This monthly summary report describes maintenance and operations activities for aerial target programs at Tyndall Air Force Base, Florida and Holloman Air Force Base, New Mexico during November 2020. It provides details on full-scale and subscale aerial target sorties and missions flown, maintenance issues, quality control inspections, range instrumentation system operations and maintenance, and recommendations. Key information includes an abort rate of 9.1% for full-scale aerial targets at Tyndall and no aborts for subscale targets. Maintenance data analysis metrics show maintenance schedule effectiveness of 72% and flying schedule effectiveness of 64.8%. The report identifies no significant trends in maintenance issues or discrepancies during the reporting period.
View the file
Other files for this federal contract opportunity
Show all 50
Aerial Targets III FY23 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AERIAL TARGETS MONTHLY SUMMARY NOVEMBER 2020
Unclassified Page 1 of 42 Distribution: A
Aerial Targets Monthly Contract Summary Report – CDRL A001
Contract Number FA4890-15-C-0018
1 – 30 November 2020
Prepared for:
Acquisition Management and Integration Center
Langley AFB, Virginia
Prepared by:
PAE Aviation and Technical Services, LLC
1001 Florida Avenue
Tyndall AFB, Florida
David Olson
Program Manager
Aerial Targets Program
UNCLASSIFIED
Distribution Limitation: A
Unclassified Page 2 of 42
TABLE OF CONTENTS
Tab 1a – FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL
Tab 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM
Tab 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL
Tab 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M
Tab 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA) METRICS
Tab 5 – TECHNICAL REPORT STATUS
Tab 6 – QUALITY CONTROL (QC) SUMMARY REPORT
Tab 7 – RIS MAINTENANCE ANALYSIS REQUESTS
Tab 8 – FACILITIES OPEN WORK REQUESTS
Tab 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS
Unclassified Page 3 of 42
TAB 1A – FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL
1. SORTIES SCHEDULED:
Note: Off-station sorties reported in this summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
2. MISSIONS FLOWN:
QF-16 NULLO:
Mission Symbol Mission Project Supported # Missions FYTD
O5ZZ WSEP WSEP 1
All O5ZZ 1
Sub Total 1 3
QF-16 MANNED:
Mission Symbol Mission Project Supported # Missions
O3ZZ WSEP WSEP 1
All O3ZZ 1 1
O5ZZ AGTS Tow AGTS 2
O5ZZ Chase AGTS 1
O5ZZ Chaser WSEP 1
O5ZZ Checkerflag O&M 14
O5ZZ JATM JATM 1
All O5ZZ 19 34
O6ZZ Chase Checkerflag 1
O6ZZ FCS Chase O&M 1
O6ZZ SP-3 Chase O&M 1
O6ZZ CT O&M 20
O6ZZ DC-1 O&M 3
O6ZZ DLS-R DC Flight Test O&M 1
O6ZZ FCS O&M 7
O6ZZ JATM O&M 1
O6ZZ LAO O&M 2
O6ZZ SP-x O&M 4
O6ZZ X/C O&M 1
All O6ZZ 42 98
QF-16 NOV 20 FYTD
Scheduled 68 162
Canceled 3 20
Successful Flown 63 139
Ground Aborts 4 8
Air Aborts 1 1
Total Flown 64 140
Unclassified Page 4 of 42 Distribution: A
O8ZZ SAFE O&M 1
All O8ZZ 1 4
Sub Total 63 137
Grand Total 64 140
3. TOTAL HOURS FLOWN:
Mission Symbol Hours FYTD
O5ZZ 1.1 4.0
Sub Total 1.1 4.0
Hours FYTD
O3ZZ 0.9 0.9
O5ZZ 37.1 71.1
O6ZZ 57.4 135.0
O8ZZ 1.0 5.1
Sub Total 96.4 212.1
Grand Total 97.5 216.1
4. MISSIONS CANCELED:
Date
MDS
AF#
Msn
Sym
Mission
Reason
5 Nov QF-16C 21 O5ZZ WSEP Project
12 Nov QF-16C 62 O6ZZ CT Ops
30 Nov QF-16C 62 O6ZZ CT Weather
5. ABORTS – GROUND AND AIR:
Date Type
Abort
MDS AF
Msn
Sym
Mission Reason
2 Nov GAB QF-16C 53 O5ZZ Checkerflag Radios
16 Nov GAB QF-16C 45 O6ZZ SP-1 Intermittent comm
17 Nov GAB QF-16C 48 O6ZZ SP-4 Fuel leak
17 Nov AAB QF-16C 69 O6ZZ SP-4 Landing gear
18 Nov GAB QF-16C 59 O6ZZ DC-1 CADC
Unclassified Page 5 of 42
6. MAINTENANCE AND LOGISTICS PROBLEMS:
a. Maintenance:
(1) QF-16:
(a) AF025 Acceptance INW
(b) AF043 Awaiting SAFE
(c) AF058 Acceptance INW
(d) AF061 Awaiting Acceptance
(e) AF067 Awaiting Acceptance
(f) AF070 Acceptance INW
(g) AF071 Awaiting Acceptance
(h) AF083 Awaiting SAFE
(2) AGE/Support Vehicles:
(a) QF-16 AGE and Support/Test Equipment
1. Procurement of AGE equipment, support/test equipment is continuing.
(b) Stock listed and commercially procured AGE maintenance equipment and tool purchasing in work.
b. Logistics:
(1) Long lead-time (MICAP) on F-16A components is negatively affecting the ability to generate aircraft.
(2) Post Hurricane Michael supply needs are being met via Tyndall AFB and Eglin AFB.
Delays in processing/receiving parts are continual.
(3) IMDS Cloud Migration
(a) Major slowdown in normal processing with near total stoppages for several days.
(b) Resulting in extreme difficulty properly documenting/tracking inspections, time changes, including safety-of-flight issues, parts tracking and debriefing procedures.
(c) Designed and implemented numerous locally designed tracking tools to track data and other issues until IMDS is fully restored.
Unclassified Page 6 of 42
7. WASHES:
a. Washes Accomplished in November 2020:
WEEK ENDING AF#
30 Day: 6 November 070, 050, 062, 056
13 November 065, 024, 027
20 November 022, 023, 029, 047, 045, 048, 053, 040
27 November 069, 026, 052, 031
30 November 059
b. Washes Not Accomplished & Reasons:
AF030 – Awaiting maintenance
AF035 – Awaiting maintenance
AF043 – In acceptance
AF049 – Cabin pressure intermittent
AF060 – Swamp – FTIT gauge
AF066 – De-man in work
AF068 – Hill AFB – Paint
AF083 – In acceptance
c. Wash Schedule for December 2020:
WEEK ENDING AF#
30 Day: 4 December 035, 050, 062, 056, 070
11 December 060, 030, 083, 068, 049, 043, 066, 024
18 December 065, 047, 023, 027, 029, 022, 048, 031
25 December 040, 045, 052, 053, 069
31 December 026, 059
8. REPEAT/RECURRING DISCREPANCIES:
Date MDS AF# R/R Discrepancy Corrective Action
None
9. RECOMMENDATIONS: Negative this report period.
10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.
Unclassified Page 7 of 42
TAB 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM
Note: Off-station sorties reported in this monthly summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
All O5ZZ 0
Sub Total
All O3ZZ XC Paint Input 1 4
All O4ZZ 0
O5ZZ
All O5ZZ 0
O6ZZ C/T Training 9
O6ZZ WITS Training 6
O6ZZ RED AIR Training 6
All O6ZZ 21 34
All O8ZZ 0
Grand Total 22 38
O5ZZ 0.0
NULLO sub Total
Hours FYTD
O3ZZ 1.7 7.4
O4ZZ 0.0
O5ZZ
0.0
QF-16 NOV 20 FYTD
Scheduled 23 44
Canceled 0 4
Successful Flown 22 38
Ground Aborts 3 6
Air Aborts 0 0
Total Flown 22 38
Unclassified Page 8 of 42 Distribution: A
O6ZZ 26.0 44.5
O8ZZ 0.0
Sub Total 27.7 51.9
Grand Total 27.7 51.9
Date MDS AF# Msn
Sym
Mission Reason
Negative this report period
MDS AF# Msn
Sym
Mission Reason
3 Nov GAB QF-16C 044 O6ZZ CT Main gen/Standby generator will not come on line
10 Nov GAB QF-16C 044 O6ZZ WITS DED inop
10 Nov GAB QF-16C 046 O6ZZ WITS Inverter battery will not test
a. Maintenance: We were without AF028 the entire month due to replacement engine needed and AF057 was NMCS for an engine oil tank. Both parts arrived on 30 Nov
b. Logistics: New Items: Negative this report period
7. WASHES:
Washes Accomplished: QF- 055, 057
Washes Not Accomplished & Reasons: AF028 – Engine change
Date MDS AF# Corrective Action
9. RECOMMENDATIONS: Negative this report period.
10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.
Unclassified Page 9 of 42
TAB 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL
Note: Off-station sorties reported in this monthly summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
BQM-167A
Symbol
Mission Project Supported #
Missions
FYTD
O5ZZ Lightning Spear Lightning Spear 0 6
O5ZZ F-15 OFP/ CTF F-15 OFP/ CTF 0 0
O5ZZ AFSAT APS AFSAT APS 0 0
O5ZZ APS Test APS Test 0 0
O5ZZ F16 Cruise Missile Defense
Test
F16 Cruise Missile Defense
Test
0 0
O5ZZ AMRAAM SIP AMRAAM SIP 0 0
O5ZZ AIM 9X AIM 9X 0 0
O5ZZ AMR PHS4 AMR PHS4 0 0
O5ZZ WSEP WSEP 12 14
Total 12 20
BQM-167A
O5ZZ 9.0 16.1
Total 9.0 16.1
BQM-167A NOV 20 FYTD
Scheduled 20 45
Canceled 8 25
Successful Flown 12 20
Ground Aborts 0 0
Air Aborts 0 0
Total Flown 12 20
Unclassified Page 10 of 42
Date
MDS
Tail #
Msn Sym
Reason
3 Nov BQM-167A O5ZZ WSEP Project
3 Nov BQM-167A O5ZZ WSEP Project
5 Nov BQM-167A O5ZZ WSEP Project
6 Nov BQM-167A O5ZZ WSEP Project
10 Nov BQM-167A O5ZZ WSEP Project
10 Nov BQM-167A O5ZZ WSEP Project
12 Nov BQM-167A O5ZZ WSEP Project
12 Nov BQM-167A O5ZZ WSEP Project
MDS Tail# Msn
Sym
Mission Reason
a. Hurricane damage to building 256’s roof continues to worsen and is impacting Mx activity as well as available storage space, due to the amount of water intrusion into the hangar.
Maintenance time is lost to cleaning it up after any rain. Temporary Mx facilities have been erected, but are scheduled to move pending other demolition (see paragraph d.).
b. Minor adjustments to the established Forward Supply point continue, but there are presently no new or major impacts to target generation.
c. The three temporary facilities for SSAT Mx and the two for the chute shop have been identified as “Not safe for Mx personnel during a 5 MILE LIGHTNING LIGHT” and will require evacuation during this entire period. PAE has engaged the 53 WEG leadership for possible alternatives that would negate the need to leave the facilities. Additionally, we have asked for a location to be identified for Mx to go to during this time.
d. We have been notified that all 5 tents (chute shop x 2 and SSAT Mx x 3) will have to be moved to the concrete pads of B256 & B268.
7. CORROSION CONTROL INSPECTION:
a. Launch Pad Corrosion Control Maintenance: Routine corrosion control is being accomplished on all applicable support equipment.
b. Launch Rail Gantry systems 1, 2, 5, & 6 are showing signs of severe corrosion (they were installed in 1975). Presently, they are all serviceable. However, their replacements should be
Unclassified Page 11 of 42 Distribution: A programmed / considered in the near future. NOTE: Gantries on rails 3 & 4 are newer and will not require replacement any time soon.
Date MDS Tail# R/R Discrepancy Corrective Action
9. RECOMMENDATIONS: None
10. SPECIAL PROJECTS: None
Unclassified Page 12 of 42 Distribution: A
TAB 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M
1. Tellabs Switch and Data/Comm. Operational Availability:
Tellabs Switch: 100% Available
Data/Comm. Circuits: 100% Available
2. Mission Availability:
GRDCS: 100% Available
RCS: 100% Available
Access Net: 100% Available
Mission Video: 100% Available
TPS-75 Radar: Scheduled Available Non-Charge Not Available
Missions 19 18 1 0
Hours 73.75 69.25 4.50 0
Overall Availability: 100% Available ((Available + Non-Charge)/Scheduled)
Unclassified Page 13 of 42 Distribution: A
3. Summary of Mission Maintenance Actions:
a. 21 November 2020: Completed annual inspection on DLS S/N 017 (RWN)
b. 22 November 2020: Completed annual inspection on DLS S/N 104 (RWS) and DLS S/N
051 (RWW).
c. 29 November 2020: Performed self-calibrations on 915 DTS S/N 002 and S/N 003;
performed full calibration on legacy DLS Test Set S/N 002.
4. RIS Scheduled Maintenance Summary:
a. GRDCS:
1) Due within 45 Days:
Monthly Console Checks, by 31 December 2020
2) Due within 90 Days:
Data Link Subsystem Annual Checks:
SITE DATE DUE S/N Test Type
A10 14 Dec 2020 028 Annual
D1C 18 Dec 2020 024 6 Month
RWER 27 Dec 2020 031 Annual
DEPOT 27 Dec 2020 054 9 Month
RWSR 29 Dec 2020 018 6 Month
DEPOT 31 Dec 2020 062 3 Month
Unclassified Page 14 of 42
b. TPS-75 Radar: Accomplished this month and due within 45 Days.
JOB Completed or due from8/3/20 until 9/31/2020 JST REOCCUR Next Due EQUIP #
/2 /2
/3 /2
/4 /2
/5 /2
/6 /2
/9 /2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/3
/2
/1 /2
/2 /2
/3 /2
/4 /2
/7 /2
/8 /2
/9 /2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/3
/2
/3
/2
0 0 = Job
Forecast / =
Partially C/W
1 = C/W
ANTENNA TIEDOWN STRAPS AND JACKPAD INSPECTION 24 DAILY RE035 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1
DAILY PERFORMANCE INSPECTION 24 DAILY RE035 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P3-2TPS75-6WC-1
UPX 37 DAILY SYSTEM CHECKS - SER # A0109 266 DAILY REA09 2UPX37-1 TBL 4-1
UPX 37 DAILY SYSTEM CHECKS - SER # C0126 266 DAILY REA26 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2UPX37-1 TBL 4-1
3N1 DAILY PERFORMANCE CHECK 301 DAILY C60A3 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-177-1 TABLE 2-1
2N1 DAILY PERFORMANCE CHECK 326 DAILY C84B2 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1
DISPLAY CONSOLE TURN ON/OFF 1301 DAILY RE035 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UYQ27-26WC-1
UPA 59 DAILY PREVENTATIVE MAINTENANCE 1308 DAILY RE035 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UPA59-1-1 & 2
WEATHER/ECM PERFORMANCE ROUTINE 2 7 DAY 12/2/20 RE035 0 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
RADAR/SIF SYSTEM TEST PERFORMANCE 50 7 DAY 11/30/20 RE035 1 1 1 1 1 0 0 0 0 31P3-2TPS75-6WC-1
I-F RECEIVER PERFORMANCE ROUTINE 51 7 DAY 12/2/20 RE035 0 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
HEIGHT PERFORMANCE ROUTINE 73 7 DAY 12/2/20 RE035 0 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
CLUTTER MAPPING PERFORMANCE ROUTINE 74 7 DAY 12/2/20 RE035 0 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
COMMUNICATIONS PERFORMANCE ROUTINE 273 7 DAY 11/30/20 RE035 1 1 1 1 1 0 0 0 0 31P3-2TPS75-6WC-1
POWER SUPPLY TEST PERFORMANCE ROUTINE 273 7 DAY 11/30/20 RE035 1 1 1 1 1 0 0 0 0 31P3-2TPS75-6WC-1
DISPLAY CONSOLE WEEKLY INSPECTION 1303 7 DAY 12/2/20 RE035 1 1 1 1 0 0 0 31P1-2UYQ27-26WC-1
ANTENNA/RECEIVER INTERFACE TEST PERFORMANCE ROUTINE 550 14 DAY 9/25/20 RE035 0 0 0 0 31P3-2TPS75-6WC-1
SYSTEM ORIENTATION PERFORMANCE CHECK 993 14 DAY 12/8/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1
AFRADES HEIGHT EVALUATION 999 14 DAY 12/8/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1
AFRADES BEACON PERFORMANCE 1038 14 DAY 12/8/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1
AFRADES CLUTTER ANALYSIS 1041 14 DAY 12/8/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1
AUTO SEQUENCER TEST 1207 14 DAY 12/7/20 RE035 1 1 0 0 31P3-2TPS75-6WC-1
HEAT EXCHANGER SERVICING 1270 14 DAY 12/7/20 RE035 1 1 0 0 35E4-177-1 TABLE 2-1
SHELTER CLEANING AND INSPECTION SERVICING 1271 14 DAY 12/4/20 RE035 0 1 0 0 35E4-177-1 TABLE 2-1
COMPRESSOR DEHYDRATOR ON/OFF RATIOS 304 28 DAY 12/1/20 RE035 1 0 0 31P3-2TPS75-6WC-1
FREQ GENERATOR COHO REF OUTPUT CHECK 1241 28 DAY 12/2/20 RE035 1 0 0 31P3-2TPS75-6WC-1
FREQ GENERATOR IF TEST TARGET AMPLITUDE CHECK 1245 28 DAY 12/2/20 RE035 1 0 0 31P3-2TPS75-6WC-1
ANTENNA PEDESTAL AND LEVELING JACK INSPECTION 1250 28 DAY 12/11/20 RE035 1 0 31P3-2TPS75-6WC-1
RF AND SLIP RING TEST 1253 28 DAY 9/29/20 RE035 0 0 31P3-2TPS75-6WC-1
MDS/FAR TEST 1254 28 DAY 9/30/20 RE035 0 0 31P3-2TPS75-6WC-1
AFRADES TILT SENSOR PERFORMANCE 1255 28 DAY 12/22/20 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA ASSEMBLY CLEANING AND INSPECTION SERVICING 1272 28 DAY 12/10/20 RE035 1 0 0 31P3-2TPS75-6WC-1
SHELTER CORROSION CONTROL INSPECTION AND SERVICING 1273 28 DAY 12/11/20 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA CORROSION CONTROL INSPECTION AND SERVICING 1274 28 DAY 12/15/20 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA POWER SUPPLY ENCLOSURE AIR FILTER CLEANING 1274 28 DAY 12/15/20 RE035 1 0 31P3-2TPS75-6WC-1
COMPRESSOR- DEHYDRATOR ASSEMBLY RELIEF VALVE SERVICING 1276 28 DAY 12/3/20 RE035 1 0 0 31P3-2TPS75-6WC-1
ANTENNA BULL GEAR LUBRICATION 1279 28 DAY 12/11/20 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA DRIVE MOTOR GEARBOX OIL LEVEL CHECK 1280 28 DAY 12/21/20 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA TUSK LUBRICATION 1281 28 DAY 12/11/20 RE035 1 0 31P3-2TPS75-6WC-1
Unclassified Page 15 of 42
DISPLAY CONSOLE INSPECTION AND CLEANING 1304 28 DAY 12/23/20 RE035 1 0 31P3-2TPS75-6WC-1
3N1 MONTHLY PERFORMANCE CHECK 323 MONTHLY 12/21/20 C60A3 1 0 35E4-177-1 TABLE 2-1
2N1 MONTHLY PERFORMANCE CHECK 329 MONTHLY 12/21/20 C84B2 1 0 35E4-178-1 TABLE 2-1
UPX 37 QUARTERLY INSPECTION - SER # A0109 283 84 DAY 12/23/20 REA09 0 2UPX37-1 TBL 4-1
UPX 37 QUARTERLY INSPECTION - SER # C0126 283 84 DAY 12/23/20 REA26 0 2UPX37-1 TBL 4-1
TRANSMITTER OIL BREAKDOWN TEST & FILAMENT INTERRUPT CHECK PROCEDURE 1256 84 DAY 12/25/20 RE035 0 31P3-2TPS75-6WC-1
STORAGE TWYSTRON PUMP DOWN 1257 84 DAY 9/8/20 RE035 31P3-2TPS75-6WC-1
MODIFIED BEARING LUBRICATION 1282 84 DAY 12/2/20 RE035 0 31P3-2TPS75-6WC-1
ANTENNA LEG ASSEMBLY INSPECTION 1283 84 DAY 12/18/20 RE035 0 31P3-2TPS75-6WC-1
PROCESSOR RACK INSPECTION AND CLEANING 1285 84 DAY 12/22/20 RE035 0 31P3-2TPS75-6WC-1
MODULAR INTERFACE GROUP INSPECTION AND CLEANING 1289 84 DAY 12/4/20 RE035 0 31P3-2TPS75-6WC-1
UPX 37 SEMIANNUAL INSPECTION - SER # A0109 294 168 DAY 12/14/20 REA09 0 2UPX37-1 TBL 4-1
UPX 37 SEMIANNUAL INSPECTION - SER # C0126 294 168 DAY 12/14/20 REA26 0 2UPX37-1 TBL 4-1
TRANSMITTER LIQUID COOLANT SERVICING 1290 168 DAY 3/19/21 RE035 31P3-2TPS75-6WC-1
PPI CIRCUIT CARD INSPECTION AND CLEANING 1291 168 DAY 1/14/21 RE035 31P3-2TPS75-6WC-1
CONTROL MONITOR INSPECTION AND CLEANING 1292 168 DAY 1/1/21 RE035 31P3-2TPS75-6WC-1
ANTENNA AND SHELTER JACKS LUBRICATION 1293 168 DAY 12/16/20 RE035 0 31P3-2TPS75-6WC-1
UPA 59 PREVENTATIVE MAINTENANCE 1309 168 DAY 12/15/20 RE035 31P1-2UPA59-1-1 & 2
ANTENNA DRIVE MOTOR GEARBOX SERVICE 1294 336 DAY 7/8/21 RE035 31P3-2TPS75-6WC-1
PROCESSOR RACK AND CIRCUIT CARD INSPECTION AND CLEANING 1295 336 DAY 7/1/21 RE035 31P3-2TPS75-6WC-1
INTERROGATOR CIRCUIT CARD INSPECTION AND CLEANING 1297 336 DAY 6/29/21 RE035 31P3-2TPS75-6WC-1
DESICCANT CARTRIDGE REPLACEMENT 1298 336 DAY 1/14/21 RE035 31P3-2TPS75-6WC-1
CONTROL MONITOR INSPECTION, CLEANING, AND LUBE 1299 336 DAY 6/18/21 RE035 31P3-2TPS75-6WC-1
HIGH VOLTAGE INSULATED GLOVES TEST SET #1 367 365 DAY 6/2/21 RE035 AFI 91-203, 812.8
HIGH VOLTAGE INSULATED GLOVES TEST SET #2 396 365 DAY 5/4/21 RE035 AFI 91-203, 812.8
ANNUAL HISTORICAL RECORDS REVIEW 1320 365 DAY 2/6/21 RE035 00-20-1 PARA 10.7.4
ANNUAL FACILITY GROUNDS INSPECTION 1322 365 DAY 12/14/20 RE035 0
MIL-HDBK-419A PARA
2.3.1, 31-10-24 Appx B
TX HOIST 1323 365 DAY 12/9/20 RE035 0 31P3-2TPS75-6 Chpt 2 Sec 1
ANT & SHELTER LIFT HARDWARE INSPECTION BY NDI/ TX HOIST 68 365 DAY 12/30/00 RE035 0 31P3-2TPS75-6 Chpt 2 Sec 1
ANTENNA TIEDOWN STRAPS INSPECT AND REPLACE ALL 1324 720 DAY 1/28/21 RE035 31P3-2TPS75-6
INSPECT AND REPLACE ALL HYDRAULIC HOSES 1325 60 MONTH 6/6/2023 RE035 31P3-2TPS75-6
5. Maintenance and Logistics Problems:
With the dissolution of the sole repair vendor for the proprietary DLS Receiver/Transmitter units, the current cache of four spare units are all that are available. Some DLSr units have been delivered, and are being used on a limited basis. The remaining DLSr delivery date is a moving target, with an anticipated delivery of December 2020.
a. Top Five Report:
b. Long Lead Report:
6. Gulf Range Tower Conditions:
a. Tower for Site RWN:
Hurricane Michael brought down tower containing this antenna.
Temporary tower installed and working well.
Contracts were awarded September 2019 for replacement of this tower.
Temporary tower moved in order for permanent replacement tower to be erected in the original location. Survey was completed, and temporary tower is running at new location.
Pilings curing, metal on-site, estimated completion December 2020.
b. Tower for Site RWW:
Hurricane Michael brought down tower containing this antenna.
Temporary tower installed and working well.
Contracts were awarded September 2019 month for replacement of this tower.
Temporary tower moved in order for permanent replacement tower to be erected in the original location. Survey was completed, and temporary tower is running at new location.
Pilings curing, metal on-site, estimated completion December 2020.
Top 5 Parts Ordered
NSN Part Number Nomenclature End Item Remarks
6145-01-305-3882 MIL-C-3432 POWER CABLE RADAR Est Due 4 Dec 20
5935-01-493-6268 F4PNM-HC CONNECTORS OPSTOCK Rec'd 30 Nov 20
5965-01-593-8311 40709-02 EAR CUSHIONS OPSTOCK Rec'd 17 Nov 20
**There were only 3 parts ordered in the month of November
Top 5 Parts With Longest Lead Time
Date Ordered NSN Part Number Nomenclature QTY End Item Remarks
19-Jun-18 8010-00-490-7650 MIL-L-81352 LACQUER 1 RADAR Est Due 11 Feb 21
15-Oct-19 6625-01-571-1592 N9912A-104 SPEC ANALYZER 1 EQUIPMENT Est Due 15 Jul 21
16-Mar-20 5998-01-326-8767 3D56988G01 CIRCUIT CARD ASBLY 1 RADAR Est Due 21 Dec 20
8-Apr-20 5996-01-475-1564 1366838 TRIGGER AMP 1 SUPPLY POINT Est Due 16 Dec 20
20-Oct-20 5840-01-538-6564 310377 RADIO FREQ EXCITER 1 RADAR Est Due 15 Dec 20
Unclassified Page 17 of 42 Distribution: A
c. Tower for Site APPL:
Hurricane Michael brought down tower containing this antenna.
Project XLWU218109 assigned to replace existing St. George Island tower as a replacement for Apalachicola, awaiting environmental approval.
d. Tower for site RWS:
Project XLWU218101B assigned to new FY21 project to replace existing tower 9352
(RWS).
e. Tower for St. George Island site STG:
Existing former STG tower has been condemned and scheduled for demolition (work order 40226), and a 332 has been submitted to CE for a new tower to replace it. This new tower will eventually house the replacement for the APPL site (and be called STG again).
f. Tower for ACDS @ 1801:
The hardware for the new ACDS tower has been delivered, and concrete pilings have been poured and are curing.
g. All other towers fully functional.
7. Wendover Status:
a. Building 625 Control Site:
PAE continues to work infrastructure requirements per TSS requests for both a consolidated Wendover only operation and the requirements for a split configuration that would have control at Wendover and drone launches at Dugway. The 388th's contractor
JT4 provided the WEG a parts list to finish their infrastructure upgrade for the host communications system. Those parts were received and installed by JT4 in September
2020.
PAE provided locations and quantities for NIPR and SIPR drops within building 625 to aid JT4 with their estimates. The TSS is working procurement of the computers and phone instruments. Separately the WEG is procuring communications equipment required by the 75th CS to provide NIPR, SIPR and phones.
Based on the consolidated versus split operations plan, the tower needed at building 625 will be new or come from the current Wig Mountain site. The tower at 625 will support antennas for GRDCS, radios and GPS timing. The fastest and most versatile path is to purchase and install a new tower onto the newly built tower base already in place at
Wendover; a new tower would provide increased height (better coverage) at a cost of
~$20K. For either solution, additional RF cable, mounting clamps, etc. must be purchased for the move; a list of those parts was provided to the TSS, ~$6.6K.
GRDCS “New Tech” hardware and software were installed in the Wendover control site; however, the software must be updated to the newest revision in order to become operational.
Unclassified Page 18 of 42 Distribution: A
b. Launch Pad:
Compressors and power supplies must be purchased for the rails. The 82nd RAs were working this in 2018; there was a contracting hiccup, so funding short stopped the purchase.
Gantries and hoists must be purchased for the launch pad as well as a contract let to install them. PAE completed a design; the narrative for the SOW for the construction must be written before the task can go out for bids.
PAE is developing parts lists for the installation of the rails, power supplies, compressors, grounding, communications, connections for generator, etc.
Fiber equipment must be purchased and installed to provide connectivity from building
625 to the LAMS, and in turn from the LAMS to the launch pad. Much of the hardware from Dugway will be reused when maintenance activities and launch operations move from Dugway; however, several additional items will be needed due to the longer fiber cable runs.
Work continues with environmental approval contractor for the launch and maintenance areas.
c. LAMS Maintenance Shelter:
PAE is working a requirements document to install electrical, grounding, lightning protection, etc.
PAE is developing parts lists for the installation of a compressor, stands to mount items like fire extinguishers, eyewash, AED, etc.
PAE is working a requirements document for a secure storage area within the LAMS.
The LAMS itself was erected; however, it requires repair due to wind damage. The
WEG is working the repair effort.
d. Wendover GRDCS Sites:
The TSS is working lease efforts for the I-80 GRDCS site. This is the single most critical RF point needed to use the Wendover control whether launching from Dugway or Wendover. Site H97 is going through the environmental process. It would also be very helpful for Dugway operations with Wendover control, but it really becomes critical when launch operations move to Wendover. PAE has designed an inclusive site platform for H97. The TSS ordered parts for H97 and matching parts to replace the existing H87. A portion of those parts was received in September 2020.
8. GRDCS and RCS Operating Hours:
Unclassified Page 19 of 42
9. GRDCS and RCS Accounts Status:
a. GRDCS Accounts:
The GRDCS computers are accessed by user groups rather than by individual accounts. The users are trained for, and only granted access to, the level required to perform their assigned tasks. The three user groups and their level of access are depicted in the following chart.
b. RCS Accounts:
The RCS computers are accessed by user groups rather than by individual accounts. The users are trained for and only granted access to the level required to perform their assigned tasks. The five user groups and their level of access are depicted in the following chart.
10. Engineering and Systems Programming Tasks:
a. Short Title: Testing and evaluation of the maximum GRDCS participant capability.
Summary: Due to the additional GRDCS hardware/software implementation of SIR 451
“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS
External Track Data” with development version 55, test flights are being supported to verify the maximum GRDCS participant capability.
Date Initiated: 24 April 2009
Completion Date (Estimated): TBD, depending on availability of mission(s).
Current Status: 85% complete.
Problems anticipated or encountered: None.
Unclassified Page 20 of 42
b. Short Title: Test TM connectivity with Bldg. 223 in order to evaluate the external
NDI-AIU C-Band Beacon data with Safety.
Summary: Due to the additional GRDCS hardware/software implementation of SIR 451
“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS
External Track Data” with development version 55, a connectivity test with
TM Bldg 223 is still pending to evaluate the data into GRDCS and RCS.
Date Initiated: 13 July 2009
Completion Date (Estimated): TBD, depending on TM shop and testing results.
Current Status: 0% complete.
Problems anticipated or encountered:
First test on 13 July 2009 was not successful. Bldg. 223 personnel could not start the program. More work on their side is required.
c. Short Title: Software installation of GRDCS Software V62.0 (29Mar19).
Summary: In process of supporting DT testing for v62.0 for the software upgrade.
Date Initiated: 29 March 2019
Completion Date (Estimated): TBD
Current Status: Demo Phase; Start date 28 Feb 2019 with video (SIR844) and .sml file
(SIR878). Continued on 29 May 19, with SIR 739, 822, 874, 849, 877, and 674.
Supported DT phase at Eglin 21-22 January 2020, 18-19 & 26 February 2020, 28
September 2020.
Problems anticipated or encountered: None at this time.
d. Short Title: Software installation of GRDCS Software V61.1.0 (09Sep20).
Summary: Installation and testing completed 09-14 Sep 2020.
Date Initiated: 09 September 2020
Completion Date: 14-Sep-2020
Current Status: Awaiting final release authorization.
Problems anticipated or encountered: None at this time.
11. Special Projects:
a. In process of enhancing locally developed ‘safe flight script’ to handle QF-16 telemetry during the different phases of the safe flight profile (10% complete).
b. Supporting Wendover system evaluation as a first look of the new hardware (console and computer) and software to include local RF environment. (Ongoing effort at this time, no
ETA available yet).
c. Carrabelle loop back testing – Identifying characteristics of ISC at GRDCS when Carrabelle designated as the Master ISC. (Ongoing effort at this time, no ETA available yet).
Unclassified Page 21 of 42 Distribution: A
12. ATIS Mission Support (Over-the-Horizon Airborne Relays using platform aircraft):
a. None for this time period.
Unclassified Page 22 of 42 Distribution: A
TAB 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA)
METRICS
1. MDSA Metrics:
a. Abort Rate: SDS Criteria FSAT/SSAT < 12%
FSAT = 9.1% (1 AAB + 7 GAB with 86 sorties flown and 2 chargeable GAB lines)
((1 / 86) + (7 / (86 + 2))) x100)
Radios
Standby and main generator (HAFB)
DED (HAFB)
Inverter battery (HAFB)
Intermittent comm
Fuel leak
Landing Gear
CADC
SSAT = 0.0% (0 AAB + 0 GAB with 12 sorties flown and 0 GAB lines)
((0 / 12) + (0 / (12 + 0))) x100)
b. Repeat/Recur Rate: SDS Criteria FSAT/SSAT < 7%
FSAT = 0.0% (0 Repeat + 0 Recur with 6 PRDs) ((0 / 6) x 100)
SSAT = 0.0% (0 Repeat & 0 Recur with 0 PRDs) ((0 / 0) x 100)
c. Cannibalization Rate: 6.1% (6 Canns with 98 Sorties Flown) ((6 / 98) x 100)
d. Data Integrity Error Rate: SDS Criteria - 98% of correctable errors corrected
100.0% (29 Errors with 2 Uncorrectable and 27 Corrected) (27 / (29 - 2)) (1,848
DDRs checked)
e. Break Rate = 8.2% (8 Code 3s with 98 Sorties Flown) ((8 / 98) x 100)
f. Primary Aerospace Vehicle Authorized (PAA) vs. Possessed (PP) Rate:
FSAT = 92.9% (42 assigned with 39 possessed, 50 baseline and 0 CLIN 4/6 inventory at EOM) ((39 / 42) x 100)
SSAT = 100.0% (37 PAA with 37 possessed and 0 CLIN4/6 inventory at EOM) ((37 /
37) x 100)
g. FSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%
96.6% (91 Sorties attempted with 85 successful and 3 non-chargeable non-successful)
((85 / (91 - 3)) x 100)
h. SSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%
Unclassified Page 23 of 42 Distribution: A
100.0% (20 Sorties attempted with 12 successful and 8 non-chargeable non-successful) ((12 / (20 - 8)) x 100)
2. Maintenance and Flying Schedule Effectiveness (MSE and FSE)
a. MSE = 72.0% (815 points scheduled with 587 complied with) ((587 / 815) x 100)
b. FSE = 64.8% (98 sorties flown, with 10 sorties cancelled, 0 sorties added and 38 total
FSE deviations) (((108 - 38) / 108) x 100)) (Of the 38 chargeable deviations, 6 were attributed to maintenance.)
The main driver was 19 Late Take-Offs.
Add Lines = 0
Add Tails = 2 (2 Mx)
Cancels = 10 (8 Project, 1 Wx, 1 Ops)
Early T/O = 5 (1 ATC, 4 Ops)
Late T/O = 19 (2 Mx, 3 Project, 4 Wx, 4 Sympathy, 4 Ops, 2 ATC)
GAB Lines = 2 (2 Mx)
3. Narratives:
Ground & Air Aborts
a. FSAT – During November, there was 1 air abort at Tyndall, 3 ground aborts at
Holloman and 4 ground aborts at Tyndall.
(1) There was little in the way of observable trends in this month’s aborts:
(a) AF044 was the only aircraft with multiple aborts during November, just as it was in October. It aborted for Standby and Main Generator problems on 3
November (R2 frequency converter, set main switch correctly), then a week later for DED issues (R2 avionics power panel). This aircraft has now ground aborted 10 times since arriving from Boeing. Its last (unrelated) aborts were last month; it has no previous aborts similar to this month’s issues.
(b) There no other real trends in November:
(1) AF053 was the only aircraft that had a previous abort similar to this month’s – Radios this month (R2 UHF) and VHF/UHF in January of this year (R2 UHF R/T). This aircraft has now recorded 5 ground abort as a
QF-16.
(2) AF059 and AF069 both recorded their first aborts since being gained by the
WEG.
Unclassified Page 24 of 42
(2) The numerical breakouts for November were:
(a) All this month’s aborts involved QF-16Cs.
(b) All 8 aborts occurred on O&M flights and were manned sorties.
(c) The weekly abort distribution was 2 on Mondays, 5 on Tuesdays and 1 on a
Wednesday. Six aborts occurred on scheduled morning sorties; 2 were on afternoon sorties.
(d) Two sorties were lost to chargeable ground aborts. One was a WITS mission at Holloman; the other was an SP-4 mission at Tyndall. A third line was flown, but unsuccessful, due to an air abort on a second SP-4 mission at
Tyndall.
b. SSAT – None this month.
Date Base AF # Reason Corrective Action
FSAT
2 Nov TAFB 53 Radios R2 UHF
3 Nov HAFB 44 Standby and main generators
R2 frequency converter, set main switch correctly
10 Nov HAFB 44 DED R2 avionics power panel
10 Nov HAFB 46 Inverter battery R2 FLCS “B” branch inverter battery
16 Nov TAFB 45 Intermittent comm
Associated equipment fault. Bad mic in pilot’s helmet
17 Nov TAFB 48 Fuel leak R2 packing on lower wiggins
17 Nov TAFB 69 Landing gear Removed gear pins
18 Nov TAFB 59 CADC R2 altimeter
SSAT
Unclassified Page 25 of 42 Distribution: A
TAB 5 – TECHNICAL REPORT STATUS
Negative this report period.
TAB 6 – QUALITY CONTROL (QC) SUMMARY REPORT
1. Full-Scale - Tyndall:
a. Nineteen Quality Verification Inspections, Fifteen Special Inspections, and Eight Personnel
Evaluations, Three KTL’s were accomplished. Forty-four inspections passed. There was one failure this period consisting of Munitions Management. One minor consisting of Engine Bay
Inspection.
b. Problem Area: None
c. PQDR/AIDRs: Seven this report period.
DR control # Date CAT Serial # Acft Noun
FA4881-20-0075 2 Nov PQDR
QF031 URAP Software
FA4881-20-0076 2 Nov PQDR
QF021 Canopy Latch Actuator
FA4881-20-0077 9 Nov PQDR
QF065 Transponder Vehicle Interface
FA4881-20-0078 10 Nov PQDR K0656C0374
QF060 HUD EA
FA4881-20-0079 30 Nov PQDR 464 AXI 1553-2 Card
FA4881-20-0080 30 Nov PQDR
124 Transponder Vehicle Interface
FA4881-20-0081 30 Nov PQDR
136 Transponder Vehicle Interface
Unclassified Page 26 of 42
d. AFTO Form 22’s: None this report period.
e. TODO: 97 technical order changes and revisions were received this period.
f. Impoundments: None this report period.
g. FOD/DOP/Lost item: Two this report period.
2. Full-Scale - Holloman:
a. Six Quality Verification Inspections, Sixteen Special Inspections, and Five Personnel
Evaluation were accomplished. Twenty-Seven inspections passed. Two Minors consisting of
Forms documentation.
b. Problem Areas: None this report.
c. PQDRs: None this report period
d. AFTO Form 22’s: None this report period.
e. TODO: Reviewed 65 Technical Order changes/revisions.
g. FOD/DOP/Lost item: None this report period
3. Subscale:
a. Fifteen Quality Verification Inspections, Six special inspections, one audit and nine personal evaluations. Thirty- one inspections passed. Zero fails this report period. There were two minors consisting of Forms Documentation.
b. Problem Areas: None this report period.
c. PQDRs: None this report period.
d. AFTO Form 22s: one this report period.
e. TODO: Eight technical order change and revision received this period.
g. DOP/Lost Item: None this report period.
Unclassified Page 27 of 42
4. GRDCS - Tyndall:
a. Eleven special inspections, five personal evaluations, and one Audit were accomplished this period. Seventeen Inspections Passed. Zero discrepancies this report period.
b. AFTO Form 22s: None this report period.
c. PQDRs: None this report period.
d. TODO: One technical orders change and revision this period.
e. Problem Areas: None this report period.
5. ESH - Tyndall:
a. Seven inspections this period. Seven passed. Zero discrepancies this period.
6. ESH - Holloman:
a. One was accomplished this month. Zero Failed.
7. Publications and Forms: No contractual impacts this period. See CDRL A009, Master
Document List.
Unclassified Page 28 of 42
0.7
0.8
0.9
TYN HMN SSAT RIS ESH
QA Inspection Pass Rate Sep - Nov 2020
Sep
Oct
Nov
Unclassified Page 29 of 42 Distribution: A
TAB 7 – RIS MAINTENANCE ANALYSIS REQUESTS
1. ELECTRO-MAGNETIC INTERFERENCE (EMI):
No EMI reported this period.
2. RIS MAINTENANCE ACTIONS:
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
183020001 CARRY OVER:
All poles holding Antenna systems at B1801 down due to Hurricane Michael.
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
DISCR. HOURS: EQUIPMENT MAKE: EQUIPMENT MODEL: EQUIPMENT S/N:
N/A N/A N/A N/A
Unclassified Page 30 of 42 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
183020002 CARRY OVER:
Runway West tower down due to Hurricane Michael.
Temporarily installed mobile DLS trailer at site.
New tower footers have been poured.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
183020003 CARRY OVER:
Runway North tower down due to Hurricane
Michael.
Temporarily installed mobile DLS trailer at site.
New tower footers have been poured.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 31 of 42
183020007 CARRY OVER:
ACDS Missile and Drone, Primary and Backup antenna systems down due to Hurricane Michael.
(See RIS# 183020001)
Temporarily installed ACDS
Missile Primary and Backup antennas on Tower 1802.
Temporarily installed Drone
Primary and backup antennas on Tower B1830.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
183020011 CARRY OVER:
Runway west video is down due to Hurricane
Michael. (See RIS#
183020002)
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 32 of 42 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
190980001 CARRY OVER:
GRDCS MULTI (RBZ94)
took a lightning strike.
Job opened with COMM
Focal Point (283-4896).
Put WETSTONE Multi in
GRDCS Multi’s slot.
None
MAINT. AREA:
COMM
START DATE:
20190408
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
DISCR. HOURS: BRAND: EQUIPMENT MODEL: EQUIPMENT S/N:
200220101 CARRY OVER:
60% data quality reported on DLSr at
SUBW
Performed DLSr FAT, Oscillator Calibration, and
Pulses Present tests, all tests passed except for
“PA Enable.” RMA requested from MSI.
None
MAINT. AREA:
DLS
START DATE:
20200122
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
N/A MSI DLSr 051
Unclassified Page 33 of 42
201150001 CARRY OVER:
TriCaster will not boot.
Awaiting RMA from
NewTek.
No mission impact noted.
MAINT. AREA:
VIDEO
START DATE:
20200424
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
202040101 CARRY OVER:
No data throughput for
DLSR 019
Test on bench with 915
DTS IAW T.O. All tests failed. RMA requested and received from MSI.
None
MAINT. AREA:
DLSr
START DATE:
20200722
STOP DATE:
REPAIRED BY:
MAN HOURS:
COST:
MSI DLSR 019
Unclassified Page 34 of 42
202900002 CARRY OVER:
The counter tops on
AATTCS Console 2 are delaminating.
N/A No mission impact noted.
MAINT. AREA:
AATTCS
START DATE:
20201016
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
202900003 CARRY OVER:
The counter tops on
AATTCS Console 6 are delaminating.
N/A No mission impact noted.
MAINT. AREA:
AATTCS
START DATE:
20201016
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 35 of 42 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
203070001 AATTCS Console 3 has a bad joystick.
Removed and replaced joystick with parts on hand.
Operational checks good.
No mission impact noted.
MAINT. AREA:
AATTCS
START DATE:
20201102
STOP DATE:
20201103
REPAIRED BY:
B.WIEBKE
MAN HOURS:
0.5
COST:
N/A
18.5 N/A N/A N/A
203090001 ACDS Drone O&MC computer has bad IRIG timing and will not boot due to software error.
Removed and replaced
O&MC computer with parts on hand.
Operational checks good.
No mission impact noted.
MAINT. AREA:
UHF DESTRUCT
START DATE:
20201104
STOP DATE:
20201104
REPAIRED BY:
K.GIA/A.BIG
MAN HOURS:
8.0
COST:
N/A
4.0 N/A N/A N/A
Unclassified Page 36 of 42 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
203090002 GATR-M1 radio doesn’t receive or transmit to aircraft or D1C radio. No audio with squelch off.
Fixed by GATR
Maintenance.
Operational checks good.
No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20201104
STOP DATE:
20201104
REPAIRED BY:
GATR MAINT
MAN HOURS:
0.5
COST:
N/A
0.5 N/A N/A N/A
203110001 RT&T generator test at
D1C power bumped the radios and they lost squelch.
Resent radio commands on the Orion system.
Operational checks good.
No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20201106
STOP DATE:
20201106
REPAIRED BY:
B.WIEBKE
MAN HOURS:
0.3
COST:
N/A
0.3 N/A N/A N/A
Unclassified Page 37 of 42 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
203200001 ACDS Drone O&MC has no video.
Removed and replaced
O&MC computer with parts on hand.
Operational checks good.
No mission impact noted.
MAINT. AREA:
UHF DESTRUCT
START DATE:
20201116
STOP DATE:
20201130
REPAIRED BY:
K.GIA/A.BIG
MAN HOURS:
4.0
COST:
N/A
336.0 N/A N/A N/A
203200002 1801 UHF-1 has no transmit or receive in local or remote.
Removed and replaced with unused radio in rack.
1801 UHF-1 deemed unrepairable.
Operational checks good.
No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20201116
STOP DATE:
20201116
REPAIRED BY:
J.TIN/D.HOL
MAN HOURS:
2.0
COST:
N/A
1.0 N/A N/A N/A
Unclassified Page 38 of 42 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
203220001 Contractor cut a fiber between D1C and D3.
Fiber repaired by contractor.
Operational checks good.
No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20201117
STOP DATE:
20201117
REPAIRED BY:
CONTRACTOR
MAN HOURS:
3.0
COST:
N/A
1.5 N/A N/A N/A
203240001 D3 UHF-3 has distorted receive audio and intermittent squelch breaks.
GATR Maintenance repaired the radio.
Operational checks good.
No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20201119
STOP DATE:
20201123
REPAIRED BY:
GATR MAINT
MAN HOURS:
0.5
COST:
N/A
96.0 N/A N/A N/A
Unclassified Page 39 of 42
TAB 8 – FACILITIES OPEN WORK REQUESTS
TOP FIVE WORK REQUESTS
TOP 5
JOB NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
38912
1801 Repair raised floor in room 114. Note:
Submitted by the 81st Range Control Squadron. Project
No. XLWU208138
CES/CEO
CONTRACT
25 Jan 18
39890 239 Repair 239 above-ground storage tank CES/CENPD
REVIEW
13 Nov 19
8513 LP Gate Repair CES
REVIEW
31 Jul 19
38125
45 Pave access road/checkpoint. CES/CENPD
REVIEW
1 Apr 15
59188
Extend existing permanent static ground system inside buildings.
CES/CENM
7 Aug 13
Full Scale Facilities – Building Manager – S. Davis
JOB
NO.
BLDG WORK DESCRIPTION STATUS DATE SUBMITTED
38125 45 Pave access road/checkpoint.
CES/CENPD
REVIEW
1 Apr 15
59222 45 Roadway Improvement
CES/CENP
REVIEW
21 Nov 13
E2953 9310
Plumb emergency eyewash drain to the building exterior. Install shower pans under emergency showers in
Bays 1 and 3 and plumb to drain outside.
CES/FM
PLUMBER
AWT
SCHEDULE
11 Aug 17
38672 9310 Install 26 electrical outlets.
CES/CENP
REVIEW
24 Jan 17
G-0425 9310 Install ice maker
CES/CENPD
IN WORK
26 Jul 19
6275 98 Install two 220 outlets on west wall of main maintenance room.
CES/ALOP
SUBMITTED
21 Jul 20
Unclassified Page 40 of 42
Range Instrumentation Systems Facilities – Building Manager - R. Williams
JOB NO. BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
38912 1801 Repair raised floor in room 114. Note:
Submitted by the 81st Range Control Squadron.
Project No. XLWU208138
CES/CEO
CONTRACT
25 Jan 18
39126 9401 Paint facility. Paint samples collected by CE for Lead
Based Paint testing.
CES/ALOP
CONTRACT
16 Aug 18
39211 9350 Replace galvanized communication tower due to
Hurricane Michael damage. Project No.
XLWU198107
CES/ALOP
CONTRACT
13 Dec 18
39210 9349 Replace galvanized communication tower due to
Hurricane Michael damage. Project No.
XLWU198107
CES/ALOP
CONTRACT
13 Dec 18
39209 1810 Replace galvanized communication tower due to
Hurricane Michael damage. Project No.
XLWU198107
CES/ALOP
CONTRACT
13 Dec 18
39297 9317 R&R 20’ Tower Ladder. Reinstall LPS
(Ladder Portion Complete)
CES/ALOP
SUBMITTED
(In Progress)
10 Jan 19
39389 9401 R&R Perimeter Security Fence CES/ALOP
CONTRACT
31 Jan 19
40127 9352 Replace 148’ communications tower. Project No.
XLWU218101A/B
CES/ALOP
SUBMITTED
7 Jul 20
40226 9901 Replace 77’ communications tower.
Project No. XLWU218109
CES/ALOP
SUBMITTED
30 Sep 20
Sub Scale Launch Pad – Building Manager - B. Prince
JOB
NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
34672 8500 Area Paint buildings and floors. CES/CEPD
REVIEW
24 Jan 06
37441 8519 Install pavement southwest of building.
Project No. XLWU142051D
CES/CENPD
CONTRACT
15 Jun 12
59188 8519
Extend existing permanent static ground system inside buildings.
CES/CENM
7 Aug 13
Unclassified Page 41 of 42 Distribution: A
C7092 8519 Install emergency eyewash/shower stations in the north and south bays.
CES/PLUMER
IN PROGRESS
24 Nov 15
F2434 8525
Rail #4
Repair rail #4 hoist electrical power conduit. CES/ALOP
SUBMITTED
30 Aug 18
8513 LP Gate Repair CES/CEPD
Review
30 Jul 19
G0555 8519 Overhead Light fixture repair CES
Submitted
30 Jul 19
Sub Scale Maintenance Facilities – Building Manager - D. Jacobs
JOB NO. BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
39890 239 Repair 239 above ground storage tank CES/CENPD
13 Nov 19
Unclassified Page 42 of 42
TAB 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS
The lack of aircraft deliveries from Boeing is impacting our overall aircraft fleet numbers as well as our ability to manage aircraft hours. Once Boeing has worked through production issues, we expect the number of aircraft deliveries will increase past the 2 deliveries/month as called out in the PWS.
This will impact PAE’s ability to meet Safe Flight time requirements and create a backlog of aircraft awaiting Safe Flights.
All the cleanup of failed data documentation and maintenance processes in aircraft generation from
AMARG and/or Boeing continues to fall on PAE for correction prior to SAFE flight.
Failure to receive delivery aircraft is impacting available manned flyers (Tyndall & Holloman).
Correspondingly, NULLO fleet health/quantity is becoming an issue. Expect continued movement of aircraft to and from Holloman and early De-Man of flyers to keep Tyndall’s NULLO fleet minimally populated.
Severe damage to most of our facilities is causing many workarounds and much turmoil. PAE is managing the situation the best we can. Construction of temporary facilities is almost complete and for the most part the facilities are adequate with a few workarounds.
A major concern is safely moving into temporary facilities while still complying with all AF regulations governing the safe handling and storage of explosive items. In addition, we are being told all 5 of the temporary facilities (chute shop & SSAT Mx tents) will have to move. There is a major concern of meeting mission support while moving all 5 tents.
Current problems with IMDS are having a serious impact on mission accomplishment. PAE is working weekend to gain access to this database. Conditions have somewhat improved but still far short of optimum performance.