TORP_0344.docx

DOCX document 74 KB Posted

Attached to
CN & GT Operations and Logistics Federal contract opportunity
Solicitation number
FA4890-14-R-0023
Issued by
Department of the Air Force Air Combat Command

About this file

Historical T/O PWS 0344

View the file

Other files for this federal contract opportunity

Other files attached to CN & GT Operations and Logistics, newest first.
File Type Posted
FA4890-14-R-0023_CN GT_Ops_ _Log_QASP_20_Mar_15.docx DOCX document
FA4890-14-R-0023-A0002_CN GT_Ops_ _Log_Table_B-1_Pricing_Table_20_Mar_15.xlsx XLSX spreadsheet
CO_Letter_Extension_of_Proposal_Submission_Due_Date_-_Ops_ _Log.pdf PDF
FA4890-14-R-0023-A0001_CN GT_Ops_ _Log_PWS_Rev_01_6_Mar_15.docx DOCX document
FA4890-14-R-0023_CO_Letter_-_Amendment_0001.pdf PDF
FA4890-14-R-0023-A0001.pdf PDF
FA4890-14-R-0023-A0001_CN GT_Ops_ _Log_Table_B-1_Pricing_Table_6_Mar_15.xlsx XLSX spreadsheet
CO_Letter_Canceled_Pre-Proposal_Conference__-_Ops_ _Log.pdf PDF
CO_Letter_Pre-Proposal_Conference_Cancelation_-_O L.pdf PDF
Ops Log_Pre-Proposal_Conference_List_of_Attendees.xlsx XLSX spreadsheet
FA4890-14-R-0023_CNGT_Ops Logs_FINAL_RFP_4Feb.docx.pdf PDF
FA4890-14-R-0023_Ops_ _Log_Qs As_4_Feb_15.docx DOCX document
CO_Letter_for_FA4890-14-R-0023_Pre-Proposal_Conference.pdf PDF
FA4890-14-R-0023_CN GT_Ops_ _Log_FINAL_PWS_4_Feb_15.docx DOCX document
CNGT_Ops Log_Questions_Submitted_4_Feb_15.docx DOCX document
TORP_0282.doc DOC document
TORP_0382.docx DOCX document
TORP_0391.docx DOCX document
TORP_0325.doc DOC document
TORP_0327.docx DOCX document
TORP_0345.docx DOCX document
TORP_0355.docx DOCX document
TORP_0310.doc DOC document
TORP_0340.docx DOCX document
TORP_0407.doc DOC document
TORP_0316.docx DOCX document
TORP_0381.docx DOCX document
TORP_0349.doc DOC document
TORP_0368.docx DOCX document
TORP_0358.docx DOCX document
TORP_0352.docx DOCX document
TORP_0216.docx DOCX document
TORP_0356.doc DOC document
TORP_0300.docx DOCX document
TORP_0386.docx DOCX document
TORP_0323.doc DOC document
TORP_0378.doc DOC document
TORP_0308.doc DOC document
TORP_0315.docx DOCX document
TORP_0394.docx DOCX document
TORP_0371.docx DOCX document
TORP_0334.doc DOC document
CN GT_Ops_ _Log_PWS_20141010.docx DOCX document
Industry_Day_Survey.doc DOC document
Request_For_Additional_Info_From_SB.docx DOCX document
CN GT_Exhibit_1 _Table_B-1 _Pricing_Table.xlsx XLSX spreadsheet
Industry_Day_Schedule__Registration_CNGT_20140827.pdf PDF
Industry_Day_-_Additional_Informtion_.pdf PDF
Industry_Day_Announcement_-_Ops_ _Log.pdf PDF
OpsLog_Sources_Sought_Notice.pdf PDF
Show all 50

CN & GT Operations and Logistics has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DoD Counter Narcoterrorism Program Office (CNTPO)

TORP 0344

PERFORMANCE WORK STATEMENT (PWS)

USNORTHCOM FY13 Mexico Procurement (Harris Radios) 1 July 2013

1.0 MISSION OBJECTIVE.

The DoD Counter Narcoterrorism Program Office (CNTPO) was established to create Counter Narcoterrorism (CN) networks, infrastructure, and capabilities worldwide that are focused on the detection, identification, and disruption of narcoterrorist activities and organizations. This task effort will support the War Fighter in the combating of Narcoterrorism worldwide.

2.0 SCOPE.

2.1 Objective:

The objective is the procurement and delivery of communications equipment to SEMAR (Mexican Navy). This equipment will consist of the Harris radio VHF 50W and the Harris 400W HF Command Post Radio.

2.2 Basic Contract References.

This PWS establishes the requirements for the contractor to provide support in the Basic Contract task area(s) of: 4.3.2 Training, Operations, and Logistics support; 4.3.2.7 Logistics Support and Equipment; 4.3.3.4 Material and Equipment Purchase.

3.0 PERFORMANCE REQUIREMENTS.

The contractor shall provide, ship, and deliver all equipment. The contractor shall provide export licenses and all associated technology transfer agreements as required. The contractor is responsible for International Traffic in Arms Regulation (ITAR) compliance, custom clearance, value added tax (VAT), and any associated taxes and fees. The Contractor shall ensure that appropriate Technical Assistance Agreements (TAAs) and/or applicable export licenses are in place and all required documentation and approvals have been obtained before conducting any delivery activities under the PWS that requires such approval and documentation. The contractor shall provide all labor, materials, equipment, travel, DBA insurance, and required actions to satisfy the requirements set forth in this PWS. All parts and equipment shall be delivered to the following United States address:

Ramirez Distribution Services Inc.

501 Nafta Blvd.

Laredo, TX. 78045

POC:

Cell# Email:

Export Licenses and ITAR compliance are required by the freight forwarder in order to export the equipment to Mexico. The freight forwarder works for SEMAR. It is their responsibility to get the equipment to the correct locations in Mexico after delivery. SEMAR will come to Texas to pick up the equipment and transfer it into Mexico.

3.1 Harris 400W HF Command Post Radio (Brand Name Only) (Quantity: 1).

Part Number
Part Description
RF-5800H-MP036
HF MANPACK, W/DATOTEK & CITADEL ENC/GPS
RF-5800H-B003
400W BASE STATION ADAPTER
RF-5845H-PP101
PRE/POST SELECTOR NON-BOWMAN
RF-382A-15
RF-382A-15, CARC Green,
RF-1912E-AT001
TRANSMITTING, ANTENNA, RADIATING ELEMENT
10181-9823-250
CABLE ASSY, PA-RF382
10181-9824-250
CABLE ASSY, PA/RF-5382 CPLR
RF-3014-02
DUAL EARPIECE HEADSET
RF-6010-NW001
TACT NET ACCESS HUB, LAN, 4 Radio, 4 Tel, 8 EXT
RF-3577-28EN
COMPUTER, RUGGED Laptop Windows 7 Profession, EN
RF-5410FC-EN001
FALCONCOMMAND, WINDOWS
RF-6705-SW001
TACTICAL CHAT IP SOFTWARE
RF-5800M-HH104
TRANSCEIVER, EXPORT MB HH W/GPS
RF-5800M-V520
VAA SYSTEM, MBAND HH RADIO
RF-5051-PS001
RF-5051 POWER SUPPLY, GREEN
12011-0775-A006
CABLE ASSY, PPP
RF-6550V-PK002
PROGRAMMING KIT, RF-5800V & U HH
RF-3183-AT003
ANTENNA, VEH, GREEN, N,30-512 MHZ, GPS
RF-392-AT001
TRIPOD, ANTENNA MOUNT
10369-7211-150
CABLE ASSY
10511-0730-A050
CABLE ASSY, GPS ANTENNA
11175-2290-02
KIT, ACCESSORY 400 W REGIONAL Base
11105-0400-03
INTEGRATION CONFIG 3 RF-6550X, SW
11105-0400-05
INTEGRATION CONFIG 5 RF-6705 ON, PC OR PDA,SW
11105-0400-19
INTEGRATION CONFIG, RF-5410FC, FALCONCOMMAND SW
E75-0017-180
CABLE EXTENSION SMB MALETO SMB FEMALE RG-316DS

3.2 Harris Radio VHF 50W (Brand Name Only) (Quantity: 9).

Part Number
Part Description
RF-7800V-HH001
Transceiver, VHF Handheld, Green w/ 12041-2200-02
RF-7800V-V501
VAA System, 7800 VHF HH Radio, Green
RF-7800V-SW002
Software option Kit, RF-7800V-HH
12041-2200-02
High cap Lith Ion Baty Pk rechargeable
RF-3023-HS005
Dual PTT Handset
RF-9072-AT001
LB VHF DiscCone
10369-7211-150
Cable Assembly-Type N to BNC Connectors
12067-5220-01
Adapter Assy, Cabled, USB to Ethernet
RF-5980-SA001
Speaker, Tactical
10535-0707-A020
Cable Assy, Speaker Audio
10535-0713-A020
Cable Assy, Spkr Power, VAU
12067-5600-01
Adapter assy, USB
RF-5051-PS001
125 Watt base Station Power Supply (CARC Grn)
10570-0716-A012
Cable assy, DC Power RF-5051 to VAU
E75-0136-002
GPS, Antenna, Base Station
11071-0203-A051
Cable Assy, GPS antenna (TNC to SMB)
RF-1918
Lightning Arrestor w/ 2 N connectors
RF-3577-28EN
CF-31
RF-6705-SW001
RF-6705 Tactical Chat IP
11105-0400-03
Integration of RF-6705 onto PC or PDA

3.3 Option A – Repeater.

Part Number
Part Description
Quantity
RF-5800VV-RU001
Tactical Retransmission Unit Assy, VHF-VHF
15
RF-5850-PS001
AC/DC/Rechargeable Power Supply
15
10513-0812-A025
Cable Assy, BNC TO BNC, LMR-400DB
30
12006-2500-01
TRU ANTENNA KIT, VHF-VHF
15
BB-2590/U
Battery, Lithium Ion Rechargeable
30

3.4 Option B – 50W Tactical VHF Vehicular Radio System (Quantity 15).

Part Number
Part Description
RF-7800V-HH001
Falcon III VHF Handheld, Green
RF-7800V-SW002
SOFTWARE OPTION KIT, RF-7800V-HH, 192K, TDMA
12067-5220-01
ADAPTER ASSY,CABLED, USB TO ETHERNET
RF-7800V-V501
50W VAA SYSTEM, 7800 VHF HH RADIO, GREEN
10369-7212-025
Coaxial Cable Assembly-Type BNC Connectors
10570-0716-A012
DC Power Cable
10181-9833-010
DC Power Cable 10'
10075-1399
Handset - Lightweight
RF-387-AT002
VHF Whip Antenna 30-108 MHz with GPS antenna in base
RF-292-01
Universal Antenna Mount

3.5 Option C – HF 150W Radio (Quantity 15).

Part Number
Part Description
RF-5800H-MP036
Transceiver HF 20W (USB, LSB, CW, AME) internal GPS, IP capability,

Citadel and DATOTEK digital encryption, internal modem at 9600 bps, MIL-STD-188-110B, STANAG 4285 y 4415, integrated digital MELP Vocoders, LPC-10, AME MIL-STD-188-141B and STANAG 4538 third generation

RF-5800H-B002
Adapter HF-150W with filter
RF-5382H-CU001
Antenna coupler 150W
RF-1912E-AT001
HF antenna
12020-1460-A250
RF-5382-CU control cable
10181-9824-A250
RF-5382-Coaxial cable
RF-3014-02
Headset dual earpiece
E75-0017-180
SMB male cable extension
RF-6010-NW001
Tactical network access hub
RF-5850-PS001
Power supply/charger AC/DC
RF-6910-SW002
C2PC-CNR software
RF-6705-SW001
Tac chat IP data transfer application
11175-2020-01
Networking gear
10511-0730-A025
Cable assembly, GPS antenna
A30-0325-005
8-port, 10/100 base-T Ethernet switch
11175-2390-01
Accessory kit for fixed HF 150W
RF-3577-28EN
Laptop Panasonic CF-31 XP English version

3.6 Option D – Multiband Radio (Quantity 15).

Part Number
Part Description
RF-5800M-HH104
Multiband transceiver
12011-2700-01
VHF blade type portable antenna
12011-2710-01
Multiband portable antanna
12006-0017-01
GPS antenna with SMB connector, magnetic mount
RF-390-AT001
Multiband mobile wipe antenna
10369-7211-150
Coaxial cable type N and BNC
12041-2200-02
High capacity rechargeable Ion-Li battery
RF-5800M-V520
VHF/UHF 50W amplifier
12050-3200-01
Power distribution (shock tray)
12065-0105-02
Mounting kit (ancillary)
10515-0328-4200
Installation manual/system maintenance
10535-0707-A009
Speaker audio cable 9ft (2.7m)
10535-0713-A009
Speaker power cable 9ft (2.7m)
RF-5980-SA001
Tactical speaker
RF-5051-PS001
Power supply RF-5051
10075-1399
Handset H-250 modified
12041-159501
Handset accessory bag
12006-0017-01
GPS antenna
10511-0730-A025
Cable assembly, GPS antenna
12011-0775-A006
Connection serial cable PPP
12011-0200-01
Programming accessories (connector 12011-6080-01)

and cable extension RS-232

12065-7100-01
Adapter and connector for KDU and serial cable PPP
RF-5932-CA003
Radio holster (green)
10518-2901-02
CR-ROM including:

0515-0234-4200 operation manual 10515-0234-4100 operation card RF-5800H-SW001 computer Programming application

3.7 Option E – Repeater.

Part Number
Part Description
Quantity
RF-5800VV-RU001
Tactical Retransmission Unit Assy, VHF-VHF
15
RF-5850-PS001
AC/DC/Rechargeable Power Supply
15
10513-0812-A025
Cable Assy, BNC TO BNC, LMR-400DB
30
12006-2500-01
TRU ANTENNA KIT, VHF-VHF
15
BB-2590/U
Battery, Lithium Ion Rechargeable
30

3.8 Option F – 50W Tactical VHF Vehicular Radio System (Quantity 15).

Part Number
Part Description
RF-7800V-HH001
Falcon III VHF Handheld, Green
RF-7800V-SW002
SOFTWARE OPTION KIT, RF-7800V-HH, 192K, TDMA
12067-5220-01
ADAPTER ASSY,CABLED, USB TO ETHERNET
RF-7800V-V501
50W VAA SYSTEM, 7800 VHF HH RADIO, GREEN
10369-7212-025
Coaxial Cable Assembly-Type BNC Connectors
10570-0716-A012
DC Power Cable
10181-9833-010
DC Power Cable 10'
10075-1399
Handset - Lightweight
RF-387-AT002
VHF Whip Antenna 30-108 MHz with GPS antenna in base
RF-292-01
Universal Antenna Mount

3.9 Option G – HF 150W Radio (Quantity 15).

Part Number
Part Description
RF-5800H-MP036
Transceiver HF 20W (USB, LSB, CW, AME) internal GPS, IP capability,

Citadel and DATOTEK digital encryption, internal modem at 9600 bps, MIL-STD-188-110B, STANAG 4285 y 4415, integrated digital MELP Vocoders, LPC-10, AME MIL-STD-188-141B and STANAG 4538 third generation

RF-5800H-B002
Adapter HF-150W with filter
RF-5382H-CU001
Antenna coupler 150W
RF-1912E-AT001
HF antenna
12020-1460-A250
RF-5382-CU control cable
10181-9824-A250
RF-5382-Coaxial cable
RF-3014-02
Headset dual earpiece
E75-0017-180
SMB male cable extension
RF-6010-NW001
Tactical network access hub
RF-5850-PS001
Power supply/charger AC/DC
RF-6910-SW002
C2PC-CNR software
RF-6705-SW001
Tac chat IP data transfer application
11175-2020-01
Networking gear
10511-0730-A025
Cable assembly, GPS antenna
A30-0325-005
8-port, 10/100 base-T Ethernet switch
11175-2390-01
Accessory kit for fixed HF 150W
RF-3577-28EN
Laptop Panasonic CF-31 XP English version

3.10 Option H – Multiband Radio (Quantity 15).

Part Number
Part Description
RF-5800M-HH104
Multiband transceiver
12011-2700-01
VHF blade type portable antenna
12011-2710-01
Multiband portable antanna
12006-0017-01
GPS antenna with SMB connector, magnetic mount
RF-390-AT001
Multiband mobile wipe antenna
10369-7211-150
Coaxial cable type N and BNC
12041-2200-02
High capacity rechargeable Ion-Li battery
RF-5800M-V520
VHF/UHF 50W amplifier
12050-3200-01
Power distribution (shock tray)
12065-0105-02
Mounting kit (ancillary)
10515-0328-4200
Installation manual/system maintenance
10535-0707-A009
Speaker audio cable 9ft (2.7m)
10535-0713-A009
Speaker power cable 9ft (2.7m)
RF-5980-SA001
Tactical speaker
RF-5051-PS001
Power supply RF-5051
10075-1399
Handset H-250 modified
12041-159501
Handset accessory bag
12006-0017-01
GPS antenna
10511-0730-A025
Cable assembly, GPS antenna
12011-0775-A006
Connection serial cable PPP
12011-0200-01
Programming accessories (connector 12011-6080-01)

and cable extension RS-232

12065-7100-01
Adapter and connector for KDU and serial cable PPP
RF-5932-CA003
Radio holster (green)
10518-2901-02
CR-ROM including:

0515-0234-4200 operation manual 10515-0234-4100 operation card RF-5800H-SW001 computer Programming application

4.0 OTHER PERFORMANCE REQUIREMENTS.

4.1 Meetings, Briefings, and Publications.

The contractor shall participate in technical interchange meetings, to be scheduled upon request of the responsible Contracting Officer or written designee, to discuss and to informally evaluate the contractor’s efforts and accomplishments. During the meetings, the contractor shall present necessary data to enable a joint review of its various assigned tasks, attendant schedules, and resource expenditures. The contractor shall present and participate in technical discussions and shall inform, in a timely fashion, the Technical Monitor of any problems with contract execution and any proposed solutions. The contractor shall attend and participate in other meetings, as scheduled by the responsible Contracting Officer or written designee.

5.0 TEMPORARY DUTY (TDY) TRAVEL.

The contractor shall perform TDY non-local travel, as required. The contractor shall provide the performance of this task order within the Continental United States (CONUS).

All travel required and approved will be paid IAW the Basic Contract by reimbursement to the contractor. Only required travel previously approved will be reimbursed.

6.0 GOVERNMENT FURNISHED EQUIPMENT OR MATERIAL (GFE/GFM).

None.

7.0 SECURITY.

All work shall be unclassified.

8.0 DELIVERABLES.

Name
CDRL
#Copies*
PWS Reference
Due
Master Schedule
A002
3
9.1
45 calendar days after award.
Progress Report
A002
3
9.2
Monthly.
Management Plan
A00G
3
9.3
45 calendar days after award.
Quality Control Plan
A00G
3
9.4
30 calendar days after award.
Status Meeting
A003
3
9.5
10 calendar days after meeting.
Program Reviews
A004
3
9.6
As required.

*Copies are to be submitted electronically whenever possible. Recipients at a minimum shall include the Contracting Officer (KO), Contracting Officer’s Representative (COR) and Technical Monitor.

9.0 DATA REQUIREMENTS:

9.1 Master Schedule.

The contractor shall provide a Master Schedule for Government approval within 45 calendar days of award. The contractor shall create, maintain, and report the schedule in conjunction with the progress report after initial delivery. The schedule shall cover all phases of the project from kick off to close out. The Master Schedule shall include; but not be limited to, the following information:

Timeline for procurement of equipment; and Milestones for Deliverables.

Additionally, the contractor shall be required to update the Master Schedule and submit for Government approval within ten (10) calendar days, in the event there are any changes or delays regarding the timeline for procurement of equipment or milestones for deliverables.

9.2 Progress Report.

A comprehensive progress report shall be delivered monthly within ten (10) business days from the end of the previous month. The report shall, at a minimum contain an overall schedule, the current status of funding, accomplishments, any potential issues, and any lessons learned.

9.3 Management Plan.

The contractor shall provide a management plan within 45 calendar days of award defining a management system to plan and control this effort. The management plan shall delineate how the contractor plans to accomplish the effort, to include a breakout of Direct Productive Person Hours (DPPHs), travel, material, ODC, DBA Insurance, a milestone schedule, and a schedule for the planned expenditure of funds.

9.4 Quality Control Plan.

The contractor shall provide a draft Quality Control (QC) Plan with their Proposal. The final plan shall be provided within 30 calendar days after award.

9.5 Status Meeting.

The contractor shall provide a status meeting report within ten (10) calendar days after a meeting.

9.6 Program Reviews.

The contractor shall support Program Reviews (commonly called Program Management Reviews (PMR)). Formats for PMRs will be provided by the COR. In addition, the dates and locations will be announced well in advance of the meetings. In some cases, time will be allotted for the contractor to meet individually with Government representatives to discuss contractual issues.

CNTPO Program and Operations Support

USNORTHCOM FY13 MEXICO PROCUREMENT (HARRIS RADIOS)

PWS 0344

APPENDIX A

PERFORMANCE REQUIREMENTS SUMMARY MATRIX

PERFORMANCE

OBJECTIVE

PERFORMANCE STANDARD
ACCEPTABLE QUALITY LEVEL (AQL)
METHOD OF SURVEILLANCE
PERFORMANCE INCENTIVE
Customer Satisfaction (Quality of Service)
T/O requirements met with few minor and no significant problems encountered

Performance meets all technical and functional requirements, and is highly responsive to changes in technical direction and/or the technical support environment

Personnel qualifications, assessments, evaluations, analyses, recommendations, and related input are thorough, reliable, highly relevant to T/O requirements, and consist of substantial depth and breadth of subject matter expertise.

Deliverable reports contain all required data and meet all applicable CDRL requirements Contractor technical performance meets all T/O requirements.

Adequate Key Personnel with appropriate qualifications including security clearances provided at least 95% of time. Problems that are encountered are minor and resolved in a satisfactory manner.

Routine Assessment of Workforce Qualifications and Availability of Resources
Assignment of performance rating for Customer Satisfaction criteria:

EXCEPTIONAL

Performance meets all and exceeds many T/O requirements. Performance delivered with no required re-performance/rework 99% of time; problems that are encountered are minor and resolved in a highly effective manner.

VERY GOOD

Performance and deliverables meet all and exceed some T/O requirements. Performance delivered with no required re-performance/rework at least 97% of time; problems that are encountered are minor and resolved in an effective manner.

SATISFACTORY

Performance and deliverables meet all T/O requirements. Performance delivered with no re-performance/rework at least 95% of time; problems that are encountered are minor and resolved in a satisfactory manner.

MARGINAL

Some T/O requirements not met and/or performance delivered with re-performance/rework required more than 20% of time. Problems encountered were resolved in a less than satisfactory manner.

UNSATISFACTORY

Many T/O requirements not met. Numerous re-performances/rework required. Substantial problems were encountered and inadequate corrective actions employed.

Adherence to Schedule
T/O milestones, periods of performance, and/or data submission dates are met or exceeded; highly qualified Key Personnel are available as required.
Contractor meets T/O delivery requirements at least 95% of the time (excluding Government- caused delays)
Routine Inspection of Deliverable Products/

Services Assignment of performance rating for schedule criteria:

EXCEPTIONAL

T/O milestones/ performance dates met or exceeded 99% of time (excluding Government caused delays)

VERY GOOD

T/O milestones/ performance dates met or exceeded at least 97% of time (excluding Government caused delays)

SATISFACTORY

T/O milestones/ performance dates met or exceeded at least 95% of time (excluding Government caused delays)

MARGINAL

T/O milestones/ performance dates met less than 95% of time (excluding Government caused delays)

UNSATISFACTORY

T/O schedule/performance dates met less than 80% of time (excluding Government caused delays)

Cost Control
Contract mix (labor, travel, and ODCs) is controlled in efficient and effective manner.

Actual T/O mix (labor, travel, and ODCs) is maintained within 3% of originally awarded.

Routine Inspection of T/O Funds & Manpower Performance Reports, Payment Invoices.
Assignment of performance rating for cost control criteria:

EXCEPTIONAL

Actual T/O resource mix maintained within originally awarded T/O resource mix

VERY GOOD

Actual T/O resource mix maintained within 1% of originally awarded T/O resource mix

SATISFACTORY

Actual T/O resource mix maintained within 3% of originally awarded T/O resource mix

MARGINAL

Actual T/O resource mix maintained within 10% of originally awarded T/O resource mix UNSATISFACTORY Actual T/O resource mix exceeds 10% of originally awarded T/O resource mix

Small Business Participation
Small business participation goals are met or exceeded.
Actual small business participation meets 80% of small business participation goals.[endnoteRef:1] [1: ]
Routine inspection of cost reports, including small business participation as a percentage of total task order value.
Assignment of performance rating for small business participation criteria:

EXCEPTIONAL

Actual T/O small business participation meets or exceeds small business participation goals.

VERY GOOD

Actual T/O small business participation meets 90% of small business participation goals.

SATISFACTORY

Actual T/O small business participation meets 80% of small business participation goals.

MARGINAL

Actual T/O small business participation meets 75% of small business participation goals.

UNSATISFACTORY

Actual TO small business participation meets less than 75% of small business participation goals.

Small business participation percentages are based on total task order value. Small business participation percentage for performance rating calculated by adding equally weighted total small business participation, woman-owned small business participation, small disadvantaged business participation service disabled veteran owned participation and historically underutilized business zone small business participation.

File details come from the government source that posted it. Updated .