EEPZ248252 INSTALL VEHICLE STORAGE SHED B375 AF Form 66.xlsx

XLSX spreadsheet 84 KB Posted

Attached to
B375 INSTALL VEHICLE STORAGE SHED Federal contract opportunity
Solicitation number
FA302225R0007
Issued by
Department of the Air Force Air Education and Training Command

About this file

The file is an Air Force Form 66 (Substitute) Schedule of Material Submittals for project EEPZ248252 to install a vehicle covered storage shed at B375, dated 14-Jan-25. The document details extensive submittal requirements across multiple disciplinary categories including General, Environmental, Civil, Architectural, Mechanical, Electrical, Special Systems, and Miscellaneous areas.

The civil engineering submittal section is the most comprehensive, requiring detailed documentation for structural components such as concrete footings, rebar, structural columns, column caps, base plates, structural beams, roof panels, siding, gutters, and associated fasteners. Additionally, the environmental section mandates specific reports including green procurement reports, hazardous waste reports, safety data sheets (SDS), storm water pollution prevention plans, state worker licenses, and disposal manifests. A separate HAZMAT Tracking Sheet is included for contractors to document all hazardous materials usage during the project, requiring detailed tracking of product names, processes, manufacturers, container types, and quantities.

View the file

Other files for this federal contract opportunity

Other files attached to B375 INSTALL VEHICLE STORAGE SHED, newest first.
File Type Posted
RFI - B375 Answers.docx DOCX document
B375_EEPZ248252 INSTALL VEHICLE STORAGE SHED -- SOW.pdf PDF
Contractors CUI Training Slides.pptx PPTX presentation
Davis-Bacon Act Wage Determination.pdf PDF
Appendix A - Cost Breakdown.xlsx XLSX spreadsheet
Solicitation - FA302225R0007.pdf PDF
MFR Contractor CUI Training Acknowledgment for Solicitations.pdf PDF
EAL Form.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General

Project No:Project Title:Date:
EEPZ248252INSTALL VEHICLE COVERED STORAGE SHED, B37514-Jan-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
1Work/Construction/phasing PlanBASICX
2Phasing PlanBASICX
3Demolition PlanBASICX
4As-Built DrawingsBASICX
5Progress ScheduleBASICX
6Guarantees and WarrantiesBASICX
7Superintendent's Qualifications and ExperienceBASICX

AF Form 66 (Substitute) GENERAL Page&Pof&N

SCHEDULE OF MATERIAL SUBMITTALS

Environmental

Project No:Project Title:Date:
EEPZ248252INSTALL VEHICLE COVERED STORAGE SHED, B37514-Jan-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
8Appropriate SDSBASICX
9Green Procurment ReportBASICX
10Hazardous waste reportBASICX
11Hazardous Material Report (AF Form 3000)BASICX
12Air Emission Source Specifications for equipment removedBASICX
13Recycled Material Report/Construction Debris reportBASICX
14Storm Water Pollution Prevention Plan with Best Management Practices IdentifiedBASICX
15Weekly Inspection Reports for ProjectsBASICX
16State Licenses for workers and supervisorsBASICX
17State license for the firmBASICX
1810 Day Notification (Demolition and Asbestos)BASICX
19Work PlanBASICX
20Copy of ACM DisposalManifestBASICX

AF Form 66 (Substitute) Environmental Page&Pof &N

SCHEDULE OF MATERIAL SUBMITTALS

Architectural

Project No:Project Title:Date:
EEPZ248252INSTALL VEHICLE COVERED STORAGE SHED, B37514-Jan-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
NONE

AF Form 66 (Substitute) Architectural Page&Pof&N

Civil

Project No:Project Title:Date:
EEPZ248252INSTALL VEHICLE COVERED STORAGE SHED, B37514-Jan-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
21Structural Concrete, FootingsBasicX
1. FormsBasicX
2. RebarBasicXXX
3. Concrete (Portland Cement Type 2)BasicXXX
22BoltsBasicXXX
23WashersBasicXXX
24NutsBasicXXX
25Structural ColumnsBasicXXXXX
26Column CapsBasicXXXX
27Column Base PlatesBasicXXXX
28Structural BeamsBasicXXXXX
29Roof PanelsBasicXXXXXX
30SidingBasicXXXXXX
31GuttersBasicXXXX
32Gutter MitresBasicXXXX
33Gutter OutletsBasicXXXX
34ScuppersBasicXXXX
35DownspoutsBasicXXXX
36Gutter and Downspouts Braces/FastenersBasicXXXX

AF Form 66 (Substitute) CIVIL Page&Pof &N

Mechanical

Project No:Project Title:Date:
EEPZ248252INSTALL VEHICLE COVERED STORAGE SHED, B37514-Jan-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
NONE

AF Form 66 (Substitute) Mechanical Page&Pof&N

Electrical

Project No:Project Title:Date:
EEPZ248252INSTALL VEHICLE COVERED STORAGE SHED, B37514-Jan-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
NONE

AF Form 66 (Substitute) Electrical Page&Pof &N

Special Systems

Project No:Project Title:Date:
EEPZ248252INSTALL VEHICLE COVERED STORAGE SHED, B37514-Jan-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
NONE

AF Form 66 (Substitute) Special Systems Page&Pof &N

Other&Misc

Project No:Project Title:Date:
EEPZ248252INSTALL VEHICLE COVERED STORAGE SHED, B37514-Jan-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
NONE

AF Form 66 (Substitute) Other and Misc Page&Pof &N

HAZMAT Tracking Sheet

Contractor Hazardous Materials Usage Tracking Form
Return this form to Contracting/Project Manager with Manufacturers original SDS
EEPZ248252INSTALL VEHICLE COVERED STORAGE SHED, B375Contract #
Start Date:End Date:Cotractor:
Product Name as seen on SDS
Process (How is material used)Part #ManufacturerType of
ContainerSize of ContainerTotal

Quantity

UsedEESOH MSN
1
Process:
2
Process:
3
Process:
4
Process:
5
Process:
6
Process:
7
Process:
8
Process:
9
Process:
10
Process:
11
Process:
12
Process:
13
Process:
14
Process:
15
Process:
16
Process:
17
Process:
18
Process:
19
Process:
20
Process:
21
Process:
22
Process:
23
Process:
24
Process:
25
Process:
26
Process:
27
Process:
28
Process:

Example and Instructions

WORKSHEET INSTRUCTIONS
BLOCKDESCRIPTIONINFORMATION REQUIRED
AProject NumberProject number or Opportunity number assigned to the project by Civil Engineering.
BProject TitleThe title of the project.
CContract NumberThe contract number or delivery order assigned by contracting.
DProduct NameThe name of the product as listed on the SDS.
EProcessA Brief description of the work performed with each material.
FPart #The part number as listed on the SDS.
GManufacturerThe name of the Manufacturer of the product (not the distributor)
HType of ContainerThe type of container that the product comes in. Example: can, barrel, bottle, container, cylinder, drum, etc…
ISize of ContainerSize as listed on container. Example: oz, lbs, Liter, Quart, Gallon, etc…
JTotal Quantity UsedThis will be the amount that you anticipate using for the first submission. At the conclusion of the project you will need to provide a final list with updated quantities.
KEESOH MSNThis is the Material Stock Number assigned for EESOH-MIS tracking. (The Air Force Hazardous Materials Manager will provide this number)

NOTE: Complete the HAZMAT Tracking Sheet located on the first TAB of this Excel spreadsheet with all hazardous materials to be used during the duration of the construction project. Once completed, save the sheet as a .pdf file and submit to the contracting officer with an AF Form 3000 Submittal form. This data will need to be submitted prior to construction start. When construction is complete, you will submit a final revised report with updated quanties.