J-FY19 Monthly Summary Report-Jul 2019.pdf
PDF 1 MB Posted
- Attached to
- Aerial Targets III FY23 Federal contract opportunity
- Solicitation number
- FA489021CPKCA
About this file
This monthly summary report outlines aerial target and range instrumentation maintenance activities for July 2019 in support of contracts FA4890-15-C-0018 and FA4890-21CPKCA. Key details include:
-
Maintenance of 31 QF-16 aircraft and 48 BQM-167 subscale drones at Tyndall and Holloman AFBs, with periodic deployments to UTTR. 92 sorties were flown with 2 air aborts and 5 ground aborts.
-
Operations and maintenance of the GRDCS and RCS range instrumentation systems, including repairs to towers and antennas damaged by Hurricane Michael and hardware/software upgrades. 22 maintenance requests were addressed without mission impact.
-
Quality control and safety inspections across platforms showed high pass rates with minor issues addressed.
-
Preparation for the August UTTR deployment and facility repairs are ongoing following hurricane damage. Contractor concerns include reduced aircraft numbers from Boeing delays and managing temporary facilities.
View the file
Other files for this federal contract opportunity
Show all 50
Aerial Targets III FY23 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AERIAL TARGETS MONTHLY SUMMARY JULY 2019
Unclassified Page 1 of 42
Distribution: A
Aerial Targets Monthly Contract Summary Report – CDRL A001
Contract Number FA4890-15-C-0018
1 – 31 July 2019
Prepared for:
Acquisition Management and Integration Center
Langley AFB, Virginia
Prepared by:
PAE Aviation and Technical Services, LLC
1311 Florida Avenue
Tyndall AFB, Florida
David Olson
Program Manager
Aerial Targets Program
UNCLASSIFIED
Distribution Limitation: A
Unclassified Page 2 of 42
Distribution: A
TABLE OF CONTENTS
Tab 1A– FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL
Tab 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM
Tab 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL
Tab 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M
Tab 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA) METRICS
Tab 5 – TECHNICAL REPORT STATUS
Tab 6 – QUALITY CONTROL (QC) SUMMARY REPORT
Tab 7 – RIS MAINTENANCE ANALYSIS REQUESTS
Tab 8 – FACILITIES OPEN WORK REQUESTS
Tab 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS
Unclassified Page 3 of 42
TAB 1A – FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL
1. SORTIES SCHEDULED:
Note: Off-station sorties reported in this summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
2. MISSIONS FLOWN:
QF-16 NULLO:
Mission Symbol Mission Project Supported # Missions FYTD
O5ZZ AMRAAM PHS 4 OT AMRAAM 2
O5ZZ Tasker Tasker 1
All O5ZZ 3 13
Sub Total 3 13
QF-16 MANNED:
Mission Symbol Mission Project Supported # Missions
O5ZZ Chase AMRAAM 1
O5ZZ Chase Tasker 1
O5ZZ JATM JATM 2
All O5ZZ 4 48
O6ZZ CT O&M 40
O6ZZ DC-x O&M 1
O6ZZ GRDCS V61 Flt Eval O&M 2
O6ZZ FCS O&M 15
O6ZZ IP O&M 2
O6ZZ SAFE Profile Test O&M 1
O6ZZ SEFE O&M 1
O6ZZ SP-x O&M 2
O6ZZ XC O&M 16
All O6ZZ 80 490
O8ZZ FCS / Checkride O&M 1
O8ZZ SAFE O&M 4
All O8ZZ 5 15
Sub Total 89 553
Grand Total 92 566
QF-16 JUL 19 FYTD
Scheduled 99 671
Canceled 6 100
Successful Flown 91 563
Ground Aborts 3 34
Air Aborts 1 3
Total Flown 92 566
Unclassified Page 4 of 42
3. TOTAL HOURS FLOWN:
Mission Symbol Hours FYTD
O5ZZ 2.6 12.7
Sub Total 2.6 12.7
Hours FYTD
O5ZZ 7.4 80.6
O6ZZ 107.7 670.6
O8ZZ 6.5 18.7
Sub Total 121.6 769.9
Grand Total 124.2 782.6
4. MISSIONS CANCELED:
Date
MDS
AF#
Msn
Sym
Mission
Reason
3 Jul QF-16A 15 O5ZZ TASKER Project
10 Jul QF-16A 37 O6ZZ CT Weather
10 Jul QF-16C 48 O6ZZ CT Weather
10 Jul QF-16A 41 O6ZZ CT Weather
10 Jul QF-16C 48 O6ZZ FCS / Checkride Weather
10 Jul QF-16A 37 O6ZZ SEFE Weather
5. ABORTS – GROUND AND AIR:
Date Type
Abort
MDS AF
Msn
Sym
Mission Reason
2 Jul GAB QF-16C 7 O5ZZ AMR PHS 4 OT Anti-skid
15 Jul AAB QF-16C 26 O6ZZ CT Fuel gauge
25 Jul GAB QF-16C 22 O5ZZ OCF Right brake
6. MAINTENANCE AND LOGISTICS PROBLEMS:
a. Maintenance:
(1) QF-16:
(a) AF047 Acceptance In Work
(2) AGE/Support Vehicles:
Unclassified Page 5 of 42
Distribution: A
(a) QF-16 AGE and Support/Test Equipment
1. Procurement of AGE equipment, support/test equipment is continuing.
(b) Stock listed and commercially procured AGE maintenance equipment and tools purchasing in work.
(c) Post Hurricane Michael vehicle damage repairs continuing.
b. Logistics:
(1) Long lead time (MICAP) on F-16A components is negatively impacting the ability to generate aircraft.
(2) Post Hurricane Michael supply needs are being met via Tyndall AFB and Eglin AFB.
Delays in processing/receiving parts are continual.
7. WASHES:
a. Washes Accomplished in July 2019:
WEEK ENDING AF#
30 Day: 5 July 007, 045, 037, 035
12 July 026, 040, 034, 038
19 July 022, 031, 030
26 July 048, 032, 033, 044
31 July 041, 042, 050, 026, 037, 046
b. Washes Not Accomplished & Reasons:
AF015 – Terminated
AF039 – De-man in work
c. Wash Schedule for August 2019:
WEEK ENDING AF#
30 Day: 9 August 036, 039, 007, 040, 034
16 August 031, 030, 050, 032, 038, 022
23 August 041, 033, 044, 042
30 August 026, 037, 046, 049
8. REPEAT/RECURRING DISCREPANCIES:
Date MDS AF
R/R Discrepancy Corrective Action
15 Jul QF-16C 45
W/DPE engaged, CADC Hiccupped for 1 sec then back
on. Missing altitude/airspeed in HUD during hiccup.
CADC 003 MFL everything cleared w/ fault ack R2 CADC
Unclassified Page 6 of 42
Distribution: A
16 Jul QF-16C 45 CADC light came on multiple times. On 3rd time, lost
HDG, AOA, Airspeed. Would not clear after flight
R2 Altitude indicator and Relay 2429K4
16 Jul QF-16A 35 Waterfall coming out of dryer vent. Humid air comes in when temp is increased. In work
9. RECOMMENDATIONS: Negative this report period.
10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.
TAB 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM
Note: Off-station sorties reported in this monthly summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
Mission Symbol Mission Project Supported # Missions FYTD
All O5ZZ
Sub Total 3
QF-16 MANNED:
Mission Symbol Mission Project Supported # Missions FYTD
All O3ZZ 2
All O4ZZ 0
O5ZZ Patriot Army 16
All O5ZZ 16 109
O6ZZ C/T Training 9
O6ZZ WITS Training 2
All O6ZZ 11 144
Sub Total 27 255
Grand Total 27 258
QF-16 JUL 19 FYTD
Scheduled 29 288
Canceled 2 29
Successful Flown 25 255
Ground Aborts 2 24
Air Aborts 1 2
Total Flown 27 258
Unclassified Page 7 of 42
05ZZ 3.2
NULLO sub Total
Hours FYTD
O3ZZ 3.3
O4ZZ 0
O5ZZ 22.9 177.1
O6ZZ 14.3 204.6
Sub Total 37.2 385.0
Grand Total 37.2 388.2
Date MDS AF# Msn
Sym
Mission Reason
17 Jul QF-16C 021 O6ZZ C/T OPS
30 Jul QF-16C 045 O6ZZ C/T MND
Abort
MDS AF# Msn
Sym
Mission Reason
10 Jul GAB QF-16C 021 O5ZZ Patriot FLCS
22 Jul GAB QF-16C 021 O5ZZ Patriot JFS no start
26 Jul AAB QF-16C 027 O5ZZ Patriot Engine AB fail
a. Maintenance: Currently waiting on 107 engine repair disposition instructions for
Combustor Discharge Pressure tubes leaking on the engines installed in QF-24 and QF-29.
The engine installed in QF-24 was just received from the Springfield facility and the leak was found during post-install operational checks. QF-27 is currently NMC for an engine afterburner malfunction that requires replacement of the Augmenter Fuel Control and the
Digital Engine Computer per the Fault Isolation Manual. QF-45 IFE’d back to base after the pilot reported an Engine 018 MFL that will require replacement of the Anti-Ice valve that is currently on order MICAP.
b. Logistics: New Items: Negative this report period.
Unclassified Page 8 of 42
7. WASHES:
(1) Washes Accomplished: QF-028
(2) Washes Not Accomplished & Reasons: Negative this report period.
Date MDS AF# R/R Discrepancy Corrective Action
1 Jul QF-16C 029 P&R Lights on departure Removed and replaced FLCP
3 Jul QF-16C 029 P,R & Y and ADC lights illuminated R2 ECA and FLCP
9. RECOMMENDATIONS: Negative this report period.
10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.
TAB 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL
Note: Off-station sorties reported in this summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
BQM-167A
Mission Symbol Mission Project Supported #
Missions
FYTD
O5ZZ AEGIS AEGIS 0 1
O5ZZ F16 M7 2 OFP F16 M7 2 OFP 0 3
O5ZZ F15 Suite 9 F15 Suite 9 1 4
BQM-167A JUL 19 FYTD
Scheduled 4 156
Canceled 2 76
Successful Flown 2 80
Ground Aborts 0 0
Air Aborts 0 0
Total Flown 2 80
Unclassified Page 9 of 42
Distribution: A
O5ZZ AIM 9X AIM 9X 0 3
O5ZZ AMR PHS4 AMR PHS4 0 1
O5ZZ WSEP WSEP 0 63
O5ZZ AMR PHS4 OT AMR PHS4 OT 1 4
O5ZZ AMRM SIPR 3 AMRM SIPR 3 0 1
Total 2 80
BQM-167A
O5ZZ 1.6 63.6
Total 1.6 63.6
Date
MDS
Tail #
Msn Sym
Mission
Reason
9 Jul BQM-167 O5ZZ F15 Suite 9 Weather
11 Jul BQM-167 O5ZZ AMR PHS4 OT PRO
Abort
MDS Tail# Msn
Sym
Mission Reason
N/A
a. Hurricane damage to building 256’s roof continues to impact Mx activity and available storage space due to the amount of water intrusion into the hangar, and the time it takes to clean it up after the rain. A temp Mx facility is currently in work.
b. Post Hurricane Michael supply and parts needs are being met via both Tyndall and direct shipment from Sacramento. However, we are encountering days of delay in processing/receiving, as expected. Additionally, Base Supply is limiting the quantity of items that are to be re-filled. Many items will be moved back to KRATOS for management and delivery to the field. Forward supply points have been established to help with the problem.
7. CORROSION CONTROL INSPECTION:
Unclassified Page 10 of 42
a. Launch Pad Corrosion Control Maintenance: Routine corrosion control is being accomplished on all applicable support equipment.
Date MDS Tail# R/R Discrepancy Corrective Action
None
9. RECOMMENDATIONS: None
10. SPECIAL PROJECTS: None
Unclassified Page 11 of 42
Distribution: A
TAB 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M
1. Tellabs Switch and Data/Comm. Operational Availability:
Tellabs Switch: 100% Available
Data/Comm. Circuits: 100% Available
2. Mission Availability:
GRDCS: 100% Available
RCS: 100% Available
Access Net: 100% Available
Mission Video: 100% Available
TPS-75 Radar: Scheduled Available Non-Charge Not Available
Missions 20 20 0 0
Hours 56.50 56.50 0 0
Overall Availability: 100% Available ((Available + Non-Charge)/Scheduled)
0%
20%
40%
60%
80%
100%
Tellabs Switch Data/Comm
July 100% 100%
12 month avg 100% 100%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90%
100%
GRDCS RCS AccessNet TPS-75 Mission Video
July 100% 100% 100% 100.0% 100.0%
12 month avg 100% 100% 100% 99.9% 100%
Unclassified Page 12 of 42
3. Summary of Mission Maintenance Actions:
a. 11 - 12 July 2019:
Configured, addressed, and performed full bench checks on DLS Units 137, 136, 053, and 055 in preparation for UTTR deployment.
b. 15 - 16 July 2019:
Configured, addressed, and performed full bench checks on DLS Units 022, 088, 092, and 100 in preparation for UTTR deployment.
c. 31 July 2019:
Performed 3 month inspection to include clock calibration on DLSr S/N 033 (classified
Depot unit)
Performed 6 month inspection to include clock calibration on DLSr S/N 018 (Site SUBW
– unit remains in Depot).
Completed self-calibration on 915 DTS S/N 002.
Attempted self-calibration on 915 DTS S/N 003; unit failed, reference RIS 192120101, reported to SPO via email.
Performed full calibration on legacy DLS Test Set S/N 002.
4. RIS Scheduled Maintenance Summary:
a. GRDCS:
1) Due within 45 Days:
Monthly Console Checks, by 30 August 2019
2) Due within 90 Days:
Data Link Subsystem Annual Checks:
SITE, Type DATE DUE S/N Test Type
D3, DLS-r 25 JUL 2019 016 3 Month
SRB, DLS-r 26 JUL 2019 034 3 Month
RWSR, DLS-r 30 JUL 2019 019 6 Month
A10, DLS-r 07 AUG 2019 028 6 Month
SHELL, DLS-r 22 AUG 2019 035 3 Month
CARR, DLS-r 22 AUG 2019 035 3 Month
PCB, DLS-r 29 AUG 2019 027 6 Month
D3, DLS 13 SEP 2019 043 Annual
PCB, DLS 21 SEP 2019 123 Annual
RWE, DLS 25 SEP 2019 055 Annual
ISCA DLS 04 OCT 2019 078 Annual
DEPOT DLS-r 31 OCT 2019 033 3 Month
Unclassified Page 13 of 42
Distribution: A
b. TPS-75 Radar: Accomplished this month and due within 45 Days.
JOB Completed or due from2-1-19 until 4-1-19 JST REOCCUR Next Due EQUIP #
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/3
/1
/3
/1
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/3
/1
ANTENNA TIEDOWN STRAPS AND JACKPAD INSPECTION 24 DAILY RE035 1 1 1 0 0 1 0 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1
DAILY PERFORMANCE INSPECTION 24 DAILY RE035 1 1 1 0 0 1 0 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P3-2TPS75-6WC-1
UPX 37 DAILY SYSTEM CHECKS - SER # A0109 266 DAILY REA09 2UPX37-1 TBL 4-1
UPX 37 DAILY SYSTEM CHECKS - SER # C0126 266 DAILY REA26 1 1 1 0 0 1 0 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2UPX37-1 TBL 4-1
3N1 DAILY PERFORMANCE CHECK 301 DAILY C60A3 1 1 1 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-177-1 TABLE 2-1
2N1 DAILY PERFORMANCE CHECK 326 DAILY C84B2 1 1 1 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1
DISPLAY CONSOLE TURN ON/OFF 1301 DAILY RE035 1 1 1 0 0 1 0 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UYQ27-26WC-1
UPA 59 DAILY PREVENTATIVE MAINTENANCE 1308 DAILY RE035 1 1 1 0 0 1 0 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UPA59-1-1 & 2
WEATHER/ECM PERFORMANCE ROUTINE 2 7 DAY 8/7/19 RE035 1 1 1 1 1 0 0 0 0 31P3-2TPS75-6WC-1
RADAR/SIF SYSTEM TEST PERFORMANCE 50 7 DAY 8/5/19 RE035 1 1 1 1 1 0 0 0 0 31P3-2TPS75-6WC-1
I-F RECEIVER PERFORMANCE ROUTINE 51 7 DAY 8/5/19 RE035 1 1 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
HEIGHT PERFORMANCE ROUTINE 73 7 DAY 8/6/19 RE035 1 1 1 1 1 0 0 0 0 31P3-2TPS75-6WC-1
CLUTTER MAPPING PERFORMANCE ROUTINE 74 7 DAY 8/7/19 RE035 1 1 1 1 1 0 0 0 0 31P3-2TPS75-6WC-1
COMMUNICATIONS PERFORMANCE ROUTINE 273 7 DAY 8/5/19 RE035 1 1 1 1 1 0 0 0 0 31P3-2TPS75-6WC-1
POWER SUPPLY TEST PERFORMANCE ROUTINE 273 7 DAY 8/5/19 RE035 1 1 1 1 1 0 0 0 0 31P3-2TPS75-6WC-1
DISPLAY CONSOLE WEEKLY INSPECTION 1303 7 DAY 8/2/19 RE035 1 1 1 1 0 0 0 0 31P1-2UYQ27-26WC-1
ANTENNA/RECEIVER INTERFACE TEST PERFORMANCE ROUTINE 550 14 DAY 8/9/19 RE035 1 1 0 0 31P3-2TPS75-6WC-1
SYSTEM ORIENTATION PERFORMANCE CHECK 993 14 DAY 8/5/19 RE035 1 1 0 0 0 31P3-2TPS75-6WC-1
AFRADES HEIGHT EVALUATION 999 14 DAY 8/13/19 RE035 1 1 1 0 0 31P3-2TPS75-6WC-1
AFRADES BEACON PERFORMANCE 1038 14 DAY 8/13/19 RE035 1 1 1 0 0 31P3-2TPS75-6WC-1
AFRADES CLUTTER ANALYSIS 1041 14 DAY 8/13/19 RE035 1 1 1 0 0 31P3-2TPS75-6WC-1
AUTO SEQUENCER TEST 1207 14 DAY 8/6/19 RE035 1 1 0 0 31P3-2TPS75-6WC-1
HEAT EXCHANGER SERVICING 1270 14 DAY 8/12/19 RE035 1 1 1 0 0 35E4-177-1 TABLE 2-1
SHELTER CLEANING AND INSPECTION SERVICING 1271 14 DAY 8/2/19 RE035 1 1 0 0 0 35E4-177-1 TABLE 2-1
COMPRESSOR DEHYDRATOR ON/OFF RATIOS 304 28 DAY 8/14/19 RE035 1 0 31P3-2TPS75-6WC-1
FREQ GENERATOR COHO REF OUTPUT CHECK 1241 28 DAY 8/16/19 RE035 1 0 31P3-2TPS75-6WC-1
FREQ GENERATOR IF TEST TARGET AMPLITUDE CHECK 1245 28 DAY 8/16/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA PEDESTAL AND LEVELING JACK INSPECTION 1250 28 DAY 8/14/19 RE035 1 0 31P3-2TPS75-6WC-1
RF AND SLIP RING TEST 1253 28 DAY 8/27/19 RE035 1 1 0 31P3-2TPS75-6WC-1
MDS/FAR TEST 1254 28 DAY 8/16/19 RE035 1 0 31P3-2TPS75-6WC-1
AFRADES TILT SENSOR PERFORMANCE 1255 28 DAY 8/27/19 RE035 1 1 0 31P3-2TPS75-6WC-1
ANTENNA ASSEMBLY CLEANING AND INSPECTION SERVICING 1272 28 DAY 8/15/19 RE035 1 0 31P3-2TPS75-6WC-1
SHELTER CORROSION CONTROL INSPECTION AND SERVICING 1273 28 DAY 8/15/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA CORROSION CONTROL INSPECTION AND SERVICING 1274 28 DAY 8/15/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA POWER SUPPLY ENCLOSURE AIR FILTER CLEANING 1274 28 DAY 8/15/19 RE035 1 0 31P3-2TPS75-6WC-1
COMPRESSOR- DEHYDRATOR ASSEMBLY RELIEF VALVE SERVICING 1276 28 DAY 8/14/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA BULL GEAR LUBRICATION 1279 28 DAY 8/12/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA DRIVE MOTOR GEARBOX OIL LEVEL CHECK 1280 28 DAY 8/5/19 RE035 1 0 31P3-2TPS75-6WC-1
TUSK ASSEMBLY, JACKSCREW, AND ANTENNA YOKE LUBRICATION 1281 28 DAY 8/12/19 RE035 1 0 31P3-2TPS75-6WC-1
DISPLAY CONSOLE INSPECTION AND CLEANING 1304 28 DAY 7/31/19 RE035 1 0 31P3-2TPS75-6WC-1
3N1 MONTHLY PERFORMANCE CHECK 323 MONTHLY 7/30/19 C60A3 1 0 35E4-177-1 TABLE 2-1
2N1 MONTHLY PERFORMANCE CHECK 329 MONTHLY 7/30/19 C84B2 1 0 35E4-178-1 TABLE 2-1
UPX 37 QUARTERLY INSPECTION - SER # A0109 283 84 DAY 2/6/19 REA09 2UPX37-1 TBL 4-1
UPX 37 QUARTERLY INSPECTION - SER # C0126 283 84 DAY 10/10/19 REA26 1 2UPX37-1 TBL 4-1
0 = Job Forecast
/ = Partially C/W
1 = C/W
Unclassified Page 14 of 42
TRANSMITTER OIL BREAKDOWN TEST & FILAMENT INTERRUPT CHECK PROCEDURE 1256 84 DAY 10/4/19 RE035 1 31P3-2TPS75-6WC-1
STORAGE TWYSTRON PUMP DOWN 1257 84 DAY 7/11/19 RE035 1 31P3-2TPS75-6WC-1
MODIFIED BEARING LUBRICATION 1282 84 DAY 8/29/19 RE035 31P3-2TPS75-6WC-1
ANTENNA LEG ASSEMBLY INSPECTION 1283 84 DAY 10/9/19 RE035 1 31P3-2TPS75-6WC-1
PROCESSOR RACK INSPECTION AND CLEANING 1285 84 DAY 10/16/19 RE035 1 31P3-2TPS75-6WC-1
MODULAR INTERFACE GROUP INSPECTION AND CLEANING 1289 84 DAY 10/10/19 RE035 1 31P3-2TPS75-6WC-1
UPX 37 SEMIANNUAL INSPECTION - SER # A0109 294 168 DAY 12/4/18 REA09 2UPX37-1 TBL 4-1
UPX 37 SEMIANNUAL INSPECTION - SER # C0126 294 168 DAY 1/2/20 REA26 1 2UPX37-1 TBL 4-1
TRANSMITTER LIQUID COOLANT SERVICING 1290 168 DAY 6/14/19 RE035 0 31P3-2TPS75-6WC-1
PPI CIRCUIT CARD INSPECTION AND CLEANING 1291 168 DAY 8/29/19 RE035 0 31P3-2TPS75-6WC-1
CONTROL MONITOR INSPECTION AND CLEANING 1292 168 DAY 8/14/19 RE035 0 31P3-2TPS75-6WC-1
ANTENNA AND SHELTER JACKS LUBRICATION 1293 168 DAY 8/2/19 RE035 0 31P3-2TPS75-6WC-1
UPA 59 PREVENTATIVE MAINTENANCE 1309 168 DAY 8/8/19 RE035 0 31P1-2UPA59-1-1 & 2
ANTENNA DRIVE MOTOR GEARBOX SERVICE 1294 336 DAY 8/29/19 RE035 0 31P3-2TPS75-6WC-1
PROCESSOR RACK AND CIRCUIT CARD INSPECTION AND CLEANING 1295 336 DAY 8/29/19 RE035 0 31P3-2TPS75-6WC-1
INTERROGATOR CIRCUIT CARD INSPECTION AND CLEANING 1297 336 DAY 8/29/19 RE035 0 31P3-2TPS75-6WC-1
DESICCANT CARTRIDGE REPLACEMENT 1298 336 DAY 10/4/19 RE035 31P3-2TPS75-6WC-1
CONTROL MONITOR INSPECTION, CLEANING, AND LUBE 1299 336 DAY 8/12/19 RE035 0 31P3-2TPS75-6WC-1
HIGH VOLTAGE INSULATED GLOVES TEST SET #1 367 365 DAY 5/28/19 RE035 AFI 91-203, 812.8
HIGH VOLTAGE INSULATED GLOVES TEST SET #2 396 365 DAY 4/22/20 RE035 AFI 91-203, 812.8
ANNUAL HISTORICAL RECORDS REVIEW 1320 365 DAY 2/7/20 RE035 00-20-1 PARA 10.7.4
ANNUAL FACILITY GROUNDS INSPECTION 1322 365 DAY 2/5/20 RE035
TX HOIST 1323 365 DAY 1/9/20 RE035 31P3-2TPS75-6 Chpt 2 Sec 1
ANT & SHELTER LIFT HARDWARE INSPECTION BY NDI/ TX HOIST 68 365 DAY 12/30/00 RE035 31P3-2TPS75-6 Chpt 2 Sec 1
ANTENNA TIEDOWN STRAPS INSPECT AND REPLACE ALL 1324 720 DAY 1/28/21 RE035 31P3-2TPS75-6
INSPECT AND REPLACE ALL HYDRAULIC HOSES 1325 60 MONTH 06/06/23 RE035 31P3-2TPS75-6
MIL-HDBK-419A PARA 2.3.1, 31-
10-24 Appx B
5. Maintenance and Logistics Problems:
With the dissolution of the sole repair vendor for the proprietary DLS Receiver/Transmitter units, the current cache of four spare units are all that are available. Some DLSr units have been delivered, and are being used on a limited basis. The remaining DLSr delivery date is a moving target, with an anticipated delivery of August 2019.
a. Top Five Report:
b. Long Lead Report:
6. Gulf Range Tower Conditions:
a. Tower for Site RWN:
Hurricane Michael brought down tower containing this antenna.
Temporary tower installed and working well.
b. Tower for Site RWW:
Hurricane Michael brought down tower containing this antenna.
Temporary tower installed and working well.
c. Tower for Site B256 (now B226):
Hurricane Michael brought down tower containing this antenna.
The WEG tower at Building 226 has been approved for use, and a DLS has been installed on the tower – awaiting survey and site calibrations to make this site fully operational.
d. Tower for Site APPL:
Hurricane Michael brought down tower containing this antenna.
e. All other towers fully functional (RWE, A10, SRB, PCB, D1C, D3, CARR, SLPT, SUBE, SUBW, RWS, ISC1, ISC2).
Top 5 Parts Ordered
NSN Part Number Nomenclature End Item Remarks
6145-00-112-8620 J-C-580 CABLE DLS-R Rec'd 27 Jul 19
5935-01-336-9497 MIL-DTL-24308/2 CONNECTOR RADAR Est Due 22 Aug 19
5975-01-525-7728 19C0531 TAPE, MARKER SHOPUSE Rec'd 16 Jul 19
5306-01-358-0286 125B053H01 BOLT, EXTERNAL RADAR Rec'd 25 Jul 19
6150-01-503-2025 UL 817 EXTENSION CORD RADAR Rec'd 15 Jul 19
Top 5 Parts With Longest Lead Time
Date Ordered NSN Part Number Nomenclature QTY End Item Remarks
19-Jun-18 8010-00-490-7650 MIL-L-81352 LACQUER 1 75 RADAR Est Due 08 Jul 19
17-Dec-18 5340-01-119-3981 175LH PADLOCK 4 SHOPUSE Est Due 20 Aug 19
15-Jan-19 7920-00-823-9773 AA1432 TOWEL UTILITY 4 SHOPUSE Est Due 8 May 20
22-Feb-19 8040-01-394-3735 3145-RTV ADHESIVE 3 RADAR Est Due 16 Sep 19
10-May-19 5305-01-241-5067 3342-3 SCREW 6 CONTRERAS Est Due 7 Oct 19
Unclassified Page 16 of 42
7. Wendover Status:
a. Building 625 Control Site:
PAE continues to work infrastructure requirements per TSS requests for both a consolidated Wendover only operation and the requirements for a split configuration that would have control at Wendover and drone launches at Dugway. The 388th's contractor
JT3 will provide the WEG an estimate for their support to finish their infrastructure upgrade for the host communications system.
PAE provided locations and quantities for NIPR and SIPR drops within building 625 to aid JT3 with their estimates. Cable and jacks for phones and NIPR computers are installed between the communications room and each location within the building so only the range infrastructure remains to be completed. The TSS is working procurement of the computers and phone instruments.
Based on the consolidated versus split operations plan, the tower needed at building 625 will be new or come from the current Wig Mountain site. The tower at 625 will support antennas for GRDCS, radios and GPS timing. The fastest and most versatile path is to purchase and install a new tower onto the newly built tower base already in place at
Wendover; a new tower would provide increased height (better coverage) at a cost of
~$20K. For either solution, additional RF cable, mounting clamps, etc. must be purchased for the move; a list of those parts was provided to the TSS, ~$6.6K.
GRDCS “New Tech” hardware and software were installed in the Wendover control site; however, the software must be updated to the newest revision in order to become operational.
On 29 April 2019, UTTR 388th personnel reported a water pipe had burst inside the wall of the mechanical room in control site building 625. The water affected several rooms including the console room and server/communications rooms. Per a report from a SPO representative from Hill, none of the WEG owned equipment was damaged and the only required repairs for the operations areas is new floor coverings. The break room received more significant damage, primarily to cabinetry and carpet.
b. Launch Pad:
Compressors and power supplies must be purchased for the rails. The 82nd RAs were working this in 2018; there was a contracting hiccup so funding short stopped the purchase.
Gantries and hoists must be purchased for the launch pad as well as a contract let to install them. PAE completed a design; the narrative for the SOW for the construction must be written before the task can go out for bids.
PAE is developing parts lists for the installation of the rails, power supplies, compressors, grounding, communications, connections for generator, etc.
Fiber equipment must be purchased and installed to provide connectivity from building
625 to the LAMS, and in turn from the LAMS to the launch pad. Much of the hardware from Dugway will be reused when maintenance activities and launch operations move from Dugway; however, several additional items will be needed due to the longer fiber cable runs.
Work continues with environmental approval contractor for the launch and maintenance areas.
Unclassified Page 17 of 42
c. LAMS Maintenance Shelter:
PAE is working a requirements document to install electrical, grounding, lightning protection, etc.
PAE is developing parts list for the installation of a compressor, stands to mount items like fire extinguishers, eyewash, AED, etc.
PAE is working a requirements document for a secure storage area within the LAMS.
The LAMS itself was erected; however, it requires repair due to wind damage. The
WEG is working the repair effort.
d. Wendover GRDCS Sites:
The TSS is working lease efforts for the I-80 GRDCS site. This is the single most critical RF point needed to use the Wendover control whether launching from Dugway or Wendover. Site H97 is going through the environmental process. It would also be very helpful for Dugway operations with Wendover control, but it really becomes critical when launch operations move to Wendover. PAE is designing an inclusive site platform for H97.
8. GRDCS and RCS Operating Hours:
9. GRDCS and RCS Accounts Status:
a. GRDCS Accounts:
The GRDCS computers are accessed by user groups rather than by individual accounts. The users are trained for and only granted access to the level required to perform their assigned tasks. The three user groups and their level of access are depicted in the following chart.
Mission Support Maintenance Programming &
Engineering
Administration
GRDCS 98.88 40.21 6.00 2.41
RCS 308.00 22.00 22.00 22.00
H o u rs
GRDCS (Operations) CDT (Maintenance) ROOT (Administration)
Hours 135.59 9.50 2.41
GRDCS User Accounts
Unclassified Page 18 of 42
b. RCS Accounts:
The RCS computers are accessed by user groups rather than by individual accounts. The users are trained for and only granted access to the level required to perform their assigned tasks. The five user groups and their level of access are depicted in the following chart.
10. Engineering and Systems Programming Tasks:
a. Short Title: Testing and evaluation of the maximum GRDCS participant capability.
Summary: Due to the additional GRDCS hardware/software implementation of SIR 451
“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS
External Track Data” with development version 55, test flights are being supported to verify the maximum GRDCS participant capability.
Date Initiated: 24 April 2009
Completion Date (Estimated): TBD, depending on availability of mission(s).
Current Status: 85% complete.
Problems anticipated or encountered: None.
b. Short Title: Test TM connectivity with Bldg. 223 in order to evaluate the external
NDI-AIU C-Band Beacon data with Safety.
Summary: Due to the additional GRDCS hardware/software implementation of SIR 451
“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS
External Track Data” with development version 55, a connectivity test with
TM Bldg 223 is still pending to evaluate the data into GRDCS and RCS.
Date Initiated: 13 July 2009
Completion Date (Estimated): TBD, depending on TM shop and testing results.
Current Status: 0% complete.
Problems anticipated or encountered:
First test on 13 July 2009 was not successful. Bldg. 223 personnel could not start the program. More work on their side is required.
83rd 82nd Rapcon ROOT USAF_Adminis trator
Wetstone MSCT
Hours 0.00 50.00 8.00 22.00 44.00 528.00 528.00
RCS User Accounts
Unclassified Page 19 of 42
Distribution: A
c. Short Title: Installation and demonstration of DLS-r Developmental Software/Hardware.
Summary: Started DT of DLS-r user version based on GRDCS software version 59.4.
Note the DLS-r effort is continuing with Version 60 OT testing.
Date Initiated: 20 August 2015
Completion Date (Estimated): TBD
Current Status: Fielding Authorization was provided by ACC on 11 May 2017.
Problems anticipated or encountered: Units on-site need to be replaced with MCI’s production units. Some units have been fielded for limited use.
d. Short Title: Software installation (Release Candidates 3 & 4) and demonstration of SIRs of GRDCS Software/Hardware Version 61.0.
Summary: In process of supporting DT for v61.0 for the hardware & software upgrade.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: DT Phase; Start date 21 Aug 2018.
Problems anticipated or encountered: None at this time.
e. Short Title: V61 Documentation Review.
Summary: In process of reviewing v61.0.3 hardware & software documentation.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: In review process; Start date 21August 2018.
f. Short Title: User software (increment-13, based on v60.4) installation for the QF-16 DR2
Hardware Changes (SIR 843).
Summary: In process of supporting ground and test flights for the QF-16 DR2 Hardware
Changes with Autopilot v1.7 software.
Date Initiated: 29 June 2018
Completion Date (Estimated): TBD
Current Status: Flight testing is complete at Tyndall and is presently taking place at
Holloman.
g. Short Title: Software installation of GRDCS Software/Hardware V61.0.1 (31Jan19).
Summary: In process of supporting DT for v61.0 for the hardware and software upgrade.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: DT Phase; Start date 21 August 2018.
Unclassified Page 20 of 42
h. Short Title: Software installation of GRDCS Software/Hardware V61.0.2 (20Feb19).
Summary: In process of supporting DT for v61.0 for the hardware and software upgrade.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: DT Phase; Start date 21 August 2018.
i. Short Title: Software installation of GRDCS Software V62.0 (29Mar19).
Summary: In process of supporting SIR Demos for v62.0 for the software upgrade.
Date Initiated: 29 March 2019
Completion Date (Estimated): TBD
Current Status: Demo Phase; Start date 28 Feb 2019 with video (SIR844) and .sml file
(SIR878). Continued on 29May19, with SIR 739, 822, 874, 849, 877, and 674.
j. Short Title: Software installation of GRDCS Software V61.0.3 (30Jul19).
Summary: In process of supporting DT for v61.0 for the har5dware & software upgrade.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: DT Phase; Start date 21 Aug 2018.
11. Special Projects:
a. In process of enhancing locally developed “MapScript” program to enable recursive directory search and loading of input files. This will provide historical analysis of a ground station relative to other ground stations and drone position on the range (70% complete, pending hardware upgrades for finalization).
b. In process of enhancing locally developed ‘safe flight script’ to handle QF-16 telemetry during the different phases of the safe flight profile (10% complete).
c. Supporting Wendover system evaluation as a first look of the new hardware (console and computer) and software to include local RF environment. (Ongoing effort at this time, no
ETA available yet).
12. ATIS Mission Support (Over-the-Horizon Airborne Relays using platform aircraft):
a. n/a this month
Unclassified Page 21 of 42
Distribution: A
TAB 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA)
METRICS
1. MDSA Metrics:
a. Abort Rate: SDS Criteria FSAT/SSAT < 12%
FSAT = 5.9% (2 AAB + 5 GAB with 119 sorties flown and 0 chargeable GAB lines)
((2 / 119) + (5 / (119 + 0))) x100)
Anti-skid
FLCS fail to test (HAFB)
Fuel gauge (AAB)
JFS no light (HAFB)
Right brake
Engine AB fail (AAB) (HAFB)
SSAT = 0.0% (0 AAB + 0 GAB with 2 sorties flown and 0 GAB lines)
((0 / 2) + (0 / (2 + 0))) x100)
b. Repeat/Recur Rate: SDS Criteria FSAT/SSAT < 7%
FSAT = 13.5% (4 Repeat + 1 Recur with 37 PRDs) ((5 / 37) x 100)
SSAT = 0.0% (0 Repeat & 0 Recur with 0 PRD) ((0 / 0) x 100)
c. Cannibalization Rate: 5.0% (6 Canns with 121 Sorties Flown) ((6 / 121) x 100)
d. Data Integrity Error Rate: SDS Criteria - 98% of correctable errors corrected
100.0% (29 Errors with 3 Uncorrectable and 26 Corrected) (26 / (29 - 3)) (3,820
DDRs checked)
e. Break Rate = 13.2% (16 Code 3s with 121 Sorties Flown) ((16 / 121) x 100)
f. Primary Aerospace Vehicle Authorized (PAA) vs. Possessed (PP) Rate:
FSAT = 100.0% (31 assigned with 31 possessed, 50 baseline and 0 CLIN 4/6 inventory at EOM) ((31 / 31) x 100)
SSAT = 100.0% (48 PAA with 48 possessed and 0 CLIN4/6 inventory at EOM) ((48 /
48) x 100)
g. FSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%
97.5% (128 Sorties attempted with 117 successful and 8 non-chargeable non-successful) ((117 / (128 - 8)) x 100)
h. SSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%
100.0% (4 Sorties attempted with 2 successful and 2 non-chargeable non-successful)
((2 / (4 - 2)) x 100)
Unclassified Page 22 of 42
2. Maintenance and Flying Schedule Effectiveness (MSE and FSE)
a. MSE = 62.4% (633 points scheduled with 395 complied with) ((395 / 633) x 100)
b. FSE = 71.8% (121 sorties flown, with 10 sorties cancelled, 0 sortie added and 37 total
FSE deviations) (((131 - 37) / 131) x 100)) (Of the 37 chargeable deviations, 14 were attributed to maintenance.)
The main drivers were 21 Early Take Offs and 10 Cancels.
Add Lines = 0
Add Tails = 4 (4 Mx)
Cancels = 10 (2 Project, 6 Wx, 1 Mx, 1 Ops)
Early T/O = 2 (2 Project)
Late T/O = 21 (9 Mx, 4 Sympathy, 2 Wx, 2 ATC, 4 Project)
GAB Lines = 0
3. Narratives:
Ground & Air Aborts
a. FSAT – Five QF-16C’s recorded 6 aborts in July – 2 ground aborts and 1 air abort each at both Tyndall and Holloman.
(1) The only trends noted this month involved AF021 and AF033.
(a) AF021 stood out for several reasons:
1. It was the only aircraft this month with more than one abort (10 July, FLCS Fail to Test, R2 “A” and “D” System Inverters and Batteries; and
22 July, JFS No Light, Replaced JFS fuel control).
2. In 26 months, AF021 has ground aborted 20 times, making it the highest aborting of the 41 aircraft involved in the program so far.
3. Of these 20 aborts, 7 have been for JFS issues (February 2018, July 2018, August 2018, September 2018 (twice), October 2018 and this month).
The same corrective action (R2 JFS Fuel Control) was performed this month and in August 2018. Different corrective actions were applied for each of the other 5 aborts.
(b) AF033 was the other repeat offender this month, as far as the reason for its aborts. In 15 months, it has aborted 7 times, 5 of them for JFS issues. A different corrective action has been performed each time. This month, it was
“Tightened grounding wires on backshells 9155J134 & 9155J238”.
a. The numerical breakouts for July were:
(a) All 6 aborts involved QF-16C’s.
Unclassified Page 23 of 42
Distribution: A
(b) Two aborts this month occurred on pilot proficiency flights, while 4 were on customer sorties. Five occurred on manned flights; one was on a NULLO mission.
(c) The weekly abort distribution was 2 on Mondays and 1 each on a Tuesday, a
Wednesday, a Thursday and a Friday. Two were on morning sorties and 4 were on afternoon missions.
b. One lines was lost to an abort this month; as an OCF, it wasn’t MSR-chargeable to the contractor.
b. SSAT – No SSAT aborts were recorded for July.
Date Base AF # Reason Corrective Action
FSAT
2 Jul TAFB 33 Anti-skid Tightened grounding wires on backshells 9155J134 & 9155J238
10 Jul HAFB 21 FLCS fail to test
R2 “A” system inverter and battery. R2 “D” system inverter and battery
15 Jul TAFB 26 Fuel gauge Lower wire loose. Reinstalled all probes
22 Jul HAFB 21 JFS no light Replaced JFS fuel control
25 Jul TAFB 22 Right brake R2 brake control valve
26 Jul HAFB 27 Engine AB fail In work
SSAT
None
TAB 5 – TECHNICAL REPORT STATUS
Negative this report period.
Unclassified Page 24 of 42
Distribution: A
TAB 6 – QUALITY CONTROL (QC) SUMMARY REPORT
1. Full-Scale - Tyndall:
a. Twenty-four Quality Verification Inspections, twenty-three Special Inspections, and seven
Personnel Evaluations were accomplished. Fifty-four inspections passed, none failed. There were no major failures this period. There were three minor discrepancies consisting of weekly metrics, TNB/FOM, vehicle management- one none rated-housekeeping.
b. Problem Area: None
c. PQDRs: Eight this report period.
(1) FA4881-19-0247 (QF025, AF036), Throttle Quadrant Assy.
(2) FA4881-19-0249 (AF044), Relay Matrix Panel, PN 160
(3) FA4881-19-0250 (PN D16A101080-1009) Canopy Actuator Bracket Assembly
(4) FA4881-19-0251 (AF049), AFCC, PN 16M0115
(5) FA4881-19-0252 (AF044), Radar Unit VSS, PN 00061
(6) FA4881-19-0255 (AF042), Transponder Vehicle Interface TVI, PN 0094
(7) FA4881-19-0256 (AF038), FTIT Indicator, PN 6468
(8) FA4881-19-0257 (PN-16T188001-1001), PFLT W1 Cable
d. AFTO Form 22’s: None this report period.
e. TODO: Sixty-two technical order changes and revisions received this period.
f. Impoundments: None this report period.
g. FOD/DOP/Lost item: None this report period.
2. Full-Scale - Holloman:
a. Fifteen Quality Verification Inspections, thirty-six Special Inspections, and nine Personnel
Evaluation were accomplished. Sixty inspections passed, zero failed. There was 1 minor discrepancy in Aircraft Servicing.
b. Problem Areas: None this report period.
c. PQDRs: Two opened.
1) FA4810-19-0006 Inverter Control Assembly OPENED – 12 July 2019
2) FA4810-19-0007 Backup Radar Altimeter OPENED – 15 July 2019
d. AFTO Form 22’s: None this report period.
e. TODO: Forty-three technical order changes and revisions received this period.
Unclassified Page 25 of 42
g. FOD/DOP/Lost item: None this report period.
3. Subscale:
a. Twenty-Six Quality Verification Inspections, seventeen Special Inspections and nineteen
Personnel Evaluations were accomplished. Sixty-two passed, Zero failed. There were no major failures this period. There was three minor discrepancies found consisting of vehicle inspections & KTL’s.
c. PQDRs: None this report period.
d. AFTO Form 22s: None this report period.
e. TODO: Seven technical order change and revision received this period.
g. DOP/Lost Item: None this report period.
4. GRDCS - Tyndall:
a. One Quality Verification Inspection, ten Special Inspections and five Personnel Evaluation were accomplished. Sixteen inspections passed, zero failed. There were no major or minor discrepancies this period.
b. AFTO Form 22s: None this report period.
c. PQDRs: None this report period.
d. TODO: Two technical order change and revision this period.
e. Problem Areas: None this report period.
5. ESH - Tyndall:
a. Nine Special Inspections were accomplished. Nine inspections passed, zero failed. There were zero minor discrepancies.
Unclassified Page 26 of 42
6. ESH - Holloman:
a. Two Special Inspection were accomplished. Two inspection passed, zero failed. There were zero minor discrepancies.
7. Publications and Forms: No contractual impacts this period. See CDRL A009, Master
Document List.
70.0%
80.0%
90.0%
100.0%
TYN HMN SSAT RIS ESH
QA Inspection Pass Rate May-July 2019
May
June
July
Unclassified Page 27 of 42
Distribution: A
TAB 7 – RIS MAINTENANCE ANALYSIS REQUESTS
1. Electro-Magnetic Interference (EMI):
No EMI reported this period.
2. RIS Maintenance Actions:
3. RIS
NUMBER:
DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
183020001 CARRY OVER:
All poles holding Antenna systems at B1801 down due to Hurricane Michael.
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
DISCR. HOURS: EQUIPMENT MAKE: EQUIPMENT MODEL: EQUIPMENT S/N:
N/A N/A N/A N/A
Unclassified Page 28 of 42
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
183020002 CARRY OVER:
Runway West tower down due to Hurricane Michael.
Temporarily installed mobile DLS trailer at site.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
183020003 CARRY OVER:
Runway North tower down due to Hurricane
Michael.
Temporarily installed mobile DLS trailer at site.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 29 of 42
183020006 CARRY OVER:
B256 tower is down due to Hurricane Michael.
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
183020007 CARRY OVER:
ACDS Missile and Drone, Primary and Backup antenna systems down due to Hurricane Michael.
(See RIS# 183020001)
Temporarily installed
ACDS Missile Primary and
Backup antennas on Tower
1802.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 30 of 42
183020011 CARRY OVER:
Runway west video is down due to Hurricane
Michael. (See RIS#
183020002)
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
190980001 CARRY OVER:
RCS MULTI (RBZ94)
took a lightning strike.
Job opened with COMM
Focal Point (283-4896).
Put GRDCS Multi in RCS
Multi’s slot.
None
MAINT. AREA:
COMM
START DATE:
20190408
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
DISCR. HOURS: BRAND: EQUIPMENT MODEL: EQUIPMENT S/N:
Unclassified Page 31 of 42
191270001 81st, D3 VHF is inoperative.
Removed and replaced
UAC-100 power supply with parts on hand.
Operational checks good.
No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20190726
STOP DATE:
20190730
REPAIRED BY:
J.TIN/D.HOL
MAN HOURS:
32.0
COST:
N/A
101.0 N/A N/A N/A
191650004 CARRY OVER:
GATR ACS UHF 1-16
require wiring from
EPlane to Channel Bank.
ACS 1-12 complete.
Waiting on rack install to complete.
None
MAINT. AREA:
COMM
START DATE:
20190614
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 32 of 42
191860001 All 82nd LMR Base
Stations keyed up and stayed.
Removed and replaced defective ALU card in
Channel Bank 30.
MAINT. AREA:
RIS
START DATE:
20190705
STOP DATE:
20190705
REPAIRED BY:
E.ROSAMOND
MAN HOURS:
0.5
COST:
$500.00
0.5 WESCOM 360 3606-00
191900001 There is an Echo on the
LPAD 1 Net, Removed Channel 002-21 from LPAD-1 CONF.
MAINT. AREA:
COMM
START DATE:
20190709
STOP DATE:
20190709
REPAIRED BY:
E.ROSAMOND
MAN HOURS:
0.5
COST:
N/A
0.5 N/A N/A N/A
Unclassified Page 33 of 42
191960001 Tricaster would not boot up.
Removed and replaced hard drive with parts on hand.
MAINT. AREA:
VIDEO
START DATE:
20190715
STOP DATE:
20190715
REPAIRED BY:
A.BIGGINS
MAN HOURS:
1.0
COST:
N/A
1.0 N/A N/A N/A
191960002 GRDCS Console 8 requires conversion to new hardware for testing.
Conversion complied with. No mission impact noted.
MAINT. AREA:
GRDCS
START DATE:
20190715
STOP DATE:
20190715
REPAIRED BY:
B.WIEBKE
MAN HOURS:
1.0
COST:
N/A
Unclassified Page 34 of 42
191970001 GRDCS Console 6, left panel, 6th column, second row, Switch Guard is broken.
Removed and replaced
Switch Guard with parts on hand.
MAINT. AREA:
GRDCS
START DATE:
20190716
STOP DATE:
20190716
REPAIRED BY:
B.WIEBKE
MAN HOURS:
0.5
COST:
N/A
0.5 N/A N/A N/A
191970002 Open:
ACDS Drone Left
Transmitter switches to the right transmitter randomly.
Removed and replaced the
Switching Unit. Same issue.
Waiting on spare FTSC to be returned from repair.
No mission impact noted.
MAINT. AREA:
UHF DESTRUCT
START DATE:
20190716
STOP DATE:
20190716
REPAIRED BY:
A.BIGGINS
MAN HOURS:
2.0
COST:
N/A
2.0 N/A N/A N/A
Unclassified Page 35 of 42
191980001 283-4260 is inoperative in the 81st Orion system
Moved 283-4260 from defective Channel Bank 2, Channel 7 at Central Office, to Bank 2 Channel 2.
MAINT. AREA:
COMM
START DATE:
20190717
STOP DATE:
20190717
REPAIRED BY:
E.ROSAMOND
MAN HOURS:
1.5
COST:
N/A
1.5 N/A N/A N/A
192100001 GRDCS Consoles 6 and
7 require conversion to new hardware for testing.
Conversion complied with. No mission impact noted.
MAINT. AREA:
GRDCS
START DATE:
20190729
STOP DATE:
20190729
REPAIRED BY:
A.BIGGINS
MAN HOURS:
2.0
COST:
N/A
Unclassified Page 36 of 42
192110001 GRDCS Console 5 requires conversion to new hardware for testing.
Conversion complied with.
MAINT. AREA:
GRDCS
START DATE:
20190730
STOP DATE:
20190730
REPAIRED BY:
B.WIE/D.HOL
MAN HOURS:
2.0
COST:
N/A
192120001 RCS-01 EI
unresponsive.
Rebooted EI.
MAINT. AREA:
COMM
START DATE:
20190731
STOP DATE:
20190731
REPAIRED BY:
B.WIEBKE
MAN HOURS:
0.2
COST:
N/A
0.2 N/A N/A N/A
Unclassified Page 37 of 42
192120002 Open:
No APTM data on Path
1.
N/A No mission impact noted.
MAINT. AREA:
GRDCS
START DATE:
20190731
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
192120003 GRDCS Console 5 requires conversion to old hardware for mission support.
Conversion complied with.
MAINT. AREA:
GRDCS
START DATE:
20190731
STOP DATE:
20190731
REPAIRED BY:
B.WIE/A.BIG
MAN HOURS:
2.0
COST:
N/A
Unclassified Page 38 of 42
192120101 GSM Transceiver
Communication Error during attempted Self-
Calibration.
IAW w/ T.O., checked all connections. Rebooted system, symptom persisted. Reported to
SPO, awaiting direction.
None
MAINT. AREA:
DLS
START DATE:
20190731
STOP DATE:
REPAIRED BY:
D. Holmes
MAN HOURS:
COST:
MSI 915 DTS 003
Unclassified Page 39 of 42
TAB 8 – FACILITIES OPEN WORK REQUESTS
TOP FIVE WORK REQUESTS
TOP 5
JOB NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
38912
1801 Repair raised floor in room 114. Note:
Submitted by the 81st Range Control Squadron.
CES/CEO
REVIEW
25 Jan 18
239 Repair 239 above-ground storage tank CES/CENPD
Review/In Progress
30 Apr 19
8513 LP Gate Repair CES
REVIEW
31 Jul 19
38125
45 Pave access road/checkpoint. CES/CENPD
REVIEW
1 Apr 15
59188
Extend existing permanent static ground system inside buildings.
CES/CENM
7 Aug 13
Range Instrumentation Systems Facilities – Building Manager - R. Williams
JOB NO. BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
38912 1801 Repair raised floor in room 114. Note:
Submitted by the 81st Range Control Squadron.
CES/CEO
REVIEW
25 Jan 2018
Full Scale Facilities – Building Manager – S. Davis
JOB
NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
38125 45 Pave access road/checkpoint. CES/CENPD
REVIEW
1 Apr 15
59222 45 Roadway Improvement CES/CENP
REVIEW
21 Nov 13
E2953 9310 Plumb emergency eye wash drain to the building exterior.
Install shower pans under emergency showers in
Bays 1 and 3 and plumb to drain outside.
CES/FM
PLUMBER
AWT SCHEDULE
11 Aug 17
38672 9310 Install 26 electrical outlets. CES/CENPD
24 Jan 17
Unclassified Page 40 of 42
Distribution: A
39126 9401 Paint facility. CES/ALOP
SUBMITTED
16 Aug 2018
39211 9350 Replace galvanized communication tower due to
Hurricane Michael damage
CES/ALOP
SUBMITTED
13 Dec 2018
39210 9349 Replace galvanized communication tower due to
Hurricane Michael damage
CES/ALOP
SUNMITTED
13 Dec 2018
39209 1810 Replace galvanized communication tower due to
Hurricane Michael damage
CES/ALOP
SUBMITTED
13 Dec 2018
39285 9352 Tower Alignment-Tensioning and LPS repair CES/ALOP
SUBMITTED
10 Jan 2019
39297 9317 R&R 20’ Tower Ladder. Reinstall LPS
(Ladder Portion Complete)
CES/ALOP
SUBMITTED
(In Progress)
10 Jan 2019
39389 9401 R&R Perimeter Security Fence CES/ALOP
SUBMITTED
31 Jan 2019
39431 9901 Comprehensive tower inspection
(St. George Island)
CES/ALOP
SUBMITTED
13 Feb 2019
39521 1801
Repair damaged ice bridge, extend/install new ice bridge to 1830 tower
CES/ALOP
SUBMITTED
12 Mar 2019
F7756 9404
Tower
Tower Obstruction Light Inop. CES/ALOP
SUBMITTED
26 Mar 2019
Sub Scale Launch Pad – Building Manager - B. Prince
JOB
NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
34672 8500 Area Paint buildings and floors. CES/CEPD
REVIEW
24 Jan 06
37441 8519 Install pavement south west of building.
Project No. XLWU142051D
CES/CENPD
CONTRACT
15 Jun 12
59188 8519
Extend existing permanent static ground system inside buildings.
CES/CENM
REVIEW
7 Aug 13
C7092 8519 Install emergency eyewash/shower stations in the north and south bays.
CES/PLUMER
IN PROGRESS
24 Nov 15
F2434 8525
Rail #4
Repair rail #4 hoist electrical power conduit. CES/ALOP
SUBMITTED
30 Aug 18
8513 LP Gate Repair CES/CEPD
Review
30 Jul 19
G0555 8519 Overhead Light fixture repair CES
Submitted
30 Jul 19
Unclassified Page 41 of 42
Distribution: A
Sub Scale Maintenance Facilities – Building Manager - D. Jacobs
JOB NO. BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
33927 256 Remove/replace separator. CES/CENPD
PROJECTS
26 Feb 04
34671 256 Paint floor/anti-slip paint. CES/CENPD
REVIEW
24 Jan 06
35352 256 Tech, pod, and office clean duct works. CES/CENPD
REVIEW
21 Jun 07
37044 256 Replace Air Handling Unit CES/CENPD
REVIEW
21 Jan 11
37148 256 Replace tiles in avionics shop. CES/ALOP
AWT-CUS PRI
4 Mar 11
C7093 256 Install two each permanent emergency eyewash / shower stations in the hangar bay.
CES/FM PLUMER
IN PROGRESS
24 Nov 15
59083 256 Upgrade Latrine CES/CENPD
CONTRACT
17 Dec 12
239 Repair 239 above ground storage tank CES/CENPD
In work
30 Apr 19
G0481 256 Repair two broken toilet seats CES
Review
30 July 19
TAB 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS
Recovery from Hurricane Michael and preparation for August UTTR.
The lack of aircraft deliveries from Boeing is impacting our overall aircraft fleet numbers as well as our ability to manage aircraft hours. Once Boeing has worked through production issues, we expect the number of aircraft deliveries will increase past the 2 deliveries/month as called out in the PWS.
This will impact PAE’s ability to meet Safe Flight time requirements and create a backlog of aircraft awaiting Safe Flights.
All the cleanup of failed data documentation and maintenance processes in aircraft generation from
AMARG and/or Boeing continues to fall on PAE for correction prior to SAFE flight.
Unclassified Page 42 of 42
Distribution: A
Failure to receive delivery aircraft is impacting available manned flyers (Tyndall & Holloman).
Correspondingly, NULLO fleet health/quantity is becoming an issue. Expect continued movement of aircraft to and from Holloman and early De-Man of flyers to keep Tyndall’s NULLO fleet minimally populated.
Severe damage to most of our facilities is causing many workarounds and much turmoil. PAE is managing the situation the best we can. Construction of temp facilities has begun with a drone storage building at subscale launch.
A major concern is safely moving into temp facilities while still complying with all AF regulations governing the safe handling and storage of explosive items.
File details come from the government source that posted it. Updated .