E-FY21 Monthly Summary Report-Feb 2021.pdf
PDF 2 MB Posted
- Attached to
- Aerial Targets III FY23 Federal contract opportunity
- Solicitation number
- FA489021CPKCA
About this file
This monthly summary report outlines maintenance activities for aerial target programs at Tyndall Air Force Base, Florida and Holloman Air Force Base, New Mexico. It details full-scale and subscale aerial target sorties and missions flown, maintenance issues addressed, quality control inspections, and range instrumentation system operations and maintenance tasks. Key systems supported include the QF-16, BQM-167A, and GRDCS. Major challenges discussed include facility damage from Hurricane Michael and ongoing data system integration problems.
View the file
Other files for this federal contract opportunity
Show all 50
Aerial Targets III FY23 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AERIAL TARGETS MONTHLY SUMMARY FEBRUARY 2021
Unclassified Page 1 of 39 Distribution: A
Aerial Targets Monthly Contract Summary Report – CDRL A001
Contract Number FA4890-15-C-0018
1 – 28 February 2021
Prepared for:
Acquisition Management and Integration Center
Langley AFB, Virginia
Prepared by:
PAE Aviation and Technical Services, LLC
1001 Florida Avenue
Tyndall AFB, Florida
David Olson
Program Manager
Aerial Targets Program
UNCLASSIFIED
Distribution Limitation: A
Unclassified Page 2 of 39
TABLE OF CONTENTS
Tab 1a – FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL
Tab 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM
Tab 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL
Tab 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M
Tab 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA) METRICS
Tab 5 – TECHNICAL REPORT STATUS
Tab 6 – QUALITY CONTROL (QC) SUMMARY REPORT
Tab 7 – RIS MAINTENANCE ANALYSIS REQUESTS
Tab 8 – FACILITIES OPEN WORK REQUESTS
Tab 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS
Unclassified Page 3 of 39
TAB 1A – FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL
1. SORTIES SCHEDULED:
Note: Off-station sorties reported in this summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
2. MISSIONS FLOWN:
QF-16 NULLO:
Mission Symbol Mission Project Supported # Missions FYTD
All O5ZZ 0 4
Sub Total 0 4
QF-16 MANNED:
Mission Symbol Mission Project Supported # Missions
All O3ZZ 0 1
O5ZZ AGTS AGTS 2
O5ZZ A120D A120D 4
O5ZZ CT O&M 2
O5ZZ DACT O&M 2
All O5ZZ 10 59
O6ZZ Checkride O&M 1
O6ZZ CT O&M 26
O6ZZ DACT O&M 4
O6ZZ FCS O&M 5
O6ZZ SAFE O&M 4
O6ZZ SEFE O&M 1
O6ZZ SP-5 O&M 2
All O6ZZ 43 220
O8ZZ SAFE O&M 2
O8ZZ CT O&M 1
All O8ZZ 3 12
Sub Total 56 292
Grand Total 56 296
QF-16 FEB 21 FYTD
Scheduled 76 366
Canceled 20 64
Successful Flown 56 295
Ground Aborts 1 19
Air Aborts 0 1
Total Flown 56 296
Unclassified Page 4 of 39
3. TOTAL HOURS FLOWN:
Mission Symbol Hours FYTD
O5ZZ 0.0 5.0
Sub Total 0.0 5.0
Hours FYTD
O3ZZ 0.0 0.9
O5ZZ 12.9 108.9
O6ZZ 56.1 298.0
O8ZZ 3.6 15.3
Sub Total 72.6 423.1
Grand Total 72.6 428.1
4. MISSIONS CANCELED:
Date
MDS
AF#
Msn
Sym
Mission
Reason
9 Feb QF-16C 53 O6ZZ CT Weather
9 Feb QF-16C 48 O6ZZ CT Weather
9 Feb QF-16C 73 O8ZZ SAFE Weather
9 Feb QF-16C 53 O5ZZ A120D Project
9 Feb QF-16C 48 O5ZZ A120D Project
10 Feb QF-16C 53 O6ZZ FCS Weather
10 Feb QF-16C 56 O6ZZ SAFE Chase Weather
10 Feb QF-16C 73 O8ZZ SAFE Weather
11 Feb QF-16C 48 O6ZZ FCS Weather
11 Feb QF-16C 53 O6ZZ SAFE Chase Weather
11 Feb QF-16C 73 O8ZZ SAFE Weather
16 Feb QF-16C 73 O8ZZ SAFE Weather
18 Feb QF-16C 50 O5ZZ AGTS Tow Weather
18 Feb QF-16C 29 O5ZZ AGTS Chase Weather
18 Feb QF-16C 60 O6ZZ CT Weather
18 Feb QF-16C 60 O6ZZ DACT Weather
18 Feb QF-16C 29 O6ZZ DACT Weather
19 Feb QF-16C 25 O5ZZ SAFE Ops
25 Feb QF-16C 48 O6ZZ DACT HHQ
25 Feb QF-16C 53 O6ZZ DACT HHQ
Unclassified Page 5 of 39
5. ABORTS – GROUND AND AIR:
Date Type
Abort
MDS AF
Msn
Sym
Mission Reason
1 Feb GAB QF-16C 48 O6ZZ CT JFS stopped after start
6. MAINTENANCE AND LOGISTICS PROBLEMS:
a. Maintenance:
(1) QF-16:
(a) AF064 Awaiting SAFE
(b) AF072 Awaiting SAFE
(c) AF074 Acceptance INWK
(2) AGE/Support Vehicles:
(a) QF-16 AGE and Support/Test Equipment
1. Procurement of AGE equipment, support/test equipment is continuing.
(b) Stock listed and commercially procured AGE maintenance equipment and tool purchasing in work.
b. Logistics:
(1) Long lead-time (MICAP) on F-16A components is negatively affecting the ability to generate aircraft.
(2) Post Hurricane Michael supply needs are being met via Tyndall AFB and Eglin AFB.
Delays in processing/receiving parts are continual.
(3) IMDS Cloud Migration
(a) Major slowdown in normal processing with near total stoppages for several days.
(b) Resulting in difficulty properly documenting/tracking inspections, time changes, including safety-of-flight issues, parts tracking and debriefing procedures.
(c) Designed and implemented numerous locally designed tracking tools to track data and other issues until IMDS is fully restored.
Unclassified Page 6 of 39
7. WASHES:
a. Washes Accomplished in February 2021:
WEEK ENDING AF#
30 Day: 5 February 071, 056, 060, 047, 062, 035
12 February 024, 072, 073, 070, 049, 065, 058, 029, 048
19 February 025, 031, 045, 053, 052, 067
26 February 050, 026, 069, 043, 061
b. Washes Not Accomplished & Reasons:
AF023 – Six-year landing gear in work
AF027 – Altimeter
AF030 – Maintenance priority
AF040 – Maintenance priority
AF059 – Maintenance priority
AF066 – De-man in work
AF083 – Fuel probe
c. Wash Schedule for March 2021:
WEEK ENDING AF#
30 Day: 5 March 040, 030, 060, 056, 035, 027, 073, 057, 059
12 March 023, 066, 083, 064, 025, 058, 062, 048
19 March 049, 031, 065, 045, 029, 067, 052, 053
26 March 070, 072, 043, 069, 024, 050, 026, 061
31 March 047
8. REPEAT/RECURRING DISCREPANCIES:
Date MDS AF# R/R Discrepancy Corrective Action
22 Feb QF-16C 29 FTIT read 0 intermittently in flight
9156J300 backshell cleaned
& reassembled
25 Feb QF-16C 29
FTIT gauge to 0 & d/n move throttle, register actual FTIT intermittently through flight In work
9. RECOMMENDATIONS: Negative this report period.
10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.
Unclassified Page 7 of 39
TAB 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM
Note: Off-station sorties reported in this monthly summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
All O5ZZ 0
Sub Total
All O3ZZ XC Paint 5 11
All O4ZZ 0
O5ZZ
All O5ZZ 0
O6ZZ C/T Training 12
O6ZZ Red Air Training 4
O6ZZ WITS Training 5
All O6ZZ 21 80
All O8ZZ 0
Grand Total 26 91
O5ZZ 0.0
NULLO sub Total
Hours FYTD
O3ZZ 8.1 19.4
O4ZZ 0.0
O5ZZ
0.0
QF-16 FEB 21 FYTD
Scheduled 29 113
Canceled 3 20
Successful Flown 26 91
Ground Aborts 1 13
Air Aborts 0 0
Total Flown 26 91
Unclassified Page 8 of 39 Distribution: A
O6ZZ 32.2 111.9
O8ZZ 0.0
Sub Total 40.3 131.3
Grand Total 40.3 131.3
Date MDS AF# Msn
Sym
Mission Reason
3 Feb QF-16C 071 O3ZZ Paint Input MTD
16 Feb QF-16C 055 O6ZZ Red Air Weather
16 Feb QF-16C 046 O6ZZ Red Air Weather
MDS AF# Msn
Sym
Mission Reason
5 Feb GAB QF-16C 068 O6ZZ CT Hydraulic leak in Lt wheel well area
a. Maintenance: Negative this report period
b. Logistics: Negative this report period
7. WASHES:
Washes Accomplished: QF-012 and QF- 046
Washes Not Accomplished & Reasons:
Date MDS AF# Corrective Action
1 Feb QF-16C 051 HUD Altimeter is 300’ low R2 PSA
9. RECOMMENDATIONS: Negative this report period.
10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.
Unclassified Page 9 of 39
TAB 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL
Note: Off-station sorties reported in this monthly summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
BQM-167A
Mission
Symbol
Mission Project Supported #
Missions
FYTD
O5ZZ Lightning Spear Lightning Spear 0 6
O5ZZ F-15 OFP/ CTF F-15 OFP/ CTF 0 0
O5ZZ AFSAT APS AFSAT APS 0 0
O5ZZ APS Test APS Test 0 0
O5ZZ F16 Cruise Missile Defense Test F16 Cruise Missile Defense Test 0 0
O5ZZ AMRAAM SIP AMRAAM SIP 0 0
O5ZZ AIM 9X AIM 9X 0 0
O5ZZ AMR PHS4 AMR PHS4 0 0
O5ZZ WSEP WSEP 9 41
Total 9 47
BQM-167A
O5ZZ 6.7 35.5
Total 6.7 35.5
Date MDS Tail # Msn Sym Mission Reason
18 Feb BQM-167A O5ZZ WSEP Weather
18 Feb BQM-167A O5ZZ WSEP Weather
18 Feb BQM-167A O5ZZ WSEP Weather
BQM-167A FEB 21 FYTD
Scheduled 18 98
Canceled 9 51
Successful Flown 9 46
Ground Aborts 0 1
Air Aborts 0 0
Total Flown 9 47
Unclassified Page 10 of 39 Distribution: A
18 Feb BQM-167A O5ZZ WSEP Weather
19 Feb BQM-167A O5ZZ WSEP Project
23 Feb BQM-167A O5ZZ WSEP Project
23 Feb BQM-167A O5ZZ WSEP Project
24 Feb BQM-167A O5ZZ WSEP Project
24 Feb BQM-167A O5ZZ WSEP Project
MDS Tail# Msn
Sym
Mission Reason
None
a. The tractor used in the recovery area (The Dresser), purchased new in 1987, needs maintenance and replacement parts for the braking system. We have exhausted avenues for support in the surrounding area. The primary issue is that no one wants to work on it because there are no parts available for it. The WEG has been briefed and provided pictures with a rough estimate on replacement cost.
b. Minor adjustments to the established Forward Supply point continue, but there are presently no new or major impacts to target generation, as far as supply support.
c. The three temporary facilities for SSAT Mx and the two for the chute shop have been identified as “Not safe for Mx personnel during a 5 MILE LIGHTNING LIGHT” and will require evacuation during this entire period. PAE has engaged the 53 WEG leadership for possible alternatives that would negate the need to leave the facilities. Additionally, we have asked for a location to be identified for Mx to go to during this time. There has been no guidance issued.
d. We have now been notified that COA #1 is to repair B256 to a livable condition and COA #2 is all 5 tents (chute shop x 2 and SSAT Mx x 3) will have to be moved to the concrete pads of B256 & B268.
7. CORROSION CONTROL INSPECTION:
a. Launch Pad Corrosion Control Maintenance: Routine corrosion control is being accomplished on all applicable support equipment.
b. Launch Rail Gantry systems 1, 2, 5, & 6 are showing signs of severe corrosion (they were installed in 1975). Presently, they are all serviceable. However, their replacements should be programmed / considered in the near future. NOTE: Gantries on rails 3 & 4 are newer and will not require replacement any time soon.
Unclassified Page 11 of 39
Date MDS Tail# R/R Discrepancy Corrective Action
9. RECOMMENDATIONS: None
10. SPECIAL PROJECTS: None
Unclassified Page 12 of 39 Distribution: A
TAB 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M
1. Tellabs Switch and Data/Comm. Operational Availability:
Tellabs Switch: 100% Available
Data/Comm. Circuits: 100% Available
2. Mission Availability:
GRDCS: 100% Available
RCS: 100% Available
Access Net: 100% Available
Mission Video: 100% Available
TPS-75 Radar: Scheduled Available Non-Charge Not Available
Missions 28 25 3 0
Hours 76.00 66.00 10.00 0
Overall Availability: 100% Available ((Available + Non-Charge)/Scheduled)
Unclassified Page 13 of 39 Distribution: A
3. Summary of Mission Maintenance Actions:
a. 5 February 2021: Performed a full bench check of DLS S/N 089 in response to report of no output while installed in E-9 047; unit found to be fully operational, annual inspection requirement completed.
b. 18 February 2021: Completed field calibration and health test on DLS S/N 089 (E-9 047).
c. 25 February 2021: Performed self-calibration on 915 DTS S/N 002. Performed full calibration of legacy DLS Test Set.
d. 26 February 2021: Performed self-calibration of 915 DTS S/N 005.
4. RIS Scheduled Maintenance Summary:
a. GRDCS:
1) Due within 45 Days:
Monthly Console Checks, by 31 March 2021
2) Due within 90 Days:
Data Link Subsystem Annual Checks:
SITE DATE DUE S/N Test Type
E-9 047 01 Mar 2021 123 Annual
Depot 13 Mar 2021 033 Annual
SUBE 18 Mar 2021 030 Annual
SUBW 29 Mar 2021 027 Annual
Santa Rosa Beach 30 Mar 2021 034 Annual
D3 30 Mar 2021 054 Annual
Shell 30 Mar 2021 035 Annual
Carrabelle 30 Mar 2021 036 Annual
Depot 30 Mar 2021 062 6 Month
Unclassified Page 14 of 39
b. TPS-75 Radar: Accomplished this month and due within 45 Days.
JST JOB Completed or due from8/3/20 until 9/31/2020 REOCCUR Next Due EQUIP #
/1
/2
/2
/2
/3
/2
/4
/2
/5
/2
/8
/2
/9
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/1
/2
/2
/2
/3
/2
/4
/2
/5
/2
/8
/2
/9
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/3
/2
/3
/2
/1
/2
0 = Job
Forecast / =
Partially C/W
1 = C/W
24 ANTENNA TIEDOWN STRAPS AND JACKPAD INSPECTION DAILY RE035 1 1 1 1 0 1 1 1 1 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1
24 DAILY PERFORMANCE INSPECTION DAILY RE035 1 1 1 1 0 1 1 1 1 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P3-2TPS75-6WC-1
266 UPX 37 DAILY SYSTEM CHECKS - SER # C0126 DAILY REA26 1 1 1 1 0 1 1 1 1 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2UPX37-1 TBL 4-1
301 3N1 DAILY PERFORMANCE CHECK DAILY C60A3 1 1 1 1 0 1 1 1 1 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2UPX37-1 TBL 4-1
326 2N1 DAILY PERFORMANCE CHECK DAILY C84B2 1 1 1 1 0 1 1 1 1 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-177-1 TABLE 2-1
1301 DISPLAY CONSOLE TURN ON/OFF DAILY RE035 1 1 1 1 0 1 1 1 1 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1
1308 UPA 59 DAILY PREVENTATIVE MAINTENANCE DAILY RE035 1 1 1 1 0 1 1 1 1 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UYQ27-26WC-1
266 UPX 37 DAILY SYSTEM CHECKS - SER # A0109 DAILY REA09 31P1-2UPA59-1-1 & 2
2 WEATHER/ECM PERFORMANCE ROUTINE 7 DAY 3/3/21 RE035 1 1 0 1 0 0 0 0 0 31P3-2TPS75-6WC-1
51 I-F RECEIVER PERFORMANCE ROUTINE 7 DAY 3/2/21 RE035 1 1 0 1 0 0 0 0 0 31P3-2TPS75-6WC-1
73 HEIGHT PERFORMANCE ROUTINE 7 DAY 3/2/21 RE035 1 1 0 1 0 0 0 0 0 31P3-2TPS75-6WC-1
74 CLUTTER MAPPING PERFORMANCE ROUTINE 7 DAY 3/3/21 RE035 1 1 0 1 0 0 0 0 0 31P3-2TPS75-6WC-1
50 RADAR/SIF SYSTEM TEST PERFORMANCE 7 DAY 3/1/21 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
273 COMMUNICATIONS PERFORMANCE ROUTINE 7 DAY 3/1/21 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
273 POWER SUPPLY TEST PERFORMANCE ROUTINE 7 DAY 3/1/21 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
1303 DISPLAY CONSOLE WEEKLY INSPECTION 7 DAY 3/5/21 RE035 1 1 1 0 0 0 0 31P1-2UYQ27-26WC-1
550 ANTENNA/RECEIVER INTERFACE TEST PERFORMANCE ROUTINE 14 DAY 9/25/20 RE035 31P3-2TPS75-6WC-1
993 SYSTEM ORIENTATION PERFORMANCE CHECK 14 DAY 3/8/21 RE035 1 1 0 0 31P3-2TPS75-6WC-1
999 AFRADES HEIGHT EVALUATION 14 DAY 3/11/21 RE035 0 1 0 0 31P3-2TPS75-6WC-1
1038 AFRADES BEACON PERFORMANCE 14 DAY 3/12/21 RE035 0 1 0 0 31P3-2TPS75-6WC-1
1041 AFRADES CLUTTER ANALYSIS 14 DAY 3/12/21 RE035 0 1 0 0 31P3-2TPS75-6WC-1
1207 AUTO SEQUENCER TEST 14 DAY 3/12/21 RE035 1 1 0 0 31P3-2TPS75-6WC-1
1270 HEAT EXCHANGER SERVICING 14 DAY 3/8/21 RE035 1 1 0 0 35E4-177-1 TABLE 2-1
1271 SHELTER CLEANING AND INSPECTION SERVICING 14 DAY 3/12/21 RE035 0 1 0 0 35E4-177-1 TABLE 2-1
304 COMPRESSOR DEHYDRATOR ON/OFF RATIOS 28 DAY 3/2/21 RE035 1 0 0 31P3-2TPS75-6WC-1
1241 FREQ GENERATOR COHO REF OUTPUT CHECK 28 DAY 3/23/21 RE035 1 0 31P3-2TPS75-6WC-1
1245 FREQ GENERATOR IF TEST TARGET AMPLITUDE CHECK 28 DAY 3/23/21 RE035 1 0 31P3-2TPS75-6WC-1
1250 ANTENNA PEDESTAL AND LEVELING JACK INSPECTION 28 DAY 2/25/21 RE035 0 0 31P3-2TPS75-6WC-1
1253 RF AND SLIP RING TEST 28 DAY 9/29/20 RE035 31P3-2TPS75-6WC-1
1254 MDS/FAR TEST 28 DAY 9/30/20 RE035 31P3-2TPS75-6WC-1
1255 AFRADES TILT SENSOR PERFORMANCE 28 DAY 3/26/21 RE035 1 0 31P3-2TPS75-6WC-1
1272 ANTENNA ASSEMBLY CLEANING AND INSPECTION SERVICING 28 DAY 2/25/21 RE035 0 0 31P3-2TPS75-6WC-1
1273 SHELTER CORROSION CONTROL INSPECTION AND SERVICING 28 DAY 3/26/21 RE035 1 0 31P3-2TPS75-6WC-1
1274 ANTENNA CORROSION CONTROL INSPECTION AND SERVICING 28 DAY 3/11/21 RE035 1 0 31P3-2TPS75-6WC-1
1274 ANTENNA POWER SUPPLY ENCLOSURE AIR FILTER CLEANING 28 DAY 3/11/21 RE035 1 0 31P3-2TPS75-6WC-1
1276 COMPRESSOR- DEHYDRATOR ASSEMBLY RELIEF VALVE SERVICING 28 DAY 3/2/21 RE035 1 0 0 31P3-2TPS75-6WC-1
1279 ANTENNA BULL GEAR LUBRICATION 28 DAY 3/5/21 RE035 1 0 31P3-2TPS75-6WC-1
Unclassified Page 15 of 39
1280 ANTENNA DRIVE MOTOR GEARBOX OIL LEVEL CHECK 28 DAY 3/22/21 RE035 1 0 31P3-2TPS75-6WC-1
1281 ANTENNA TUSK LUBRICATION 28 DAY 3/5/21 RE035 1 0 31P3-2TPS75-6WC-1
1304 DISPLAY CONSOLE INSPECTION AND CLEANING 28 DAY 3/26/21 RE035 1 0 31P3-2TPS75-6WC-1
323 3N1 MONTHLY PERFORMANCE CHECK MONTHLY 3/22/21 C60A3 1 0 35E4-177-1 TABLE 2-1
329 2N1 MONTHLY PERFORMANCE CHECK MONTHLY 3/22/21 C84B2 1 0 35E4-178-1 TABLE 2-1
283 UPX 37 QUARTERLY INSPECTION - SER # A0109 84 DAY 3/22/21 REA09 0 2UPX37-1 TBL 4-1
283 UPX 37 QUARTERLY INSPECTION - SER # C0126 84 DAY 3/22/21 REA26 0 2UPX37-1 TBL 4-1
1256 TRANSMITTER OIL BREAKDOWN TEST & FILAMENT INTERRUPT CHECK PROCEDURE 84 DAY 3/29/21 RE035 0 31P3-2TPS75-6WC-1
1257 STORAGE TWYSTRON PUMP DOWN 84 DAY 9/8/20 RE035 31P3-2TPS75-6WC-1
1282 MODIFIED BEARING LUBRICATION 84 DAY 3/15/21 RE035 0 31P3-2TPS75-6WC-1
1283 ANTENNA LEG ASSEMBLY INSPECTION 84 DAY 3/10/21 RE035 0 31P3-2TPS75-6WC-1
1285 PROCESSOR RACK INSPECTION AND CLEANING 84 DAY 3/22/21 RE035 0 31P3-2TPS75-6WC-1
1289 MODULAR INTERFACE GROUP INSPECTION AND CLEANING 84 DAY 5/24/21 RE035 0 0 31P3-2TPS75-6WC-1
294 UPX 37 SEMIANNUAL INSPECTION - SER # A0109 168 DAY 6/9/21 REA09 2UPX37-1 TBL 4-1
294 UPX 37 SEMIANNUAL INSPECTION - SER # C0126 168 DAY 6/9/21 REA26 2UPX37-1 TBL 4-1
1290 TRANSMITTER LIQUID COOLANT SERVICING 168 DAY 3/19/21 RE035 0 31P3-2TPS75-6WC-1
1291 PPI CIRCUIT CARD INSPECTION AND CLEANING 168 DAY 7/15/21 RE035 31P3-2TPS75-6WC-1
1292 CONTROL MONITOR INSPECTION AND CLEANING 168 DAY 6/15/21 RE035 31P3-2TPS75-6WC-1
1293 ANTENNA AND SHELTER JACKS LUBRICATION 168 DAY 6/15/21 RE035 31P3-2TPS75-6WC-1
1309 UPA 59 PREVENTATIVE MAINTENANCE 168 DAY 12/15/20 RE035 31P1-2UPA59-1-1 & 2
1294 ANTENNA DRIVE MOTOR GEARBOX SERVICE 336 DAY 7/8/21 RE035 31P3-2TPS75-6WC-1
1295 PROCESSOR RACK AND CIRCUIT CARD INSPECTION AND CLEANING 336 DAY 7/1/21 RE035 31P3-2TPS75-6WC-1
1297 INTERROGATOR CIRCUIT CARD INSPECTION AND CLEANING 336 DAY 6/29/21 RE035 31P3-2TPS75-6WC-1
1298 DESICCANT CARTRIDGE REPLACEMENT 336 DAY 1/31/22 RE035 0 31P3-2TPS75-6WC-1
1299 CONTROL MONITOR INSPECTION, CLEANING, AND LUBE 336 DAY 6/18/21 RE035 31P3-2TPS75-6WC-1
367 HIGH VOLTAGE INSULATED GLOVES TEST SET #1 365 DAY 6/2/21 RE035 AFI 91-203, 812.8
396 HIGH VOLTAGE INSULATED GLOVES TEST SET #2 365 DAY 5/4/21 RE035 AFI 91-203, 812.8
1320 ANNUAL HISTORICAL RECORDS REVIEW 365 DAY 1/5/22 RE035 00-20-1 PARA 10.7.4
1322 ANNUAL FACILITY GROUNDS INSPECTION 365 DAY 12/7/21 RE035
MIL-HDBK-419A PARA
2.3.1, 31-10-24 Appx B
1323 TX HOIST 365 DAY 12/9/20 RE035 31P3-2TPS75-6 Chpt 2 Sec 1
68 ANT & SHELTER LIFT HARDWARE INSPECTION BY NDI/ TX HOIST 365 DAY 12/30/00 RE035 31P3-2TPS75-6 Chpt 2 Sec 1
1324 ANTENNA TIEDOWN STRAPS INSPECT AND REPLACE ALL 720 DAY 1/28/21 RE035 0 31P3-2TPS75-6
1325 INSPECT AND REPLACE ALL HYDRAULIC HOSES 60 MONTH 6/6/2023 RE035 31P3-2TPS75-6
5. Maintenance and Logistics Problems:
With the dissolution of the sole repair vendor for the proprietary DLS Receiver/Transmitter units, the current cache of four spare units are all that are available. Some DLSr units have been delivered, and are being used on a limited basis. The remaining DLSr delivery date is a moving target, with an anticipated delivery of March 2021.
a. Top Five Report:
b. Long Lead Report:
6. Gulf Range Tower Conditions:
a. Tower for Site RWN:
Hurricane Michael brought down tower containing this antenna.
Temporary tower installed and working well.
Contracts were awarded September 2019 for replacement of this tower.
Temporary tower moved in order for permanent replacement tower to be erected in the original location. Survey was completed, and temporary tower is running at new location.
Pilings curing, metal on-site, estimated completion March 2021.
b. Tower for Site RWW:
Hurricane Michael brought down tower containing this antenna.
Temporary tower installed and working well.
Contracts were awarded September 2019 month for replacement of this tower.
Temporary tower moved in order for permanent replacement tower to be erected in the original location. Survey was completed, and temporary tower is running at new location.
Pilings curing, metal on-site, estimated completion March 2021.
c. Tower for Site APPL:
Hurricane Michael brought down tower containing this antenna.
Project XLWU218109 assigned to replace existing St. George Island tower as a replacement for Apalachicola, awaiting environmental approval.
Top 5 Parts Ordered
NSN Part Number Nomenclature End Item Remarks
6135-01-351-1131 443-9099 BATTERY RADAR Rec'd 17 Feb 21
5935-01-239-9648 MS3101R32-17P CONNECTOR RADAR Est Due 5 Mar 21
4020-00-240-2146 10203740 FIBROUS CORD GRDCS Est Due 3 Apr 21
5965-01-593-8311 40709-02 EAR CUSHION GRDCS Rec'd 10 Feb 21
Only four (4) parts ordered during this timeframe.
Top 5 Parts With Longest Lead Time
Date Ordered NSN Part Number Nomenclature QTY End Item Remarks
19-Jun-18 8010-00-490-7650 MIL-L-81352 LACQUER 1 RADAR Est Due 20 Jun 21
15-Oct-19 6625-01-571-1592 N9912A-104 SPEC ANALYZER 1 EQUIPMENT Est Due 24 Dec 22
16-Mar-20 5998-01-326-8767 3D56988G01 CIRCUIT CARD ASBLY 1 RADAR Est Due 14 Mar 21
20-Oct-20 5840-01-538-6564 310377 RADIO FREQ EXCITER 1 RADAR Est Due 5 Mar 21
26-Oct-20 3439-00-545-3396 40-1-5 DESOLDERING WICK 1 OPS STOCK Est Due 8 Mar 21
Unclassified Page 17 of 39 Distribution: A
d. Tower for site RWS:
Project XLWU218101B assigned to new FY21 project to replace existing tower 9352
(RWS).
e. Tower for St. George Island site STG:
Existing former STG tower has been condemned and scheduled for demolition (work order 40226), and a 332 has been submitted to CE for a new tower to replace it. This new tower will eventually house the replacement for the APPL site (and will be called
STG again).
f. Tower for ACDS @ 1801:
The hardware for the new ACDS tower has been delivered; concrete pilings were poured and are curing.
g. All other towers fully functional.
7. Wendover Status:
a. Building 625 Control Site:
PAE continues to work infrastructure requirements per TSS requests for both a consolidated Wendover only operation and the requirements for a split configuration that would have control at Wendover and drone launches at Dugway. The 388th's contractor
JT4 provided the WEG a parts list to finish their infrastructure upgrade for the host communications system. Those parts were received and installed by JT4 in September
2020.
PAE provided locations and quantities for NIPR and SIPR drops within building 625 to aid JT4 with their estimates. The TSS is working procurement of the computers and phone instruments. Separately the WEG is procuring communications equipment required by the 75th CS to provide NIPR, SIPR and phones.
Based on the consolidated versus split operations plan, the tower needed at building 625 will be new or come from the current Wig Mountain site. The tower at 625 will support antennas for GRDCS, radios and GPS timing. The fastest and most versatile path is to purchase and install a new tower onto the newly built tower base already in place at
Wendover; a new tower would provide increased height (better coverage) at a cost of
~$20K. For either solution, additional RF cable, mounting clamps, etc. must be purchased for the move; a list of those parts was provided to the TSS, ~$6.6K.
GRDCS “New Tech” hardware and software were installed in the Wendover control site; however, the software must be updated to the newest revision in order to become operational.
b. Launch Pad:
Compressors and power supplies must be purchased for the rails. The 82nd RAs were working this in 2018; there was a contracting hiccup, so funding short stopped the purchase.
Gantries and hoists must be purchased for the launch pad as well as a contract let to install them. PAE completed a design; the narrative for the SOW for the construction must be written before the task can go out for bids.
Unclassified Page 18 of 39 Distribution: A
PAE is developing parts lists for the installation of the rails, power supplies, compressors, grounding, communications, connections for generator, etc.
Fiber equipment must be purchased and installed to provide connectivity from building
625 to the LAMS, and in turn from the LAMS to the launch pad. Much of the hardware from Dugway will be reused when maintenance activities and launch operations move from Dugway; however, several additional items will be needed due to the longer fiber cable runs.
Work continues with environmental approval contractor for the launch and maintenance areas.
c. LAMS Maintenance Shelter:
PAE is working a requirements document to install electrical, grounding, lightning protection, etc.
PAE is developing parts lists for the installation of a compressor, stands to mount items like fire extinguishers, eyewash, AED, etc.
PAE is working a requirements document for a secure storage area within the LAMS.
The LAMS itself was erected; however, it requires repair due to wind damage. The
WEG is working the repair effort.
d. Wendover GRDCS Sites:
The TSS is working lease efforts for the I-80 GRDCS site. This is the single most critical RF point needed to use the Wendover control whether launching from Dugway or Wendover. Site H97 is going through the environmental process. It would also be very helpful for Dugway operations with Wendover control, but it really becomes critical when launch operations move to Wendover. PAE has designed an inclusive site platform for H97. The TSS ordered parts for H97 and matching parts to replace the existing H87. A portion of those parts was received in September 2020.
8. GRDCS and RCS Operating Hours:
Unclassified Page 19 of 39 Distribution: A
9. GRDCS and RCS Accounts Status:
a. GRDCS Accounts:
The GRDCS computers are accessed by user groups rather than by individual accounts. The users are trained for, and only granted access to, the level required to perform their assigned tasks. The three user groups and their level of access are depicted in the following chart.
b. RCS Accounts:
The RCS computers are accessed by user groups rather than by individual accounts. The users are trained for and only granted access to the level required to perform their assigned tasks. The five user groups and their level of access are depicted in the following chart.
10. Engineering and Systems Programming Tasks:
a. Short Title: Testing and evaluation of the maximum GRDCS participant capability.
Summary: Due to the additional GRDCS hardware/software implementation of SIR 451
“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS
External Track Data” with development version 55, test flights are being supported to verify the maximum GRDCS participant capability.
Date Initiated: 24 April 2009
Completion Date (Estimated): TBD, depending on availability of mission(s).
Current Status: 85% complete.
Problems anticipated or encountered: None.
b. Short Title: Test TM connectivity with Bldg. 223 in order to evaluate the external
NDI-AIU C-Band Beacon data with Safety.
Unclassified Page 20 of 39 Distribution: A
Summary: Due to the additional GRDCS hardware/software implementation of SIR 451
“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS
External Track Data” with development version 55, a connectivity test with
TM Bldg 223 is still pending to evaluate the data into GRDCS and RCS.
Date Initiated: 13 July 2009
Completion Date (Estimated): TBD, depending on TM shop and testing results.
Current Status: 0% complete.
Problems anticipated or encountered:
First test on 13 July 2009 was not successful. Bldg. 223 personnel could not start the program. More work on their side is required.
c. Short Title: Software installation of GRDCS Software V62.0 (29Mar19).
Summary: In process of supporting DT testing for v62.0 for the software upgrade.
Date Initiated: 29 March 2019
Completion Date (Estimated): TBD
Current Status: OT Testing; Start date 28 Feb 2019 with video (SIR844) and .sml file
(SIR878). Continued on 29 May 19, with SIR 739, 822, 874, 849, 877, and 674.
Supported DT phase at Eglin 21-22 January 2020, 18-19 & 26 February 2020, 28
September 2020; Software installed 17 December 2020.
Problems anticipated or encountered: None at this time.
d. Short Title: v62.0.0 Software installation of GRDCS Software V62.0.0.
Summary: In process of supporting OT testing for v62.0 for the software upgrade.
Date Initiated: 17 December 2020
Completion Date (Estimated): TBD
Current Status: 10% complete.
e. Short Title: v62.0.0 Documentation Evaluation.
Summary: In process of supporting documentation review for v62.0 software.
Date Initiated: 17 December 2020
Completion Date (Estimated): TBD
Current Status: 80% complete.
11. Special Projects:
a. In process of enhancing locally developed ‘safe flight script’ to handle QF-16 telemetry during the different phases of the safe flight profile (10% complete).
b. Supporting Wendover system evaluation as a first look of the new hardware (console and computer) and software to include local RF environment. (Ongoing effort at this time, no
ETA available yet).
c. Carrabelle loop back testing – Identifying characteristics of ISC at GRDCS when Carrabelle designated as the Master ISC. (Ongoing effort at this time, no ETA available yet).
Unclassified Page 21 of 39 Distribution: A
12. ATIS Mission Support (Over-the-Horizon Airborne Relays using platform aircraft):
a. N/A this reporting period
TAB 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA)
METRICS
1. MDSA Metrics:
a. Abort Rate: SDS Criteria FSAT/SSAT < 12%
FSAT = 2.4% (0 AAB + 2 GAB with 82 sorties flown and 0 chargeable GAB lines)
((0 / 82) + (2 / (82 + 0))) x100)
JFS stopped after start
Hydraulic leak left wheel well (HAFB)
SSAT = 0.0% (0 AAB + 0 GAB with 9 sorties flown and 0 GAB lines)
((0 / 9) + (0 / (9 + 0))) x100)
b. Repeat/Recur Rate: SDS Criteria FSAT/SSAT < 7%
FSAT = 11.5% (3 Repeat + 0 Recur with 26 PRDs) ((3 / 26) x 100)
SSAT = 0.0% (0 Repeat & 0 Recur with 0 PRDs) ((0 / 0) x 100)
c. Cannibalization Rate: 6.6% (6 Canns with 91 Sorties Flown) ((6 / 91) x 100)
d. Data Integrity Error Rate: SDS Criteria - 98% of correctable errors corrected
100.0% (25 Errors with 2 Uncorrectable and 23 Corrected) (23 / (25 - 2)) (2,298
DDRs checked)
e. Break Rate = 13.2% (12 Code 3s with 91 Sorties Flown) ((12 / 91) x 100)
f. Primary Aerospace Vehicle Authorized (PAA) vs. Possessed (PP) Rate:
FSAT = 100.0% (46 assigned with 46 possessed, 50 baseline and 0 CLIN 4/6 inventory at EOM) ((46 / 46) x 100)
Unclassified Page 22 of 39
SSAT = 100.0% (37 PAA with 37 possessed and 0 CLIN4/6 inventory at EOM) ((37 /
37) x 100)
g. FSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%
100.0% (106 Sorties attempted with 82 successful and 24 non-chargeable non-successful) ((82 / (106 - 24)) x 100)
h. SSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%
100.0% (18 Sorties attempted with 9 successful and 9 non-chargeable non-successful)
((9 / (18 - 9)) x 100)
2. Maintenance and Flying Schedule Effectiveness (MSE and FSE)
a. MSE = 76.2% (823 points scheduled with 627 complied with) ((627 / 823) x 100)
b. FSE = 64.8% (91 sorties flown, with 31 sorties cancelled, 0 sortie added and 43 total
FSE deviations) (((122 - 43) / 122) x 100)) (Of the 43 chargeable deviations, 2 were attributed to maintenance.)
The main driver was 31 Cancels.
Add Lines = 0
Add Tails = 2 (2 Mx)
Cancels = 31 (2 HHQ, 7 Project, 21 Wx, 1 Ops)
Early T/O = 0
Late T/O = 10 (1 Ops, 5 Project, 4 Wx)
GAB Lines = 0
3. Narratives:
Ground & Air Aborts
a. FSAT – February ended up with two ground aborts recorded – 1 at Tyndall and 1 at
Holloman.
(1) There wasn’t much in the way of trends in this month’s aborts:
(a) AF048 has now recorded 6 ground aborts, the highest total of this month’s aborters. It aborted for JFS Stopped After Start (Bled Hydraulic system “B” to include JFS bottles), its first abort for JFS issues. Its last unrelated occurred in
November 2020.
(b) AF068 ground aborted for Hydraulic Leak in the Left Wheel Well Area
Forward (R2 “B” system reservoir), bringing it to 4 aborts in the FSAT program. This is the only one of this month’s aborting aircraft to have a similar
Unclassified Page 23 of 39 Distribution: A previous abort. In this case, it aborted for the same thing last month (Hydraulic
Leak in the Left Wheel Well Area Forward; CND).
(2) The numerical breakouts for January were:
(a) Both aborts this month involved QF-16Cs.
(b) Both aborts occurred on O&M lines and were manned sorties.
(c) The weekly abort distribution was 1 on a Monday and 1 on a Friday. Both aborts occurred on scheduled morning sorties.
(d) No sorties were lost to an abort this month.
b. SSAT – There were no SSAT aborts recorded this month.
Date Base AF # Reason Corrective Action
FSAT
1 Feb TAFB 48 JFS stopped after start
Bled Hydraulic system “B” to include JFS bottles
5 Feb HAFB 68 Hydraulic leak R2 “B” system reservoir
SSAT
TAB 5 – TECHNICAL REPORT STATUS
Negative this report period.
Unclassified Page 24 of 39
TAB 6 – QUALITY CONTROL (QC) SUMMARY REPORT
1. Full-Scale - Tyndall:
a. Twenty-eight Quality Verification Inspections, fifteen Special Inspections, and nine
Personnel Evaluations were accomplished. Fifty-two inspections passed. Zero failures this report period.
b. Problem Area: None
c. PQDR/AIDRs: Four this report period.
d. AFTO Form 22’s: None this report period.
e. TODO: 54 technical order changes and revisions were received this period.
f. Impoundments: None this report period.
g. FOD/DOP/Lost item: None this report period.
2. Full-Scale - Holloman:
a. Eight Quality Verification Inspections, Eleven Special Inspections, four Personnel Evaluation and one Audit were accomplished. Twenty-four inspections passed. Zero discrepancies this period.
b. Problem Areas: None this report.
c. PQDRs: None this period
d. AFTO Form 22’s: None this report period.
e. TODO: Reviewed 33 Technical Order changes/revisions.
g. FOD/DOP/Lost item: None this report period
Unclassified Page 25 of 39
3. Subscale:
a. Fourteen Quality Verification Inspections, two special inspection, and nine personal evaluations. Twenty-five inspections passed. Zero fails this report period.
b. Problem Areas: None this report period.
c. PQDRs: None this report period.
d. AFTO Form 22s: None this report period.
e. TODO: Eight technical order change and revision received this period.
g. DOP/Lost Item: None this report period.
4. GRDCS - Tyndall:
a. Three Special Inspections and three Personnel Evaluation were accomplished. Six
Inspections passed. Zero discrepancies this report period.
b. AFTO Form 22s: None this report period.
c. PQDRs: None this report period.
d. TODO: One technical orders change and revision this period.
e. Problem Areas: None this report period.
5. ESH - Tyndall:
a. Seven inspections this period. Six passed. One Discrepancy this report period, consisting of munitions management.
6. ESH - Holloman:
a. Two were accomplished this month. Zero failed.
Unclassified Page 26 of 39 Distribution: A
7. Publications and Forms: No contractual impacts this period. See CDRL A009, Master
Document List.
0.7
0.8
0.9
TYN HMN SSAT RIS ESH
QA Inspection Pass Rate Dec 2020 - Feb 2021
Nov
Dec
Jan
Unclassified Page 27 of 39
TAB 7 – RIS MAINTENANCE ANALYSIS REQUESTS
1. ELECTRO-MAGNETIC INTERFERENCE (EMI):
No EMI reported this period.
2. RIS MAINTENANCE ACTIONS:
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
183020001 CARRY OVER:
All poles holding Antenna systems at B1801 down due to Hurricane Michael.
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
DISCR. HOURS: EQUIPMENT MAKE: EQUIPMENT MODEL: EQUIPMENT S/N:
N/A N/A N/A N/A
Unclassified Page 28 of 39
183020002 CARRY OVER:
Runway West tower down due to Hurricane Michael.
Temporarily installed mobile DLS trailer at site.
New tower footers have been poured.
Tower installed.
Acceptance inspection scheduled for 20210301.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
183020003 CARRY OVER:
Runway North tower down due to Hurricane
Michael.
Temporarily installed mobile DLS trailer at site.
New tower footers have been poured.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 29 of 39 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
183020007 CARRY OVER:
ACDS Missile and Drone, Primary and Backup antenna systems down due to Hurricane Michael.
(See RIS# 183020001)
Temporarily installed
ACDS Missile Primary and
Backup antennas on Tower
1802. Temporarily installed
Drone Primary and backup antennas on Tower B1830.
New tower under construction.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
183020011 CARRY OVER:
Runway west video is down due to Hurricane
Michael. (See RIS#
183020002)
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 30 of 39
190980001 CARRY OVER:
GRDCS MULTI (RBZ94)
took a lightning strike.
Job opened with COMM
Focal Point (283-4896).
Put WETSTONE Multi in
GRDCS Multi’s slot.
None
MAINT. AREA:
COMM
START DATE:
20190408
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
DISCR. HOURS: BRAND: EQUIPMENT MODEL: EQUIPMENT S/N:
200220101 CARRY OVER:
60% data quality reported on DLSr at
SUBW
Performed DLSr FAT, Oscillator Calibration, and
Pulses Present tests, all tests passed except for
“PA Enable.” RMA requested from MSI.
None
MAINT. AREA:
DLS
START DATE:
20200122
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
N/A MSI DLSr 051
Unclassified Page 31 of 39
201150001 CARRY OVER:
TriCaster will not boot.
Awaiting RMA from
NewTek.
No mission impact noted.
MAINT. AREA:
VIDEO
START DATE:
20200424
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
202040101 CARRY OVER:
No data throughput for
DLSR 019
Test on bench with 915
DTS IAW T.O. All tests failed. RMA requested and received from MSI.
None
MAINT. AREA:
DLSr
START DATE:
20200722
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
N/A MSI DLSR 019
Unclassified Page 32 of 39
202900002 CARRY OVER:
The counter tops on
AATTCS Console 2 are delaminating.
N/A No mission impact noted.
MAINT. AREA:
AATTCS
START DATE:
20201016
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
202900003 CARRY OVER:
The counter tops on
AATTCS Console 6 are delaminating.
N/A No mission impact noted.
MAINT. AREA:
AATTCS
START DATE:
20201016
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 33 of 39 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
210060101 OPEN: No data throughput for DLSR
Test on bench with 915
DTS IAW T.O. All tests failed. RMA requested and received from MSI.
None
MAINT. AREA:
DLS
START DATE:
20210106
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
N/A MSI DLSR 016
210120101 OPEN: 915 DTS
failure
RMA issued from MSI None
MAINT. AREA:
DLS
START DATE:
20210112
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
N/A MSI 915 DTS 003
Unclassified Page 34 of 39
210140101 OPEN: No data throughput for DLSR
Test on bench with 915
DTS IAW T.O. All tests failed. RMA requested and received from MSI.
MSI Repair in progress.
None
MAINT. AREA:
DLS
START DATE:
20210114
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
N/A MSI DLSR 025
210340001 All Orion comm in
B256 requires relocation to B256A & C.
Relocation complied with.
Operational checks good.
No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20210203
STOP DATE:
20210204
REPAIRED BY:
J.TINSLEY
MAN HOURS:
8.5
COST:
N/A
26.5 N/A N/A N/A
Unclassified Page 35 of 39
210470001 SAFETY NET is bad.
Audio scratchy on
AATTCS console 7R.
Removed and replaced
End Instrument with parts on hand.
COMM
START DATE:
20210216
STOP DATE:
20210216
REPAIRED BY:
K.GIA/A.BIG
MAN HOURS:
1.0
COST:
N/A
0.5 N/A N/A N/A
210500001 Tyndall RAPCON
EMC-31 has no receive audio at Tyndall
RAPCON. Verified problem is on Tyndall end.
Problem repaired at
RAPCON.
COMM
START DATE:
20210219
STOP DATE:
20210223
REPAIRED BY:
RAPCON
MAN HOURS:
0.5
COST:
N/A
96.0 N/A N/A N/A
Unclassified Page 36 of 39 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
210550001 OPEN: 81st, 82nd, and
83rd Digital Logger quit recording.
N/A No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20210224
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 37 of 39
TAB 8 – FACILITIES OPEN WORK REQUESTS
TOP FIVE WORK REQUESTS
TOP 5
JOB NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
38912
1801 Repair raised floor in room 114. Note:
Submitted by the 81st Range Control Squadron. Project
No. XLWU208138
CES/CEO
CONTRACT
25 Jan 18
39890 239 Repair 239 above-ground storage tank CES/CENPD
REVIEW
13 Nov 19
8513 LP Gate Repair CES
REVIEW
31 Jul 19
38125
45 Pave access road/checkpoint. CES/CENPD
REVIEW
1 Apr 15
59188
Extend existing permanent static ground system inside buildings.
CES/CENM
7 Aug 13
Full Scale Facilities – Building Manager – S. Davis
JOB
NO.
BLDG WORK DESCRIPTION STATUS DATE SUBMITTED
38125 45 Pave access road/checkpoint.
CES/CENPD
REVIEW
1 Apr 15
59222 45 Roadway Improvement
CES/CENP
REVIEW
21 Nov 13
G-0425 9310 Install ice maker
CES/CENPD
IN WORK
26 Jul 19
6275 98 Install two 220 outlets on west wall of main maintenance room.
CES/ALOP
SUBMITTED
21 Jul 20
Range Instrumentation Systems Facilities – Building Manager - R. Williams
JOB NO. BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
38912 1801 Repair raised floor in room 114. Note:
Submitted by the 81st Range Control Squadron.
Project No. XLWU208138
CES/CEO
CONTRACT
25 Jan 18
39211 9350 Replace galvanized communication tower due to
Hurricane Michael damage. Project No.
XLWU198107
CES/ALOP
CONTRACT
13 Dec 18
Unclassified Page 38 of 39 Distribution: A
39210 9349 Replace galvanized communication tower due to
Hurricane Michael damage. Project No.
XLWU198107
CES/ALOP
CONTRACT
13 Dec 18
39209 1810 Replace galvanized communication tower due to
Hurricane Michael damage. Project No.
XLWU198107
CES/ALOP
CONTRACT
13 Dec 18
39297 9317 R&R 20’ Tower Ladder. Reinstall LPS
(Ladder Portion Complete)
CES/ALOP
SUBMITTED
(In Progress)
10 Jan 19
39389 9401 R&R Perimeter Security Fence CES/ALOP
CONTRACT
31 Jan 19
40127 9352 Replace 148’ communications tower. Project No.
XLWU218101A/B
CES/ALOP
SUBMITTED
7 Jul 20
40226 9901 Replace 77’ communications tower.
Project No. XLWU218109
CES/ALOP
SUBMITTED
30 Sep 20
Sub Scale Launch Pad – Building Manager - B. Prince
JOB
NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
34672 8500 Area Paint buildings and floors. CES/CEPD
REVIEW
24 Jan 06
37441 8519 Install pavement southwest of building.
Project No. XLWU142051D
CES/CENPD
CONTRACT
15 Jun 12
59188 8519
Extend existing permanent static ground system inside buildings.
CES/CENM
REVIEW
7 Aug 13
C7092 8519 Install emergency eyewash/shower stations in the north and south bays.
CES/PLUMER
IN PROGRESS
24 Nov 15
F2434 8525
Rail #4
Repair rail #4 hoist electrical power conduit. CES/ALOP
SUBMITTED
30 Aug 18
8513 LP Gate Repair CES/CEPD
Review
30 Jul 19
G0555 8519 Overhead Light fixture repair CES
Submitted
30 Jul 19
Sub Scale Maintenance Facilities – Building Manager - D. Jacobs
JOB NO. BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
39890 239 Repair 239 above ground storage tank CES/CENPD
13 Nov 19
Unclassified Page 39 of 39
TAB 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS
All the cleanup of failed data documentation and maintenance processes in aircraft generation from
AMARG and/or Boeing continues to fall on PAE for correction prior to SAFE flight.
Severe damage to most of our facilities is causing many workarounds and much turmoil. PAE is managing the situation the best we can. Construction of temporary facilities is almost complete and for the most part the facilities are adequate with a few workarounds.
A major concern is safely moving into temporary facilities while still complying with all AF regulations governing the safe handling and storage of explosive items. In addition, we are being told all 5 of the temporary facilities (chute shop & SSAT Mx tents) will have to move. There is a major concern of meeting mission support while moving all 5 tents.
PAE continues to experience problems with IMDS. Large portions of the workday are lost awaiting the system to respond or to complete jobs. The push of SAFE aircraft data from REMIS to IMDS has taken an average of 2 weeks to complete recently, directly affecting the acceptance process.
SSAT Mx data recording is to be removed from IMDS and migrated to GO-81. This will require
PAE to get Mx Control personnel trained in GO-81 operations. The SPO is aware of the situation and promises training will be provided.