Historical T/O PWS 0326
View the file
Other files for this federal contract opportunity
Show all 50
CN & GT Operations and Logistics has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOD COUNTER NARCOTERRORISM TECHNOLOGY PROGRAM OFFICE
PROGRAM AND OPERATIONS SUPPORT
PERFORMANCE WORK STATEMENT
KAZAKHSTAN BORDER GUARD SERVICE (BGS) COUNTER NARCOTIC (CN) VEHICLES AND EQUIPMENT
TORP 0326
DOD COUNTER NARCOTERRORISM TECHNOLOGY PROGRAM OFFICE
PROGRAM AND OPERATIONS SUPPORT
PERFORMANCE WORK STATEMENT
KAZAKHSTAN BORDER GUARD SERVICE (BGS) COUNTER NARCOTIC (CN) VEHICLES AND EQUIPMENT
TORP 0326
18 SEPTEMBER 2013
1.0 MISSION OBJECTIVE
The DoD Counter-Narcoterrorism Program Office (CNTPO) was established to create Counter-Narcoterrorism Technology (CNT) networks, infrastructure, and capabilities worldwide that are focused on the detection, identification, and disruption of narcoterrorist activities and organizations. This task effort will support the War Fighter in the combating of narco-terrorism worldwide.
2.0 SCOPE
2.1 Task Order Objective:
This Task Order (T/O) objective is to procure all-terrain vehicles and equipment necessary to support ongoing Counter Narcotics training and operations efforts conducted by the Border Guard Service, Ministry of Internal Affairs in the Republic of Kazakhstan.
2.2 Base Contract References:
This T/O establishes the requirements for the Contractor to provide support in the Basic Contract task area(s) of:
4.3.2.7 Logistics Support and Equipment
4.3.3.4 Material and Equipment Purchase
3.0 PERFORMANCE REQUIREMENTS
3.1 Base Requirement – All-terrain vehicles (ATVs).
The contractor shall provide, deliver and ensure receipt and turn-over acceptance of all equipment listed in the attached ‘Appendix A’. The appendix identifies Brand Name Only purchases when required. The base requirement for the ATVs shall be delivered to the following Point of Delivery (POD): Military Unit 2458, Suyunbay Street 351, Almaty, Kazakhstan, 050000
3.2 Option A – High Frequency (HF) tactical/base radios.
The contractor shall provide, deliver and ensure receipt and turn-over acceptance of all equipment listed in the attached ‘Appendix B’. The appendix identifies Brand Name Only purchases when required.
The Option A requirement for HF radios shall be delivered to the following POD:
Military Unit 2458, Suyunbay Street 351, Almaty, Kazakhstan, 050000
3.3 Option B – Inspection Equipment.
The contractor shall provide, deliver and ensure receipt and turn-over acceptance of all equipment listed in the attached ‘Appendix C’. The appendix identifies Brand Name Only purchases when required.
The Option B requirement for inspection equipment shall be delivered to the following POD:
Military Unit 2458, Suyunbay Street 351, Almaty, Kazakhstan, 050000
3.4 Option C – ATVs.
The contractor shall provide, deliver and ensure receipt and turn-over acceptance of all equipment listed in the attached ‘Appendix D’.
The Option C requirement for ATVs shall be delivered to the following POD:
Military Unit 2458, Suyunbay Street 351, Almaty, Kazakhstan, 050000
3.5 Option D – HF mobile radios.
The contractor shall provide, deliver and ensure receipt and turn-over acceptance of all equipment listed in the attached ‘Appendix E’. The appendix identifies Brand Name Only purchases when required.
The Option D requirement for HF mobile radios shall be delivered to the following POD:
Military Unit 2458, Suyunbay Street 351, Almaty, Kazakhstan, 050000
3.6 Option E – HF tactical/manpack (portable) radios.
The contractor shall provide, deliver and ensure receipt and turn-over acceptance of all equipment listed in the attached ‘Appendix F’. The appendix identifies Brand Name Only purchases when required.
The Option E requirement for HF mobile radios shall be delivered to the following POD:
Military Unit 2458, Suyunbay Street 351, Almaty, Kazakhstan, 050000
3.7 Option F – Bore Scopes.
The contractor shall provide, deliver and ensure receipt and turn-over acceptance of all equipment listed in the attached ‘Appendix G’.
The Option F requirement for bore scopes shall be delivered to the following POD:
Military Unit 2458, Suyunbay Street 351, Almaty, Kazakhstan, 050000
3.8 Option G – Video Bore Scopes.
The contractor shall provide, deliver and ensure receipt and turn-over acceptance of all equipment listed in the attached ‘Appendix H’.
The Option G requirement for video bore scopes shall be delivered to the following POD:
Military Unit 2458, Suyunbay Street 351, Almaty, Kazakhstan, 050000
4 TASK ORDER PERFORMANCE REQUIREMENTS
4.1 The contractor shall provide all labor, material, equipment, travel, DBA insurance, and all necessary required to satisfy the requirements set forth in the PWS.
4.2 The contractor shall be responsible for all associated taxes (e.g. VAT), duties and customs fees, and other related charges. Historically Kazakhstan has had very high (est. 20%) customs fees and taxes for the importation and delivery of material that is not accepted as locally or regionally produced. At this time, waivers or exemptions are not available to preclude the payment of the VAT tax.
4.3 The contractor shall also be responsible for all aspects of export compliance, including compliance with the Arms Export Control Act and International Traffic in Arms Regulations (ITAR).
4.4 The contractor shall ensure the appropriate Technical Assistance Agreements (TAAs) and/or applicable export licenses are in place before conducting any activity under this task order that requires such approval and documentation.
4.5 All materials shall be of good quality and durability according to commercially accepted quality standards for similar products. All equipment shall be new. All equipment shall be supplied with OEM use and maintenance manuals in Russian language. In an effort to reduce translation required and translation costs, the Original Equipment Manufacturer (OEM) manuals shall be requested in the Russian language. Any manuals not available in the Russian language shall be translated to Russian.
4.6 All items shall be provided with standard Original Equipment Manufacturer (OEM) warranties. The terms of the warranties shall be clearly presented in the name of End User (EU). The contractor agrees that the supplies or services furnished under this contract shall be covered by the most favorable commercial warranties for such supplies or services and that the rights and remedies provided herein are in addition to and do not limit any rights afforded to the Government by any other clause of this contract. All utilization of commercially available OEM warranty associated with the equipment shall be the responsibility of the EU upon receipt of the material from the United States Government.
4.7 DELIVERY
4.7.1 Ordered items shall be delivered in a single shipment unless the contractor can demonstrate value to the USG for a multiple delivery approach. Partial shipments of ordered items are not authorized unless preapproved or requested by the Contracting Officer (KO). Any change in the FOB address shall be agreed to by the KO and the prime contractor in writing.
4.7.2 The contractor shall provide DD250 Forms and the list of vehicles, equipment and accessories (including serial numbers) with by-item costs to the POCs below one month prior to the delivery and transfer.
4.7.3 The contractor shall be responsible for providing their own lodging and air/ground transportation while in Almaty, Kazakhstan for vehicle and equipment delivery.
4.7.4 Final delivery of ordered items shall be Free on Board (FOB) to destination. All equipment and material shall clear customs prior to delivery. The use of an in-country broker is highly encouraged to guarantee proper customs clearance and equipment delivery.
4.7.5 The contractor shall provide, deliver and ensure receipt and turn-over acceptance of all ATVs and equipment listed in the attached appendices for this T/O. The ATVs shall be delivered will all tanks full of fuel.
4.7.6 The specific POD locations are specified in paragraphs 3.2 – 3.8 of this T/O.
4.7.7 The following personnel are Points of Contact (POC) for the delivery location:
5 WORK HOURS AND LOCATION
5.1 Level of Effort
The principal place of performance for this T/O shall be in Kazakhstan. The Contractor may be required to provide labor hours in excess of 40 hours per work week to include holiday and weekends, and/or during irregular times and shifts based upon CNTPO operations and exercises.
5.3 Temporary Duty (TDY) Travel
5.3.1 The Contractor shall perform TDY non-local travel, as required in the performance of this effort. All travel required and approved under this effort will be paid IAW the Basic Contract by reimbursement to the Contractor. Only required travel previously approved by the KO/COR will be reimbursed under this effort.
5.3.2 The contractor shall perform TDY non-local travel, as required in the performance of this T/O, as directed by the KO/COR/TM. The Contractor shall provide the performance of this task order OCONUS and inside the Continental United States (CONUS). Specific countries may include Kazakhstan.
5.3.3 The Contractor shall ensure that all employees in the SPOT database have a current DD Form 93, Record of Emergency Data Card, on file with both the Contractor and the designated Government official.
5.3.4 All personnel performing duties Outside the Continental United States (OCONUS) shall be included in and insured with a policy covering Defense Base Act (DBA) requirements. DBA insurance for all personnel performing work OCONUS under this task order is required.
6 GOVERNMENT FURNISHED EQUIPMENT OR MATERIAL (GFE/GFM)
The Government will not provide government-furnished-equipment (GFE) or government-furnished-material (GFM) in support of this effort.
7 TASK ORDER DELIVERABLES
7.1 Basic Contract Deliverables
The following deliverables are required as per the basic contract and are applicable to this task order.
| Name |
| CDRL |
No.
No. of
Copies* Basic
Contract
Reference
PWS
Reference Due**
| Contractor’s Progress Report |
| A002 |
| 3 |
| 4.2.2 |
| 7.2 |
| Tenth (10th) day of Each Month |
| Management Plan |
| A00G |
| 3 |
| 7.2 |
| 7.3 |
| Ten (10) Days After Request |
| Status Meetings |
| A003 |
| 3 |
| 7.2.3.1 |
| 7.4 |
| Forty-five (45) Days After Award |
| Export Control Document |
| A00H |
| 3 |
| 4.3.1.6 |
| 7.5 |
| Five (5) days before final delivery |
*Copies are to be submitted electronically whenever possible. Recipients at a minimum should include the Contracting Officer’s Representative (COR) and Technical Monitor (TM).
**Unless specified otherwise, number of days after the effective date of this T/O.
7.2 Contractor’s Progress Report (CDRL A002)
The contractor shall provide a monthly report summarizing all tasks preformed, meetings, reports, presentations, deliverables personnel changes/rotations for the previous month. These reports shall be delivered in accordance with CDRL A002 Contractor’s Progress Report of the Basic Contract. These reports are due on the tenth (10) day of each month.
7.3 Management Plan (A00G)
The Contractor shall provide a management plan that shall define the management approach to plan and control this task order effort. The management plan must delineate how the Contractor plans to accomplish the effort supporting the specific T/O, to include a breakout of Direct Productive Person Hours (DPPHs), travel, material, Other Direct Costs (ODC), DBA Insurance, a milestone schedule, and a schedule for the planned expenditure of funds. This deliverable is due ten (10) days after the date of request.
7.4 Status Meetings (A003)
The Contractor shall participate in status meetings, to be scheduled upon request of the responsible Contracting Officer or written designee, to discuss and to informally evaluate the Contractor’s efforts and accomplishments in direct relation to specific T/Os. During the meetings, the Contractor shall present necessary data to enable a joint review of its various assigned tasks, attendant schedules, and resource expenditures. The Contractor shall present and participate in technical discussions and shall inform, in a timely fashion, the TM of any problems with contract execution and any proposed solutions. The Contractor shall attend and participate in other meetings, as scheduled by the responsible contracting officer or written designee.
7.5 Export Control Document (A00H)
The contractor shall provide a cover letter describing the purpose of their submission, POC, Contract/TORP number, description of each enclosed attachment and shall include original document(s) nomenclature (if revised). The attachments shall be originals or certified originals and be dated, signed by a cognizant authority and indicate specific agreement terms. The contractor shall provide the KO/COR copies of all export control documents in the English language. This documentation is due five (5) days prior to final delivery, unless otherwise specified in task order.
8 Task Order Unique Deliverables
The following deliverables are required as stated in this task order.
| Name |
| CDRL No. |
| PWS Reference |
| Due** |
| Master Schedule |
| A00G |
| 8.1 |
| Thirty (30) days from date of award. |
*Copies are to be submitted electronically whenever possible. Recipients at a minimum should include the Contracting Officer’s Representative (COR) and Technical Monitor (TM).
**Unless specified otherwise, number of days after the effective date of this T/O.
8.1 Master Schedule (A00G)
The Contractor shall create, maintain, and provide a Master Project Schedule for Government approval. The schedule may be incorporated in the standard monthly report deliverable with any updates specifically noted. The schedule must cover all phases of the project from kick off to task order close out. The Master Schedule must clearly show; but is not limited to, the following information as applicable:
· Milestones for staffing
· Milestones for procurement of equipment
· Milestones showing all deliverables
APPENDIX A
BASE PERIOD
Nomenclature:
The following items are presented in Brand Name format.
QTY
All-Terrain Vehicles (ATV): Model Sample: UAZ-39094 (Brand Specific) Technical specification:
4x4 all-wheel drive;
Metal hull;
Color: green;
Gasoline engine of 2.69-3.0 l
5-mode synchronized manual transmission;
2-mode transfer gearbox – helical;
Fabric interior;
Number of seats: 5+4: the cab has a front seat (driver and passenger), backseat in cab (seats 3 people) and the bed of the truck has a foldable bench (seats four people);
Electrically adjustable heated rearview mirrors (OEM standard rear view mirrors are acceptable) Breaks system: front disk brakes; rear drum brakes;
Sunroof.
The ATVs shall be equipped with: fire extinguisher, first aid kit, lug nut wrench, jack, complete set of spare tires, snow cleaning brush, spare oil filter, spare air filter.
The ATV shall have a Inbuilt “Motorola” radio: MOTOROLA DM3600/3601 Mobile terminal with LED.
Motorola Radio Technical Specifications:
Frequency range not narrower than 136-174 Mhz; Frequency step (programmable) 12.5/20/25.0 Khz; Max. transmitter power no less than 45Wt; Number of programmable channels no less than 16; Receiver sensitivity no less than 0.22 mkV (analog) and 0.3 mkV (digital); Transmitter frequency stability no less than 0.5x10-6; Operating temperatures range not narrower than -20 to +40 degrees Celsius; LED; multi-language interface (incl. Russian language); location identification information review support and text message in GPS;
distance listening capability; individual and all-stations call-up capability; terminal turn-off capability; IP protocol support; channel scanning (analog, digital channels, mixed scanning of analog and digital channels (including the priority); in accordance with standard MIL-STD-810F; not narrower than IP54; digital protocol ETSI-TS102 361-1, 2 & 3, radiation class F3E; power from vehicle power 12 V with minus on hull.
The MOTOROLA DM3600/3601 shall have a warranty for at least 1 year from the date of delivery clearly stated in the name of the end user – Border Guard Service of Kazakhstan. It should be new and manufactured within 12 months of purchase.
The MOTOROLA DM3600/3601 shall be provide with the following items:
· Receiver/transmitter bloc – 1 ea;
· Microphone handset on twisted cable – 1 ea;
· Handset mount – 1 ea;
· Connection and power cables set – 1 ea;
· Whip/pole antenna with HF cable and HF plug – 1 ea;
· Power filter to suppress the distortion from vehicle power – 1 ea;
· In-built GPS receiver – 1 ea;
· GPS antenna – 1 ea;
· Mounting set to install the radio and antenna – 1 ea;
· Kit to program the radio (CD, serial cable, adapter, USB-serial) – 1 ea;
· OEM manual in Russian language – 1 ea;
APPENDIX B
OPTION A
Nomenclature:
The following items are presented in Brand Name format.
QTY
High Frequency radios; Barrett-2092 HF tactical/base radios Specifications:
Frequencies range (not narrower than) 1.6-30Mhz, frequency step (no more than) 10 Hz in program mode, and no more than 1 Hz in manual mode. Average transmitter power 100 Wt (in entire band). No less than 200 programmable channels, stability of transmitter frequency no less than 0.3 PPM. Receiver sensitivity no less than 0.22 mkV, RS-232 interface with standard functions: (1) emergency call-up; (2) selective call-up which is compatible with “CCIR493-4”; (3) telephone call-up; (4) programming from front radio panel; (5) programming the individual address for the radio (digital and alphabetic options); (6) adaptive noise suppression in accordance with the standard MIL-STD-810F. At least IP54, class of radiated emission: J3E (USB, LSB), H3E (AM), J2A, J2B. Operating temperatures range no less than -15 to +40 degrees Celsius. The radio should have protection from polarity reversal and power surge. The radio should have the following options activated: (1) GPS with scanning capability to locate the coordinates of the other radio; (2) capability to send short text messages (SMS). Power source with entry voltage of 220 V +/- 20% of alternating current of 50 Hz with (1) automatic switch to reserve power source, (2) automatic charging of the reserve battery/ power source. ALE of a standard MIL-STD-188-141B and FED-STD-1045, selective and telephone call-up. Technical characteristics of the equipment for data transfer: compatibility with CLOVER 2000, standard speed of data transfer no less than 7200 bit per second. The radio should have the scrambling mode for oral messages.
Each radio shall include the following items:
· Receiver/transmitter bloc – 1 ea;
· Power cable – 1 ea;
· Loud speaker – 1 ea;
· In-built GPS interface – 1 ea;
· Handset telephone receiver – 1 ea;
· Ventilation bloc – 1 ea;
· In-built adaptive noise suppression – 1 ea;
· In-built data transfer card – 1 ea;
· Power source/ battery including: connection cable and power cable – 1 set;
· GPS receiver – 1 ea;
· Kit for mounting the radio – 1 ea;
· Dipole/ polar multi-wire antenna with outlets on cable (no less than 30 m) and anchors/rods kit – 2 sets;
· Radio programming kit (CD, serial cable, USB-serial adapter) – 1 ea;
APPENDIX C
| OPTION B |
| QTY |
Inspection Rod Kits;
“KSh-612” (In Russian - «КЩ-612»)
Rod technical specification:
Length of work piece of rod #1, mm - 455
Length of work piece of rod #2, mm - 290
Length of work piece of extension rod, mm - 455
Diameter of work piece of rod #1, mm - 4
Diameter of work piece of rod #2, mm - 4
Diameter of work piece of extension rod, mm – 4, 5
Weight with carrying case, kg – No more than 0.6
Maximum length of a rod, mm – 1200
APPENDIX D
OPTION C
Nomenclature:
The following items are presented in Brand Name format.
QTY
All-Terrain Vehicles (ATV): Model Sample: KAMAZ-43114, NefAZ-4208, or URAL-32551-41
Specifications:
Color: military khaki
6x6 all-wheel drive;
Fabric interior;
Enclosed body with box carrier made of metal with thermal insulation with 20 seats in it.
On the right side of the box body the vehicle shall have two doors; one of them is emergency door. The doors shall be single leaf, opening outside in accordance with direction of vehicle movement.
The windows shall be double pane with heat-treated glass;
The vehicle shall have a spare tire attached from outside to the back of the box body;
Two fuel tanks on the left and right of the chassis;
The soft, trauma reducing, not dismountable seats in the box body with not-adjustable back;
Heating shall be provided from three autonomous sources:
1. Main heating system – from vehicle liquid heater; \
2. Emergency – using the the engine cooling system connected to Main heating system;
3. Reserve (air) – from heating ventilating unit;
Ventilation shall be provided by:
1. Regular – from open windows and hatches on top;
2. Forced – from turbo ventilators installed at the top of the box body;
Radio receiver, communication device to communicate between box body and vehicle cab;
Adjustable and heated rearview mirrors;
The vehicle shall be supplied with: fire extinguisher, first aid kit, lug nut wrench, complete set of spare tires, snow brush, spare oil and air filters, jack and a winch (60m long cable).
The ATV shall have a Inbuilt “Motorola” radio: MOTOROLA DM3600/3601 Mobile terminal with LED.
Motorola Radio Technical Specifications:
Frequency range not narrower than 136-174 Mhz; Frequency step (programmable) 12.5/20/25.0 Khz; Max. transmitter power no less than 45Wt; Number of programmable channels no less than 16; Receiver sensitivity no less than 0.22 mkV (analog) and 0.3 mkV (digital); Transmitter frequency stability no less than 0.5x10-6; Operating temperatures range not narrower than -20 to +40 degrees Celsius; LED; multi-language interface (incl. Russian language); location identification information review support and text message in GPS;
distance listening capability; individual and all-stations call-up capability; terminal turn-off capability; IP protocol support; channel scanning (analog, digital channels, mixed scanning of analog and digital channels (including the priority); in accordance with standard MIL-STD-810F; not narrower than IP54; digital protocol ETSI-TS102 361-1, 2 & 3, radiation class F3E; power from vehicle power 12 V with minus on hull.
The MOTOROLA DM3600/3601 shall have a warranty for at least 1 year from the date of delivery clearly stated in the name of the end user – Border Guard Service of Kazakhstan. It should be new and manufactured within 12 months of purchase.
The MOTOROLA DM3600/3601 shall be provide with the following items:
· Receiver/transmitter bloc – 1 ea;
· Microphone handset on twisted cable – 1 ea;
· Handset mount – 1 ea;
· Connection and power cables set – 1 ea;
· Whip/pole antenna with HF cable and HF plug – 1 ea;
· Power filter to suppress the distortion from vehicle power – 1 ea;
· In-built GPS receiver – 1 ea;
· GPS antenna – 1 ea;
· Mounting set to install the radio and antenna – 1 ea;
· Kit to program the radio (CD, serial cable, adapter, USB-serial) – 1 ea;
APPENDIX E
OPTION D
Nomenclature:
The following items are presented in Brand Name format.
QTY
High Frequency radios;
Barrett-2091 HF mobile radio package Specifications:
Frequencies range (not narrower than) 1.6-30Mhz, frequency step (no more than) 10 Hz in program mode, and no more than 1 Hz in manual mode. Average transmitter power 100 Wt (in entire band). No less than 200 programmable channels, stability of transmitter frequency no less than 0.3 PPM. Receiver sensitivity no less than 0.22 mkV, RS-232 interface with standard functions: (1) emergency call-up; (2) selective call-up which is compatible with “CCIR493-4”; (3) telephone call-up; (4) programming from front radio panel; (5) programming the individual address for the radio (digital and alphabetic options); (6) adaptive noise suppression in accordance with the standard MIL-STD-810F. At least IP54, class of radiated emission: J3E (USB, LSB), H3E (AM), J2A, J2B. Operating temperatures range no less than -15 to +40 degrees Celsius. The radio should have protection from polarity reversal and power surge. The radio should have the following options activated: (1) GPS with scanning capability to locate the coordinates of the other radio; (2) capability to send short text messages (SMS). Power source with entry voltage of 220 V +/- 20% of alternating current of 50 Hz with (1) automatic switch to reserve power source, (2) automatic charging of the reserve battery/ power source. ALE of a standard MIL-STD-188-141B and FED-STD-1045, selective and telephone call-up. Technical characteristics of the equipment for data transfer: compatibility with CLOVER 2000, standard speed of data transfer no less than 7200 bit per second. The radio should have the scrambling mode for oral messages.
Each radio set should consist of following items:
· Receiver/transmitter bloc – 1 ea;
· Microphone headset – 1 ea;
· In-built GPS interface – 1 ea;
· Tactical Handset telephone receiver – 1 ea;
· In-built adaptive noise suppression – 1 ea;
· In-built data transfer card – 1 ea;
· Tuner (adapter) – 1 ea;
· Power source (batteries) – 2 ea;
· GPS receiver – 1 ea;
· Universal charging device to charge batteries separately from the radio – 1 ea;
· Carrying rucksack for radio, khaki color – 1 ea;
· Foldable whip/ rod antenna – 1 ea;
· Tactical wide-band dipole – 1 ea;
· External power source cable – 1 ea;
· Radio programming kit (CD, serial cable, USB-serial adapter) – 1 ea;
· OEM manual in Russian language – 1 ea;
The Kazakhstan Border Guard Service shall be responsible for installation of these radios on their vehicle fleet after delivery which includes vehicles such as UAZ Hunter, UAZ-39094, URAL, KAMAZ, ZIL, etc.
APPENDIX F
OPTION E
Nomenclature:
The following items are presented in Brand Name format.
QTY
High Frequency radios; Barrett-2090 HF tactical/manpack (portable) radio package specifications:
Frequencies range (not narrower than) 1.6-30Mhz, frequency step (no more than) 10 Hz in program mode, and no more than 1 Hz in manual mode. Average transmitter power 100 Wt (in entire band). No less than 200 programmable channels, stability of transmitter frequency no less than 0.3 PPM. Receiver sensitivity no less than 0.22 mkV, RS-232 interface with standard functions: (1) emergency call-up; (2) selective call-up which is compatible with “CCIR493-4”; (3) telephone call-up; (4) programming from front or remote radio panel; (5) programming the individual address for the radio (digital and alphabetic options); (6) adaptive noise suppression in accordance with the standard MIL-STD-810F. At least IP54, class of radiated emission: J3E (USB, LSB), H3E (AM), J2A, J2B. Operating temperatures range no less than -15 to +40 degrees Celsius. The radio should have protection from polarity reversal and power surge. The radio should have the following options activated: (1) GPS with scanning capability to locate the coordinates of the other radio; (2) capability to send short text messages (SMS). Power source with entry voltage of 220 V +/- 20% of alternating current of 50 Hz with (1) automatic switch to reserve power source, (2) automatic charging of the reserve battery/ power source. ALE of a standard MIL-STD-188-141B and FED-STD-1045, selective and telephone call-up. Technical characteristics of the equipment for data transfer: compatibility with CLOVER 2000, standard speed of data transfer no less than 4800 bit per second. The radio should have the scrambling mode for oral messages.
Each radio set shall consist of following items:
Receiver/transmitter bloc – 1 ea;
Remote radio panel – 1 ea;
Power cable – 1 ea;
Loud speaker – 1 ea;
Microphone headset on twisted cable – 1 ea;
In-built GPS interface – 1 ea;
Handset telephone receiver – 1 ea;
Ventilation bloc – 1 ea;
In-built adaptive noise suppression – 1 ea;
In-built data transfer card – 1 ea;
Kit for mounting the radio and the antenna tuner – 1 ea;
GPS receiver – 1 ea;
Power filter including: filter for the generator and the engine, 2 wire clamps, earth cable, clipses, power converter from 24 to 12 V with negative side on body frame – 1 set;
Automatic tuner with standard antenna and cable set – 1 set;
Tactical dipole/ polar antenna – 1 ea;
Radio programming kit (CD, serial cable, USB-serial adapter) – 1 ea;
OEM manual in Russian language – 1 ea;
APPENDIX G
| OPTION F |
| QTY |
Articulating Bore scopes or equivalent; model sample: FBS-6 (4-way, 80 inch configuration) Technical Specification:
Each scope shall have the following accessories:
Fiberscope – 1 ea;
Battery – 1 ea;
Videoadapter and digital videocamera – 1 set;
OEM manual in Russian language – 1 ea;
Carrying case – 1 ea.
APPENDIX H
OPTION G
Nomenclature:
The following items are presented in equivalent format. The minimum salient characteristics are as shown.
QTY
Video Bore scopes or equivalent; model sample: Cobra
The video bore scope “Cobra” shall be supplied with 1.8 m telescopic arm bar.
The video bore scope shall be designed for use during the daylight and dark (with infrared LED light).
The video bore scope shall have a TFT LCD monitor.
The battery shall provide for 3.5 hour daylight operation and 3 hour night time operation.
The weight of video bore scope shall be no more than 2.7 kg.
Technical Specification:
Camera
Color camera, diameter – 60мм, length – 95 mm
Resolution – 420 ТВЛ
1/3 "Sony Super HAD CCD, PAL
Sensitivity 0.0 lux
850 IR light emitting diode for up to 10 m
IP 67
Lens – 3.6 mm, which provides for 68 ° view
Working temperatures range from -10 to +55 ° Celsius
Controller
5" LCD TFT color monitor in protective cover and carrying belt
Resolution 960 (H) х 234 (Ш)
Batteries and charging device main battery batteries SANYO, Eneloop 2000mAh, NIMH low self-discharge, quick charge of 2 А within an hour, more than 1000 cycles, 10 cells charging device
APPENDIX I
PERFORMANCE REQUIREMENTS SUMMARY MATRIX
PERFORMANCE
OBJECTIVE
| PERFORMANCE STANDARD |
| ACCEPTABLE QUALITY LEVEL (AQL) |
| METHOD OF SURVEILLANCE |
PERFORMANCE INCENTIVE
| Customer Satisfaction (Quality of Service) |
| T/O requirements met with few minor and no significant problems encountered |
Performance meets all technical and functional requirements, and is highly responsive to changes in technical direction and/or the technical support environment.
Personnel qualifications, assessments, evaluations, analyses, recommendations, and related input are thorough, reliable, highly relevant to T/O requirements, and consist of substantial depth and breadth of subject matter expertise.
Deliverable reports contain all required data and meet all applicable CDRL requirements.
Contractor technical performance meets all T/O requirements.
Adequate Key Personnel with appropriate qualifications including security clearances (if required) provided at least 95% of time. Problems that are encountered are minor and resolved in a satisfactory manner.
| Routine Assessment of Workforce Qualifications and Availability of Resources |
| Assignment of performance rating for Customer Satisfaction criteria: |
EXCEPTIONAL
Performance meets all and exceeds many T/O requirements. Performance delivered with no required re-performance/rework 99% of time; problems that are encountered are minor and resolved in a highly effective manner.
VERY GOOD
Performance and deliverables meet all and exceed some T/O requirements. Performance delivered with no required re-performance/rework at least 97% of time; problems that are encountered are minor and resolved in an effective manner.
SATISFACTORY
Performance and deliverables meet all T/O requirements. Performance delivered with no re-performance/rework at least 95% of time; problems that are encountered are minor and resolved in a satisfactory manner.
MARGINAL
Some T/O requirements not met and/or performance delivered with re-performance/rework required more than 20% of time. Problems encountered were resolved in a less than satisfactory manner.
UNSATISFACTORY
Many T/O requirements not met. Numerous re-performances/rework required. Substantial problems were encountered and inadequate corrective actions employed.
| Adherence to Schedule |
| T/O milestones, periods of performance, and/or data submission dates are met or exceeded; highly qualified Key Personnel are available as required. |
| Contractor meets T/O delivery requirements at least 95% of the time (excluding government- caused delays). |
| Routine Inspection of Deliverable Products/ |
Services.
Assignment of performance rating for schedule criteria:
EXCEPTIONAL
T/O milestones/ performance dates met or exceeded 99% of time (excluding government caused delays)
VERY GOOD
T/O milestones/ performance dates met or exceeded at least 97% of time (excluding government caused delays)
SATISFACTORY
T/O milestones/ performance dates met or exceeded at least 95% of time (excluding government caused delays)
MARGINAL
T/O milestones/ performance dates met less than 95% of time (excluding government caused delays)
UNSATISFACTORY
T/O schedule/performance dates met less than 80% of time
(excluding government caused delays)
| Cost Control |
| Contract labor mix is controlled in efficient and effective manner; travel and ODCs effectively controlled. |
Actual T/O labor resource mix is maintained within 3% of originally awarded T/O resource mix; travel and ODCs effectively monitored and controlled.
| Routine Inspection of T/O Funds & Manpower Performance Reports, Payment Invoices |
| Assignment of performance rating for cost control criteria: |
EXCEPTIONAL
Actual T/O resource mix maintained within originally awarded T/O resource mix
VERY GOOD
Actual T/O resource mix maintained within 1% of originally awarded T/O resource mix
SATISFACTORY
Actual T/O resource mix maintained within 3% of originally awarded T/O resource mix
MARGINAL
Actual T/O resource mix maintained within 10% of originally awarded T/O resource mix
UNSATISFACTORY Actual T/O resource mix exceeds 10% of originally awarded T/O resource mix