This document is a Task Assignment Change Order (TACO) #5 issued by the State of Florida Department of Environmental Protection (FDEP) to APTIM Environmental and Infrastructure, LLC for environmental remediation work at the former Imperial Cleaners facility (ERIC_4106) in Oakland Park, Broward County, Florida. The change order amends the existing task assignment under Contract HW689. The primary parties involved are the FDEP Hazardous Waste Cleanup Section, represented by Project Manager Nicole Knutson, and APTIM, represented by Project Manager Eric Kramer.
TACO #5 increases the task assignment compensation by $24,205.18 to accommodate direct push technology (DPT) groundwater sampling at six offsite residential locations and sampling of two offsite monitoring wells. The amended total task value is $131,826.91, increased from the prior amount of $107,621.73. The scope includes groundwater sample collection at depths of 10, 25, and 40 feet below land surface, utility location services via Ground Penetrating Radar (GPR) and electromagnetic methods, IDW (investigation-derived waste) transportation and disposal, and site assessment reporting. The task completion date was extended from May 26, 2025 to August 25, 2025 (91 additional days), with a final deliverable due date of June 23, 2025. Subcontractors identified include Groundwater Protection for DPT drilling ($5,199), Erwin Remediation for IDW transportation and disposal ($110-$125 per drum), and GPRS for subsurface utility location ($700). The work is funded through the State of Florida's appropriations for the Drycleaning Solvent Cleanup Program.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC013B 5 HW689
Nicole Knutson 850-245-8763 APTIM Environmental and Infrastructure, LLC
Eric Kramer 407 287 3216
ERIC_4106
Imperial Cleaners
$ 131,826.91 $ 107,621.73
$ 131,826.91 $ 107,621.73
05/26/2025 08/25/2025 91
1 1 5
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2024.11.22 09:51:24 -05'00'
Teresa Booeshaghi
Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2024.11.22 09:22:31 -05'00'
11/22/2024
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: ERIC_4106
Imperial Cleaners
FROM: Nicole Knutson, Project Manager
SUBJECT: Negotiation Summary
HW689 DC013B-5
DATE: November 15, 2024
This Change Order increases costs to allow for DPT groundwater sampling at six offsite locations. Additionally, two offsite monitoring wells will be sampled, as detailed in the November 4, 2024 proposal. Erwin Remediation will complete IDW transportation and disposal, Groundwater Protection will conduct DPT drilling, and GPRS will locate utility lines.
The cost has increased by $24,205.18. The previous price was $107,621.73 and the amended price is $131,826.91. APTIM’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is June 23, 2025.
Task completion date is August 25, 2025.
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : Imperial Cleaners
SUBTASK:
DATE: July 15, 2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5
G. Roberts 12
Engineer/Scientist 4 J. Wilhoit
Engineer/Scientist 2
K. Howard 73
Engineer/Scientist 2
K. McDonald 33
Engineer/Scientist 1
K. Lucey 29
Engineering Technician 2 J. Bell Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 149
VEHICLE TYPE RATE UNIT USEAGE TOTAL
Automobile $80.00 Day 1 $80.00
Van or Truck $120.00 Day 8 $960.00
Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $1,040.00
PER DIEM STAFF RATE UNIT USEAGE ACTUAL TOTAL
Hotel 3 $110.00 Day 6 $1,186.84 $660.00
Day 1-leave before 6:00 AM 3 $36.00 Day 3 $108.00
Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 3 $36.00 Day 6 $216.00
TOTAL PER DIEM $984.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNIT USEAGE ACTUAL TOTAL
Survtech Solutions Survey and Benchmark Placement $4,955.00 LS 1 $4,955.00 $4,955.00
GeoTek Utility Locate Services $750.00 LS 1 $750.00 $750.00
Atlantic Supply MAGS/Well Supplies (Casing, Screen, Sand) $1,167.49 LS 1 $1,163.94 $1,163.94
TOTAL $6,868.94
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTAL
EPA Method TO-15 (VOC Soil Vapor) $200.00 10 0 $2,000.00
EPA Method 8260 (Full List) Soil $150.00 31 0 $4,650.00
EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 Contingency $0.00
EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00
EPA Method 8260 (Full List) Well $150.00 0 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 1 $150.00
TOTAL LAB $6,800.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTAL
Expendables $40.00 Day 6 $240.00
Soil Sampling Kit (concrete) $235.00 Day 2 $470.00
MAGS Investigation Kit $500.00 Day 2 $1,000.00
Tedlar Bags $20.00 bag 7 $140.00
Shallow GW Sampling Kit $260.00 Day 0 $0.00
Encore Sampler $16.00 each 31 $496.00
55 Gallon Drums $100.00 each 1 $100.00
TOTAL EQUIPMENT $2,446.00
Note: Air Analysis by TO-15, Soil Samples by VOCs by EPA Method 8260 (Full List)
Onsite Meeting with Property Manager and Utility White-lines for Markouts including travel (12 hrs), Perform Municipal Sampling, Sample Handling and Shipping to FDEP Laboratory (3 hrs), Oversight of GPR Utility Subcontract Survey (10 hrs), Oversight of Professional Site Survey (12 hrs), MAGS Location Soil Sampling Mobilization and Field Event Preparation (2 hrs), Travel (6 hrs), Advancement of 10 MAGS Soil Borings, including coring for the collection of 40 soil samples at depths of 6", 2', 4, and 6' (20 hrs), Installation of Interior Monitoring Well, including Coring (2 hrs), Surface and Site Restoration (3 hrs), Preparation of Soil Boring Logs (3 hrs).
MAGS Mobilization and Field Event Preparation for MAGS Well and Interior Well Installation and Vapor Sampling (3 hrs), Travel Round Trip (6 hrs), Installation and Construction of 10 MAGS Testing Wells (8 hrs), Installation of 5 Vapor Monitoring Point Locations, including coring (5 hrs), Perform MAGS Tests at 10 locations and collection of 10 Vapor Samples (10 hrs), Assistance with Installation of Interior Monitoring Well (1 hr).
Travel Round Trip (6 hrs), Installation and Construction of 10 MAGS Testing Wells (8 hrs), Installation of 5 Vapor Monitoring Point Locations, including coring (5 hrs), Perform MAGS Tests at 10 locations and collection of 10 Vapor Samples (10 hrs).
2-SiteMeeting, MAGS
MAGS Analytical Data Summary Reporting to FDEP (2 hrs)
Preparation of MAGS, Survey, Utility Markout Soil Sampling Field Events (3 hrs), Investigate Adjacent Property (east) and ROWs (west and south) and Pursue Access/Agreements for Offsite Locations (2 hrs), Prepare Access Request Letters/Forms, Prepare Permission to Enter Property Agreement and Submit Requests to Adjacent Owner (3 hrs), Sunshine One Markout Requests (1 hr), Reporting of Preliminary Soil Sample Data to FDEP (3 hrs).
2-Meeting & MAGs Page 3 of 12 DC013B SAR TACO #5
SUBTASK:
DATE: July 15, 2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5
G. Roberts 14.5
Engineer/Scientist 4 J. Wilhoit
Engineer/Scientist 2
K. Howard 90
Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey
Engineering Technician 2
J. Bell 38
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 144.5
VEHICLE TYPE RATE UNIT USEAGE TOTAL
Automobile $80.00 Day 2 $160.00 Van or Truck $120.00 Day 3 $360.00
Van or Truck $480.00 Week 1 $480.00
TOTAL VEHICLE $1,000.00
PER DIEM STAFF RATE UNIT USEAGE ACTUAL TOTAL
Hotel 3 $110.00 Day 5 $605.00 $550.00 Day 1-leave before 6:00 AM 2 $36.00 Day 2 $72.00 Day 1-Leave between 6 - Noon 1 $30.00 Day 1 $30.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 3 $36.00 Day 5 $180.00
TOTAL PER DIEM $832.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNIT USEAGE ACTUAL TOTAL
GW Protection DPT Drilling $8,832.00 Lump 1 $8,886.00 $8,832.00
TOTAL $8,832.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTAL
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 45 0 $6,750.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 8 0 Contingency $400.00 EPA Method 8260 (VOHs) Leachate $73.00 8 0 Contingency $584.00 EPA Method 8260 (Full List) DPT Groundwater $150.00 24 0 $3,600.00 EPA Method 8260 (Full List) Well/Piezometers $150.00 4 0 $600.00 EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Solid $50.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals)-Solid $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $11,934.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTAL
Expendables $40.00 Day 7 $280.00
Soil Sampling Kit (concrete) $235.00 Day 3 $705.00 Monitor Well Installation Kit $325.00 Day 3 $975.00 Total Survey Station $50.00 Day 1 $50.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Encore Sampler $16.00 each 45 $720.00 55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $3,020.00
Collect Remaining Soil Samples at 17 locations including Travel, Coring, Collection of Soil Samples (20 hrs), Site Restoration, Drum Labeling (2 hrs), Soil Sample Packaging, Chain of Custody and Sample Delivery to Laboratory (2 hrs), Survey Piezometers and Wells with Travel (4 hrs). Round Trip (2 hrs), Additional Hours for the collection of Soil Borings (8 hrs)
Soil and Groundwater Samples by VOCs by EPA Method 8260 (Full List)
3-Soil and Groundwater Field Activities
Conference with FDEP for Final Proposed DPT Locations (1 hr), Conference with FDEP for Final Proposed Well Locations (1 hr).
Contacting Property Owners and City of Oakland Park of Proposed Sampling Schedule and Confirming Access (1.5 hrs), Compilation of Field Soil Analytical Data, Preparation of Soil Summary Maps for FDEP (3 hrs), Preparation of Cross Section from DPT Cores to Review Proposed GW Sampling Depths with FDEP (3 hrs), Calculation of TOC and Watertable Elevations, Preparation of Groundwater Flow Map for FDEP (2 hrs), Conference with FDEP for Final Proposed DPT Locations (1 hr), Preparation of DPT Data Maps and Conference with FDEP for Final Proposed Well Locations (2 hrs). Preparation of Source Area Access Agreement for New Site Owner (2 hrs)
Remaining Soil Sampling Field Event Preparation and Mobilization (2 hrs), Collect Remaining Soil Samples at 17 locations including, Coring, Collection of 68 Soil Samples (20 hrs), DPT Drilling Field Event Preparation and Mobilization (2 hrs), Travel to Site (6 hrs), Installation of two DPT Macrocores to 60 ft bls and installation of 3 Piezometers, DPT Groundwater Sampling at 8 locations (36 hrs), Collection of Groundwater Samples from 3 Piezometers and Interior well (3 hrs), and Survey Wells (1 hr), DPT and Well Groundwater Chain of Custody preparation, Sample Packaging and Sample Delivery (2 hrs), Preparation of Soil Boring and Well Construction Logs (4 hrs) Round Trip (6 hrs) Additional Hours for the collection of Soil Borings (8 hrs)
3-Soil&GW Field Activities Page 4 of 12 DC013B SAR TACO #5
SITE :
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts 5
Engineer/Scientist 4 J. Wilhoit
Engineer/Scientist 2 K. Howard 40
Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 K. Lucey
Engineering Technician 2 J. Bell 12
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 57
VEHICLE TYPE RATE UNIT USEAGE TOTAL
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 4 $480.00
Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE TOTAL
Hotel 2 $110.00 Day 2 $220.00 Day 1-leave before 6:00 AM 2 $36.00 Day 2 $72.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 $36.00 Day 2 $72.00
TOTAL PER DIEM $364.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNIT USEAGE TOTAL
GW Protection Well Installations $5,073.00 LS 1 $5,073.00 Erwin Remediation IDW T&D $110.00 LS 8 $880.00
TOTAL $5,953.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTAL
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $150.00 0 0 $0.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $50.00 0 0 Contingency $0.00 EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (Full List) Wells $150.00 8 0 $1,200.00 EPA Method 8260 (Full List) IDW $150.00 2 0 $300.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $39.00 2 0 $78.00 EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $50.00 1 0 $50.00 EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 1 0 $45.00 Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $1,673.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTAL
Expendables $40.00 Day 4 $160.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 2 $650.00 Total Survey Station $50.00 Day 1 $50.00 Shallow GW Sampling Kit $290.00 Day 2 $580.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 1 $100.00
TOTAL EQUIPMENT $1,540.00
Installation of final well network of 3 shallow/1 deep, including travel (20 hrs). Collection of Final Groundwater Samples (8 wells) with travel and Survey Wells (16 hrs), Deliver final samples to laboratory (2 hrs), Preparation of Well Construction Logs (2 hrs).
Imperial Cleaners
July 15, 2024
Prepare Proposed Location Maps and Recommendations (3 hrs), Characterization and Waste Profile for Transportation and Disposal of IDW Drums (2 hours)
4-Final Well Installations
Collection of Final Groundwater Samples and IDW Samples, with travel, Survey Wells, Site Restoration (12 hrs)
4-Final Well Installations Page 5 of 12 DC013B SAR TACO #5
SITE :
SUBTASK: 5-Reporting DATE: July 15, 2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 4
Engineer/Scientist 5
G. Roberts 20
Engineer/Scientist 4
J. Wilhoit 40
Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald 6 Engineer/Scientist 1 K. Lucey Engineering Technician 2 J. Bell Designer 2 S. Ferianc 8 Technical Pub Specialist 3 H. Vining 6
TOTAL LABOR: 84
VEHICLE TYPE RATE UNIT USEAGE TOTAL
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTAL
Hotel 0 $110.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST TOTAL
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTAL
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTAL
TOTAL EQUIPMENT $0.00
Imperial Cleaners
Vapor Data Tabulation (3 hrs), Step Test and Radius of Influence calculations and graphs (3 hrs)
Preparation of MAGS Assessment Findings text (2 hrs), finalization of tables, figures and graphs (2 hrs).
Review Logs and Prepartion of SAR Cross Sections, Preparation of Physiography, Regional Geology and Regional Hydrogeology Sections, Preparation of Conceptual Model based on Findings, Preparation of Laboratory QA/QC Summary and Data Recommendations, Preparation of Site Assessment Conclusions and Recommendations (20 hrs).
Preparation of SAR text including Site Description, Topography and Drainage, Potable Well Survey tables and figures, Operational History, Summarize Previous Investigations, Site Specific Soil and Groundwater Site Characterization Procedures Text, Tabulate and Report Preparation of Assessment Findings (lithologic borings, soil borings, DPT Sampling, Piezometer and Monitoring Well Installations, Groundwater Sampling) Review and summarize boring logs, Preparation of GW Flow and Analytical Figures (40 hrs).
Document Production and Formatting Tables and Text (6 hrs).
Site Assessment Report Map Preparations and Drafting
5-SAR Rept Page 6 of 12 DC013B SAR TACO #5
SUBTASK:
DATE: November 04, 2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 4 J. Wilhoit
Engineer/Scientist 2 K. Howard 79
Engineer/Scientist 2 K. McDonald
Engineer/Scientist 1 K. Lucey
Engineering Technician 2 J. Bell
Designer 2 S. Ferianc Expanding Base Maps and Drafting Analytical Maps 9
Technical Pub Specialist 3 H. Vining
TOTAL LABOR 122
VEHICLE TYPE RATE UNIT USEAGE TOTAL
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 2 $240.00
Van or Truck $480.00 Week 1 $480.00
TOTAL VEHICLE $720.00
PER DIEM STAFF RATE UNIT USEAGE TOTAL
Hotel 1 $150.00 Day 3 $450.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 1 $30.00 Day 3 $90.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 1 $36.00 Day 3 $108.00
TOTAL PER DIEM $648.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNIT USEAGE TOTAL
GW Protection DPT Drilling $5,199.00 Lump 1 $5,199.00
Erwin Remediation Soil IDW T&D $110.00 LS 1 $110.00
Erwin Remediation Liquid IDW T&D $125.00 LS 2 $250.00 GPRS Subsurface Utility Locations $700.00 LS 1 $700.00
TOTAL $6,259.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTAL
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00
EPA Method 8260 (Full List) DPT GW $150.00 30 0 $4,500.00
EPA Method 8260 (VOHs) On and Offsite Wells $73.00 8 0 Contingency $584.00
EPA Method 8260 (VOHs) IDW Soil $73.00 1 0 Contingency $73.00
EPA Method 8260 (VOHs) IDW Liquid $73.00 1 0 $73.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $5,230.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTAL
Expendables $40.00 Day 7 $280.00
Soil Sampling Kit (concrete) $235.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Total Survey Station $50.00 Day 0 $0.00
Shallow GW Sampling Kit $290.00 Day 4 $1,160.00
Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 1 $100.00
TOTAL EQUIPMENT $1,540.00
6-Additional Assessment
Scope of Work Meeting with Project Geologist (1 hr), Contact Adjacent property to east (Boulevard Center) for access, preparation and submittal of updated requests (2 hrs), Scope of Work Meeting with Project Geologist (1 hr), Call for Markouts at 6 locations for DPT Sampling, Notification of City of Oakland (by phone) and six Property Owners at each of the locations (by mail) (4 hrs), Order Laboratory Kit for collection of DPT groundwater samples (1 hr), Notify notify PRP Project Managers, and property owners, as necessary, of Groundwater Sampling, Order Laboratory Kit for collection of onsite and offsite well locations (2 hrs), Characterization and Waste Profile for Transportation and Disposal of IDW Drums (2 hours), Review Findings and preparation of Recommendations for FDEP (5 hrs)
Visit site to Collect Groundwater Samples from Former Hess Property (current Restaurant, Wells MW- 7R and MW-13) and Former Sunshine 378 (current Chevron. Wells MW=7 and MW-9), Collect Groundwater samples from Onsite MW-1 and Piezometers PZ001, PZ002 and PZ003 (12 hrs), Collection of IDW Samples Soil and Groundwater (2 hrs), Sample Delivery to Laboratory (1 hr), Secure IDW and Site Restoration (1 hr)
Research City of Oakland Park and Broward County Services to determine Contacts for Permitting, ROW Determination, Maintenance of Traffic Requirements MOT, discuss Fees, Utilities and schedule meetings (6 hrs), Research FDEP Records to locate data related to nearby sites with possible monitoring wells, Contact FDEP PMs for access if located (3 hrs), Round Trip travel to Site (7 hrs), Review and Locate and Mark Proposed Well Locations (3 hrs) and document locations and visible utilities, Meet with City of Oakland Park Permitting to discuss Proposed Work Permitting Requirements and Futrue Work requirements, including travel to offices (4 hrs), Meet with Oakland Park Engineering Department and/or Broward County to review ROWs, Meet with Oakland Park and/or Broward County to discuss MOT Planning requirments (4 hrs), Return to site to Visit Adjacent Propoerty (Boulevard Center), Former Hess Property (current Restaurant), Former Sunshine 378 (current Chevron) for Well Survey and Property Contacts (4 hrs), Travel to site (4 hrs), White-line DPT Groundwater Sampling Locations, Meet with Property Owners and City of Oakland Park, Document Sunshine Marked Utilities, Oversee GPR Subcontaractor to clear Borehole locations (12 hrs), Oversee Offsite DPT Groundwater Sampling (20 hrs), Travel back to office from site (4 hrs), DPT sample delivery to Laboratory (2 hrs), update Tables and Maps for Reporing DPT and Groundwater Well Resuslts to FDEP (6 hrs)
6-Total Page 7 of 12 DC013B SAR TACO #5
SUBTASK:
DATE: October 30, 2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 4 J. Wilhoit
Engineer/Scientist 2 K. Howard 48
Engineer/Scientist 2 K. McDonald
Engineer/Scientist 1 K. Lucey
Engineering Technician 2 J. Bell
Designer 2 S. Ferianc Expanding Base Maps and Drafting Analytical Maps 9 Technical Pub Specialist 3 H. Vining
TOTAL LABOR 88
VEHICLE TYPE RATE UNIT USEAGE TOTAL
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
Van or Truck $480.00 Week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE TOTAL
Hotel 1 $150.00 Day 2 $300.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 1 $30.00 Day 2 $60.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 1 $36.00 Day 2 $72.00
TOTAL PER DIEM $432.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE UNIT USEAGE TOTAL
GW Protection DPT Drilling $5,199.00 Lump 1 $5,199.00
Erwin Remediation Soil IDW T&D $110.00 LS 1 $110.00
Erwin Remediation Liquid IDW T&D $125.00 LS 2 $250.00
GPRS Subsurface Utility Locations $700.00 LS 1 $700.00
TOTAL $6,259.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTAL
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00
EPA Method 8260 (Full List) DPT GW $150.00 30 0 $4,500.00
EPA Method 8260 (VOHs) On and Offsite Wells $73.00 8 0 Contingency $584.00
EPA Method 8260 (VOHs) IDW Soil $73.00 1 0 Contingency $73.00
EPA Method 8260 (VOHs) IDW Liquid $73.00 1 0 $73.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $5,230.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTAL
Expendables $40.00 Day 5 $200.00
Soil Sampling Kit (concrete) $235.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Total Survey Station $50.00 Day 0 $0.00
Shallow GW Sampling Kit $290.00 Day 4 $1,160.00
Encore Sampler $16.00 each 0 $0.00
55 Gallon Drums $100.00 each 1 $100.00
TOTAL EQUIPMENT $1,460.00
Visit site to Collect Groundwater Samples from Former Hess Property (current Restaurant, Wells MW- 7R and MW-13) and Former Sunshine 378 (current Chevron. Wells MW-7 and MW-9), Collect Groundwater samples from Onsite MW-1 and Piezometers PZ001, PZ002 and PZ003 (12 hrs), Collection of IDW Samples Soil and Groundwater (2 hrs), Sample Delivery to Laboratory (1 hr), Secure IDW and Site Restoration (1 hr)
Groundwater Samples from Former Hess Property Wells MW-7R and MW-13 (to east) and Former Sunshine 378 Wells MW-7 and MW-9 (to north) and Onsite Wells MW-1 and Piezometers PZ001, PZ002 and PZ003, all for EPA Method 8260 (VOHs only).
Travel to site (4 hrs), White-line DPT Groundwater Sampling Locations, Meet with Property Owners and City of Oakland Park, Document Sunshine Marked Utilities, Oversee GPR Subcontaractor to clear Borehole locations (12 hrs), Oversee Offsite DPT Groundwater Sampling (20 hrs), Travel back to office from site (4 hrs), DPT sample delivery to Laboratory (2 hrs), update Tables and Maps for Reporing DPT and Groundwater Well Resuslts to FDEP (6 hrs)
6-Additional Assessment
Scope of Work Meeting with Project Geologist (1 hr), Call for Markouts at 6 locations for DPT Sampling, Notification of City of Oakland (by phone) and six Property Owners at each of the locations (by mail) (4 hrs), Order Laboratory Kit for collection of DPT groundwater samples (1 hr), Notify notify PRP Project Managers, and property owners, as necessary, of Groundwater Sampling, Order Laboratory Kit for collection of onsite and offsite well locations (2 hrs), Characterization and Waste Profile for Transportation and Disposal of IDW Drums (2 hours), Review Findings and preparation of Recommendations for FDEP (5 hrs)
6-Delta Page 10 of 12 DC013B SAR TACO #5
Proposed Scope of Work Imperial Cleaners Site Assessment and Reporting Task Assignment DC013B TACO #5 1500 E. Commercial Blvd, Oakland Park, Broward County, FL ERIC_4106 (Former Facility No. 069500959) Aptim Environmental & Infrastructure, LLC November 4, 2024
The following is the proposed scope of work for DC013B Task Assignment Change Order (TACO) #5 for the former Imperial Cleaners site located in Oakland Park, Broward County, Florida. During our recent conversations with the City of Oakland Park, it was determined that no permits or specific MOT requirements will be required for the offsite work within the adjacent residential neighborhood to the south. The county did request that property owners be notified of the work in the ROW in front of each address prior to the work being performed. This scope of work proposed under Task Assignment DC013B TACO #5 includes providing the necessary notices and performing the offsite DPT groundwater sampling, as proposed by the FDEP.
Subtask - 1: Project Management
This task includes project management activities associated with the completion of the remaining Subtasks, as calculated in accordance with Contract HW689.
Subtask 2: Site Meeting and MAGS Testing: Previously Reconciled
Subtask 3: Soil and Groundwater Field Activities: Previously Reconciled
Subtask 4: Final Well Installations and Sampling: No Changes
Subtask 5: Reporting: No Changes
Subtask 6: Additional Assessment:
As noted above, the proposed scope of work included in Subtask 6 includes the DPT groundwater sampling of the six sample locations in the neighborhood to the south of the former drycleaning facility.
Following extensive discussions with the City of Oakland Park, it appears that they will not require permitting or MOT for the drilling activities, despite previously requesting general permits. Therefore, Subtask 6 provides the costs necessary to perform the DPT groundwater sampling. Groundwater samples will be collected from depths of 10, 25 and 40 ft bls (or shallower if refusal is encountered), based on the lithology and similar to previous DPT sampling events. Prior to drilling, the owners of the properties and the City of Oakland Park will be notified of the schedule and scope of work. The locations will be white lined and Sunshine markouts will be requested. Next each location will be checked for unknown utilities by GPR.
Currently the proposed DPT groundwater sampling locations include:
1. 1350 NE 49th Street – Parcel #4942-14-12-1180 (Owner: MRG Realty LLC)
2. 1500 NE 49th Street – Parcel #4942-14-12-1160 (Owner: Michelle Lemoine)
3. 1520 NE 49th Street – Parcel #4942-14-12-1140 (Owner: Roland Nolet)
4. 1330 NE 48th Court – Parcel #4942-14-12-1850 (Owner: Gemini Leo LLC)
5. 1501 NE 48th Court – Parcel #4942-14-12-1250 (Owner: Yoseph Kidane)
6. 1531 NE 48th Court – Parcel #4942-14-12-1280 (Owner: Diana Eustice)
In addition, the onsite monitoring wells, including interior monitoring well MW001, and piezometers PZ001 through PZ003 will be sampled. Two monitoring wells are also proposed to be sampled at the former Sunshine #378, currently a Chevron Station (FAC ID 068501714), located north of the facility across Commercial Boulevard, including monitoring wells MW-7 and MW-9. Two wells are also proposed to be sampled at the former Hess Station (FAC ID 068501746), currently a Spice n Vybe chicken wing restaurant, located east of the former cleaners. The two Hess wells proposed include MW-7R and MW-
13. All the offsite monitoring wells proposed are shallow depth wells. No deep wells currently exist at the two offsite PRP sites. Permission to sample will be requested prior to sampling the four offsite wells. Site maps of the two PRP sites with proposed wells to be sampled are included with the attached well location maps.
An extension to allow for the additional offsite DPT groundwater assessment activities including the above DPT groundwater sampling is requested. Currently, the Site Assessment Report, including the final well installations is due March 25, 2025, and the current Task Assignment Completion date is May 26, 2025. Although the DPT groundwater sampling will likely be completed by January 31, 2025, the data review and approval of the proposed final well depths and locations, many of which will be offsite, will likely not be completed by March 25, 2025. Therefore, an extension of 3 months is requested (90 days).
The extension sets the proposed SAR submittal date as June 23, 2025, and a Task Completion date of August 24, 2025.
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between Aptim Environmental & Infrastructure, LLC. and Florida Department of Environmental Protection No. HW689. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.
If you have any questions, please do not hesitate to call.
It e m D e sc ri p ti o n D a ys
E s ti m a te d
T o ta l
D a y s
E s ti m a ta l
D a y s
E s ti m at ed ta l D a ys
E st im a ta l
S er vi ce s (M ob ili za tio n
L um p
5, .0
Lu m p $8
,3
.0
Lu m p
,9
5.
L um p
5, .0
E st im at e d T o ta l D ru m s
T o ta ls
It e m D e sc ri p ti o n U n it s U n it
P ri ce ta l
A m o u n t
U n it s
U n it P ta l A m o u n t U n it s U n it
P ta l
A m o u n t
U n it s
U n it P ta l A m o u n t
P ic ku p
/T ra ns p or at io n
0.
0.
In cl u de d in
D ru m D is po sa l C o st
In cl u de d in
D ru m D is p o sa l C o st In cl ud ed in
D ru m D is p os a l C os t D is p o sa l ( so il)
0.
0.
$1
.0
$1
0.
.0
$1
.0
1.
.0
D is p o sa l ( liq u id
2.
4.
$1
.0
$2
0.
.0
$2
.0
6.
.0
A dd iti on al
5.
5.
$1
.0
$1
3.
0.
.3
T o ta ls
9.
$5
.0
0.
$1 ,0
.3
E st im at e d
T o ta l D ru m s
V en d o r B id S ite L in e s
0.
G
P R
S
0.
0.
N o B id
G P
R S u rv ey
G eo
T ek
G eo
V ie w
S af et y
-K le en
ID
W D is p o s al R e p u b li c
S e rv ic es E n v ir o
S e rv e, I n c.
E rw in
R e m ed ia ti o n
N o ne
5, 9.
D P
T D ri lli n g
8, 0.
$6 ,9
.0
E ar th T e c h D ri ll in g
T o ta l D ru m s
T o ta l D ru m s
T ot al
D ru m s
T o ta l D ru m s
P re fe rr ed D ri ll in g
S o lu ti o n s
5, 0.
G ro u n d w at er
P ro te c ti o n A m b ie n t T ec h n o lo g y
O ct ob er
0, B id
S u m m ar ie s Im p er ia l C le an e rs
E a st
C om m e rc ia l B o ul ev a rd
O ak la nd
P ar k, B ro w ar d
C o un ty
, F lo ri da
F D
E P
S ite
N o.
E R
IC
(F o rm er F
A C
I D
9)
Request for Quotation (RFQ) FDEP Hazardous Waste Cleanup Section (HWCS)
DPT GW Sampling
RE: Imperial Cleaners 1500 East Commercial Boulevard Fort Lauderdale (Oakland Park), Broward County, Florida 33334 ERIC_4106 (Former FAC ID No. 069500959)
Vendors:
SECTION 1
You are hereby invited to submit a quotation in accordance with the instructions and items below in support of Aptim Environmental & Infrastructure, Inc. (APTIM), www.aptim.com.
Please submit your complete proposal, prepared as specified herein, to APTIM by close of business 10/28/24. Proposal submission before or on the required date by e-mail is acceptable.
SECTION 2
YOUR PROPOSAL SHOULD INCLUDE THE FOLLOWING: The omission of any of the following may deem your response as non-responsive. Note, for regular bidders only provide the following red highlighted, if the information has not been submitted within the last month.
A. Submit your proposal on the Attached Lump Sum DPT Drilling Quote Form. You may include additional backup as required.
B. Schedule of values (individual hourly rates) C. Your proposal is valid for 120 days.
D. Provide Insurance Certificate, show evidence that your Workman�s Comp insurance is valid in
Florida (if not on file with APTIM).
E. Provide Experience Modification Rate (EMR) certified by your carrier for Workmen�s Comp (if not on file with APTIM).
F. Please identify any restrictions on your ability to meet the period of performance.
SECTION 3
REQUIREMENT AND SCHEDULE:
Technical issues will be addressed by the Project Manager, Gregg Roberts at 813-612-3687 or gregg.roberts@aptim.com.
General
1. Drilling locations have the potential for exposure to chlorinated solvents. Assume Level D PPE, with APTIM conducting health and safety monitoring.
2. Sunshine Utility mark outs must be requested and performed prior to the work being performed.
In addition, the drilling contractor will also hand auger each location to a depth of 10 feet or to refusal (but not less than 5 ft bls) below the surface to check for utilities.
3. Property access arrangements will be made by APTIM. However, the drilling contractor is responsible for any necessary State or Local drilling permits, including Water Management District requirements.
4. The small property contains a single building which is currently vacant. Working spaces will be extremely restricted due to the site layout. Water and electricity will not be available onsite during drilling operations.
5. All the proposed drilling locations are offsite within a neighborhood.
6. Drillers are to provide and utilize safety vests and cones in pedestrian, active parking and vehicle traffic areas. All of the work in this phase will be performed within ROWs, and on offsite residential properties.
7. Drilling equipment must be properly decontaminated between locations in accordance with FDEP 2017 DEP-SOP-001/01 Standard Operating Procedures for Field Activities procedures.
8. Driller to provide NEW 55-gallon drums for all IDW containment (decon fluids, soil, and groundwater purge water). At the end of the project, all drums are to be consolidated to one location at the southwest corner of the former Cleaners facility.
9. Approximate start and completion date of the project is January/February 2024.
Specific:
The site location:
The former Imperial Cleaners is located in Oakland Park at 1500 East Commercial Boulevard in Fort Lauderdale, Broward County, Florida. The former Imperial Cleaners was located within a single building which is located at the southeast corner of East Commercial Boulevard and Northeast 15th Avenue.
The property was originally developed in 1964.
The former Imperial Cleaners was accepted into the Drycleaning Solvent Cleanup Program in 1996 under FDEP Facility Identification Number 069500959 (now listed as ERIC_4106). The work is being performed for the FDEP Waste Cleanup Section.
Based on historical research, the drycleaning business opened in 1980 and operated as a PCE drycleaning facility for approximately 35 years.
All the proposed drilling locations are offsite within a neighborhood, and in ROW of residential homes (See Attached Map). Since the sampling areas are remote, all materials, water and electricity must be provided by the driller and transported to the sample location. A decontamination area can be set up at the former Imperial Cleaners property for cleaning tools and equipment. All IDW must be captured and transported back to the Imperial property for storage, characterization and future removal.
Scope-of-Work: For bidding purposes, please consider the following scope of work for the site:
1. Offsite DPT Groundwater Sampling:
a. Six (6) outdoor DPT groundwater locations are proposed within the adjacent residential neighborhood to the south of the former cleaners. Three (3) screen point groundwater samples will be collected from each location from depths of 10, 25, and 40 ft bls for the collection of a groundwater samples.
b. Upon completion of sampling, all DPT groundwater sampling locations will be properly abandoned by tremie-grouting the hole under pressure from the bottom up.
c. Please include all equipment and supplies, pumps, tubing, foot valves, connectors and miscellaneous materials necessary for the collection of the groundwater samples. Sample containers will be provided by the laboratory.
d. The proposed locations for the DPT groundwater sampling are shown in the attached figure.
Please call Gregg Roberts at (863) 670-0215 should you have any questions.
Provide the following:
1. All bidders please include the make and model of the rig intended to perform this scope-of-work.
2. Note that the actual construction and depth of the shallow wells will be dependent on the depth to shallow groundwater determined in the field.
3. Also note that all IDW will need to be consolidated to a designated area in the vicinity of the
Cleaners for future characterization, removal and disposal.
3. All bidders please include an estimated number of drums in their bid.
4. All bidders please include an estimated time required to complete the scope at the site.
5. Please provide an all-inclusive price quote by close of business Monday, October 28, 2022, if possible.
SECTION 4
This request for proposal does not constitute a commitment on the part of APTIM, Offeror's proposal shall in no way be binding upon APTIM unless and until it is accepted in writing. APTIM reserves the right to reject any and/or all proposals received, and to negotiate separately with any offeror if such action is considered to be in the best interest of APTIM. APTIM shall not be liable to Offeror for any costs incurred by Offeror in the submission of its proposal in reply hereto. Offerors are cautioned to initially submit their most favorable proposal price and other factors considered. The possibility exists that APTIM may award a Purchase Order without holding discussion with any Offeror prior to award.
APTIM reserves the right to consider for award any alternate proposal if it appears to be in the best interest of APTIM. An alternate proposal providing for technical improvements and/or cost reduction considerations may be submitted. Any alternate proposal must be separately packaged and clearly marked Alternate Proposal.
Deviations and/or assumptions pursuant to the requirements stated herein shall be accompanied by rationale and explanation and clearly identified. APTIM will, if no deviations and/or assumptions are submitted, assume full compliance to the requirements set forth herein. Award will be made to that proposal determined to be most advantageous to APTIM and as a result the award may be made to other than the Offeror with the lowest proposed price. Any Purchase Order resulting from this RFQ shall be subject to the Terms and Conditions as stated below:
SECTION 5
The selected subcontractor by signing a purchase order will agree to perform the approved scope of work at the approved costs. Any changes to the scope of work or cost must be approved in writing by APTIM prior to the completion of the project. Subcontractor must notify APTIM immediately either verbally or in writing once a change in scope is identified.
No first tier contractor or vendor awarded work under this purchase order shall further subcontract, assign, or transfer any work that costs $2,500 or more without the prior written consent of APTIM. Violations of this provision shall result in forfeiture of payment for the associated work.
The contractor represents it services and installations shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professionals under similar circumstances at the time of services are performed and that the services meet the requirements as required by State statute.
The contractor agrees to be responsible for the fulfillment of all work elements included in any subcontract consented to by APTIM and agrees to be responsible for the payment of all monies due under any subcontract in accordance with Section 287.0585, F.S. It is understood and agreed by the contractor that APTIM shall not be liable to any subcontractor or vendor for any expenses or liabilities incurred under the subcontract and that the contractor shall be solely liable to the subcontractor or vendor for all expenses and liabilities incurred under the subcontract.
This purchase order does not relieve the contractor or vendor from liability for harm or injury to human health or welfare, animal or plant life, or property, caused by its activities or from penalties.
This work is being performed by the State of Florida's Hazardous Waste Cleanup Program and as such, the State of Florida's performance and obligation to pay for services under a Work Order to the Prime Contractor (APTIM) is contingent upon appropriations by the Legislature in effect at the time of execution.
Authorization for continuation and completion of this work and payment may be rescinded with proper notice at the discretion of APTIM if Legislative appropriations are reduced.
If the contractor fails to perform the required scope of work, fails to perform the work in a satisfactory manner, or makes misrepresentations to APTIM, then payment for that work will be forfeited.
SECTION 6
A. Terms of Payment: Net 45 days B. Terms and Conditions:
APTIM Work Agreement
Client flow downs as applicable
Should you have any questions please call Gregg Roberts at 813-612-3687.
Attachments: Figure
L O
C A
L L
A N
D U
S E
M A
P
SECTION 7
DPT Drilling Services DPT Groundwater Sampling
Imperial Cleaners 1500 East Commercial Boulevard
Fort Lauderdale, Florida 33334 Site ID ERIC_4106 (Former FAC ID No. 069500959)
Mobilization (Offsite DPT GW Sampling):
Make and Model of Rig =
1. Number of days to complete DPT GW Sampling work scope including mobe/demobe -
2. Estimated number of Drums:
Lump Sum Price Quotation for DPT Scope of Work :____________/Lump
(Please also provide Price Estimate Spreadsheet with Company Letterhead)
Proposal valid of 120 days
Terms and Conditions in accordance with APTIM�s RFQ
Signed:___________________________________
Name:____________________________________
Title:____________________________________
Company:________________________________
Date:____________________________________
DATE: 10/24/2024
ESTIMATE #: 1024033
ID QTY Unit Rate TOTAL
1 1 each 1,200.00$ 1,200.00$
2 1 night 300.00$ 300.00$
3 1 day 1,750.00$ 1,750.00$
4 1 1/2 day 1,250.00$ 1,250.00$
5 18 each 3.00$ 54.00$
6 2 foot 120.00$ 240.00$
6 6 each 20.00$ 120.00$
7 New Drums (Soil) (Estimated) 1 each 95.00$ 95.00$
8 New Drums (Water) (Estimated) 2 each 95.00$ 190.00$
9 Permit: (Broward County - Not Applicable) -$
Completion: 1.5 Days Subtotal 5,199.00$
Todd Hodgson Todd Hodgson TOTAL 5,199.00$ Partner
Mobilization
THANK YOU FOR YOUR BUSINESS!
Actual quantities used and days on site will be invoiced
DPT Rig and Crew
Materials: HDPE Tubing (per 500' roll)
Materials: GW Sampling Points
Materials: Borehole Grouting and Rake Level
***Utility Locates on Private Property are the responsibility of the client*** Borehole Clearance to 5’ bgs beyond 20 minutes will require a change order for additional time and cost.
Well Locations must be accessible by track mounted DPT Rig
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com.
Per Diem - 2 Man Crew Est. (Min. Hotel Cost + $50/per man)
DESCRIPTION
***Damage to utilities on private property are the responsibility of the client***
DPT Rig and Crew
PROJECT
Imperial Cleaners 1500 E Commercial Blvd.
CUSTOMER
Gregg Roberts, P. G.
APTIM
Fort Lauderdale, Broward County, Florida
GWP Not Responsible for Any Damage to Grass in Residential Areas
DPT GW Sampling
725 US Hwy 301 South
(813) 612-3687
Project Description:
Tampa, Florida 33619
Drum IDW
(6) DPT Borings to 40' w/GW Grabs at 3 Intervals (6-10', 21-25' and 36-40'). Grout Borehole/Rake Level (In Grass)
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
SECTION 7
DPT Drilling Services DPT Groundwater Sampling
Imperial Cleaners 1500 East Commercial Boulevard
Fort Lauderdale, Florida 33334 Site ID ERIC_4106 (Former FAC ID No. 069500959)
Mobilization (Offsite DPT GW Sampling):
Make and Model of Rig =
1. Number of days to complete DPT GW Sampling work scope including mobe/demobe -
2. Estimated number of Drums:
Lump Sum Price Quotation for DPT Scope of Work :____________/Lump
(Please also provide Price Estimate Spreadsheet with Company Letterhead)
Proposal valid of 120 days
Terms and Conditions in accordance with APTIM�s RFQ
Signed:___________________________________
Name:____________________________________
Title:____________________________________
Company:________________________________
Date:____________________________________
Geoprobe 7822Dt or 7730DT approx. 3 days
3 drums
$8,340.00
Marcelo Reis
V.P.
ATI Companies / Ambient Technologies Inc
10/28/2024
Contractor: Aptim Proposal No.: 22410026
Contact Name: Gregg Roberts Contact Phone: 813 612-3687 Date: 10/25/2024
Contact Email: gregg.roberts@aptim.com Site Address: FDEP ID#: ERIC 4106
PROPOSED SCOPE OF WORK: Estimator: MR
Direct Push Rig - (maximum 10 hours) whole day $1,680.00 3 $5,040.00
Direct Push Rig Half-Day Rate 1 - (maximum 5 hours) half day $1,480.00 $0.00
Open, Plug/resurface borehole- SB/GW each $80.00 6 $480.00
Borehole clearance using geophysics (GPR and Electronics) Day
Vac/soft dig for borehole clearance Day
Mobilization (one rig) Miles round trip: 320 round trip $850.00 1 $850.00
Daily travel- Automatic when travel distances are 100 to 150 miles round trip day $65.00 $0.00
Per Diem - Automatic when field work is longer than 9hr/day or round trip over 150 miles per crew/night $480.00 3 $1,440.00
DOT Approved 55-gal Drum - SOIL each $70.00 3 $210.00
Special Order Closed Top Drums- WATER each $95.00 $0.00
Permits 2 (Drilling only; cost according to WMD & Local Municipalities) each $0.00
Pre-drilling on site meeting- LS
Pre-drilling conference call- 30 minutes LS included
Extra hour rate 5 hour $275.00 $0.00
Use of a concrete saw or concrete core bit -To open asphalt or concrete for SB/MW LS $320.00 1 $320.00
TOTAL QUOTE PRICE $8,340.00
NOTES: This proposal is only valid for this specific scope of work. Any changes, prices shall be revised. Actual field days, materials and hours will be invoiced
Days to Complete Scope of Work: approx. 3 day(s) (depends on access, client sampling time or other restrictions) "
Subcontractor Company Name: ATI Companies, LLC
Subcontractor Mailing Address: 5709 1st Avenue South, St. Petersburg FL 33707
Signature:___________________________ Reviewer:____________________________ Date: 10/25/2024
NOTE: to schedule work, contact 727-328-0268 Bid Valid for 90 Days
Payment terms: Net 60 days
This proposal acceptance includes ATI's standard Terms and Conditions
Name of Firm:__________________________________________________ Date: ______________
Signature of Representative: _________________________________________
Print name of signing Representative:________________________________
1500 E Commerce Blvd, Ft Lauderdale, FL
If pea gravel is encountered, drilling must stop. No drilling on pea gravel is permitted.
Client is responsible for any ROW or access permits and MOT for the work to be performed, if needed.
Is also client responsability to have all utilities located when on Private Property. If not, any damages on utilities and other structures related to drilling activities will be client responsability.
TD.
---- Per Aptim requirement, have a stand alone coring machine on site ----
SAFETY
DRILLING DOUBLE CASED WELL
ABANDONMENT
DRILLING ACTIVITIES
NOTE: This proposal needs to be signed once job is awarded to ATI Companies, LLC
6. A perdiem will automatically be charged when field work is longer than 9hr/day or round trip over 150 miles
1. Includes expendables, tubing, points, liners, caps, plugs, sawcuts, steam cleaning decon, well development, and grouting.
MISCELLANEOUS
2. Well Permits -Requires 5 days Notice to Water Management District - Actual cost only.
3. Utility Clearance - Requires 72 Hour Notice Prior to Drilling. ATI will complete notification to Sunshine State One Call (Sunshine) prior to initiating drilling.
Sunshine will not perform locates on private property (only right of ways and easements). It is the client and/or owners responsibility to provide information from private property. Damage repairs (time and materials) caused to any underground utilities on private property is client responsibility. ATI will review information provided regarding underground utilities to confirm clearance at boring locations. As another safety precaution, ATI will perform hand clear to approximately 5 feet below ground surface to check for utilities prior to drilling. If the client anticipates the potential for multiple utilities underground but has no information on location, we can provide private utility locating services at an additional cost. Please advise us of your needs prior to date of drilling.
4. Price assumes no rock will be encountered in the depth of penetration.
5. DPT Daily and Half-Day Rate: Hours over Half-day and Full Day Rate - $275 / hour
HORIZONTAL WELLS
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 10/31/24 FAC ID#: ERIC_4106
Unit Unit Rate Number of Units
Extended Price whole day $1,975.00 2 3,950.00$ half day $1,475.00 -$ per foot $25.00 -$ each $110.00 -$ each $50.00 -$ each $35.00 -$ per well $125.00 -$ roundtrip $950.00 1 950.00$ per crew / per night $575.00 1 575.00$ each $75.00 -$ each $125.00 5 625.00$ per day $150.00 2 300.00$ each $75.00 -$ lump sum $350.00 1 350.00$ per day $100.00 2 200.00$ lump sum $25.00 1 25.00$
TOTAL QUOTE PRICE $6,975.00
Notes: 1. Includes saw…