Attachmemt 2 AF FORM 66.pdf

Air Force Form PDF 94 KB Posted

Attached to
Rec Camp Seal Coat
Solicitation number
FA303025Q0050
Issued by

About this file

This AF Form 66 Submittal Register is for a project titled "Rec Camp Roads Seal Coat" with project number JCGU 25-7005. The document outlines nine key submission requirements for the contractor, including:

  1. Work Breakdown Schedule/Project Schedule (4 copies required)
  2. Work Clearance Request (AF Form 103)
  3. Technical design submissions with 14-day advance notice, including:
    • Hot Cracksealer Design
    • Sealcoat Design
    • Sand Type
    • Striping Paint
  4. Traffic Control Plan
  5. Daily Quality Control Report (prior to final inspection)
  6. DD Form 1354 (prior to final inspection)

The register provides a structured template for tracking document submissions, approvals, and key milestone dates, with specific instructions such as submissions being required no later than 10 days after Notice to Proceed and 7 days prior to beginning work.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER

JCGU 25-7005

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

Work Breakdown Schedule/Project Schedule 4 (a) FIO

01020, Para 2.1, Work Clearance Request, AF Form

4 x (a) GA

Hot Cracksealer Design 4 14 Days Prior

(c ) GA

Sealcoat Design 4 14 Days Prior

(c ) GA

Sand Type 4 14 Days Prior

(c ) GA

Striping Paint 4 14 Days Prior

(c ) GA

Traffic Control Plan 14 Days Prior

(c )

Daily Quality Control Report Prior to Final

Inspection (d)

DD Form 1354 Prior to Final

Inspection (d)

ATTACHMENT #: AF FORM 66 SUBMITTAL REGISTER

PROJECT TITLE: SOLICITATION/CONTRACT NO.

Rec Camp Roads Seal Coat

REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-

TOR RE-

SUBMIT-

TAL

FINAL

APPROVAL

IN

ST

RU

CT

IO

NS

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

RE

CO

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

ER

'S

W

AR

RA

NT

Y

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

OP

ER

AT

IN

G

FORM66.xls

JCGU 25-7005

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

ATTACHMENT #: AF FORM 66 SUBMITTAL REGISTER

PROJECT TITLE: SOLICITATION/CONTRACT NO.

Rec Camp Roads Seal Coat

REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-

TOR RE-

SUBMIT-

TAL

FINAL

APPROVAL

IN

ST

RU

CT

IO

NS

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

RE

CO

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

ER

'S

W

AR

RA

NT

Y

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

OP

ER

AT

IN

G

JCGU 25-7005

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

ATTACHMENT #: AF FORM 66 SUBMITTAL REGISTER

PROJECT TITLE: SOLICITATION/CONTRACT NO.

Rec Camp Roads Seal Coat

REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-

TOR RE-

SUBMIT-

TAL

FINAL

APPROVAL

IN

ST

RU

CT

IO

NS

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

RE

CO

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

ER

'S

W

AR

RA

NT

Y

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

OP

ER

AT

IN

G

AF Form 66

(a) No later than 10 days after Notice To Proceed

(b) Prior to starting Phase Two & prior to demo/construction

JCGU 25-7005

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

ATTACHMENT #: AF FORM 66 SUBMITTAL REGISTER

PROJECT TITLE: SOLICITATION/CONTRACT NO.

Rec Camp Roads Seal Coat

REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-

TOR RE-

SUBMIT-

TAL

FINAL

APPROVAL

IN

ST

RU

CT

IO

NS

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

RE

CO

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

ER

'S

W

AR

RA

NT

Y

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

OP

ER

AT

IN

G

( c) 7 days prior to beginning work

(d) Prior to Final Inspection

(e) Final Inspection

(f) As required per Statement of Work

(g) Prior to Notice to Proceed

Sheet1

File details come from the government source that posted it. Updated .