPX 37 QUARTERLY INSPECTION - SER # C0126 283 84 DAY 6/17/20 REA26 0 2UPX37-1 TBL 4-1

TRANSMITTER OIL BREAKDOWN TEST & FILAMENT INTERRUPT CHECK PROCEDURE 1256 84 DAY 6/23/20 RE035 0 31P3-2TPS75-6WC-1

STORAGE TWYSTRON PUMP DOWN 1257 84 DAY 6/17/20 RE035 0 31P3-2TPS75-6WC-1

MODIFIED BEARING LUBRICATION 1282 84 DAY 8/24/20 RE035 1 31P3-2TPS75-6WC-1

ANTENNA LEG ASSEMBLY INSPECTION 1283 84 DAY 6/22/20 RE035 0 31P3-2TPS75-6WC-1

PROCESSOR RACK INSPECTION AND CLEANING 1285 84 DAY 6/25/20 RE035 0 31P3-2TPS75-6WC-1

MODULAR INTERFACE GROUP INSPECTION AND CLEANING 1289 84 DAY 6/19/20 RE035 0 31P3-2TPS75-6WC-1

UPX 37 SEMIANNUAL INSPECTION - SER # A0109 294 168 DAY 6/26/20 REA09 0 2UPX37-1 TBL 4-1

UPX 37 SEMIANNUAL INSPECTION - SER # C0126 294 168 DAY 6/18/20 REA26 0 2UPX37-1 TBL 4-1

TRANSMITTER LIQUID COOLANT SERVICING 1290 168 DAY 9/8/20 RE035 31P3-2TPS75-6WC-1

PPI CIRCUIT CARD INSPECTION AND CLEANING 1291 168 DAY 7/27/20 RE035 31P3-2TPS75-6WC-1

CONTROL MONITOR INSPECTION AND CLEANING 1292 168 DAY 7/15/20 RE035 31P3-2TPS75-6WC-1

ANTENNA AND SHELTER JACKS LUBRICATION 1293 168 DAY 7/1/20 RE035 31P3-2TPS75-6WC-1

UPA 59 PREVENTATIVE MAINTENANCE 1309 168 DAY 6/23/20 RE035 0 31P1-2UPA59-1-1 & 2

ANTENNA DRIVE MOTOR GEARBOX SERVICE 1294 336 DAY 7/29/20 RE035 31P3-2TPS75-6WC-1

PROCESSOR RACK AND CIRCUIT CARD INSPECTION AND CLEANING 1295 336 DAY 7/29/20 RE035 31P3-2TPS75-6WC-1

INTERROGATOR CIRCUIT CARD INSPECTION AND CLEANING 1297 336 DAY 7/29/20 RE035 31P3-2TPS75-6WC-1

DESICCANT CARTRIDGE REPLACEMENT 1298 336 DAY 1/14/21 RE035 31P3-2TPS75-6WC-1

CONTROL MONITOR INSPECTION, CLEANING, AND LUBE 1299 336 DAY 7/13/20 RE035 31P3-2TPS75-6WC-1

HIGH VOLTAGE INSULATED GLOVES TEST SET #1 367 365 DAY 5/7/20 RE035 0 / AFI 91-203, 812.8

HIGH VOLTAGE INSULATED GLOVES TEST SET #2 396 365 DAY 5/4/21 RE035 / / / / / / / / / / / / / / / / / / / / / / 1 AFI 91-203, 812.8

ANNUAL HISTORICAL RECORDS REVIEW 1320 365 DAY 2/6/21 RE035 00-20-1 PARA 10.7.4

ANNUAL FACILITY GROUNDS INSPECTION 1322 365 DAY 12/14/20 RE035

TX HOIST 1323 365 DAY 12/9/20 RE035 31P3-2TPS75-6 Chpt 2 Sec 1

ANT & SHELTER LIFT HARDWARE INSPECTION BY NDI/ TX HOIST 68 365 DAY 12/30/00 RE035 31P3-2TPS75-6 Chpt 2 Sec 1

ANTENNA TIEDOWN STRAPS INSPECT AND REPLACE ALL 1324 720 DAY 1/28/21 RE035 31P3-2TPS75-6

INSPECT AND REPLACE ALL HYDRAULIC HOSES 1325 60 MONTH 06/06/23 RE035 31P3-2TPS75-6

MIL-HDBK-419A PARA 2.3.1, 31-

10-24 Appx B

5. Maintenance and Logistics Problems:

With the dissolution of the sole repair vendor for the proprietary DLS Receiver/Transmitter units, the current cache of four spare units are all that are available. Some DLSr units have been delivered, and are being used on a limited basis. The remaining DLSr delivery date is a moving target, with an anticipated delivery of June 2020.

a. Top Five Report:

b. Long Lead Report:

6. Gulf Range Tower Conditions:

a. Tower for Site RWN:

Hurricane Michael brought down tower containing this antenna.

Temporary tower installed and working well.

Contracts were awarded September 2019 for replacement of this tower.

Temporary tower moved in order for permanent replacement tower to be erected in the original location. Survey was completed, and temporary tower is running at new location.

b. Tower for Site RWW:

Hurricane Michael brought down tower containing this antenna.

Temporary tower installed and working well.

Contracts were awarded September 2019 month for replacement of this tower.

Temporary tower moved in order for permanent replacement tower to be erected in the original location. Survey was completed, and temporary tower is running at new location.

c. Tower for Site APPL:

Hurricane Michael brought down tower containing this antenna.

d. All other towers fully functional.

Top 5 Parts Ordered

NSN Part Number Nomenclature End Item Remarks

4210-00-595-4085 D737907 BRACKETS SHOPUSE Est Due 5 Jun 20

5965-01-593-8311 40709-02 EAR CUSHIONS GRDCS Rec'd 21 May 20

Only two parts were ordered during this reporting period.

Top 5 Parts With Longest Lead Time

Date Ordered NSN Part Number Nomenclature QTY End Item Remarks

19-Jun-18 8010-00-490-7650 MIL-L-81352 LACQUER 1 RADAR Est Due 9 Nov 20

15-Jan-19 7920-00-823-9773 AA1432 TOWEL UTILITY 4 SHOPUSE Est Due 8 Jul 20

16-Oct-19 6625-01-571-1592 N9912A-104/230 SIGNAL ANALYZER 1 EQUIPMENT Est Due 18 Feb 21

10-Dec-19 6625-01-344-9277 SMR27 SIGNAL GENERATOR 2 EQUIPMENT Est Due 31 Dec 20

16-Mar-20 5998-01-326-8767 3D56988G01 CCA 1 RADAR Est Due 13 Jun 20

Unclassified Page 16 of 42 Distribution: A

7. Wendover Status:

a. Building 625 Control Site:

PAE continues to work infrastructure requirements per TSS requests for both a consolidated Wendover only operation and the requirements for a split configuration that would have control at Wendover and drone launches at Dugway. The 388th's contractor

JT3 will provide the WEG an estimate for their support to finish their infrastructure upgrade for the host communications system.

PAE provided locations and quantities for NIPR and SIPR drops within building 625 to aid JT3 with their estimates. Cable and jacks for phones and NIPR computers are installed between the communications room and each location within the building so only the range infrastructure remains to be completed. The TSS is working procurement of the computers and phone instruments.

Based on the consolidated versus split operations plan, the tower needed at building 625 will be new or come from the current Wig Mountain site. The tower at 625 will support antennas for GRDCS, radios and GPS timing. The fastest and most versatile path is to purchase and install a new tower onto the newly built tower base already in place at

Wendover; a new tower would provide increased height (better coverage) at a cost of

~$20K. For either solution, additional RF cable, mounting clamps, etc. must be purchased for the move; a list of those parts was provided to the TSS, ~$6.6K.

GRDCS “New Tech” hardware and software were installed in the Wendover control site; however, the software must be updated to the newest revision in order to become operational.

On 29 April 2019, UTTR 388th personnel reported a water pipe had burst inside the wall of the mechanical room in control site building 625. The water affected several rooms including the console room and server/communications rooms. Per a report from a SPO representative from Hill, none of the WEG owned equipment was damaged and the only required repair for the operations areas is new floor coverings. The break room received more significant damage, primarily to cabinetry and carpet.

b. Launch Pad:

Compressors and power supplies must be purchased for the rails. The 82nd RAs were working this in 2018; there was a contracting hiccup, so funding short stopped the purchase.

Gantries and hoists must be purchased for the launch pad as well as a contract let to install them. PAE completed a design; the narrative for the SOW for the construction must be written before the task can go out for bids.

PAE is developing parts lists for the installation of the rails, power supplies, compressors, grounding, communications, connections for generator, etc.

Fiber equipment must be purchased and installed to provide connectivity from building

625 to the LAMS, and in turn from the LAMS to the launch pad. Much of the hardware from Dugway will be reused when maintenance activities and launch operations move from Dugway; however, several additional items will be needed due to the longer fiber cable runs.

Work continues with environmental approval contractor for the launch and maintenance areas.

Unclassified Page 17 of 42 Distribution: A

c. LAMS Maintenance Shelter:

PAE is working a requirements document to install electrical, grounding, lightning protection, etc.

PAE is developing parts lists for the installation of a compressor, stands to mount items like fire extinguishers, eyewash, AED, etc.

PAE is working a requirements document for a secure storage area within the LAMS.

The LAMS itself was erected; however, it requires repair due to wind damage. The

WEG is working the repair effort.

d. Wendover GRDCS Sites:

The TSS is working lease efforts for the I-80 GRDCS site. This is the single most critical RF point needed to use the Wendover control whether launching from Dugway or Wendover. Site H97 is going through the environmental process. It would also be very helpful for Dugway operations with Wendover control, but it really becomes critical when launch operations move to Wendover. PAE is designing an inclusive site platform for H97.

8. GRDCS and RCS Operating Hours:

9. GRDCS and RCS Accounts Status:

a. GRDCS Accounts:

The GRDCS computers are accessed by user groups rather than by individual accounts. The users are trained for, and only granted access to, the level required to perform their assigned tasks. The three user groups and their level of access are depicted in the following chart.

Mission Support Maintenance Programming &

Engineering

Administration

GRDCS 54.27 15.37 1.42 3.22

RCS 266.00 31.00 34.00 49.00

H o u rs

GRDCS (Operations) CDT (Maintenance) ROOT (Administration)

Hours 68.54 2.52 3.22

GRDCS User Accounts

Unclassified Page 18 of 42 Distribution: A

b. RCS Accounts:

The RCS computers are accessed by user groups rather than by individual accounts. The users are trained for and only granted access to the level required to perform their assigned tasks. The five user groups and their level of access are depicted in the following chart.

10. Engineering and Systems Programming Tasks:

a. Short Title: Testing and evaluation of the maximum GRDCS participant capability.

Summary: Due to the additional GRDCS hardware/software implementation of SIR 451

“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS

External Track Data” with development version 55, test flights are being supported to verify the maximum GRDCS participant capability.

Date Initiated: 24 April 2009

Completion Date (Estimated): TBD, depending on availability of mission(s).

Current Status: 85% complete.

Problems anticipated or encountered: None.

b. Short Title: Test TM connectivity with Bldg. 223 in order to evaluate the external

NDI-AIU C-Band Beacon data with Safety.

Summary: Due to the additional GRDCS hardware/software implementation of SIR 451

“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS

External Track Data” with development version 55, a connectivity test with

TM Bldg 223 is still pending to evaluate the data into GRDCS and RCS.

Date Initiated: 13 July 2009

Completion Date (Estimated): TBD, depending on TM shop and testing results.

Current Status: 0% complete.

Problems anticipated or encountered:

First test on 13 July 2009 was not successful. Bldg. 223 personnel could not start the program. More work on their side is required.

83rd 82nd ROOT USAF_Administr ator

Wetstone MSCT

Hours 0.00 17.50 19.00 38.00 416.00 416.00

RCS User Accounts

Unclassified Page 19 of 42 Distribution: A

c. Short Title: Software installation (Release Candidates 3 & 4) and demonstration of SIRs of GRDCS Software/Hardware Version 61.0 – 61.0.7

Summary: Testing is complete.

Date Initiated: 21 August 2018

Completion Date: 04 December 2019

Current Status: Sufficiency of Test Review (SOTR) for fielding authorization was provided on 04 Mar 2020. SOTR pending field changes at this time. Fielding scheduled for the week of June 15th, 2020.

Problems anticipated or encountered: None at this time.

d. Short Title: User software (increment-13, based on v60.4) installation for the QF-16 DR2

Hardware Changes (SIR 843).

Summary: In process of supporting ground and test flights for the QF-16 DR2 Hardware

Changes with Autopilot v1.7 software.

Date Initiated: 29 June 2018

Completion Date (Estimated): TBD

Current Status: Flight testing is complete at Tyndall and is presently taking place at

Holloman. SIR 843 scheduled to be included in v62 software upgrade.

e. Short Title: Software installation of GRDCS Software V62.0 (29Mar19).

Summary: In process of supporting DT testing for v62.0 for the software upgrade.

Date Initiated: 29 March 2019

Completion Date (Estimated): TBD

Current Status: Demo Phase; Start date 28 Feb 2019 with video (SIR844) and .sml file

(SIR878). Continued on 29 May 19, with SIR 739, 822, 874, 849, 877, and 674.

Supported DT phase at Eglin 21-22 January 2020, 18-19 & 26 February 2020.

11. Special Projects:

a. In process of enhancing locally developed ‘safe flight script’ to handle QF-16 telemetry during the different phases of the safe flight profile (10% complete).

b. Supporting Wendover system evaluation as a first look of the new hardware (console and computer) and software to include local RF environment. (Ongoing effort at this time, no

ETA available yet).

12. ATIS Mission Support (Over-the-Horizon Airborne Relays using platform aircraft):

a. None for this reporting period.

Unclassified Page 20 of 42 Distribution: A

TAB 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA)

METRICS

1. MDSA Metrics:

a. Abort Rate: SDS Criteria FSAT/SSAT < 12%

FSAT = 10.2% (1 AAB + 5 GAB with 59 sorties flown and 0 chargeable GAB lines)

((1 / 59) + (5 / (59 + 0))) x100)

FLCS self-test would not start (HAFB)

Aircraft battery fail

Engine warning light / Master caution light (HAFB)

Engine light (AAB) (HAFB)

Engine warning light (HAFB)

Aircraft battery fail

SSAT = 0.0% (0 AAB + 0 GAB with 2 sorties flown and 0 GAB lines)

((0 / 2) + (0 / (2 + 0))) x100)

b. Repeat/Recur Rate: SDS Criteria FSAT/SSAT < 7%

FSAT = 12.5% (2 Repeat + 0 Recur with 16 PRDs) ((2 / 16) x 100)

SSAT = 0.0% (0 Repeat & 0 Recur with 0 PRDs) ((0 / 0) x 100)

c. Cannibalization Rate: 16.4% (10 Canns with 61 Sorties Flown) ((10 / 61) x 100)

d. Data Integrity Error Rate: SDS Criteria - 98% of correctable errors corrected

100.0% (26 Errors with 1 Uncorrectable and 25 Corrected) (25 / (26 - 1)) (2,575

DDRs checked)

e. Break Rate = 9.8% (6 Code 3s with 61 Sorties Flown) ((6 / 61) x 100)

f. Primary Aerospace Vehicle Authorized (PAA) vs. Possessed (PP) Rate:

FSAT = 100.0% (34 assigned with 34 possessed, 50 baseline and 0 CLIN 4/6 inventory at EOM) ((34 / 34) x 100)

SSAT = 100.0% (46 PAA with 46 possessed and 0 CLIN4/6 inventory at EOM) ((46 /

46) x 100)

g. FSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%

98.3% (70 Sorties attempted with 58 successful and 11 non-chargeable non-successful) ((58 / (70 - 11)) x 100)

h. SSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%

100.0% (4 Sorties attempted with 2 successful and 2 non-chargeable non-successful)

((2 / (4 - 2)) x 100)

Unclassified Page 21 of 42

2. Maintenance and Flying Schedule Effectiveness (MSE and FSE)

a. MSE = 84.4% (768 points scheduled with 648 complied with) ((648 / 768) x 100)

b. FSE = 70.3% (61 sorties flown, with 13 sorties cancelled, 0 sortie added and 22 total

FSE deviations) (((74 - 22) / 74) x 100)) (Of the 22 chargeable deviations, 3 were attributed to maintenance.)

The main driver was 13 Cancels.

Add Lines = 0

Add Tails = 1 (1 Mx)

Cancels = 13 (2 HHQ, 1 Ops, 2 Other, 6 Project, 2 Wx)

Early T/O = 4 (2 Ops, 1 Project, 1 Range)

Late T/O = 4 (2 Mx, 1 HHQ, 1 Sympathy)

GAB Lines = 0

3. Narratives:

Ground & Air Aborts

a. FSAT – There were 3 ground aborts and 1 air abort at Holloman and 2 ground aborts at

Tyndall during May. These aborts involved 4 aircraft.

(1) For the third month in a row, one aircraft recorded 3 aborts. AF049 ground aborted twice and air aborted once, all for engine-related issues.

(a) On 11 May, it ground aborted for Engine Warning Light/Master Caution Light, corrected by replacing the RPM Gauge.

(b) On 15 May, it air aborted for Engine Light, corrected by A System Hydraulic

Warning Light On for A System Lower Pressure Switch, corrected by replacing the 5 Mod/10 Function Caution Light Assembly.

(c) On 20 May, it aborted for Engine Warning Light, corrected by replacing the

EWCU.

(d) AF049 had only recorded 2 other aborts previously – one unrelated ground abort in October 2019 and one air abort in September 2019 for Engine Caution

Light (R2 DEC). This makes it the 35th highest aborting aircraft of the 57 QF-

16s we thus far received.

(2) There were 2 ground aborts for Aircraft Battery Fail, one on AF022 at Tyndall on

11 May and one 10 days later on AF026 at Holloman. Both were corrected by replacing the battery. Neither aircraft has had a similar abort previously. This brings AF026 to a total of 7 ground aborts and 2 air aborts, just 20th in the QF-16

Unclassified Page 22 of 42 Distribution: A abort rankings. AF022 doubles that with a total of 18 ground aborts, the 4th highest of all QF-16s and 2nd highest of the active QF-16s.

(3) There were no other trends noted this month.

(4) The numerical breakouts for May were:

(a) The 6 aborts involved 2 QF-16Cs at Tyndall and 2 at Holloman.

(b) Five aborts occurred on O&M flights and 1 on a customer sorties. All were manned sorties.

(c) The weekly abort distribution was 2 on a Monday, 1 on a Wednesday, 1 on a

Thursday, and 2 on Fridays. Five aborts occurred on scheduled morning sorties and 1 an afternoon sortie.

(d) No sorties were lost to an abort.

b. SSAT – None

Date Base AF # Reason Corrective Action

FSAT

1 May HAFB 44 FLCS Did FLCS self-test x3 on engine run. CND

11 May TAFB 22 Aircraft battery fail R2 aircraft battery

11 May HAFB 49

Engine warning light/Master caution light R2 RPM gauge

15 May HAFB 49 Engine light R2 5 mod/10 function caution light assembly

20 May HAFB 49 Engine warning light R2 EWCU

21 May TAFB 26 Acft battery fail R2 aircraft battery

SSAT

TAB 5 – TECHNICAL REPORT STATUS

Negative this report period.

Unclassified Page 23 of 42 Distribution: A

TAB 6 – QUALITY CONTROL (QC) SUMMARY REPORT

1. Full-Scale - Tyndall:

a. Seventeen Quality Verification Inspections, two SI, and one KTL were accomplished.

Twenty inspections passed. There were zero failures this period.

b. Problem Area: None

c. PQDR/AIDRs: Seven this report period.

DR control # Date CAT ACFT #/Serial # Noun

FA4881-20-0023 5/19/20 AIDR QF056 780600

Leading edge flap rotary actuator has wrong serial number

FA4881-20-0024 5/19/20 AIDR

QF060 780615 Torque shafts overdue time change

FA4881-20-0025 5/19/20 AIDR QF062 780618 Landing Gear 95's missing from jacket file

FA4881-20-0026 5/19/20 AIDR QF056 780767 Torque shafts overdue time change

FA4881-20-0027 5/28/20 AIDR QF062 781788

Main engine feed line bolt not installed. Bolt found inside of ventral panel

FA4881-20-0028 5/28/20 PQDR QF056 781647 GPS Antenna Splitter

FA4881-20-0029 5/28/20 PQDR QF056 781874 VSS Telemetry Antenna

d. AFTO Form 22’s: None this report period.

e. TODO: Sixty-one technical order changes and revisions were received this period.

f. Impoundments: None this report period.

g. FOD/DOP/Lost item: None this report period

2. Full-Scale - Holloman:

a. Eight Quality Verification Inspections, thirteen Special Inspections, twenty-one audits, and four Personnel Evaluation were accomplished. Forty-six inspection/audits passed. One minor for CTK Management.

b. Problem Areas: None this report.

c. PQDRs: One this report period.

1) FA4810-20-0002 DPE Pushbutton Panel

Unclassified Page 24 of 42

d. AFTO Form 22’s: None this report period.

e. TODO: Reviewed 46 Technical Order changes/revisions.

g. FOD/DOP/Lost item: None this report period.

3. Subscale:

a. Five Quality Verification Inspections, seven special inspections, and eight personal evaluations. Nineteen inspections passed. There was one Fail this report period, consisting of

CTK management. There was one minor consisting of Forms documentation.

b. Problem Areas: None this report period.

c. PQDRs: None this report period.

d. AFTO Form 22s: None this report period.

e. TODO: Two technical order change and revision received this period.

g. DOP/Lost Item: None this report period.

4. GRDCS - Tyndall:

a. Four personal evaluations, two Quality Verification Inspections, and two special inspections were accomplished this period. Eight inspections passed. One minor consisting of hazmat overdue verification.

b. AFTO Form 22s: None this report period.

c. PQDRs: None this report period.

d. TODO: Zero technical orders change and revision this period.

e. Problem Areas: None this report period.

5. ESH - Tyndall:

Four inspections this period. One minor for overdue CDL due to short term disability.

Unclassified Page 25 of 42

a. Problem Areas: None this report period.

6. ESH - Holloman:

a. Two were accomplished this month. Zero Failed.

b. Problem Areas: None this report period.

7. Publications and Forms: No contractual impacts this period. See CDRL A009, Master

Document List.

0.7

0.8

0.9

TYN HMN SSAT RIS ESH

QA Inspection Pass Rate Mar - May 2020

Mar

April

May

Unclassified Page 26 of 42 Distribution: A

TAB 7 – RIS MAINTENANCE ANALYSIS REQUESTS

1. ELECTRO-MAGNETIC INTERFERENCE (EMI):

No EMI reported this period.

2. RIS MAINTENANCE ACTIONS:

RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:

183020001 CARRY OVER:

All poles holding Antenna systems at B1801 down due to Hurricane Michael.

N/A No mission impact noted.

MAINT. AREA:

RIS

START DATE:

20181029

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

DISCR. HOURS: EQUIPMENT MAKE: EQUIPMENT MODEL: EQUIPMENT S/N:

N/A N/A N/A N/A

Unclassified Page 27 of 42

183020002 CARRY OVER:

Runway West tower down due to Hurricane Michael.

Temporarily installed mobile DLS trailer at site.

No mission impact noted.

MAINT. AREA:

RIS

START DATE:

20181029

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

183020003 CARRY OVER:

Runway North tower down due to Hurricane

Michael.

Temporarily installed mobile DLS trailer at site.

No mission impact noted.

MAINT. AREA:

RIS

START DATE:

20181029

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

Unclassified Page 28 of 42 Distribution: A

RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:

183020007 CARRY OVER:

ACDS Missile and Drone, Primary and Backup antenna systems down due to Hurricane Michael.

(See RIS# 183020001)

Temporarily installed ACDS

Missile Primary and Backup antennas on Tower 1802.

Temporarily installed Drone

Primary and backup antennas on Tower B1830.

No mission impact noted.

MAINT. AREA:

RIS

START DATE:

20181029

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

183020011 CARRY OVER:

Runway west video is down due to Hurricane

Michael. (See RIS#

183020002)

N/A No mission impact noted.

MAINT. AREA:

RIS

START DATE:

20181029

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

Unclassified Page 29 of 42

190980001 CARRY OVER:

RCS MULTI (RBZ94)

took a lightning strike.

Job opened with COMM

Focal Point (283-4896).

Put GRDCS Multi in RCS

Multi’s slot.

None

MAINT. AREA:

COMM

START DATE:

20190408

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

DISCR. HOURS: BRAND: EQUIPMENT MODEL: EQUIPMENT S/N:

192120101 CARRY OVER:

GSM Transceiver

Communication Error during attempted Self-

Calibration.

IAW w/ T.O., checked all connections. Rebooted system, symptom persisted.

Reported to SPO, awaiting direction. SPO picked up unit for delivery to MSI for repair.

None

MAINT. AREA:

DLS

START DATE:

20190731

STOP DATE:

N/A

REPAIRED BY:

D. Holmes

MAN HOURS:

N/A

COST:

N/A

N/A MSI 915 DTS 003

Unclassified Page 30 of 42

200220001 CARRY OVER:

No receive on

WETSTONE GATR-A

radio (288.5).

Opened a remedy ticket. No mission impact noted.

MAINT. AREA:

COMM

START DATE:

20200122

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

200220101 CARRY OVER:

60% data quality reported on DLSr at

SUBW

Performed DLSr FAT, Oscillator Calibration, and

Pulses Present tests, all tests passed except for

“PA Enable.” RMA requested from MSI.

None

MAINT. AREA:

DLS

START DATE:

20200122

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

N/A MSI DLSr 051

Unclassified Page 31 of 42

200240101 CARRY OVER:

No output reported from DLSr at RWER

No pulses present, oscillator will not calibrate, no output.

RMA requested from

MSI.

None

MAINT. AREA:

DLS

START DATE:

20200124

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

N/A MSI DLSr 030

201150001 CARRY OVER:

TriCaster will not boot.

Awaiting RMA from

NewTek.

No mission impact noted.

MAINT. AREA:

VIDEO

START DATE:

20200424

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

Unclassified Page 32 of 42

201190001 CARRY OVER:

1801 Building UPS has

Temperature alarm and cycles on and off.

Awaiting for GE tech rep to arrive for system troubleshooting.

No mission impact noted.

MAINT. AREA:

1801 UPS

START DATE:

20200428

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

201250001 1801 VHF has intermittent garbled transmit audio.

Removed and replaced

URC-200 radio with parts on hand.

Operational checks good.

No mission impact noted.

MAINT. AREA:

COMM

START DATE:

20200504

STOP DATE:

20200504

REPAIRED BY:

J.TINSLEY

MAN HOURS:

0.5

COST:

N/A

0.5 N/A N/A N/A

Unclassified Page 33 of 42 Distribution: A

RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:

201250002 APTM data inoperative at the aircraft. Requires an operations check prior to mission.

Operational checks good. No mission impact noted.

MAINT. AREA:

APTM

START DATE:

20200504

STOP DATE:

20200509

REPAIRED BY:

J.TINSLEY

MAN HOURS:

0.5

COST:

N/A

121.0 N/A N/A N/A

201270001 SUBE AND SUBW

DLSr’s are inoperative.

SUBE required a power cycle. SUBW had antenna cable removed for building maintenance.

Operational checks good.

No mission impact noted.

MAINT. AREA:

DLS

START DATE:

20200506

STOP DATE:

20200506

REPAIRED BY:

J.TINSLEY

MAN HOURS:

1.0

COST:

N/A

1.0 N/A N/A N/A

Unclassified Page 34 of 42

201310001 AATTCS Console 8 requires conversion to old system for mission support.

Conversion complied with.

Operational checks good.

No mission impact noted.

MAINT. AREA:

AATTCS

START DATE:

20200511

STOP DATE:

20200512

REPAIRED BY:

D.CONTRERAS

MAN HOURS:

1.0

COST:

N/A

15.5 N/A N/A N/A

201330001 Copper cable bundle 04-

03 cut by lightning arrestor contractor during

B1801 install.

N/A. Opened for documentation only.

No mission impact noted.

MAINT. AREA:

COMM

START DATE:

20200512

STOP DATE:

20200512

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

Unclassified Page 35 of 42 Distribution: A

RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:

201330002 Camera control was lost on both cameras at

Subscale launch pad.

Removed and replaced

Pelco Fiber transmitter with parts on hand.

Operational checks good.

No mission impact noted.

MAINT. AREA:

VIDEO

START DATE:

20200512

STOP DATE:

20200514

REPAIRED BY:

D.CONTRERAS

MAN HOURS:

3.5

COST:

N/A

52.0 N/A N/A N/A

201350001 Comm Room 81st

Workstation EI has sidetone present when there should not be.

Removed and replaced EI with parts on hand.

Operational checks good.

No mission impact noted.

MAINT. AREA:

COMM

START DATE:

20200514

STOP DATE:

20200514

REPAIRED BY:

B.WIEBKE

MAN HOURS:

1.0

COST:

N/A

1.5 N/A N/A N/A

Unclassified Page 36 of 42

201350002 SUBW Camera has a broken pan gear.

Removed camera to repair gear.

Reinstalled camera.

Operational checks good.

No mission impact noted.

MAINT. AREA:

VIDEO

START DATE:

20200514

STOP DATE:

20200521

REPAIRED BY:

D.CON/B.WIE

MAN HOURS:

6.0

COST:

N/A

170.0 N/A N/A N/A

201360001 Open:

ACDS Missile Left has fault in Exciter or HPA.

Removed HPA and sent in for repair.

No mission impact noted.

MAINT. AREA:

COMM

START DATE:

20200515

STOP DATE:

N/A

REPAIRED BY:

N/A

MAN HOURS:

N/A

COST:

N/A

Unclassified Page 37 of 42 Distribution: A

RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:

201360002 AATTCS switch #2 failed.

Removed switch from

Newtek system and installed as AATTCS switch #2.

Operational checks good.

No mission impact noted.

MAINT. AREA:

AATTCS

START DATE:

20200515

STOP DATE:

20200515

REPAIRED BY:

K.GIAWASHI

MAN HOURS:

1.0

COST:

N/A

1.0 N/A N/A N/A

201360003 No video at full-scale maintenance control.

Found degraded fiber path.

Rerouted video.

Operational checks good.

No mission impact noted.

MAINT. AREA:

VIDEO

START DATE:

20200515

STOP DATE:

20200515

REPAIRED BY:

D.CONTRERAS

MAN HOURS:

3.0

COST:

N/A

8.0 N/A N/A N/A

Unclassified Page 38 of 42

201360004 During CDT checks on

AATTCS console 8, the touchscreen was unresponsive.

Removed and replaced touchscreen with parts on hand.

Operational checks good.

No mission impact noted.

MAINT. AREA:

AATTCS

START DATE:

20200515

STOP DATE:

20200515

REPAIRED BY:

J.TIN/D.CON

MAN HOURS:

2.0

COST:

N/A

1.0 ELO ET1900L C09L030259

201470001 B9310 APC UPS fails intermittently.

Removed and replaced

UPS battery.

Operational checks good.

No mission impact noted.

MAINT. AREA:

COMM

START DATE:

20200526

STOP DATE:

20200526

REPAIRED BY:

B.WIE/K.GIA

MAN HOURS:

4.0

COST:

N/A

2.0 APC 2200 BATTERY 7A2009L59436

Unclassified Page 39 of 42

TAB 8 – FACILITIES OPEN WORK REQUESTS

TOP FIVE WORK REQUESTS

TOP 5

JOB NO.

BLDG WORK DESCRIPTION STATUS DATE

SUBMITTED

38912

1801 Repair raised floor in room 114. Note:

Submitted by the 81st Range Control Squadron.

CES/CEO

REVIEW

25 Jan 18

39890 239 Repair 239 above-ground storage tank CES/CENPD

REVIEW

13 Nov 19

8513 LP Gate Repair CES

REVIEW

31 Jul 19

38125

45 Pave access road/checkpoint. CES/CENPD

REVIEW

1 Apr 15

59188

Extend existing permanent static ground system inside buildings.

CES/CENM

7 Aug 13

Full Scale Facilities – Building Manager – S. Davis

JOB NO. BLDG WORK DESCRIPTION STATUS DATE SUBMITTED

38125 45 Pave access road/checkpoint.

CES/CENPD

REVIEW

1-Apr-15

59222 45 Roadway Improvement

CES/CENP

REVIEW

21-Nov-13

E2953 9310

Plumb emergency eyewash drain to the building exterior. Install shower pans under emergency showers in Bays 1 and 3 and plumb to drain outside.

CES/FM

PLUMBER

AWT

SCHEDULE

11-Aug-17

38672 9310 Install 26 electrical outlets.

CES/CENP

REVIEW

24-Jan-17

G-0425 9310 Install ice maker

CES/CENPD

IN WORK

26-Jul-19

Unclassified Page 40 of 42 Distribution: A

Range Instrumentation Systems Facilities – Building Manager - R. Williams

JOB NO. BLDG WORK DESCRIPTION STATUS DATE

SUBMITTED

38912 1801 Repair raised floor in room 114. Note:

Submitted by the 81st Range Control Squadron.

CES/CEO

REVIEW

25 Jan 2018

39126 9401 Paint facility. Paint samples collected by CE for Lead

Based Paint testing.

CES/ALOP

SUBMITTED

16 Aug 2018

39211 9350 Replace galvanized communication tower due to

Hurricane Michael damage

CES/ALOP

SUBMITTED

13 Dec 2018

39210 9349 Replace galvanized communication tower due to

Hurricane Michael damage

CES/ALOP

SUNMITTED

13 Dec 2018

39209 1810 Replace galvanized communication tower due to

Hurricane Michael damage

CES/ALOP

SUBMITTED

13 Dec 2018

39285 9352 Tower Alignment-Tensioning and LPS repair CES/ALOP

SUBMITTED

10 Jan 2019

39297 9317 R&R 20’ Tower Ladder. Reinstall LPS

(Ladder Portion Complete)

CES/ALOP

SUBMITTED

(In Progress)

10 Jan 2019

39389 9401 R&R Perimeter Security Fence CES/ALOP

SUBMITTED

31 Jan 2019

39431 9901 Comprehensive tower inspection

(St. George Island)

CES/ALOP

SUBMITTED

13 Feb 2019

G4809 9404 Tower Clearance Light Inoperative CLOSED 27 Mar 2020

G5222 9401 Emergency Light Inop CES/ALOP

SUBMITTED

12 May 2020

Unclassified Page 41 of 42 Distribution: A

Sub Scale Launch Pad – Building Manager - B. Prince

JOB

NO.

BLDG WORK DESCRIPTION STATUS DATE

SUBMITTED

34672 8500 Area Paint buildings and floors. CES/CEPD

REVIEW

24 Jan 06

37441 8519 Install pavement southwest of building.

Project No. XLWU142051D

CES/CENPD

CONTRACT

15 Jun 12

59188 8519

Extend existing permanent static ground system inside buildings.

CES/CENM

REVIEW

7 Aug 13

C7092 8519 Install emergency eyewash/shower stations in the north and south bays.

CES/PLUMER

IN PROGRESS

24 Nov 15

F2434 8525

Rail #4

Repair rail #4 hoist electrical power conduit. CES/ALOP

SUBMITTED

30 Aug 18

8513 LP Gate Repair CES/CEPD

Review

30 Jul 19

G0555 8519 Overhead Light fixture repair CES

Submitted

30 Jul 19

Sub Scale Maintenance Facilities – Building Manager - D. Jacobs

JOB NO. BLDG WORK DESCRIPTION STATUS DATE

SUBMITTED

39890 239 Repair 239 above ground storage tank CES/CENPD

13 Nov 19

TAB 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS

The lack of aircraft deliveries from Boeing is impacting our overall aircraft fleet numbers as well as our ability to manage aircraft hours. Once Boeing has worked through production issues, we expect the number of aircraft deliveries will increase past the 2 deliveries/month as called out in the PWS.

This will impact PAE’s ability to meet Safe Flight time requirements and create a backlog of aircraft awaiting Safe Flights.

Unclassified Page 42 of 42 Distribution: A

All the cleanup of failed data documentation and maintenance processes in aircraft generation from

AMARG and/or Boeing continues to fall on PAE for correction prior to SAFE flight.

Failure to receive delivery aircraft is impacting available manned flyers (Tyndall & Holloman).

Correspondingly, NULLO fleet health/quantity is becoming an issue. Expect continued movement of aircraft to and from Holloman and early De-Man of flyers to keep Tyndall’s NULLO fleet minimally populated.

Severe damage to most of our facilities is causing many workarounds and much turmoil. PAE is managing the situation the best we can. Construction of temporary facilities is almost complete and for the most part the facilities are adequate with a few workarounds.

A major concern is safely moving into temporary facilities while still complying with all AF regulations governing the safe handling and storage of explosive items. Also, we are being told all 5 of the temporary facilities (chute shop & SSAT Mx tents) will have to move. There is a major concern of meeting mission support while moving all 5 tents.