Appendix A - Cost Breakdown.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- B375 INSTALL VEHICLE STORAGE SHED Federal contract opportunity
- Solicitation number
- FA302225R0007
About this file
This document is a Cost Breakdown template for a Department of the Air Force solicitation (FA302225R0007) for a vehicle storage shed project at Columbus Air Force Base. The project involves constructing a metal shed approximately 180'-0" long by 36'-0" deep with a minimum 15'-0" clear height to protect maintenance vehicles, particularly a line truck. The cost proposal template requires vendors to itemize expenses across categories including bonds and insurance, mobilization, architecture/engineering design, materials, equipment, labor, and miscellaneous charges.
Key solicitation details include a site visit scheduled for Tuesday, 20 May 2025 at 9:00 AM CST, with mandatory pre-registration by 2:00 PM CST on 15 May 2025. All Request for Information (RFIs) must be submitted by 2:00 PM CST on 28 May 2025. The procurement is valued between $100,000 and $250,000, and contractors must complete Controlled Unclassified Information (CUI) training and submit an acknowledgment form to access detailed project documentation. Proposals will be submitted electronically, with vendors expected to provide comprehensive cost documentation demonstrating the total project expense.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI - B375 Answers.docx | DOCX document | |
| B375_EEPZ248252 INSTALL VEHICLE STORAGE SHED -- SOW.pdf | ||
| Contractors CUI Training Slides.pptx | PPTX presentation | |
| Davis-Bacon Act Wage Determination.pdf | ||
| EAL Form.docx | DOCX document | |
| EEPZ248252 INSTALL VEHICLE STORAGE SHED B375 AF Form 66.xlsx | XLSX spreadsheet | |
| Solicitation - FA302225R0007.pdf | ||
| MFR Contractor CUI Training Acknowledgment for Solicitations.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAFB
| Appendix A - COLUMBUS AIR FORCE BASE | |||||
| INSTRUCTIONS: Please provide information that properly reflects the total cost of the project. Refer to the Statement of Work and Sections L and M in the solicitation to ensure that your proposal meets the requirementsof this project. | |||||
| SOLICITATION NUMBER: | |||||
| CONSTRUCTION PRICE PROPOSAL BREAKDOWN | |||||
| VENDOR'S INFORMATION | |||||
| Name: | |||||
| Address: | |||||
| Phone Number: | |||||
| Email: | |||||
| NAICS Code | |||||
| Cage Code: | |||||
| SOLICITATION INFORMATION | |||||
| Title of Project: | |||||
| Solicitation Number: | |||||
| Proposed Period of Performance | |||||
| Number of Days Proposal and Price are Valid: | |||||
| BONDS AND INSURANCE | QTY | UNIT OF ISSUE | PRICE | TOTAL | |
| Certificate of Insurance | 1 | ||||
| Performance Bonds | 1 | ||||
| Payment Bonds | 1 | ||||
| Bid Bonds | 1 | ||||
| subtotal | |||||
| MOBILIZATION | QTY | UNIT OF ISSUE | PRICE | TOTAL | |
| subtotal | |||||
| ARCHITECTURE AND ENGINEERING DESIGN | QTY | UNIT OF ISSUE | PRICE | TOTAL | |
| 35% Design | |||||
| 65% Design | |||||
| 95% Design | |||||
| 100% Design (Construction Set) | |||||
| subtotal | |||||
| MATERIAL | QTY | UNIT OF ISSUE | PRICE | TOTAL | |
| subtotal | |||||
| EQUIPMENT | QTY | UNIT OF ISSUE | PRICE | TOTAL | |
| subtotal | |||||
| LABOR | HOURS | UNIT OF ISSUE | RATE | AMOUNT | |
| subtotal | |||||
| MISCELLANEOUS CHARGES | QTY | UNIT OF ISSUE | PRICE | TOTAL | |
| Misissippi State Tax | |||||
| subtotal | |||||
| CONSTRUCTION PROJECT | TOTAL PROJECT PRICE |
| GENERAL INFORMATION |
| The purpose of the requested information in the attached worksheets is to assist government personnel in the review and evaluation of proposals submitted by offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed pricing; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal that reflects the total cost of the project. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate. |