B-FY20 Monthly Summary Report-Nov 2019.pdf
PDF 2 MB Posted
- Attached to
- Aerial Targets III FY23 Federal contract opportunity
- Solicitation number
- FA489021CPKCA
About this file
This monthly summary report provides an overview of aerial target and range instrumentation system operations and maintenance activities for November 2019. Key details include flight operations of 31 QF-16 and 31 BQM-167 sorties at Tyndall AFB and 31 QF-16 sorties at Holloman AFB. Maintenance metrics cover abort rates, repeat discrepancies, cannibalization rates, and data integrity. The report also summarizes quality inspections, technical orders, maintenance analysis requests, facilities work orders, and engineering program tasks supporting the aerial target and range systems under contract number FA4890-15-C-0018 with PAE Aviation and Technical Services, LLC.
View the file
Other files for this federal contract opportunity
Show all 50
Aerial Targets III FY23 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unclassified Page 1 of 42 Distribution: A
Aerial Targets Monthly Contract Summary Report – CDRL A001
Contract Number FA4890-15-C-0018
1 – 30 November 2019
Prepared for:
Acquisition Management and Integration Center
Langley AFB, Virginia
Prepared by:
PAE Aviation and Technical Services, LLC
1311 Florida Avenue
Tyndall AFB, Florida
David Olson
Program Manager
Aerial Targets Program
UNCLASSIFIED
Distribution Limitation: A
Unclassified Page 2 of 42
TABLE OF CONTENTS
Tab 1a – FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL
Tab 1b – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM
Tab 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL
Tab 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M
Tab 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA) METRICS
Tab 5 – TECHNICAL REPORT STATUS
Tab 6 – QUALITY CONTROL (QC) SUMMARY REPORT
Tab 7 – RIS MAINTENANCE ANALYSIS REQUESTS
Tab 8 – FACILITIES OPEN WORK REQUESTS
Tab 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS
Unclassified Page 3 of 42
TAB 1A – FULL-SCALE AERIAL TARGETS – TYNDALL AFB, FL
1. SORTIES SCHEDULED:
Note: Off-station sorties reported in this summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
2. MISSIONS FLOWN:
QF-16 NULLO:
Mission Symbol Mission Project Supported # Missions FYTD
O5ZZ WSEP WSEP 1
All O5ZZ 1 5
Sub Total 1 5
QF-16 MANNED:
Mission Symbol Mission Project Supported # Missions
O3ZZ SAFE O&M 2
All O3ZZ 2 2
O5ZZ AGTS Tow O&M 2
O5ZZ Chase O&M 2
O5ZZ Checkerflag O&M 10
O5ZZ CT O&M 1
O5ZZ F-15 OFP/CTF F-16 1
All O5ZZ 16 36
O6ZZ Checkerflag O&M 1
O6ZZ CT O&M 15
O6ZZ FCS O&M 10
O6ZZ GRDCS v61 Flight Eval O&M 3
O6ZZ SP-x O&M 4
O6ZZ X/C O&M 6
All O6ZZ 39 102
All O8ZZ 0 2
Sub Total 57 142
Grand Total 58 147
QF-16 NOV 19 FYTD
Scheduled 65 170
Canceled 5 19
Successful Flown 58 146
Ground Aborts 6 16
Air Aborts 0 1
Total Flown 58 147
Unclassified Page 4 of 42
3. TOTAL HOURS FLOWN:
Mission Symbol Hours FYTD
O5ZZ 1.0 3.7
Sub Total 1.0 3.7
Hours FYTD
O3ZZ 3.2 3.2
O5ZZ 27.4 51.8
O6ZZ 53.9 130.5
O8ZZ 0.0 2.9
Sub Total 84.5 188.4
Grand Total 85.5 192.1
4. MISSIONS CANCELED:
Date
MDS
AF#
Msn
Sym
Mission
Reason
7 Nov QF-16C 53 O6ZZ CHECKERFLAG Ops
12 Nov QF-16C 53 O6ZZ CT Ops
13 Nov QF-16C 49 O6ZZ CT Ops
13 Nov QF-16C 53 O6ZZ CT Ops
20 Nov QF-16C 49 O6ZZ X/C Ops
5. ABORTS – GROUND AND AIR:
Date Type
Abort
MDS AF
Msn
Sym
Mission Reason
4 Nov GAB QF-16C 52 O6ZZ FCS Fuel leak
4 Nov GAB QF-16C 51 O6ZZ FCS Anti-skid light
18 Nov GAB QF-16C 44 O6ZZ FCS FLCS A light
18 Nov GAB QF-16C 51 O6ZZ FCS Fuel leak
18Nov GAB QF-16C 44 O6ZZ CT CADC
25 Nov GAB QF-16C 21 O6ZZ GRDCS v61 Flight Eval JFS no start
6. MAINTENANCE AND LOGISTICS PROBLEMS:
a. Maintenance:
(1) QF-16:
(a) AF052 Partial SAFE Complete
(b) AF051 Acceptance In Work
Unclassified Page 5 of 42
(2) AGE/Support Vehicles:
(a) QF-16 AGE and Support/Test Equipment
1. Procurement of AGE equipment, support/test equipment is continuing.
(b) Stock listed and commercially procured AGE maintenance equipment and tools purchasing in work.
(c) Post Hurricane Michael vehicle damage repairs continuing.
b. Logistics:
(1) Long lead time (MICAP) on F-16A components is negatively impacting the ability to generate aircraft.
(2) Post Hurricane Michael supply needs are being met via Tyndall AFB and Eglin AFB.
Delays in processing/receiving parts are continual.
(3) Received/populating two new CONEX storage containers with tools/equipment due to hurricane damage to previous storage buildings.
7. WASHES:
a. Washes Accomplished in November 2019:
WEEK ENDING AF#
30 Day: 8 November 026, 036, 041, 052, 050, 048
15 November 034, 044, 022
22 November 033, 040, 030, 053, 032, 035, 021, 024
29 November 038, 025
b. Washes Not Accomplished & Reasons:
AF031 – ACIU
AF042 – Hangar 3 – Oil consumption
AF049 – Transferred to Holloman
AF051 – Fuel Barn – Fuel leak
c. Wash Schedule for December 2019:
WEEK ENDING AF#
30 Day: 6 December 031, 026, 036, 034
13 December 041, 052, 048, 050, 042, 051, 022
20 December 033, 021, 024, 040, 030
27 December 032, 053, 027
31 December 035, 038
Unclassified Page 6 of 42
8. REPEAT/RECURRING DISCREPANCIES:
Date MDS AF
R/R Discrepancy Corrective Action
None
9. RECOMMENDATIONS: Negative this report period.
10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.
TAB 1B – FULL-SCALE AERIAL TARGETS – HOLLOMAN AFB, NM
Note: Off-station sorties reported in this monthly summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
Mission Symbol Mission Project Supported # Missions FYTD
All O5ZZ
Sub Total 0
QF-16 MANNED:
Mission Symbol Mission Project Supported # Missions FYTD
O3ZZ XC/Hill Paint input 1
O3ZZ XC/Tyndall Aircraft Delivery 4
All O3ZZ 5 5
QF-16 OCT 19 FYTD
Scheduled 34 74
Canceled 3 4
Successful Flown 31 70
Ground Aborts 2 6
Air Aborts 0 0
Total Flown 31 70
Unclassified Page 7 of 42
All O4ZZ 0
O5ZZ J-Hawk Army/Japanese 4
O5ZZ Patriot Army 10
All O5ZZ 14 26
O6ZZ C/T Training 7
O6ZZ RED AIR Training 4
All O6ZZ 11 38
O8ZZ OCF ECS Data 1
All O8ZZ 1 1
Sub Total 31 70
Grand Total 31 70
05ZZ 0.0
NULLO sub Total
Hours FYTD
O3ZZ 8.7 8.7
O4ZZ 0.0
O5ZZ 24.4 41.1
O6ZZ 15.0 51.8
O8ZZ 1.3 1.3
Sub Total 49.4 102.9
Grand Total 49.4 102.9
Date MDS AF# Msn
Sym
Mission Reason
11 Nov QF-16C 046 O6ZZ Red Air OPS
18 Nov QF-16C 046 O6ZZ C/T OPS
18 Nov QF-16C 027 O3ZZ Aircraft Delivery MND
Abort
MDS AF# Msn
Sym
Mission Reason
14 Nov GAB QF-16C 046 O6ZZ C/T Left W/W Hyd. leak
18 Nov GAB QF-16C 027 O3ZZ Aircraft delivery Flight Controls
Unclassified Page 8 of 42
a. Maintenance: We were without QF-29 the entire month due to replacement engine needed.
It’s been ordered, but not received as it’s still in work at the CRF facility.
b. Logistics: New Items: Negative this report period.
7. WASHES:
Washes Accomplished:
Washes Not Accomplished & Reasons: AF014 - NULLO conversion in-work
AF012 - Fuel Quantity – Awaiting parts
AF029 - Awaiting Engine and panels
Date MDS AF# R/R Discrepancy Corrective Action
Negative this report period
9. RECOMMENDATIONS: Negative this report period.
10. SPECIAL PROJECTS/SPECIAL INTEREST: Negative this report period.
Unclassified Page 9 of 42
TAB 2 – SUBSCALE AERIAL TARGETS – TYNDALL AFB, FL
Note: Off-station sorties reported in this summary are credited to the location that possessed the aircraft, regardless of who launched or recovered the aircraft.
BQM-167A
Mission Symbol Mission Project Supported #
Missions
FYTD
O5ZZ F-15 OFP/ CTF F-15 OFP/ CTF 2 2
O5ZZ F16 M7 2 OFP F16 M7 2 OFP 0 0
O5ZZ F15 Suite 9 F15 Suite 9 0 0
O5ZZ AIM 9X AIM 9X 0 5
O5ZZ AMR PHS4 AMR PHS4 0 1
O5ZZ WSEP WSEP 10 10
O5ZZ AMR PHS4 OT AMR PHS4 OT 0 0
O5ZZ AMRM SIPR 3 AMRM SIPR 3 0 0
Total 12 18
BQM-167A
O5ZZ 12.3 16.0
Total 12.3 16.0
Date
MDS
Tail #
Msn Sym
Mission
Reason
8 NOV BQM-167 O5ZZ WSEP Project
12 NOV BQM-167 O5ZZ WSEP Weather
12 NOV BQM-167 O5ZZ WSEP Weather
BQM-167A NOV 19 FYTD
Scheduled 18 27
Canceled 5 8
Successful Flown 12 18
Ground Aborts 2 3
Air Aborts 0 0
Total Flown 12 18
Unclassified Page 10 of 42
Abort
MDS Tail# Msn
Sym
Mission Reason
13 Nov GAB BQM-167 14-0473 O5ZZ WSEP ENG NO START - INW
13 Nov GAB BQM-167 14-0474 O5ZZ WSEP ENG NO START - INW
a. Hurricane damage to building 256’s roof continues to impact Mx activity and available storage space due to the amount of water intrusion into the hangar, and the time it takes to clean it up after the rain. A temp Mx facility is currently in work but not complete.
b. Post Hurricane Michael supply and parts needs are being met via both Tyndall and direct shipment from Sacramento. However, we are encountering days of delay in processing/receiving, as expected. Additionally, Base Supply is limiting the quantity of items that are to be re-filled. Many items have been moved back to KRATOS for management and delivery to the field. Forward supply points have been established to help with the problem.
c. The three temp facilities for SSAT Mx are awaiting power, building grounds, and resolution of static electricity from flooring. The plastic floor is generating static even during the humid summer months; expectation is to have flooring replaced.
7. CORROSION CONTROL INSPECTION:
a. Launch Pad Corrosion Control Maintenance: Routine corrosion control is being accomplished on all applicable support equipment.
Date MDS Tail# R/R Discrepancy Corrective Action
None
9. RECOMMENDATIONS: None
10. SPECIAL PROJECTS: None
Unclassified Page 11 of 42
TAB 3 – RANGE INSTRUMENTATION SYSTEM (RIS) O&M
1. Tellabs Switch and Data/Comm. Operational Availability:
Tellabs Switch: 100% Available
Data/Comm. Circuits: 100% Available
2. Mission Availability:
GRDCS: 100% Available
RCS: 100% Available
Access Net: 100% Available
Mission Video: 100% Available
TPS-75 Radar: Scheduled Available Non-Charge Not Available
Missions 31 31 0 0
Hours 93.00 93.00 0 0
Overall Availability: 100% Available ((Available + Non-Charge)/Scheduled)
0%
20%
40%
60%
80%
100%
Tellabs Switch Data/Comm
November 100% 100%
12 month avg 100% 100%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90%
100%
GRDCS RCS AccessNet TPS-75 Mission Video
November 100% 100% 100% 100.0% 100.0%
12 month avg 100% 100% 100% 100.0% 100%
Unclassified Page 12 of 42
3. Summary of Mission Maintenance Actions:
a. 7 November 2019: Performed full bench check on DLS S/N 113 in preparation for installation at RWE if needed.
b. 18 November 2019: Troubleshot, removed, and replaced RF Filter on DLS S/N 037.
Performed full bench check and returned to WSMR.
c. 21 November 2019: Performed full bench check on DLS S/N 036 for DLS spare inventory.
d. 22 November 2019:
Performed 9 month inspection and clock calibration check on DLS-r S/N 019 (RWSR)
IAW T.O. 31S8-4-16-11
Performed annual inspection on DLS S/N 104 (RWS)
Performed annual inspection on DLS S/N 017 (RWN)
Performed annual inspection on DLS S/N 051 (RWW).
e. 26 November 2019:
Performed 6 month inspection and clock calibration checks on DLS-r S/N 035 (Shell
Point) IAW T.O. 31S8-4-16-11.
Performed 6 month inspection and clock calibration checks on DLS-r S/N 036
(Carrabelle) IAW T.O. 31S8-4-16-11.
f. 27 November 2019: Performed 6 month inspection and clock calibration check on DLS-r
S/N 016 (D-3) IAW T.O. 31S8-4-16-11.
4. RIS Scheduled Maintenance Summary:
a. GRDCS:
1) Due within 45 Days:
Monthly Console Checks, by 31 December 2019
2) Due within 90 Days:
Data Link Subsystem Annual Checks:
SITE, Type DATE DUE S/N Test Type
SRB, DLS-r 14 Nov 2019 034 6 Month
A10, DLS-r 14 Nov 2019 028 9 Month
SUBW, DLS-r 18 Dec 2019 018 Annual
RWER, DLS-r 19 Dec 2019 030 9 Month
PCB, DLS-r 19 Dec 2019 027 9 Month
SUBE, DLS-r 31 Dec 2019 025 3 Month
D1C, DLS-r 31 Dec 2019 024 6 Month
A10, DLS-r 31 Dec 2019 028 Annual
DEPOT, DLS-r 31 Dec 2019 033 9 Month
SRB, DLS-r 31 Dec 2019 034 9 Month
SHELL, DLS-r 31 Dec 2019 035 9 Month
CARRA, DLS-r 31 Dec 2019 036 9 Month
SUBW 31 Dec 2019 051 6 Month
E-9 (048) 21 Feb 2020 098 Annual
Unclassified Page 13 of 42
b. TPS-75 Radar: Accomplished this month and due within 45 Days.
JOB Completed or due from11/1/19 until 12/4/19 JST REOCCUR Next Due EQUIP #
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/0
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/2
/1
/3
/1
/3
/1
ANTENNA TIEDOWN STRAPS AND JACKPAD INSPECTION 24 DAILY RE035 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1
DAILY PERFORMANCE INSPECTION 24 DAILY RE035 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P3-2TPS75-6WC-1
UPX 37 DAILY SYSTEM CHECKS - SER # A0109 266 DAILY REA09 2UPX37-1 TBL 4-1
UPX 37 DAILY SYSTEM CHECKS - SER # C0126 266 DAILY REA26 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2UPX37-1 TBL 4-1
3N1 DAILY PERFORMANCE CHECK 301 DAILY C60A3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-177-1 TABLE 2-1
2N1 DAILY PERFORMANCE CHECK 326 DAILY C84B2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35E4-178-1 TABLE 2-1
DISPLAY CONSOLE TURN ON/OFF 1301 DAILY RE035 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UYQ27-26WC-1
UPA 59 DAILY PREVENTATIVE MAINTENANCE 1308 DAILY RE035 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31P1-2UPA59-1-1 & 2
WEATHER/ECM PERFORMANCE ROUTINE 2 7 DAY 12/2/19 RE035 1 0 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
RADAR/SIF SYSTEM TEST PERFORMANCE 50 7 DAY 12/2/19 RE035 1 0 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
I-F RECEIVER PERFORMANCE ROUTINE 51 7 DAY 12/2/19 RE035 1 0 0 1 1 0 0 0 0 31P3-2TPS75-6WC-1
HEIGHT PERFORMANCE ROUTINE 73 7 DAY 12/2/19 RE035 1 0 0 1 1 0 0 0 0 31P3-2TPS75-6WC-1
CLUTTER MAPPING PERFORMANCE ROUTINE 74 7 DAY 12/2/19 RE035 1 0 0 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
COMMUNICATIONS PERFORMANCE ROUTINE 273 7 DAY 12/2/19 RE035 1 0 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
POWER SUPPLY TEST PERFORMANCE ROUTINE 273 7 DAY 12/2/19 RE035 1 0 1 1 0 0 0 0 0 31P3-2TPS75-6WC-1
DISPLAY CONSOLE WEEKLY INSPECTION 1303 7 DAY 11/29/19 RE035 1 0 1 1 0 0 0 0 0 31P1-2UYQ27-26WC-1
ANTENNA/RECEIVER INTERFACE TEST PERFORMANCE ROUTINE 550 14 DAY 12/5/19 RE035 0 1 0 0 31P3-2TPS75-6WC-1
SYSTEM ORIENTATION PERFORMANCE CHECK 993 14 DAY 12/3/19 RE035 1 1 0 0 0 31P3-2TPS75-6WC-1
AFRADES HEIGHT EVALUATION 999 14 DAY 12/2/19 RE035 1 1 0 0 0 31P3-2TPS75-6WC-1
AFRADES BEACON PERFORMANCE 1038 14 DAY 12/2/19 RE035 1 1 0 0 0 31P3-2TPS75-6WC-1
AFRADES CLUTTER ANALYSIS 1041 14 DAY 12/2/19 RE035 1 1 0 0 0 31P3-2TPS75-6WC-1
AUTO SEQUENCER TEST 1207 14 DAY 12/3/19 RE035 1 1 0 0 31P3-2TPS75-6WC-1
HEAT EXCHANGER SERVICING 1270 14 DAY 12/2/19 RE035 1 1 0 35E4-177-1 TABLE 2-1
SHELTER CLEANING AND INSPECTION SERVICING 1271 14 DAY 12/5/19 RE035 0 1 0 0 0 35E4-177-1 TABLE 2-1
COMPRESSOR DEHYDRATOR ON/OFF RATIOS 304 28 DAY 12/6/19 RE035 1 0 31P3-2TPS75-6WC-1
FREQ GENERATOR COHO REF OUTPUT CHECK 1241 28 DAY 12/3/19 RE035 1 0 0 31P3-2TPS75-6WC-1
FREQ GENERATOR IF TEST TARGET AMPLITUDE CHECK 1245 28 DAY 12/3/19 RE035 1 0 0 31P3-2TPS75-6WC-1
ANTENNA PEDESTAL AND LEVELING JACK INSPECTION 1250 28 DAY 12/16/19 RE035 1 0 31P3-2TPS75-6WC-1
RF AND SLIP RING TEST 1253 28 DAY 12/23/19 RE035 1 1 0 31P3-2TPS75-6WC-1
MDS/FAR TEST 1254 28 DAY 12/16/19 RE035 1 0 31P3-2TPS75-6WC-1
AFRADES TILT SENSOR PERFORMANCE 1255 28 DAY 12/23/19 RE035 1 1 0 31P3-2TPS75-6WC-1
ANTENNA ASSEMBLY CLEANING AND INSPECTION SERVICING 1272 28 DAY 12/24/19 RE035 1 0 31P3-2TPS75-6WC-1
SHELTER CORROSION CONTROL INSPECTION AND SERVICING 1273 28 DAY 12/2/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA CORROSION CONTROL INSPECTION AND SERVICING 1274 28 DAY 12/17/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA POWER SUPPLY ENCLOSURE AIR FILTER CLEANING 1274 28 DAY 12/17/19 RE035 1 0 31P3-2TPS75-6WC-1
COMPRESSOR- DEHYDRATOR ASSEMBLY RELIEF VALVE SERVICING 1276 28 DAY 12/16/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA BULL GEAR LUBRICATION 1279 28 DAY 12/24/19 RE035 1 0 31P3-2TPS75-6WC-1
ANTENNA DRIVE MOTOR GEARBOX OIL LEVEL CHECK 1280 28 DAY 12/24/19 RE035 1 0 31P3-2TPS75-6WC-1
TUSK ASSEMBLY, JACKSCREW, AND ANTENNA YOKE LUBRICATION 1281 28 DAY 12/24/19 RE035 1 0 31P3-2TPS75-6WC-1
DISPLAY CONSOLE INSPECTION AND CLEANING 1304 28 DAY 12/24/19 RE035 1 0 31P3-2TPS75-6WC-1
3N1 MONTHLY PERFORMANCE CHECK 323 MONTHLY 12/18/19 C60A3 1 0 35E4-177-1 TABLE 2-1
2N1 MONTHLY PERFORMANCE CHECK 329 MONTHLY 12/18/19 C84B2 1 0 35E4-178-1 TABLE 2-1
UPX 37 QUARTERLY INSPECTION - SER # A0109 283 84 DAY 2/6/19 REA09 2UPX37-1 TBL 4-1
UPX 37 QUARTERLY INSPECTION - SER # C0126 283 84 DAY 12/31/19 REA26 0 2UPX37-1 TBL 4-1
TRANSMITTER OIL BREAKDOWN TEST & FILAMENT INTERRUPT CHECK PROCEDURE 1256 84 DAY 12/23/19 RE035 0 31P3-2TPS75-6WC-1
0 = Job Forecast
/ = Partially C/W
1 = C/W
Unclassified Page 14 of 42
STORAGE TWYSTRON PUMP DOWN 1257 84 DAY 12/30/19 RE035 0 31P3-2TPS75-6WC-1
MODIFIED BEARING LUBRICATION 1282 84 DAY 11/20/19 RE035 0 31P3-2TPS75-6WC-1
ANTENNA LEG ASSEMBLY INSPECTION 1283 84 DAY 12/30/19 RE035 0 31P3-2TPS75-6WC-1
PROCESSOR RACK INSPECTION AND CLEANING 1285 84 DAY 1/9/20 RE035 31P3-2TPS75-6WC-1
MODULAR INTERFACE GROUP INSPECTION AND CLEANING 1289 84 DAY 12/30/19 RE035 0 31P3-2TPS75-6WC-1
UPX 37 SEMIANNUAL INSPECTION - SER # A0109 294 168 DAY 12/4/18 REA09 2UPX37-1 TBL 4-1
UPX 37 SEMIANNUAL INSPECTION - SER # C0126 294 168 DAY 1/2/20 REA26 2UPX37-1 TBL 4-1
TRANSMITTER LIQUID COOLANT SERVICING 1290 168 DAY 1/30/20 RE035 31P3-2TPS75-6WC-1
PPI CIRCUIT CARD INSPECTION AND CLEANING 1291 168 DAY 2/12/20 RE035 31P3-2TPS75-6WC-1
CONTROL MONITOR INSPECTION AND CLEANING 1292 168 DAY 1/28/20 RE035 31P3-2TPS75-6WC-1
ANTENNA AND SHELTER JACKS LUBRICATION 1293 168 DAY 1/16/20 RE035 31P3-2TPS75-6WC-1
UPA 59 PREVENTATIVE MAINTENANCE 1309 168 DAY 8/8/19 RE035 31P1-2UPA59-1-1 & 2
ANTENNA DRIVE MOTOR GEARBOX SERVICE 1294 336 DAY 7/29/20 RE035 31P3-2TPS75-6WC-1
PROCESSOR RACK AND CIRCUIT CARD INSPECTION AND CLEANING 1295 336 DAY 7/29/20 RE035 31P3-2TPS75-6WC-1
INTERROGATOR CIRCUIT CARD INSPECTION AND CLEANING 1297 336 DAY 7/29/20 RE035 31P3-2TPS75-6WC-1
DESICCANT CARTRIDGE REPLACEMENT 1298 336 DAY 4/23/20 RE035 31P3-2TPS75-6WC-1
CONTROL MONITOR INSPECTION, CLEANING, AND LUBE 1299 336 DAY 7/13/20 RE035 31P3-2TPS75-6WC-1
HIGH VOLTAGE INSULATED GLOVES TEST SET #1 367 365 DAY 5/7/20 RE035 AFI 91-203, 812.8
HIGH VOLTAGE INSULATED GLOVES TEST SET #2 396 365 DAY 4/23/20 RE035 AFI 91-203, 812.8
ANNUAL HISTORICAL RECORDS REVIEW 1320 365 DAY 3/7/20 RE035 00-20-1 PARA 10.7.4
ANNUAL FACILITY GROUNDS INSPECTION 1322 365 DAY 2/5/20 RE035
TX HOIST 1323 365 DAY 1/9/20 RE035 31P3-2TPS75-6 Chpt 2 Sec 1
ANT & SHELTER LIFT HARDWARE INSPECTION BY NDI/ TX HOIST 68 365 DAY 12/30/00 RE035 0 31P3-2TPS75-6 Chpt 2 Sec 1
ANTENNA TIEDOWN STRAPS INSPECT AND REPLACE ALL 1324 720 DAY 1/28/21 RE035 31P3-2TPS75-6
INSPECT AND REPLACE ALL HYDRAULIC HOSES 1325 60 MONTH 06/06/23 RE035 31P3-2TPS75-6
MIL-HDBK-419A PARA 2.3.1, 31-
10-24 Appx B
AERIAL TARGETS MONTHLY SUMMARY NOVEMBER 2019
5. Maintenance and Logistics Problems:
With the dissolution of the sole repair vendor for the proprietary DLS Receiver/Transmitter units, the current cache of four spare units are all that are available. Some DLSr units have been delivered, and are being used on a limited basis. The remaining DLSr delivery date is a moving target, with an anticipated delivery of December 2019.
a. Top Five Report:
b. Long Lead Report:
6. Gulf Range Tower Conditions:
a. Tower for Site RWN:
Hurricane Michael brought down tower containing this antenna.
Temporary tower installed and working well.
Contracts were awarded Sep19 for replacement of this tower.
b. Tower for Site RWW:
Hurricane Michael brought down tower containing this antenna.
Temporary tower installed and working well.
Contracts were awarded Sep19 month for replacement of this tower
c. Tower for Site APPL:
Hurricane Michael brought down tower containing this antenna.
d. All other towers fully functional.
Top 5 Parts With Longest Lead Time
Date Ordered NSN Part Number Nomenclature QTY End Item Remarks
19-Jun-18 8010-00-490-7650 MIL-L-81352 LACQUER 1 RADAR Est Due 10 Feb 20
15-Jan-19 7920-00-823-9773 AA1432 TOWEL UTILITY 4 SHOPUSE Est Due 8 May 20
19-Aug-19 5340-01-112-5151 AA19282 PADLOCK 3 SHOPUSE Est Due 28 Dec 19
25-Nov-19 6140-01-515-2724 8G24 DLS BATTERIES 2 DLS Est Due 26 Dec 19
Top 5 Parts Ordered
NSN Part Number Nomenclature End Item Remarks
8415-01-492-0180 60005PF XLG XL RUBBER GLOVES SHOPUSE Esd Due 28 Dec 19
6130-01-441-1566 SMART750 POWER SUPPLY SHOPUSE Rec'd 15 Nov 19
6140-01-515-2724 8G24 DLS BATTERIES DLS Esd Due 26 Dec 19
6135-00-826-4798 824 AAA BATTERIES SHOPUSE Rec'd 15 Nov 19
6135-00-900-2139 MN1604 9V BATTERIES SHOPUSE Rec'd 15 Nov 19
Unclassified Page 16 of 42 Distribution: A
7. Wendover Status:
a. Building 625 Control Site:
PAE continues to work infrastructure requirements per TSS requests for both a consolidated Wendover only operation and the requirements for a split configuration that would have control at Wendover and drone launches at Dugway. The 388th's contractor
JT3 will provide the WEG an estimate for their support to finish their infrastructure upgrade for the host communications system.
PAE provided locations and quantities for NIPR and SIPR drops within building 625 to aid JT3 with their estimates. Cable and jacks for phones and NIPR computers are installed between the communications room and each location within the building so only the range infrastructure remains to be completed. The TSS is working procurement of the computers and phone instruments.
Based on the consolidated versus split operations plan, the tower needed at building 625 will be new or come from the current Wig Mountain site. The tower at 625 will support antennas for GRDCS, radios and GPS timing. The fastest and most versatile path is to purchase and install a new tower onto the newly built tower base already in place at
Wendover; a new tower would provide increased height (better coverage) at a cost of
~$20K. For either solution, additional RF cable, mounting clamps, etc. must be purchased for the move; a list of those parts was provided to the TSS, ~$6.6K.
GRDCS “New Tech” hardware and software were installed in the Wendover control site; however, the software must be updated to the newest revision in order to become operational.
On 29 April 2019, UTTR 388th personnel reported a water pipe had burst inside the wall of the mechanical room in control site building 625. The water affected several rooms including the console room and server/communications rooms. Per a report from a SPO representative from Hill, none of the WEG owned equipment was damaged and the only required repair for the operations areas is new floor coverings. The break room received more significant damage, primarily to cabinetry and carpet.
b. Launch Pad:
Compressors and power supplies must be purchased for the rails. The 82nd RAs were working this in 2018; there was a contracting hiccup, so funding short stopped the purchase.
Gantries and hoists must be purchased for the launch pad as well as a contract let to install them. PAE completed a design; the narrative for the SOW for the construction must be written before the task can go out for bids.
PAE is developing parts lists for the installation of the rails, power supplies, compressors, grounding, communications, connections for generator, etc.
Fiber equipment must be purchased and installed to provide connectivity from building
625 to the LAMS, and in turn from the LAMS to the launch pad. Much of the hardware from Dugway will be reused when maintenance activities and launch operations move from Dugway; however, several additional items will be needed due to the longer fiber cable runs.
Work continues with environmental approval contractor for the launch and maintenance areas.
Unclassified Page 17 of 42 Distribution: A
c. LAMS Maintenance Shelter:
PAE is working a requirements document to install electrical, grounding, lightning protection, etc.
PAE is developing parts list for the installation of a compressor, stands to mount items like fire extinguishers, eyewash, AED, etc.
PAE is working a requirements document for a secure storage area within the LAMS.
The LAMS itself was erected; however, it requires repair due to wind damage. The
WEG is working the repair effort.
d. Wendover GRDCS Sites:
The TSS is working lease efforts for the I-80 GRDCS site. This is the single most critical RF point needed to use the Wendover control whether launching from Dugway or Wendover. Site H97 is going through the environmental process. It would also be very helpful for Dugway operations with Wendover control, but it really becomes critical when launch operations move to Wendover. PAE is designing an inclusive site platform for H97.
8. GRDCS and RCS Operating Hours:
9. GRDCS and RCS Accounts Status:
a. GRDCS Accounts:
The GRDCS computers are accessed by user groups rather than by individual accounts. The users are trained for and only granted access to the level required to perform their assigned tasks. The three user groups and their level of access are depicted in the following chart.
Mission Support Maintenance Programming &
Engineering
Administration
GRDCS 86.76 22.35 8.34 9.58
RCS 252.00 18.00 18.00 18.00
H o u rs
GRDCS (Operations) CDT (Maintenance) ROOT (Administration)
Hours 109.82 7.63 9.58
GRDCS User Accounts
Unclassified Page 18 of 42
b. RCS Accounts:
The RCS computers are accessed by user groups rather than by individual accounts. The users are trained for and only granted access to the level required to perform their assigned tasks. The five user groups and their level of access are depicted in the following chart.
10. Engineering and Systems Programming Tasks:
a. Short Title: Testing and evaluation of the maximum GRDCS participant capability.
Summary: Due to the additional GRDCS hardware/software implementation of SIR 451
“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS
External Track Data” with development version 55, test flights are being supported to verify the maximum GRDCS participant capability.
Date Initiated: 24 April 2009
Completion Date (Estimated): TBD, depending on availability of mission(s).
Current Status: 85% complete.
Problems anticipated or encountered: None.
b. Short Title: Test TM connectivity with Bldg. 223 in order to evaluate the external
NDI-AIU C-Band Beacon data with Safety.
Summary: Due to the additional GRDCS hardware/software implementation of SIR 451
“Integration of NDI-AIU C-Band Beacon data into GRDCS and RCS
External Track Data” with development version 55, a connectivity test with
TM Bldg 223 is still pending to evaluate the data into GRDCS and RCS.
Date Initiated: 13 July 2009
Completion Date (Estimated): TBD, depending on TM shop and testing results.
Current Status: 0% complete.
Problems anticipated or encountered:
First test on 13 July 2009 was not successful. Bldg. 223 personnel could not start the program. More work on their side is required.
83rd 82nd ROOT USAF_Administr ator
Wetstone MSCT
Hours 16.00 32.50 18.00 36.00 432.00 432.00
RCS User Accounts
Unclassified Page 19 of 42 Distribution: A
c. Short Title: Installation and demonstration of DLS-r Developmental Software/Hardware.
Summary: Started DT of DLS-r user version based on GRDCS software version 59.4.
Note the DLS-r effort is continuing with Version 60 OT testing.
Date Initiated: 20 August 2015
Completion Date: 30 November 2019
Current Status: 100% Complete
Problems anticipated or encountered: Fielding Authorization was provided by ACC on
11 May 2017. All existing permanent tower sites have been equipped with MSI’s production units. Sites RWN & RWW are awaiting new towers, and St. George, which is replacing Apalachicola, with new site installation in work, will receive them when their site work is complete.
d. Short Title: Software installation (Release Candidates 3 & 4) and demonstration of SIRs of GRDCS Software/Hardware Version 61.0.
Summary: In process of supporting DT for v61.0 for the hardware & software upgrade.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: DT Phase; Start date 21 Aug 2018.
Problems anticipated or encountered: None at this time.
e. Short Title: V61 Documentation Review.
Summary: In process of reviewing v61 hardware & software documentation.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: Ongoing process. Currently reviewing version v61.0.6, 19 Nov 2019.
f. Short Title: User software (increment-13, based on v60.4) installation for the QF-16 DR2
Hardware Changes (SIR 843).
Summary: In process of supporting ground and test flights for the QF-16 DR2 Hardware
Changes with Autopilot v1.7 software.
Date Initiated: 29 June 2018
Completion Date (Estimated): TBD
Current Status: Flight testing is complete at Tyndall and is presently taking place at
Holloman. SIR 843 scheduled to be included in v62 software upgrade.
g. Short Title: Software installation of GRDCS Software/Hardware V61.0.1 (31Jan19).
Summary: In process of supporting DT for v61.0 for the hardware and software upgrade.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: DT Phase; Start date 21 August 2018.
Problems anticipated or encountered: Code discrepancies found/need to be corrected.
Unclassified Page 20 of 42 Distribution: A
h. Short Title: Software installation of GRDCS Software/Hardware V61.0.2 (20Feb19).
Summary: In process of supporting DT for v61.0 for the hardware and software upgrade.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Current Status: DT Phase; Start date 21 August 2018.
i. Short Title: Software installation of GRDCS Software V62.0 (29Mar19).
Summary: In process of supporting SIR Demos for v62.0 for the software upgrade.
Date Initiated: 29 March 2019
Completion Date (Estimated): TBD
Current Status: Demo Phase; Start date 28 Feb 2019 with video (SIR844) and .sml file
(SIR878). Continued on 29 May 19, with SIR 739, 822, 874, 849, 877, and 674.
j. Short Title: Software installation of GRDCS Software V61.0.3 (30Jul19).
Summary: In process of supporting DT for v61.0 for the hardware & software upgrade.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
k. Short Title: Software installation of GRDCS Software V61.0.4 (04Oct19).
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
l. Short Title: Software installation of GRDCS Software V61.0.5 (18Oct19).
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
m. Short Title: Software installation of GRDCS Software V61.0.6 (19Nov19).
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Unclassified Page 21 of 42 Distribution: A
n. Short Title: Software installation of GRDCS Software V61.0.7 (21Nov19).
Summary: In process of supporting DT for v61.0 for the hardware & software upgrade.
Date Initiated: 21 August 2018
Completion Date (Estimated): TBD
Problems anticipated or encountered: None.
11. Special Projects:
a. In process of enhancing locally developed “MapScript” program to enable recursive directory search and loading of input files. This will provide historical analysis of a ground station relative to other ground stations and drone position on the range (90% complete, pending hardware upgrades for finalization).
b. In process of enhancing locally developed ‘safe flight script’ to handle QF-16 telemetry during the different phases of the safe flight profile (10% complete).
c. Supporting Wendover system evaluation as a first look of the new hardware (console and computer) and software to include local RF environment. (Ongoing effort at this time, no
ETA available yet).
12. ATIS Mission Support (Over-the-Horizon Airborne Relays using platform aircraft):
a. Mission # 6014 / 19-Nov-19
Number of Aircraft Scheduled: 4
Number of Aircraft Provided: 5
Aircraft Data Quality:
Call Sign
Data
Link Rate
(DLR)
Remarks –
(Mandatory if DLR < 90% else observations of feedback)
PLT1
(Tail#487)
90%
PLT2
(Tail#486)
90%
PLT3
(Tail#481)
90%
PLT4
(Tail#485)
90%
Unclassified Page 22 of 42 Distribution: A
TAB 4 – MAINTENANCE DATA SYSTEM ANALYSIS (MDSA)
METRICS
1. MDSA Metrics:
a. Abort Rate: SDS Criteria FSAT/SSAT < 12%
FSAT = 8.9% (0 AAB + 8 GAB with 89 sorties flown and 1 chargeable GAB lines)
((0 / 89) + (8 / (89 + 1))) x100)
Fuel leak
Anti-skid light
Hydraulic leak (Holloman)
FLCS A light
Fuel leak
CADC
FLCS w/n reset (Holloman)
JFS no start
SSAT = 16.7% (0 AAB + 2 GAB with 12 sorties flown and 0 GAB lines)
((0 / 12) + (2 / (12 + 0))) x100)
Cons engine NS
Cons engine NS
b. Repeat/Recur Rate: SDS Criteria FSAT/SSAT < 7%
FSAT = 0.0% (0 Repeat + 0 Recur with 19 PRDs) ((0 / 19) x 100)
SSAT = 0.0% (0 Repeat & 0 Recur with 2 PRD) ((0 / 2) x 100)
c. Cannibalization Rate: 4.0% (4 Canns with 101 Sorties Flown) ((4 / 101) x 100)
d. Data Integrity Error Rate: SDS Criteria - 98% of correctable errors corrected
73.5% (37 Errors with 2 Uncorrectable and 26 Corrected) (26 / (37 - 2)) (2,813
DDRs checked)
e. Break Rate = 8.9% (9 Code 3s with 101 Sorties Flown) ((9 / 101) x 100)
f. Primary Aerospace Vehicle Authorized (PAA) vs. Possessed (PP) Rate:
FSAT = 100.0% (31 assigned with 31 possessed, 50 baseline and 0 CLIN 4/6 inventory at EOM) ((31 / 31) x 100)
SSAT = 100.0% (44 PAA with 44 possessed and 0 CLIN4/6 inventory at EOM) ((44 /
44) x 100)
g. FSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%
98.9% (99 Sorties attempted with 89 successful and 9 non-chargeable non-successful)
((89 / (99 - 9)) x 100)
Unclassified Page 23 of 42 Distribution: A
h. SSAT Mission Success Rate: SDS Criteria - 95%, Critical Standard – 98%
100.0% (18 Sorties attempted with 12 successful and 6 non-chargeable non-successful) ((12 / (18 - 6)) x 100)
2. Maintenance and Flying Schedule Effectiveness (MSE and FSE)
a. MSE = 78.4% (685 points scheduled with 537 complied with) ((537 / 685) x 100)
b. FSE = 78.4% (101 sorties flown, with 12 sorties cancelled, 5 sortie added and 32 total
FSE deviations) (((108 - 32) / 108) x 100)) (Of the 32 chargeable deviations, 5 were attributed to maintenance.)
The main drivers were 12 Cancels and 9 Late Take-Offs.
Add Lines = 5 (1 Ops, 1 HHQ, 2 Mx, 1 Project)
Add Tails = 0
Cancels = 12 (1 Project, 4 Wx, 7 Ops)
Early T/O = 5 (1 Ops, 4 Project)
Late T/O = 9 (2 Mx, 3 Ops, 3 Project, 2 Other, 3 Sympathy)
GAB Lines = 1 (1 Mx) (+3 non-chargeable Mx)
3. Narratives:
Ground & Air Aborts
a. FSAT – In November, there were 6 QF-16C ground aborts at Tyndall and 2QF-16C ground aborts at Holloman. These 8 aborts involved6 aircraft.
(1) There were a few, mainly minor, trends in this month’s aborts:
(a) Two Tyndall aircraft aborted twice in November:
(1) AF044 recorded 2 unrelated ground aborts on the same day: FLCS A light
(R2 lamp) and CADC (Recycled MUX bus power CADC light reset and
003 MFL reset). These were its first aborts since delivery from Boeing.
(2) AF051 also recorded 2 aborts this month: Anti-skid Light (CND) on 4
November, then Fuel Leak (R2 F-1 cavity drain valve) on 18 November
(the same day as AF044’s 2 aborts). This brings this aircraft to a total of 3 ground aborts as an FSAT. Its other abort occurred last month and also involved an anti-skid issue.
(3) AF021 only aborted once (JFS No Start; In Work), but this brings it up to
22 ground aborts as an aerial target. This solidifies its position as the top-aborting aircraft in the QF-16 program, 3 aborts more than its nearest
Unclassified Page 24 of 42 Distribution: A competitor. Its last previous abort was last month, also for JFS issues.
Nine of AF021’s aborts have involved JFS problems.
(b) Two systems accounted for 2 aborts each in November:
(1) There were 2 aborts for FLCS problems: AF044 as discussed above and
AF027 (R2 ECA). AF027 had one previous abort for FLCS, in September
2018.
(2) Two aborts involved Fuel Leaks: AF051, discussed earlier, and AF052
(Retorqued fasteners).
2. The numerical breakouts for November were:
(a) Eight aborts involved 6 QF-16C’s.
(b) Seven aborts this month occurred on O&M flights; 1 was a customer sortie.
All aborts occurred on manned flights.
(c) The weekly abort distribution was 7 on Mondays and 1 on a Thursday. Seven were on morning sorties and 1 was an afternoon mission.
(d) A Holloman Cross Country sortie and two Tyndall FCS lines were lost to aborts.
b. SSAT – November saw two SSAT ground aborts for Cons Engine NS. On aircraft 14-
0474, the corrective action was R2 Fuel Block. Aircraft 14-0473 is still in work.
Date Base AF # Reason Corrective Action
FSAT
4 Nov TAFB 52 Fuel leak Retorqued fasteners
4 Nov TAFB 51 Anti-skid light CND
14 Nov HAFB 46 Hydraulic leak
Did general bleed/leak check, ran hyd mule at 3000 psi, did 10 minute engine run, found no leaks
18 Nov TAFB 44 FLCS A light R2 lamp
18 Nov TAFB 51 Fuel leak R2 F-1 cavity drain valve
18 Nov TAFB 44 CADC
Recycled MUX bus power CADC light reset and
003 MFL reset
18 Nov HAFB 27 FLCS w/n reset R2 ECA
25 Nov TAFB 21 JFS no start In work
SSAT
13 Nov TAFB 0592 Cons engine NS In work
13 Nov TAFB 0474 Cons engine NS In work
Unclassified Page 25 of 42 Distribution: A
TAB 5 – TECHNICAL REPORT STATUS
Negative this report period.
TAB 6 – QUALITY CONTROL (QC) SUMMARY REPORT
1. Full-Scale - Tyndall:
a. Twenty-two Quality Verification Inspections, thirty-seven Special Inspections, and ten
Personnel Evaluations were accomplished. Sixty-seven inspections passed, two failed. There were two major failures this period consisting of TNB/FOM and Housekeeping. There were 3 minor discrepancies consisting of training, FSAT maintenance actions.
b. Problem Area: None
c. PQDRs: Seven this report period.
DR control # Date CAT Serial # Acft Noun
FA4881-19-
0286 11/25/2019 PQDR
QF051 Transponder Vehicle Interface
FA4881-19-
0287 11/25/2019 PQDR ASTS 006 Signal Generator
FA4881-19-
0288 11/25/2019 PQDR
12C0012 QF040 Automatic Flight Control Computer (AFCC)
FA4881-19-
0289 11/25/2019 PQDR
QF040 Transponder Vehicle Interface
FA4881-19-
0290 11/25/2019 PQDR
1521 021 QF051 Switching unit, Antenna, CTS
FA4881-19-
0291 11/25/2019 PQDR
QF040 Radar Unit VSS
FA4881-19-
0292 11/25/2019 PQDR
QF040 Radar Unit VSS
d. AFTO Form 22’s: None this report period.
e. TODO: Sixty-nine technical order changes and revisions received this period.
f. Impoundments: One this report period.
g. FOD/DOP/Lost item: None this report period.
Unclassified Page 26 of 42
2. Full-Scale - Holloman:
a. Twelve Quality Verification Inspections, eighteen Special Inspections, and four Personnel
Evaluation were accomplished. Thirty-four inspections passed, Zero failed
b. Problem Areas: None this report.
c. PQDRs: None this report period.
d. AFTO Form 22’s: None this report period.
e. TODO: Reviewed 53 Technical Order changes/revisions.
f. Impoundments: None this report period.
g. FOD/DOP/Lost item: Two this report period.
3. Subscale:
a. Fourteen Quality Verification Inspections, fourteen Special Inspections, and twenty-seven
Personnel Evaluations were accomplished. Fifty-five passed, Zero fail. There was one minor discrepancies found consisting of CTKs.
b. Problem Areas: None this report period.
d. AFTO Form 22s: None this report period.
e. TODO: Fourteen technical order change and revision received this period.
g. DOP/Lost Item: None this report period.
4. GRDCS - Tyndall:
a. Eleven inspections this period. Eleven passed, Zero failed.
b. AFTO Form 22s: None this report period.
d. TODO: Three technical order change and revision this period.
e. Problem Areas: None this report period.
Unclassified Page 27 of 42
5. ESH - Tyndall:
a. Ten Special Inspections were accomplished. Zero Failed.
6. ESH - Holloman:
a. One was accomplished this month. Zero Failed.
7. Publications and Forms: No contractual impacts this period. See CDRL A009, Master
Document List.
0.7
0.8
0.9
TYN HMN SSAT RIS ESH
QA Inspection Pass Rate Sep - Nov 2019
Sep
Oct
Nov
Unclassified Page 28 of 42 Distribution: A
TAB 7 – RIS MAINTENANCE ANALYSIS REQUESTS
1. Electro-Magnetic Interference (EMI): No EMI reported this period.
2. RIS Maintenance Actions:
3.
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
183020001 CARRY OVER:
All poles holding Antenna systems at B1801 down due to Hurricane Michael.
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
DISCR. HOURS: EQUIPMENT MAKE: EQUIPMENT MODEL: EQUIPMENT S/N:
N/A N/A N/A N/A
Unclassified Page 29 of 42
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
183020002 CARRY OVER:
Runway West tower down due to Hurricane Michael.
Temporarily installed mobile DLS trailer at site.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
183020003 CARRY OVER:
Runway North tower down due to Hurricane
Michael.
Temporarily installed mobile DLS trailer at site.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 30 of 42 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
183020006 CARRY OVER:
B256 tower is down due to Hurricane Michael.
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
183020007 CARRY OVER:
ACDS Missile and Drone, Primary and Backup antenna systems down due to Hurricane Michael.
(See RIS# 183020001)
Temporarily installed
ACDS Missile Primary and
Backup antennas on Tower
1802.
No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 31 of 42
183020011 CARRY OVER:
Runway west video is down due to Hurricane
Michael. (See RIS#
183020002)
N/A No mission impact noted.
MAINT. AREA:
RIS
START DATE:
20181029
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
190980001 CARRY OVER:
RCS MULTI (RBZ94)
took a lightning strike.
Job opened with COMM
Focal Point (283-4896).
Put GRDCS Multi in RCS
Multi’s slot.
None
MAINT. AREA:
COMM
START DATE:
20190408
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
DISCR. HOURS: BRAND: EQUIPMENT MODEL: EQUIPMENT S/N:
Unclassified Page 32 of 42 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
191650004 CARRY OVER:
GATR ACS UHF 1-16
require wiring from
EPlane to Channel Bank.
ACS 1-12 complete.
Waiting on rack install to complete.
None
MAINT. AREA:
COMM
START DATE:
20190614
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
192120002 CARRY OVER:
No APTM data on Path
1.
N/A No mission impact noted.
MAINT. AREA:
GRDCS
START DATE:
20190731
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 33 of 42
192120101 CARRY OVER:
GSM Transceiver
Communication Error during attempted Self-
Calibration.
IAW w/ T.O., checked all connections. Rebooted system, symptom persisted. Reported to
SPO, awaiting direction.
SPO picked up unit for delivery to MSI for repair.
None
MAINT. AREA:
DLS
START DATE:
20190731
STOP DATE:
N/A
REPAIRED BY:
D. Holmes
MAN HOURS:
N/A
COST:
N/A
N/A MSI 915 DTS 003
193010003 82nd OPS VHF has bad receive.
Removed and replaced antenna.
Operational checks good.
No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20191028
STOP DATE:
20191115
REPAIRED BY:
K.G/B.W/R.G
MAN HOURS:
3.0
COST:
$247.39
431.5 VHF ANTENNA N/A 17568
Unclassified Page 34 of 42
193110001 AATTCS Console #7 has a broken switch guard on the middle panel.
Removed and replaced switch guard with parts on hand.
Operational checks good.
No mission impact noted.
MAINT. AREA:
AATTCS
START DATE:
20191107
STOP DATE:
20191107
REPAIRED BY:
A.BIGGINS
MAN HOURS:
0.5
COST:
N/A
0.5 N/A N/A N/A
193110002 Open:
Poor data quality on
RWE DLS.
Found VSWR 5:1 due to fault near antenna.
No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20191107
STOP DATE:
N/A
REPAIRED BY:
N/A
MAN HOURS:
N/A
COST:
N/A
Unclassified Page 35 of 42 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
193160001 Full-scale OPS radio has constant noise on receive.
Radio power cord was disconnected overnight.
Reapplied power.
Operational checks good.
No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20191112
STOP DATE:
20191113
REPAIRED BY:
J.TIN/E.ROS
MAN HOURS:
3.0
COST:
N/A
18.5 N/A N/A N/A
193190001 The Computer on
AATTCS Console 2L is beeping and has a flashing light near hard drive.
Removed and replaced computer with parts on hand.
Operational checks good.
No mission impact noted.
MAINT. AREA:
GRDCS
START DATE:
20191115
STOP DATE:
20191115
REPAIRED BY:
K.GIA/G.WOL
MAN HOURS:
10.0
COST:
N/A
5.0 DELL T7500 8R1NVK1
Unclassified Page 36 of 42
193190002 ACDS system, drone left side, FTSC failed during maintenance.
Removed and replaced
FTSC with parts on hand.
Operational checks good.
No mission impact noted.
MAINT. AREA:
UHF DESTRUCT
START DATE:
20191115
STOP DATE:
20191115
REPAIRED BY:
D.HOL/K.GIA
MAN HOURS:
5.0
COST:
N/A
2.5 N/A N/A N/A
193220001 AATTCS Consoles 7 and 8 require conversion to new hardware for software testing.
Conversion complied with.
Operational checks good.
No mission impact noted.
MAINT. AREA:
AATTCS
START DATE:
20191118
STOP DATE:
20191118
REPAIRED BY:
A.BIG/K.GIA
MAN HOURS:
1.0
COST:
N/A
Unclassified Page 37 of 42 Distribution: A
RIS NUMBER: DISCREPANCY: ACTION TAKEN: MISSION IMPACT:
193240001 AATTCS UHF-2 failed. Repaired by GATR maintenance.
Operational checks good.
No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20191120
STOP DATE:
20191121
REPAIRED BY:
GATR
MAN HOURS:
1.0
COST:
N/A
22.0 N/A N/A N/A
193240002 Runway North has no
TOA response.
Commercial power down due to debris clearing.
Power restored by CE.
Operational checks good.
No mission impact noted.
MAINT. AREA:
AATTCS
START DATE:
20191120
STOP DATE:
20191120
REPAIRED BY:
CE
MAN HOURS:
3.0
COST:
N/A
7.0 N/A N/A N/A
Unclassified Page 38 of 42
193290001 AATTCS 1801 VHF has no transmit modulation. It has a loud static on transmit carrier when keyed.
Moved radio from port 1 to port 2 on RIP4.
Operational checks good.
No mission impact noted.
MAINT. AREA:
COMM
START DATE:
20191125
STOP DATE:
20191125
REPAIRED BY:
E.ROS/J.TIN
MAN HOURS:
1.0
COST:
N/A
Unclassified Page 39 of 42
TAB 8 – FACILITIES OPEN WORK REQUESTS
TOP FIVE WORK REQUESTS
TOP 5
JOB NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
38912
1801 Repair raised floor in room 114. Note:
Submitted by the 81st Range Control Squadron.
CES/CEO
REVIEW
25 Jan 18
239 Repair 239 above-ground storage tank CES/CENPD
Review/In Progress
30 Apr 19
8513 LP Gate Repair CES
REVIEW
31 Jul 19
38125
45 Pave access road/checkpoint. CES/CENPD
REVIEW
1 Apr 15
59188
Extend existing permanent static ground system inside buildings.
CES/CENM
REVIEW
7 Aug 13
Full Scale Facilities – Building Manager – S. Davis
JOB
NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
38125 45 Pave access road/checkpoint. CES/CENPD
REVIEW
1 Apr 15
59222 45 Roadway Improvement CES/CENP
REVIEW
21 Nov 13
E2953 9310 Plumb emergency eye wash drain to the building exterior.
Install shower pans under emergency showers in
Bays 1 and 3 and plumb to drain outside.
CES/FM
PLUMBER
AWT SCHEDULE
11 Aug 17
38672 9310 Install 26 electrical outlets. CES/CENPD
REVIEW
24 Jan 17
G-0424 156 Install ice maker CES/CENPD
IN WORK
26 JUL 19
G-0425 9310 Install ice maker CES/CENPD
IN WORK
26 JUL 19
Unclassified Page 40 of 42 Distribution: A
Range Instrumentation Systems Facilities – Building Manager - R. Williams
JOB NO. BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
38912 1801 Repair raised floor in room 114. Note:
Submitted by the 81st Range Control Squadron.
CES/CEO
REVIEW
25 Jan 2018
39126 9401 Paint facility. CES/ALOP
SUBMITTED
16 Aug 2018
39211 9350 Replace galvanized communication tower due to
Hurricane Michael damage
CES/ALOP
SUBMITTED
13 Dec 2018
39210 9349 Replace galvanized communication tower due to
Hurricane Michael damage
CES/ALOP
SUNMITTED
13 Dec 2018
39209 1810 Replace galvanized communication tower due to
Hurricane Michael damage
CES/ALOP
SUBMITTED
13 Dec 2018
39285 9352 Tower Alignment-Tensioning and LPS repair CES/ALOP
SUBMITTED
10 Jan 2019
39297 9317 R&R 20’ Tower Ladder. Reinstall LPS
(Ladder Portion Complete)
CES/ALOP
SUBMITTED
(In Progress)
10 Jan 2019
39389 9401 R&R Perimeter Security Fence CES/ALOP
SUBMITTED
31 Jan 2019
39431 9901 Comprehensive tower inspection
(St. George Island)
CES/ALOP
SUBMITTED
13 Feb 2019
Sub Scale Launch Pad – Building Manager - B. Prince
JOB
NO.
BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
34672 8500 Area Paint buildings and floors. CES/CEPD
REVIEW
24 Jan 06
37441 8519 Install pavement south west of building.
Project No. XLWU142051D
CES/CENPD
CONTRACT
15 Jun 12
59188 8519
Extend existing permanent static ground system inside buildings.
CES/CENM
REVIEW
7 Aug 13
C7092 8519 Install emergency eyewash/shower stations in the north and south bays.
CES/PLUMER
IN PROGRESS
24 Nov 15
F2434 8525
Rail #4
Repair rail #4 hoist electrical power conduit. CES/ALOP
SUBMITTED
30 Aug 18
Unclassified Page 41 of 42 Distribution: A
8513 LP Gate Repair CES/CEPD
Review
30 Jul 19
G0555 8519 Overhead Light fixture repair CES
Submitted
30 Jul 19
Sub Scale Maintenance Facilities – Building Manager - D. Jacobs
JOB NO. BLDG WORK DESCRIPTION STATUS DATE
SUBMITTED
33927 256 Remove/replace separator. CES/CENPD
PROJECTS
26 Feb 04
34671 256 Paint floor/anti-slip paint. CES/CENPD
REVIEW
24 Jan 06
35352 256 Tech, pod, and office clean duct works. CES/CENPD
REVIEW
21 Jun 07
37044 256 Replace Air Handling Unit CES/CENPD
REVIEW
21 Jan 11
37148 256 Replace tiles in avionics shop. CES/ALOP
AWT-CUS PRI
4 Mar 11
C7093 256 Install two each permanent emergency eyewash / shower stations in the hangar bay.
CES/FM PLUMER
IN PROGRESS
24 Nov 15
59083 256 Upgrade Latrine CES/CENPD
CONTRACT
17 Dec 12
239 Repair 239 above ground storage tank CES/CENPD
In work
30 Apr 19
G0481 256 Repair two broken toilet seats CES
Review
30 July 19
Unclassified Page 42 of 42
TAB 9 – CONTRACTOR PROGRAM MANAGEMENT CONCERNS
The lack of aircraft deliveries from Boeing is impacting our overall aircraft fleet numbers as well as our ability to manage aircraft hours. Once Boeing has worked through production issues, we expect the number of aircraft deliveries will increase past the 2 deliveries/month as called out in the PWS.
This will impact PAE’s ability to meet Safe Flight time requirements and create a backlog of aircraft awaiting Safe Flights.
All the cleanup of failed data documentation and maintenance processes in aircraft generation from
AMARG and/or Boeing continues to fall on PAE for correction prior to SAFE flight.
Failure to receive delivery aircraft is impacting available manned flyers (Tyndall & Holloman).
Correspondingly, NULLO fleet health/quantity is becoming an issue. Expect continued movement of aircraft to and from Holloman and early De-Man of flyers to keep Tyndall’s NULLO fleet minimally populated.
Severe damage to most of our facilities is causing many workarounds and much turmoil. PAE is managing the situation the best we can. Construction of temp facilities is almost complete and for the most part the facilities are adequate with few work around.
Base Supply functions and support are slowly coming back but lack of wheels and tires this past month did have an impact on aircraft availability.
A major concern is safely moving into temp facilities while still complying with all AF regulations governing the safe handling and storage of explosive items.
File details come from the government source that posted it. Updated .