Q A 2

View the file

Other files

File Type Posted
FA4890-14-R-0023_CNGT_Ops__Log_Q As_26_Mar_15.pdf PDF
FA4890-14-R-0023_CNGT_Ops__Log_Q_ _As_20_Mar_15.pdf PDF
FA4890-14-R-0023_CN GT_Ops_ _Log_QASP_20_Mar_15.docx DOCX document
FA4890-14-R-0023-A0002_CN_ _GT_Ops_ _Logs.pdf PDF
FA4890-14-R-0023-A0002_CN GT_Ops_ _Log_PWS_Rev_02_20_Mar_15.docx DOCX document
FA4890-14-R-0023-A0002_CN GT_Ops_ _Log_Table_B-1_Pricing_Table_20_Mar_15.xlsx XLSX spreadsheet
CO_Letter_Extension_of_Proposal_Submission_Due_Date_-_Ops_ _Log.pdf PDF
FA4890-14-R-0023-A0001_CN GT_Ops_ _Log_PWS_Rev_01_6_Mar_15.docx DOCX document
FA4890-14-R-0023_CO_Letter_-_Amendment_0001.pdf PDF
FA4890-14-R-0023-A0001.pdf PDF
FA4890-14-R-0023-A0001_CN GT_Ops_ _Log_Table_B-1_Pricing_Table_6_Mar_15.xlsx XLSX spreadsheet
FA4890-14-R-0023_CN GT_Ops Logs_RFP_Qs As_5_Mar_FINAL.docx DOCX document
CN GT_Pre-Proposal_Conference_Briefing.pdf PDF
CO_Letter_Canceled_Pre-Proposal_Conference__-_Ops_ _Log.pdf PDF
CO_Letter_Pre-Proposal_Conference_Cancelation_-_O L.pdf PDF
Ops Log_Pre-Proposal_Conference_List_of_Attendees.xlsx XLSX spreadsheet
FA4890-14-R-0023_CN GT_Ops_ _Log_FINAL_PWS_4_Feb_15.docx DOCX document
CO_Letter_for_FA4890-14-R-0023_Pre-Proposal_Conference.pdf PDF
FA4890-14-R-0023_CNGT_Ops Logs_FINAL_RFP_4Feb.docx.pdf PDF
FA4890-14-R-0023_CN GT_Ops_ _Log_Table_B-1 _Pricing_Table_4_Feb_15.xlsx XLSX spreadsheet
CNGT_Ops Log_Questions_Submitted_4_Feb_15.docx DOCX document
CO_Letter_for_Pre-Proposal_Conference.pdf PDF
TORP_0358.docx DOCX document
TORP_0352.docx DOCX document
TORP_0216.docx DOCX document
TORP_0313.docx DOCX document
TORP_0328.doc DOC document
TORP_0338.docx DOCX document
TORP_0360.docx DOCX document
TORP_0214.docx DOCX document
TORP_0354.docx DOCX document
TORP_0320.docx DOCX document
TORP_0350.doc DOC document
TORP_0362.doc DOC document
TORP_0330.docx DOCX document
TORP_0344.docx DOCX document
TORP_0282.doc DOC document
TORP_0382.docx DOCX document
TORP_0396.docx DOCX document
TORP_0353.docx DOCX document
TORP_0280.docx DOCX document
TORP_0317.docx DOCX document
TORP_0399.doc DOC document
TORP_0337.doc DOC document
TORP_0391.docx DOCX document
TORP_0325.doc DOC document
TORP_0311.docx DOCX document
TORP_0326.doc DOC document
TORP_0388.docx DOCX document
TORP_0373.docx DOCX document
Show 40 more

Latest 50 of 113 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION No. FA4890-14-R-0023 CN&GT Operations and Logistics Support

No
REFERENCE
COMMENT/QUESTION
GOVERNMENT RESPONSE
1
RFP paragraphs L-1.1 and L-1.2
L-1.1 The exclusive responsibility for Source Selection will reside with the Government. Each individual involved in this acquisition has executed a Non-Disclosure Agreement with ACC AMIC.

L-1.2 Millennium Engineering and Integration Company, and its subcontractor, Deloitte Consulting LLP will serve as advisors to the technical evaluation team during this source selection. Any issues or concerns shall be provided in writing to the Contracting Officer no later than the proposal due date and shall include a detailed statement of the basis for issues or concerns. Millennium Engineering and Integration Company and its subcontractor, Deloitte Consulting, LLP, are bound contractually by Organizational Conflict of Interest and Non-Disclosure clauses with respect to proprietary information. In accordance with the Trade Secrets Act, 18 USC 1905, Offerors are encouraged to protect their interest by signing Non-Disclosure Agreements directly with Millennium Engineering and Integration Company and Deloitte Consulting, LLP. Failure to implement will not eliminate the Government’s use of the aforementioned advisors.

Question: Could the government please provide a point of contact at Millennium Engineering and Integration and Deloitte Consulting LLP in order for prospective offerors to execute Non-Disclosure Agreements?

Mr. Duane Beatty will be the POC and will ensure the Non-Disclosure Agreements get routed appropriately within Millennium and Deloitte:

Duane Beatty Program Director, CN&GT Millennium Engineering and Integration Company

(540) 644-9409

(571) 308-4381

2
RFP paragraph L-8.1
Comment: Table L-8.1 item 2, PPI Summary, states: Not to exceed five (5) pages total (Note: Page limit is for description of all requirements, not per PPI reference) See paragraph L-8.1.2

Question: Is this a single 5-page summary addressing all PPIs (for PPI 1 through PPI 6), or 5-page limit per PPI?

This is a single 5-page summary addressing all PPIs.

3
RFP paragraph L-8.1
Question: Is the total page-count limit for the Past Performance Volume 13 pages (6 PPI sheet, one 5-page summary, and 2 pages for Organizational changes) or 32 pages (six PPI sheets, six 5-page summaries, and 2 pages for Organizational Changes), or some other number?
Please see the table at L-8.1 and response to question #2 above.
4
RFP Section K-Clause 52.234-2
Is there a page limit for the EVMS Plan? Also, please confirm the EVMS Plan shall be submitted in the Pricing Volume, along with other Section K required information.
EVMS Plan will be required at the Task Order Level.
5
RFP paragraph L-9.1.1 Labor Rates
Comment: In reference to section B Pricing Table B-1, the 2nd sentence of L-9.1.1 states, “Multipliers based on yearly utilization are included to more easily distinguish among Offerors’ proposed prices.”

Question: The Multiplier cells/columns of Pricing table B-1 are blank in the Draft RFP. When will offerors receive Table B-1 with populated Multiplier cells/columns?

The multiplier cells/columns have been populated by the Government. The multiplier is 1,920 for CONUS (hourly) Rates (based on 4 weeks off (2 weeks of federal holidays and 2 weeks of vacation time)) and 240 for OCONUS (daily) Rates (also based on 4 weeks off per previous). The updated Table B-1 has been posted to FBO.

6
RFP, Section H, H-4; M-3.47.5
For Large Business Primes, the Contractor’s small business subcontracting plan shall ensure a minimum of 40% of the total annual awarded contract value is subcontracted to small businesses.

Questions:

1) Due to the nature of this work being performed outside of the United States, how will the government apply FAR 52.219-9, or does CN & GT have an exemption from the FAR where overseas work can be counted toward the SB Goals?

2) AMIC has also placed an emphasis on Primes taking on more direct performance to ensure effective integration of all aspects of the work over subcontracting it with the attendant risk to cost and schedule when a prime is forced to step in or change subcontractors. How does this SB Goal support AMIC’s effort to reduce risk and improve contract performance through greater direct performance?

3) Would the government considering modifying the language to “40% of subcontracted work must be performed by small businesses”?

FAR 52.219-9

(l) The Contractor shall submit ISRs and SSRs using the web-based eSRS at http://www.esrs.gov. Purchases from a corporation, company, or subdivision that is an affiliate of the prime Contractor or subcontractor are not included in these reports. Subcontract award data reported by prime Contractors and subcontractors shall be limited to awards made to their immediate next-tier subcontractors. Credit cannot be taken for awards made to lower tier subcontractors unless the Contractor or subcontractor has been designated to receive a small business or small disadvantaged business credit from an ANC or Indian tribe. Only subcontracts involving performance in the United States or its outlying areas should be included in these reports with the exception of subcontracts under a contract awarded by the State Department or any other agency that has statutory or regulatory authority to require subcontracting plans for subcontracts performed outside the United States and its outlying areas.

Prescribed in 19.708(b)

(a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts when the contract amount is expected to exceed the simplified acquisition threshold unless --

(1) A personal services contract is contemplated (see 37.104); or

(2) The contract, together with all of its subcontracts, will be performed entirely outside of the United States and its outlying areas.

1) The subcontracting plan will be utilized to ensure that Offerors have a plan to meet the requirement to subcontract at least 40% to SBs. Please note that this is a requirement vs. a goal.

2) The emphasis is for Primes to ensure they are effectively managing their subcontractors. The SB Requirement has no bearing on this emphasis.

3) The requirement remains 40% of total contract value.

7
RFP, Section H, H-4; M-3.4.5
Some large businesses participate in the DOD Comprehensive Small Business Subcontracting Plan Test Program (CSP) and anticipate the CSP being extended for an additional three years through 2017. If the program is extended we will be required to submit the CSP in response to the requirement for a Small Business Plan once negotiated, which may not meet the 40% set forth by AMIC for this program.

Question: For prime contractors that participate in the DOD Comprehensive Small Business Subcontracting Plan Program, is it anticipated that their respective Corporate Comprehensive Plan will be submitted to satisfy the requirement for a Small Business Plan?

FAR language addressing SB Plans and FY 2014 performance against the Comprehensive Small Business Subcontracting Plan, FAR 52.219-9 Small Business Subcontracting Plan, paragraph d(1):

(d) The offeror’s subcontracting plan shall include the following:

(1) Goals, expressed in terms of percentages of total planned subcontracting dollars, for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. The offeror shall include all subcontracts that contribute to contract performance, and may include a proportionate share of products and services that are normally allocated as indirect costs. In accordance with 43 U.S.C. 1626:

Offeror’s Corporate Comprehensive Plan does not satisfy the Requirement for a Small Business Plan, due to the 40% Subcontracting requirement vs. goal.

8
RFP, Section L, L-9.1.1 Labor Rates
L-9.1.1 Labor Rates. Offerors shall propose loaded CONUS (hourly) and OCONUS (daily) labor rates and associated cost elements for each labor category.

Question: Will the USG provide us how many hours per day that should be factored into the OCONUS (daily) labor rates?

The Government will not provide the number of hours per day expected for the OCONUS (daily) labor rates. This is a performance-based requirement; therefore, the Government expects that offerors will propose varying approaches and therefore propose varying hours based on those approaches.

9
Draft RFP, Section L, L-9.1.1 Labor Rates.
L-9.1.1 Labor Rates. Multipliers based on yearly utilization are included to more easily distinguish among Offerors’ proposed prices.

Questions:

1) Will multipliers be provided by the USG for all labor categories?

2) Will multipliers represent sample hours?

3) Will indirect multipliers represent sample dollar values?

The multiplier cells/columns have been populated by the Government. The multiplier is 1,920 for CONUS (hourly) Rates (based on 4 weeks off (2 weeks of federal holidays and 2 weeks of vacation time)) and 240 for OCONUS (daily) Rates (also based on 4 weeks off per previous). The updated Table B-1 has been posted to FBO.

10
RFP, Section L, L-9.1 Table B-1, Pricing Schedule
L-9.1 Table B-1, Pricing Schedule. Offerors shall provide the following per RFP Section B, Pricing Table paragraph and format specified in Section B, Table B-1 (the table is provided as the template/format for submission; the burden of providing mathematically accurate and complete pricing proposals (total overall evaluated price) using the format provided in Section B, Table B-1 rests with each Offeror)

Question: The total CONUS labor formulae (K72) are referencing the OCONUS column. Is this a formulae error that will be resolved once formal RFP is released?

The Government has reviewed the referenced cell (K72) and any cells containing a formula and believes all items reference the correct cells.

Please note that per RFP L-9.1, “…the burden of providing mathematically accurate and complete pricing proposals (total overall evaluated price) using the format provided in Section B, Table B-1 rests with each Offeror)”

11
RFP, Section L, L-7.3.1.3 QMS & Section M, M-3.2.1.3
L-7.3.1.3 Quality Management System (QMS). Provide: Evidence of current ISO 9001 registration per PWS paragraph 3.1.1 Quality Manual outline per PWS paragraph 3.5, Table 2 and paragraph 3.5.4.8 that summarizes the Offeror’s Quality Management System and identifies the Offeror’s approach for maintaining a Quality Control process / Quality Management System that is compliant per PWS paragraph 3.1.1 and integrated into the overall management approach and meets the requirements of PWS paragraph 3.0 and Table 3, Services Summary.

M-3.2.1.3 Quality Management System. Demonstrate evidence of ISO 9001 registration. Demonstrate an effective and efficient quality management structure and processes that is/are compliant per PWS paragraph 3.1.1 and integrated into the overall management approach and allow management of task order requirements. Demonstrate ability to maintain an inspection system integrated into the overall management approach and meet the requirements of PWS paragraph 3.0 and Table 3, Services Summary.

Question: Is the USG requiring the Offeror to achieve ISO certification after award for the CN&GT program?

Offerors shall have the required ISO certification at proposal submission in order to be considered for award.

12
PWS 3.1.1 Quality Management System;

RFP M-3.2.1.3 Quality Management System (QMS) The QMS shall include a Quality Management Representative that shall be an American Society for Quality Certified Quality Auditor (CQA) and dedicated to the CN&GT Operations and Logistics Support ID/IQ contract and all underlying T/Os.

Our Quality Management system is important to our organization. We would like to ensure we have qualified personnel to manage QA that understand our business. However, the requirement to have a certified CQA is a concern as there is only one open enrollment for the mandatory exam between now and when the response is due. This poses the following concerns:

1. The cost of flying someone to California to sit the exam for a contract that may not be awarded puts on undue burden on our company.

2. Our company would need to hire someone to fulfill this role that may not have as much experience with our work.

3. The requirement for a CQA seems arbitrary, as other auditor credentials exist, such as the ISO 9001:2008 internal or lead auditor certification. This course is available at multiple venues by various providers within the time period between now and submission. The CQA credential provides no additional value that is specific to the type of work. We would like to request that there be other optional certifications that could be achieved that would be comparable.

4. If the one available date for the CQA exam is a conflict for our management representative, our company would not be able to respond. This poses a threat to the competitiveness of this procurement.

Based on the following comments, we would like to respectfully request that this be required upon award.

Questions:

•Would you consider a comparable certification, such as holding an internal or lead auditor certificate for ISO 9001:2008?

•Could the requirement be waived for acquiring upon award?

•If the organization is ISO 9001:2008 certified, could this requirement be removed due to the emphasis the company has placed on quality at an organizational level based on standardized processes?

The Government has changed PWS paragraph 3.1.1 to reflect that the Quality Management Representative shall be an ISO 9001:2008 Lead Auditor or ASQ Certified CQA.

13
PWS paragraph 7.0; Labor Categories Table 5
The experience description is fairly straight forward with the exception of the phrases “and the functional area identified in the T/O” and/or “area of expertise required by T/O”. An example of the difference in Labor category: “Engineer/Architect/Scientist” the level of experience and areas of expertise will be driven by the task order (proposed labor can become imbalance and difficult to evaluate on the LPTA criteria with one offeror pricing a nuclear engineer and one offeror proposing an environmental scientist)

Can the government provide clarification as to the categories driven by task order in order for offerors to propose pricing on like categories?

Especially given the statement in Section L 9.1.1: “the proposed labor rates will be the max allowable rates for the life of the contract for FFP T/Os….”

The Government combined “multiple role” labor categories in PWS Table 4 (previously Table 5) because the descriptions were the same; however, in Table B-1, Pricing Table, each labor category is priced separately.

T/O requirements will very often provide unique specifications/experience/degrees (for instance, different types of engineers, scientists and/or architects), which would drive the level and associated rate that primes would propose at the T/O level. See PWS paragraph 6.1.2.11.

The Government has posted numerous historical T/Os so that all potential offerors can see the type of work that has been done in the past and that is likely reflective of much of the work that will be done in the future. This is, however, no guarantee of future work, in part or in whole.

14
PWS paragraph 7.0 Labor Categories Table 5
The following “multiple role” labor categories-Specialist/Developer/Designer, Maintainer/Mechanic/Technician/Assembler, Engineer/Architect/Scientist, Instructor/Inspector -are very diverse to be lumped and priced at the same labor rate. An example of the difference in these roles of the same category: the maintainer of an aircraft would be different than the maintainer of an UAV. This could create an imbalance and difficult evaluation on the LPTA criteria

Question: Would the government clarify the roles within the labor categories in order offerors to price the same role or be willing to separate these into separate categories?

The referenced “multiple role” labor categories are combined in PWS Table 4 (previously Table 5) because the descriptions were the same; however, in Table B-1, Pricing Table, each labor category is priced separately.

The Government has posted numerous historical T/Os so that all potential offerors can see the type of work that has been done in the past and that is likely reflective of much of the work that will be done in the future. This is, however, no guarantee of future work, in part or in whole.

15
RFP Pricing Table Spreadsheet and Section M 3.4.1
In the pricing table spreadsheet, there is not a multiplier or percent offered by the government, however in Section M 3.4.1 it states that “The total price for labor and indirect rates will be determined by applying the Offeror’s proposed rates to the multipliers provided by the Government in Section B, Exhibit 1, Table B-1.

Question: Can the Government please provide the multiplier and percent as stated in Section M 3.4.1 so offeror’s are able to work on pricing their response?

The multiplier cells/columns have been populated by the Government. The multiplier is 1,920 for CONUS (hourly) Rates (based on 4 weeks off (2 weeks of federal holidays and 2 weeks of vacation time)) and 240 for OCONUS (daily) Rates (also based on 4 weeks off per previous). The updated Table B-1 has been posted to FBO. The percentage columns have been removed in Table B-1.

16
PWS paragraph 2.1.1
The draft OLS PWS section 2.1.1 begins by stating “The Contractor shall provide personnel, services, equipment and construction as necessary to support start-up of a new, restart of a former, or conduct and sustainment of an existing program, project, process, initiative or directive. This includes procurement (purchase or lease) of necessary services, equipment and material that directly or indirectly support the mission and objectives of an operation.” (emphasis added)

PWS section 2.1.1 then goes on by stating “…the Contractor shall provide the resources necessary to design, build, … platforms, systems, subsystems, vehicles, watercraft, vessels, aircraft (fixed wing, rotary wing, aerostats, unmanned aerial vehicles (UAV)), spacecraft, electronics equipment, shelters, facilities, ground support equipment, support structures, or any other distinct, serviceable and/or replacement element, part, component, assembly, subassembly or tool…”(emphasis added) It is one thing to require NAICS 561210, Facilities Support Services contract companies to procure customer specified platforms, systems, subsystems, vehicles, watercraft, vessels, aircraft (fixed wing, rotary wing, aerostats, unmanned aerial vehicles (UAV)), spacecraft, electronics equipment, and ground support equipment, but it is a very different thing to require a Facilities Support Services contractor to design and build the identified list of items.

Question: Is it the Government’s intent that Facilities Support Services companies that do not design or build the list of items identified in section 2.1.1 should be concerned about their ability to comply with the scope as it is written?

Is it the Government’s intent that each offeror’s proposed team can fulfill all PWS requirements.

The term “Spacecraft” was removed from PWS paragraph 2.1.1. This paragraph was also updated to reflect that the design and/or build portion only applies to equipment, shelters, facilities, ground support equipment, and/or support structures, while the ‘operate, maintain and/or sustain’ applies to the full original list, to include these items.

17
PWS paragraph 2.1.1
The draft OLS PWS section 2.1.1 design build scope requirements seems out of place for Facilities Support Services contract, given the Government’s industry day comments about limited building/ construction requirements. Further, the broad range of design build requirements including “spacecraft” also seems more appropriate for the C3IDM contract rather than the OLS PWS.

Question: Is it the Government’s intent to include the new broad range of design build requirements in the OLS scope or, is this an overgeneralization of the section 2.1.1.6 design construction requirement?

The term “Spacecraft” was removed from PWS paragraph 2.1.1. This paragraph was also updated to reflect that the design and/or build portion only applies to equipment, shelters, facilities, ground support equipment, and/or support structures, while the ‘operate, maintain and/or sustain’ applies to the full original list, to include these items.

18
PWS paragraph 2.1.1
The draft OLS PWS section 2.1.1 design build scope requirement seems out of place in this paragraph which deals mainly with the ability to provide personnel, services, equipment and construction including procuring necessary services, equipment and material for the Government. Please clarify.
The term “Spacecraft” was removed from PWS paragraph 2.1.1. This paragraph was also updated to reflect that the design and/or build portion only applies to equipment, shelters, facilities, ground support equipment, and/or support structures, while the ‘operate, maintain and/or sustain’ applies to the full original list, to include these items.
19
PWS paragraph 2.1.1
Since the Defense Drug Interdiction and Counter-Drug Activities account is not currently funded for research and development, is the OLS PWS section 2.1.1 requirement to design/build a spacecraft or other specified items likely?
The term “Spacecraft” was removed from PWS paragraph 2.1.1. This paragraph was also updated to reflect that the design and/or build portion only applies to equipment, shelters, facilities, ground support equipment, and/or support structures, while the ‘operate, maintain and/or sustain’ applies to the full original list, to include these items.
20
PWS paragraphs 2.1.1and subparagraphs
PWS sections 2.1.1, 2.1.1.1, 2.1.1.2, 2.1.1.3, 2.1.1.4, 2.1.1.5, and 2.1.1.6 frame and differentiate very broad spectrum of work to be performed under this Multiple Award (MA) ID/IQ. Is it the Government’s intent that a single integrator have all the capabilities required or may the capabilities be covered by the contractors proposed team?
Is it the Government’s intent that each offeror’s proposed team can fulfill all PWS requirements.
21
RFP paragraph M-1.2
Section M-1.2 states that the Government intends to award the CN&GT Operations and Logistics Support multiple award ID/IQ contract to a target of five (5) Large Businesses and three (3) Small Businesses (SB) under NAICS 561210, Facilities Support Services, $38.5M size standard. Are the SB awards limited to bidding Task Orders (TO) the Government sets aside for small businesses or will large and small businesses be allowed to compete on an equal basis against all the Operations and Logistics Support TO’s?
See RFP Section H, paragraph H-8(c).
22
RFP paragraphs L-8.1.1, L-8.1.1.2,

M-3.3 Factor 2, and M-3.3.2;

PWS Paragraph 2.1.1 and 4.3

L-8.1.1, States that offerors shall submit PPI Sheets on contracts considered most relevant in demonstrating the ability to perform CN&GT Operations and Logistics Support requirements. Offerors shall save each PPI sheet in a standard name format with a number associated with the submitted PPO: Offeror Name-Volume Name-PPI X (e.g., XYZ Company-Past Performance Volume-PPI 3) to submit as part of the electronic copy of the Past Performance Volume.

L-8.1.1.2, States that offerors may provide various contracts as PPI references… M-3.3 Factor 2, states that the past performance factor evaluation provides an assessment of each Offeror’s recent and relevant present and past performance to determine whether there is a reasonable expectation that the Offeror can successfully perform as proposed.

M-3.3.2, Defines relevancy as present/past performance effort involved similar scope and magnitude of effort (or portion of effort) and complexities required in this solicitation.

2.1.1, Establishes the solicitation scope when it states that the Contractor shall provide personnel, services, equipment and construction as necessary to support start-up of a new, restart of a former, or conduct and sustainment of an existing program, project, process, initiative or directive. This includes procurement (purchase or lease) of necessary services, equipment and material that directly or indirectly support the mission and objectives of an operation. Specifically, the Contractor shall provide the resources necessary to design, build, and/or operate, maintain and sustain platforms, systems, subsystems, vehicles, watercraft, vessels, aircraft (fixed wing, rotary wing, aerostats, unmanned aerial vehicles (UAV)), spacecraft, electronics equipment, shelters, facilities, ground support equipment, support structures, or any other distinct, serviceable and/or replacement element, part, component, assembly, subassembly or tool … Question: What can an offeror do if it has relevant and recent present/past performance involving similar scope and magnitude of effort and complexity required by PWS paragraph 2.1.1, however, it is classified and the customer has approved the use of the classified performance information in a PPI sheet for the CN & GT solicitation. RFP sections L and M and PWS section 4.3 do not describe a process for submitting classified PPIs. Please provide a process so that the contractor can demonstrate there is a reasonable expectation that the contractor can successfully submit this past performance for consideration?

Only unclassified PPI shall be submitted.

23
RFP Paragraph H-2, page 24
RFP Paragraph H-2 states that Organizational Conflicts of Interest (OCI) violations are a significant contract performance issue. Lack of adherence to the OCI Plan or this clause may have serious consequences that may include contract termination, suspension and debarment, or other appropriate remedies or administrative actions. This clause applies to all CN&GT Operations and Logistics Support task orders.

H-2 goes on to state that “If a Contractor performing on a CN&GT Operations and Logistics Support task order assists in preparing a requirement, or provides information leading directly or predictably to the preparation of a requirement, that Contractor's parent companies, subsidiaries, and any organization with which the Contractor is affiliated through an ownership or direct financial interest shall be ineligible to participate in any competition for CN&GT Operations and Logistics Support task orders described within those requirements documents.”

Question: While this provision clearly applies to CN&GT Task Orders it does not appear that H-2 would apply to contractors performing legacy CNTPO Task Orders. There is a real potential that a Contractor performing on a legacy CNTPO Task Order could assist in preparing a requirement, or provides information leading directly or predictably to the preparation of a requirement under the CN & GT Operations and Logistics Support MAIDIQ. Is it the Government’s intention that such activity would not constitute an OCI violation?

Any activity where a contractor assists in development of a requirement and then also assists in development of a proposal for that same requirement would be considered an OCI violation. Any knowledge of such activity should be immediately brought to the Contracting Officer’s attention.

The Government recognizes that there is some inherent benefit to incumbent contractors on any effort under recompetition. As a result, the Government has provided information to minimize that competitive advantage as much as possible. This includes the numerous historical T/Os posted to FBO, so that all potential offerors can see the type of work that has been done in the past and that is likely reflective of much of the work that will be done in the future. This is, however, no guarantee of future work, in part or in whole.

24
RFP Paragraph H-2, page 24
RFP Paragraph H-2 states that Organizational Conflicts of Interest (OCI) violations are a significant contract performance issue. Lack of adherence to the OCI Plan or this clause may have serious consequences that may include contract termination, suspension and debarment, or other appropriate remedies or administrative actions. This clause applies to all CN&GT Operations and Logistics Support task orders.

H-2 goes on to state that “If a Contractor performing on a CN&GT Operations and Logistics Support task order assists in preparing a requirement, or provides information leading directly or predictably to the preparation of a requirement, that Contractor's parent companies, subsidiaries, and any organization with which the Contractor is affiliated through an ownership or direct financial interest shall be ineligible to participate in any competition for CN&GT Operations and Logistics Support task orders described within those requirements documents.”

Question: While this provision clearly applies to CN&GT Task orders it does not appear that H-2 would apply to Task Orders issued under the new CNTPO C3IDM contract. There is a real potential that a Contractor performing on Task Orders issued under the new CNTPO C3IDM contract could assist in preparing a requirement, or provides information leading directly or predictably to the preparation of a requirement under the CN & GT Operations and Logistics Support MAIDIQ. Is it the Government’s intention that such activity would not constitute an OCI violation? Consistent with this question would teaming with C3IDM contractors constitute an OCI violation or not?

Teaming with C3IDM contractors does not, in and of itself, constitute an OCI violation. However, if any contractor assists in developing a Government requirement that contractor will be addressed in the T/O solicitation using similar verbiage to that in RFP paragraph L-1.2.

24
RFP Paragraph H-2, page 24
RFP Paragraph H-2 states that Organizational Conflicts of Interest (OCI) violations are a significant contract performance issue. Lack of adherence to the OCI Plan or this clause may have serious consequences that may include contract termination, suspension and debarment, or other appropriate remedies or administrative actions. This clause applies to all CN&GT Operations and Logistics Support task orders.

H-2 goes on to state that “If a Contractor performing on a CN&GT Operations and Logistics Support task order assists in preparing a requirement, or provides information leading directly or predictably to the preparation of a requirement, that Contractor's parent companies, subsidiaries, and any organization with which the Contractor is affiliated through an ownership or direct financial interest shall be ineligible to participate in any competition for CN&GT Operations and Logistics Support task orders described within those requirements documents.”

Question: Some COCOM CN&GT Program Offices are executing their programs with other non-CNTPO/ CN&GT contract vehicles. While H-2 clearly applies to CN&GT Task orders it does not appear that H-2 would apply to Task Orders issued under other non-CNTPO/ CN&GT contract vehicles. There is a real potential that contractors on those vehicles may be assisting in the preparation of CN&GT requirements, or providing information leading directly or predictably to the preparation of requirements. Is it the Government’s intention that such activity would or would not constitute an OCI violation, and are the companies on other non-CNTPO/ CN&GT contract vehicles able to compete for a position on the O&L MAIDIQ without limitation?

Such activity would constitute an OCI violation. It is each contractor’s responsibility to comply with the proposed and awarded OCI Plan, RFP Section H, paragraph H-2, and applicable contract clauses. Any knowledge of a real or perceived OCI violation should be immediately brought to the Contracting Officer’s attention.

25
RFP Paragraph H-2, page 24
RFP Paragraph H-2 states that Organizational Conflicts of Interest (OCI) violations are a significant contract performance issue. Lack of adherence to the OCI Plan or this clause may have serious consequences that may include contract termination, suspension and debarment, or other appropriate remedies or administrative actions. This clause applies to all CN&GT Operations and Logistics Support task orders.

H-2 goes on to state that “If a Contractor performing on a CN&GT Operations and Logistics Support task order assists in preparing a requirement, or provides information leading directly or predictably to the preparation of a requirement, that Contractor's parent companies, subsidiaries, and any organization with which the Contractor is affiliated through an ownership or direct financial interest shall be ineligible to participate in any competition for CN&GT Operations and Logistics Support task orders described within those requirements documents.”

Question: In our analysis of H-2 does teaming with a contractor generating requirements or providing information predictably resulting in requirement for CN&GT through another contract (i.e., CERDEC I2WD Engineering Training Logistics and Systems Engineering and Technical Assistance Support (SETA) Task Order, Solicitation # W15P7T14RA151, under the Rapid Response 3RD Generation (R2-3G) constitute an OCI violation?

It is each offeror’s / contractor’s responsibility to comply with the proposed and awarded OCI Plan, RFP Section H, paragraph H-2, and applicable contract clauses. Any knowledge of a real or perceived OCI violation should be immediately brought to the Contracting Officer’s attention.

36
RFP Reference: RFP Attachment 3, Section L, Past Performance Information (PPI) Sheet Instructions

Topic: Contract Type Question: Instructions indicate, “**If ID/IQ or BPA, offerors shall provide a separate list showing each of the task/delivery order(s) performed under the ID/IQ contract or BPA, in addition to the period of performance, dollar value, place(s) of performance and a brief description (not to exceed 500 characters) for each underlying task/delivery order deemed appropriate to demonstrate recency and relevancy in accordance with L-8.1.1.3 & L-8.1.2.2. The limitations in L-5.3.1 apply to this list.” Our question in two parts:

1. As part of our response we intend to submit PPI Sheets on up to 3 ID/IQs; the number of task orders for those ID/IQs range from the teens into the 90s – most of the TOs demonstrate recency and relevancy. Is it necessary for offerors to address TOs in the PPI sheets or may offerors discuss their selected TOs in the Past Performance Summary?

2. If the Government determines that the requirement must be discussed in the PPI sheets, please advise how this is to be accomplished since the instructions indicate PPI sheets cannot exceed 1 page and completing the format itself will use up most of that 1 page.

Recommendation: That the Government consider eliminating the requirement (quoted above) from the PPI instructions and direct offerors to discuss task orders deemed appropriate to demonstrate recency and relevancy in the PPI Summary.

The Government will not eliminate the requirement quoted above as each PPI addresses a singular reference, while the PPI Summary addresses all PPI references (there is only one PPI Summary (total of five (5) pages) for the entire Past Performance Volume).

Per RFP paragraph L-8.1.1 and subparagraphs, as well as Section L Attachment 3, for ID/IQs and BPAs, underlying task or delivery orders “…deemed appropriate to demonstrate recency and relevancy…” shall be included in the PPI Sheet. If an offeror chooses to also utilize the five pages allowed for the PPI Summary, there is nothing precluding that.

There is plenty of space in the PPI sheet to meet the requirement for inclusion of task/delivery orders in the PPI Sheet (limited to 500 characters) without exceeding one (1) page.

37
RFP paragraph L-5.3.6
Can you please confirm whether the requirement to verify ISO 9001 registration is still under consideration for the subject Training solicitation, or if a decision has been made regarding 'registration vs compliance'?

Section L-5.3.6 of the most recent draft RFP states a requirement to provide ISO registration verification - identical to the previous (23 Dec) draft ("L-5.3.6 Pages Not Included in Page Count. The organizational chart, acronym list, ISO registration verification, ..."). In the previously released Q&A, Question 48 and other ISO Registration-related questions were answered, " The Government is still considering its approach for ISO registration vs. ISO compliance."

The way this requirement is stated in the Training RFP (#-24) is not consistent with the way the identical requirement is (and was previously) stated in the Ops/Log RFP (#23).

In the Ops/Log RFP (#-23), the ISO 9001 registration requirement is specifically stated in 4 places:

1) L-5.3.6 (consistent with #24), but also...

2) the table in L-7.3 (Tech Volume requirements),

3) L-7.3.1.3 (QMS requirements, part of Tech Vol), and

4) M-3.2.1.3 (QMS evaluation methodology).

For the Operations and Logistics Support ID/IQ, Offerors shall have the required ISO certification at proposal submission in order to be considered for award (see RFP paragraphs L-7.3.1.3 and M-3.2.1.3)

38
RFP paragraph L-9.1.1 Labor Rates
Question: What is the guidance for determining OCONUS daily rates?

Please provide guidance for invoicing employee’s daily OCONUS rate to the Government:

1. For every productive day the employee is on the contract

1. For every day the employee is deployed in-country

1. For every day the employee is paid on the contract – productive days, holidays, sick days, leave days, etc.

1. For every calendar day the employee is employed on the contract The multiplier is 1,920 for CONUS (hourly) Rates (based on 4 weeks off (2 weeks of federal holidays and 2 weeks of vacation time)) and 240 for OCONUS (daily) Rates (also based on 4 weeks off per previous). The updated Table B-1 has been posted to FBO.

Invoicing for CONUS vs. OCONUS rates will be specified at the T/O level depending on the T/O requirement and contract type.

39
RFP paragraph L-9.1.1 Labor Rates
Question: Does the daily OCONUS ceiling rate need to incorporate all of the variations in labor law for all countries where work will be performed under the contract? Examples of variations, such as:

1. Maximum number of hours worked during a week

1. Payment of overtime premiums

1. Paid holidays including those associated with Ramadan

1. Payment of end of service gratuities

1. Payments regarding employment termination (severance)

1. Payment of holiday (vacation), housing, and transportation allowances

1. Payment of local payroll and/or income taxes Offerors shall propose loaded OCONUS (daily) Basic Labor and associated cost elements (Fringe, Overhead (OH), G&A), and Profit for each labor category. The Government will apply the Department of State Differential(s) for the applicable country(ies) at the T/O level for OCONUS performance.

40
RFP paragraph L-9.1.1 Labor Rates
Question: Does the Government plan to stipulate a standard leave / rotation policy for OCONUS employees?

The Government may specify such details at the T/O level, but regardless, Offerors must demonstrate ability to ensure continuity of services during leave/rotation such that disruption to mission accomplishment is minimal.

41
RFP paragraph L-9.1.1 Labor Rates
Question: Does the Government plan to stipulate a standard workweek for OCONUS employees?
The Government will not stipulate a standard workweek for the OCONUS (daily) labor rates. This is a performance-based requirement; therefore, the Government expects that offerors will propose varying approaches and therefore propose varying hours based on those approaches.

The Government may specify such details at the T/O level; however, at the ID/IQ level, Offerors must demonstrate ability to ensure continuity of services during leave/rotation such that disruption to mission accomplishment is minimal.

42
RFP paragraph L-9.1.1 Labor Rates
Question: Are all DSSR payments (cost of living, post differential, danger pay, education, and living quarters) considered to be “cost reimbursable” under the contract?

Application of DSSR payments will be specified at the T/O level.