CN-370000-HW689-DC30ACO1.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW689|a751b87398beb5bfc7861f19a403533e
Contract number
HW689
Issued by
Florida

About this file

This document is a Task Assignment Change Order (TACO) #1 issued by the State of Florida Department of Environmental Protection (FDEP) to APTIM Environmental & Infrastructure, LLC for environmental assessment services at Care Cleaners of Jacksonville, Inc., located at 8011-1 Merrill Road in Jacksonville, Duval County, Florida. The task assignment number is DC030A, with FDEP Project Manager Nicole Knutson and contractor Project Manager Eric Kramer serving as the primary contacts. The change order reconciles three previously approved Work Change Directives (WCDs #1, #2, and #3) related to unforeseen field conditions and additional analytical work required during the initial site assessment phase.

The amended total task value increased from $102,782.76 to $106,876.86, representing an increase of $4,094.10. The scope of work encompasses project management, MAGS vapor well installation and soil sampling, direct push technology groundwater sampling, monitoring well installations, site assessment reporting, PFAS groundwater sampling, and equipment inspection services. Deliverables include field notes packages with boring logs and analytical reports (due 07/31/2025 and 08/29/2025) and a comprehensive Site Assessment Report with PFAS sampling results (due 11/07/2025). Invoice payments are structured upon FDEP approval of each deliverable, with amounts of $43,584.08, $25,586.42, and $37,706.36 corresponding to the three major deliverable milestones. The task completion date remains January 16, 2026, and all costs are on a fixed-price basis under contract HW689.

View the file

Other files

File Type Posted
CN-370000-HW689-BF01A.pdf.crdownload CRDOWNLOAD file
CN-370000-HW689-BF01D.pdf PDF
CN-370000-HW689-BIL01G.pdf PDF
CN-370000-HW689-BIL1BCO1.pdf PDF
CN-370000-HW689-BIL1BCO3.pdf PDF
CN-370000-HW689-DC001A.pdf PDF
CN-370000-HW689-DC001B.pdf PDF
CN-370000-HW689-DC001C.pdf PDF
CN-370000-HW689-DC001D.pdf PDF
CN-370000-HW689-DC002A.pdf PDF
CN-370000-HW689-DC003B.pdf PDF
CN-370000-HW689-DC004A.pdf PDF
CN-370000-HW689-DC004B.pdf PDF
CN-370000-HW689-DC005C.pdf PDF
CN-370000-HW689-DC006A.pdf PDF
CN-370000-HW689-DC008B.pdf PDF
CN-370000-HW689-DC010B.pdf PDF
CN-370000-HW689-DC011B.pdf PDF
CN-370000-HW689-DC011D.pdf PDF
CN-370000-HW689-DC012A.pdf PDF
CN-370000-HW689-DC013B.pdf PDF
CN-370000-HW689-DC014B.pdf PDF
CN-370000-HW689-DC015E.pdf PDF
CN-370000-HW689-DC019A.pdf PDF
CN-370000-HW689-DC019B.pdf PDF
CN-370000-HW689-DC024A.pdf PDF
CN-370000-HW689-DC025A.pdf PDF
CN-370000-HW689-DC028A.pdf PDF
CN-370000-HW689-DC029A.pdf PDF
CN-370000-HW689-DC02ACO1.pdf PDF
CN-370000-HW689-DC031A.pdf PDF
CN-370000-HW689-DC034A.pdf PDF
CN-370000-HW689-DC035A.pdf PDF
CN-370000-HW689-DC037A.pdf PDF
CN-370000-HW689-DC03ACO1.pdf PDF
CN-370000-HW689-DC03ACO2.pdf PDF
CN-370000-HW689-DC03CC01.pdf PDF
CN-370000-HW689-DC03DCO1.pdf PDF
CN-370000-HW689-DC05CCO1.pdf PDF
CN-370000-HW689-DC05DCO1.pdf PDF
CN-370000-HW689-DC08CCO1.pdf PDF
CN-370000-HW689-DC08CCO2.pdf PDF
CN-370000-HW689-DC08CCO3.pdf PDF
CN-370000-HW689-DC11CCO5.pdf PDF
CN-370000-HW689-DC11CCO6.pdf PDF
CN-370000-HW689-DC12BCO4.pdf PDF
CN-370000-HW689-DC13BCO2.pdf PDF
CN-370000-HW689-DC13BCO4.pdf PDF
CN-370000-HW689-DC13BCO7.pdf PDF
CN-370000-HW689-DC16CCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC030A 1 HW689

Nicole Knutson 850-245-8763 Contractor APTIM Environmental & Infrastructure Contractor

Contractor Eric Kramer Contractor 407-287-3216

ERIC_4516

Care Cleaners of Jacksonville, Inc.

✔ $ 106,876.86 $ 102,782.76

$ 106,876.86 $ 102,782.76 ✔ Completion

Completion 01/16/2026 01/16/2026 0

✔ 1 1 1

Contractor

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.08.19 08:00:28 -04'00' Tim Bahr Digitally signed by Tim Bahr

Date: 2025.08.18 14:28:14 -04'00'

This Change Order reconciles WCDs 1, 2, and 3 for Care Cleaners of Jacksonville.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW689

DC030A

$ 106,876.86

Subtasks 2 & 7: MAGS and Soil Sampling Field Notes Package, including boring logs and analytical report

Subtask 3: DPT Groundwater Sampling Field Notes Package, including drilling logs, analytical report, and email summary with recommendations

Subtasks 4, 5, 6, & 1: Site Assessment Report, including PFAS sampling results and recommendations & PM

Upon DEP approval of Subtasks 2 & 7: MAGS and Soil Sampling Field Notes Package, including boring logs and analytical report

Upon DEP approval of Subtasks 4, 5, 6, & 1: Site Assessment Report, including PFAS sampling results and recommendations & PM

Upon DEP approval of Subtask 3: DPT Groundwater Sampling Field Notes Package, including drilling logs, analytical report, and email summary with recommendations

07/31/2025

08/29/2025

11/07/2025

$ 25,586.42

$ 43,584.08

$ 37,706.36

Memorandum

TO: ERIC_4516

Care Cleaners of Jacksonville, Inc.

FROM: Nicole Knutson, Project Manager

SUBJECT: Negotiation Summary

HW689 DC030A-1

DATE: August 15, 2025

This Change Order reconciles WCDs 1, 2, and 3 for Care Cleaners of Jacksonville. WCD #1 was approved for additional hours to complete the MAGS testing and soil sampling during the Subtask 2 field activities at the Care Cleaners. Subtask 2 also resolves WCD #2 which was approved for the SPLP extraction and analysis of three (3) soil samples based on the total analytical results, which exceeded the Soil Cleanup Target Level (SCTL) for leachability. WCD #3 was approved for an additional site visit to oversee a drycleaning technician with OEM Laundry troubleshoot issues associated with equipment malfunctions, which the operator claims is a result of the assessment activities within the store.

Total task amount has increased from $102,782.76 to $106,876.86. The difference between the revised cost and the original cost is $4,094.10. APTIM’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date remains November 7, 2025. Task completion date remains January 16, 2025.

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

A pt im E nv iro nm en ta l &

In fra st ru ct ur e, L

LC

D at e:

8/

/2

Ta sk

H W

D C

0A

T A

C O

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

6- A dd iti on al

P

FA

S S am pl in g

R ep or tin g

S ite

C ar e

C le an er s of

J ac ks on vi lle

E R

IC

_4

S ub

Ta sk

2-

S ite

M ee tin g, M A

G S

/S oi l, In te rio r W el l S ub Ta sk

7- W

C D

A ct iv ity

/P ha se

S A

R S ub Ta sk

3- D

P T an d

G ro un dw at er

F ie ld A ct iv iti es

S ub

Ta sk

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Fi na l W el l I ns ta lla tio ns S ub Ta sk

S ub

Ta sk

5-

R ep or tin g S ub Ta sk

T To ta ls

La bo r

R at e C at eg or y

$7 3.

P P ro je ct M an ag er

E . K ra m er

.5

$7 3.

En gi ne er /S ci en tis t 5

E . K ra m er

$6

8.

En gi ne er

/S ci en tis t 5 G

. R ob er ts

$6 5.

En gi ne er /S ci en tis t 4

S . F ly nn

$3 7.

En gi ne er /S ci en tis t 3

K . H ow ar d

$3

7.

En gi ne er

/S ci en tis t 2 K

. M cD on al d

$3

1.

En gi ne er

/S ci en tis t 2 D

. M cC on na ug

$2

5.

En gi ne er

/S ci en tis t 1 K

. R an ck

$2

6.

En gi ne er

/S ci en tis t 1 B

. B lo un t

$2

8.

En gi ne er

/S ci en tis t 1 N

. J en ni ng s

$3

3.

En gi ne er

S ci en tis t 1 R

. L in ds ay

$2 6.

En gi ne er S ci en tis t 1

K . G ar tla nd

$3

2.

En gi ne er in g

Te ch ni ci an

B . S ki pp er

$2

4.

En gi ne er in g

Te ch ni ci an

C . R ar do n

$4

4.

G eo sp at ia l A na lys t 3 H

. V ol lm er

$3 5.

D es ig ne r 2

S . F er ia nc

$3

0.

Te ch ni ca l P ub lic at io ns

S pe ci al is t 3

H . V in in g

$2

8.

Te ch ni ca l P ub lic at io ns

S pe ci al is t 3

L.

H ou se r

$0

.0

To ta l H ou rs

D ire ct L ab or

$2

0, 0.

$2 ,3

.0

$7

,1

.6

$2 ,4

.6

$1

,9

.5

$5 ,5

.1

$5

.8

$5

.5

$0

.0

$0 .0

$0

.0

O ve rh ea d

.5 8%

$1 7, 9.

$2

,0

.1

$6 ,1

.4

$2

,1

.9

$1 ,7

.0

$4

,7

.2

$4

.6

$4

.2

$0 .0

$0

.0

$0 .0

G en

A dm in

.3 8%

$4 ,0

.9

$4

.8

$1

,3

.3

$4

.4

$3

.3

$1 ,0

.6

$1

.2

$1

.1

$0

.0

$0 .0

$0

.0

Fr in ge

.9 6%

$6 ,6

.2

$7

.0

$2

,3

.0

$7

.5

$6

.1

$1 ,7

.6

$1

.5

$1

.3

$0

.0

$0 .0

$0

.0

To ta l L

$4 8, 2.

$5

,6

.9

$1 7, 7.

$5

,8

.6

$4 ,7

.0

$1

3, 5.

$1 ,2

.1

$1

,2

.3

$0 .0

$0

.0

$0 .0

Tr av el V eh ic le R en ta l $2

,2

.0

$1 ,2

.0

$4

.0

$4

.0

$0

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$2 ,2

.6

$1

,5

.6

$4

.0

$3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$4 ,5

.6

$2

,7

.6

$9

.0

$7

.0

$0 .0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m en t)

W el l M at er ia ls

$9

.8

$9

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$9

.8

$9

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$9 1.

$9

1.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$1 ,0

.8

$1

,0

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$1 7, 2.

$0

.0

$1 2, 7.

$5

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pa ge

Pa ge

C O

ST

E

ST

IM

A

TE

C on tra ct or

A pt im E nv iro nm en ta l &

In fra st ru ct ur e, /2

H W

D C

0A

T A

C O

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

6- A dd iti on al

P

FA

S S am pl in g

R ep or tin g

S ite

C ar e

C le an er s of

J ac ks on vi lle

E R

IC

_4

S ub

Ta sk

2-

S ite

M ee tin g, M A

G S

/S oi l, In te rio r W el l S ub Ta sk

7- W

C D

A ct iv ity

/P ha se

S A

R S ub Ta sk

3- D

P T an d

G ro un dw at er

F ie ld A ct iv iti es

S ub

Ta sk

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Fi na l W el l I ns ta lla tio ns S ub Ta sk

S ub

Ta sk

5-

R ep or tin g S ub Ta sk

TTo ta ls

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $4

,9

.0

$4 ,9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $9

.0

$0

.0

$0 .0

$9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $7

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O

E M

L au nd ry

$5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$2 5, 7.

$5

,7

.0

$1 2, 7.

$6

,6

.0

$0 .0

$0

.0

$5

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$2 ,5

.7

$5

.5

$1

,2

.7

$6

.5

$0 .0

$0

.0

$5 0.

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$ $2 7, 0.

$6

,3

.5

$1 3, 4.

$7

,2

.5

$0 .0

$0

.0

$5

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

A na ly tic al

C os ts $1

3, 8.

$9 ,4

.0

$3

,3

.0

$1 ,1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$1 3, 8.

$9

,4

.0

$3 ,3

.0

$1

,1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en se s

P so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $6

.0

$3

.0

$1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $1

,0

.0

$0 .0

$3

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$3 ,7

.0

$2

,6

.0

$8

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$3

.0

$2

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $5

,7

.0

$3 ,1

.0

$1

,4

.0

$1 ,2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $1

,9

.6

$5

,6

.9

$3 9, 4.

$2

5, 0.

$1 5, 3.

$1

3, 5.

$1 ,2

.1

$1

,9

.3

$0 .0

$0

.0

$0 .0

C om pl et io n Fe e $4

,8

.2

$5

.4

$1 ,7

.7

$5

.0

$4

.3

$1

,3

.5

$1

.6

$1

.5

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

$1

,8

.8

$6 ,1

.3

$4

1, 0.

$2 5, 6.

$1

5, 5.

$1 4, 8.

$1

,4

.8

$2 ,0

.8

$0

.0

$0 .0

$0

.0

C os t f ro m P rio r C

E F:

$1

,7

.7

M an ua l E nt ry

C os t f ro m D el ta

C E

F;

$4

,0

.0

M an ua l E nt ry

C os t ( P rio r +

D el ta

$1

,8

.8

Au to

-C al cu la te d

R ou nd in g E rr or

$0

.0

Au to

-C al cu la te d

Fi na l T ot al C os t:

$1

,8

.8

Au to

-C al cu la te d

Pa ge

Pa

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : Care Cleaners of Jacksonville

SUBTASK:

DATE: August 13, 2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2

Engineer/Scientist 5 G. Roberts 8

Engineer/Scientist 4 S. Flynn 12

Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 2 D. McConnaughe

Engineer/Scientist 1 K. Ranck 35

Engineer/Scientist 1 B. Blount 69

Engineer/Scientist 1 N. Jennings

Engineer Scientist 1 R. Lindsay 47

Engineer Scientist 1 K. Gartland Engineering Technician 3 B. Skipper

Engineering Technician 1 C. Rardon 56

Designer 2 S. Ferianc Technical Publications Speciali H. Vining Technical Publications Speciali L. Houser 3

TOTAL LABOR 232

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 6 $720.00 Van or Truck $480.00 Week 1 $480.00

TOTAL VEHICLE $1,200.00

PER DIEM STAFF DESCRIPTION RATE UNIT USEAGE ACTUAL TOTALS

Hotel 2 MAGS/Soil Blount, Ranck $124.85 Day 1 $249.70 $249.70 Hotel 2 MAGS Lindsay, Ranck $124.85 Day 1 $249.70 $249.70 Hotel 2 Add Soil Blount, Ranck $124.85 Day 1 $249.70 $249.70 Hotel 1 MAGS/Soil Blount $124.85 Day 1 $124.85 $124.85 Hotel 1 MAGS/Soil Lindsay $124.85 Day 2 $249.70 $249.70 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 3 $90.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 9 $324.00

TOTAL PER DIEM $1,537.65

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE ACTUAL TOTALS

Survtech Solutions Survey and Benchmark Placement $4,995.00 LS 1 $4,995.00 $4,995.00 GeoTek Utility Locate Services $750.00 LS 1 $750.00 $750.00 Hole Products MAGS Well Supplies (Casing, Screen, Sand) $919.84 LS 1 $919.84 $919.84

TOTAL $6,664.84

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 7 0 $1,400.00 EPA Method 8260 (Full List) Soil $110.00 69 0 $7,590.00 EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 3 0 Contingency $165.00 EPA Method 8260 (VOHs) Leachate $73.00 3 0 Contingency $219.00 EPA Method 8260 (Full List) Well $110.00 1 0 $110.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $9,484.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 9 $360.00 Soil Sampling Kit (concrete) $235.00 Day 4 $940.00 MAGS Investigation Kit $500.00 Day 1 $500.00 Tedlar Bags $20.00 bag 4 (3 Included w/Kit) $80.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 69 $1,104.00 55 Gallon Drums $100.00 each 2 $200.00

TOTAL EQUIPMENT $3,184.00

2-SiteMeeting, MAGS/Soil, Interior Well

MAGS Analytical Data and Graph Reviews for Reporting to FDEP (2 hrs)

Research and Discuss with Clean Vapor the Sub-Slab system operation and access to deactivate during Assessment (2 hrs), Summarize MAGS and MAGS Soil Data for Preliminary Reporting to FDEP (3 hrs). Compilation of Field Soil Analytical Data, Preparation of Soil Summary Maps for FDEP (3 hrs), Onsite Meeting with Property Owner/Property Manager/Maintenance Technician and Tenant and perform Utility White-lines for Markouts including travel (9 hrs), Site Work Notifications (1 hr), Submit Sunshine One Markout Requests (2 hrs)

MAGS Testing Mobilization and Equipment Preparation (2 hrs), Travel Round Trip for MAGS Well Installations (6 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Installation and Construction of 7 MAGS Testing Wells, including coring (7 hrs), Installation of 2 Vapor Monitoring Point Locations, including coring (2 hrs), Perform MAGS Tests at 7 locations and collection of 7 Vapor Samples (12 hrs), Surface and Site Restoration (2 hrs). Delivery of Vapor Samples to Laboratory (1 hrs). WCD #2 Additional time needed for MAGS crew to mitigate the sub-slab depresurizing system (SSDS). Difficulty in coring of MAGS wells and soil borings due to subsurface obstacles, lithology and slab thickness required additional labor hours (14 hrs)

MAGS Testing Mobilization and Equipment Preparation (1 hrs), Round Trip Travel for MAGS Testing with Equipment (5 hrs), Perform MAGS Tests at 7 locations and collection of 7 Vapor Samples (12 hrs), Surface and Site Restoration, Equipment Demobilization (3 hrs) Additional time needed for MAGS crew to mitigate the sub-slab depresurizing system (SSDS). Difficulty in coring of MAGS wells and soil borings due to subsurface obstacles, lithology and slab thickness required additional labor hours (14 hrs)

Onsite Meeting with Property Owner/Property Manager/Maintenance Technician and Tenant and perform Utility White-lines for Markouts including travel (8 hrs), Oversight of GPR Utility Subcontract Survey including travel (9 hrs), MAGS Testing and Soil Sampling Mobilization and Field Event Preparation (2 hrs), Round Trip Travel for two days to site for MAGS Soil Sampling and MAGS well Installations (8 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Advancement of 7 MAGS Soil Borings for the collection of 28 soil samples at depths of 6", 2', 4', 6' (8 hrs), Assistance with Installation and Construction of 7 MAGS Testing Wells (4 hrs), Assistance with Installation of two Vapor Monitoring Point Locations, including coring (2 hrs), Install and sample one groundwater monitor well and set 5-inch diameter manhole into slab for access to the well (2 hrs). Preparation of Soil Boring Logs and MAGS Well Construction Logs (3 hrs). Remaining Soil Sampling Field Event Preparation and Mobilization (2 hrs), Round Trip Travel to site (4 hrs), Collect Remaining Soil Samples at 11 locations including, Coring, Collection of 44 Soil Samples (16 hrs).

Note: Air Analysis by TO-15, Soil Samples by VOCs by EPA Method 8260 (Full List)

MAGS Testing and Soil Sampling Mobilization and Field Event Preparation (2 hrs), Round Trip Travel for two days to site for MAGS Soil Sampling and MAGS well Installations (8 hrs), Attend Onsite H&S and Scoping meeting (1 hr), Assist with collection of 7 MAGS Soil Borings for the collection of 28 soil samples at depths of 6", 2', 4', 6' (8 hrs), Assistance with Installation and Construction of 7 MAGS Testing Wells (4 hrs), Assistance with Installation of two Vapor Monitoring Points (2 hr), core concrete and install, using a hand auger, one groundwater monitor well as deep as possible, construct a 5-inch manhole into the floor slab for access to the well (3 hrs). MAGS Soil Sample Delivery to Laboratory (1 hr). Travel to site (4 hrs), Collect Remaining Soil Samples at 11 locations, Coring, Collection of 44 Soil Samples (16 hrs), Daily delivery of Soil Samples to Laboratory (2 hrs), Site Restoration (2 hrs), Drum Handling and Demobilization (3 hrs)

Preparation of Site Specific Health and Safety Plan (3 hrs)

2-Total Page 3 of 10 HW689 DC030A TACO #1 (002)

SUBTASK:

DATE: April 15, 2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts 2

Engineer/Scientist 4 S. Flynn 7

Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 B. Blount 60

Engineer/Scientist 1 N. Jennings 11

Engineer Scientist 1 R. Lindsay Designer 2 S. Ferianc Technical Publications SpecialisH. Vining Technical Publications SpecialisL. Houser

TOTAL LABOR 80

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 1 Blount $150.00 Day 3 $450.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $450.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

GW Protection DPT Drilling $12,277.00 Lump 1 $12,277.00

TOTAL $12,277.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Full List) DPT Groundwater $110.00 27 0 $2,970.00 EPA Method 8260 (Full List) Wells/Piezometers $110.00 3 0 $330.00 EPA Method 8260 (Full List) IDW $110.00 0 0 $0.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Solid $55.00 0 0 $0.00 EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals)-Solid $45.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $3,300.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 4 $160.00 Monitor Well Installation Kit $325.00 Day 1 $325.00 Total Survey Station $50.00 Day 1 $50.00 Shallow GW Sampling Kit $290.00 Day 3 $870.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $1,405.00

DPT Drilling Field Event Preparation and Mobilization (2 hrs), Travel to Site (5 hrs), Installation of two DPT Macrocore to 60 ft bls, installation of 3 Piezometers, DPT Groundwater Sampling at 9 locations (38 hrs), Survey Piezometers and measure DTWs (2 hrs), Daily DPT Groundwater Sample Chain of Custody preparation, Sample Packaging (3 hrs), Preparation of Soil Boring and Well Construction Logs (4 hrs), Preparation of Summary Tables and Figures of Groundwater Sampling Results for Preliminary Reporting to FDEP (6 hrs).

Travel to site, collection of Groundwater Sampling from Piezometrs, Assistance with Survey (10 hrs), Delivery of samples to laboratory (1 hr).

Groundwater Samples by VOCs by EPA Method 8260 (Full List)

3-DPT and Groundwater Field Activities

Finalize Proposed DPT Locations (1 hr), Finalize Proposed Piezometer Locations (1 hr).

Contacting Property Owner, Property Manager, Maintenance Technician, Tenant of Proposed Sampling Schedule and Confirming Access (1 hr), Preparation and Review of Cross Section from DPT Cores for Recommendations of Proposed GW Sampling Depths with FDEP (3 hrs), Calculation of Well and Watertable Elevations for Flow Direction and Preparartion of Map (2 hrs.), Prepare Map of Final Proposed DPT Locations (1 hr).

3-DPT & GW Sampling Page 3 of 6 Copy of Proposal Care Cleaners DC-TBD rev 4-16-25

SUBTASK:

DATE: April 15, 2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts 4

Engineer/Scientist 4 S. Flynn 6

Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 B. Blount 40

Engineer/Scientist 1 N. Jennings 10

Engineer Scientist 1 R. Lindsay Designer 2 S. Ferianc Technical Publications SpecialisH. Vining Technical Publications SpecialisL. Houser

TOTAL LABOR 60

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 4 $480.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 1 Blount $150.00 Day 2 Well Install $300.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $300.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

GW Protection Well Installations $5,675.00 LS 1 $5,675.00 Erwin Remediation IDW T&D Soil IDW Drums $110.00 LS 4 $440.00 Erwin Remediation IDW T&D Liquid IDW Drums $125.00 LS 4 $500.00

TOTAL $6,615.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Full List) Wells $110.00 7 0 $770.00 EPA Method 8260 (Full List) IDW $110.00 2 0 $220.00 EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 2 0 $104.00 EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $55.00 1 0 $55.00 EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 1 0 $45.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $1,194.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 3 $120.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 2 $650.00 Total Survey Station $50.00 Day 1 $50.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 1 $100.00

TOTAL EQUIPMENT $1,210.00

Groundwater Samples by VOCs by EPA Method 8260 (Full List)

4-Final Well Installations

Property Owner, Property Manager, Tenant Site Work Notifications (2 hrs), Development of Sunshine Markout Request (1 hr), Prepare Proposed Well Location Maps and Recommendations (3 hrs), Prepare, Edit and Submit Proposed Well Location Maps and Recommendations to FDEP for Review (2 hrs), Characterization and Waste Profile for Transportation and Disposal of IDW Drums (2 hours).

Whiteline Final Well Locations for Markouts including travel (8 hrs), Installation of final well network of 3 shallow/1 deep, including Travel (18 hrs). Collection of Final Groundwater Samples from 7 wells with Travel and Survey Wells (10 hrs), Deliver final samples to laboratory (2 hrs), Preparation of Well Construction Logs (2 hrs).

Assist with Collection of Final Groundwater Samples from 7 wells, with Travel, Assist with Survey Wells, Site Restoration and IDW Samples, Drum Handling (10 hrs)

4-Final Well Installations Page 4 of 6 Copy of Proposal Care Cleaners DC-TBD rev 4-16-25

SITE :

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 4 S. Flynn

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 B. Blount Engineer/Scientist 1 Engineer Scientist 1 R. Lindsay

Designer 2 S. Ferianc

Technical Publications Specia H. Vining

Technical Publications Specia L. Houser

TOTAL LABOR 90

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 8270 (PAHs) Soil $110.00 0 0 $0.00 EPA Method 8290 (Dioxins&Furans) Soil $950.00 0 0 $0.00 EPA Method 6010 (Total Arsenic) Soil $13.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Global Positioning System (Handheld G $175.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Compilation of Logs and Prepartion of SAR Cross Sections, Preparation of Physiography, Regional Geology and Regional Hydrogeology Sections, Preparation of Conceptual Model based on Findings, Preparation of Laboratory QA/QC Summary and Data Recommendations, Preparation of Site Assessment Conclusions, Recommendations for Assessment (24 hrs).

Care Cleaners of Jacksonville

Preparation of MAGS Assessment Findings text (4 hrs), Revise and Provide Edits to Site Assessment Report (5 hrs), Preparation of Deliverable Email and Submittal of Report (1 hr)

Preparation of SAR text including, Operational History, Previous Investigations, Site Specific Soil and Groundwater Site Characterization, Preparation of Tables, Preparation of Draft Soil and Analytical Summary Figures, Preparation of Assessment Findings (lithologic borings, soil borings, DPT Sampling, Piezometer and Monitoring Well Installations, Groundwater Sampling) (40 hrs).

5-Reporting 4/15/2025

Vapor Data Tabulation (3 hrs), Step Test and Radius of Influence calculations and graphs (3 hrs)

Report Drafting, including Site Location Map, Local Land Use Map, Site Layout Map, Utility Location Map, MAGS Location Map. Soil Boring Location Map, DPT Push Groundwater Sample Location Map, Piezometer and Monitoring Well Location Map, Lithologic Cross Section, MAGS Analtyical Summary Map, Soil Analytical Summary Map for several depth intervals, Groundwater Elevation Contour Maps, DPT Analytical Summary Map (3 depths), Monitoring Well and Piezometer Groundwater Analytical Map (6 hrs)

Report Document Production, Formating Tables and Text, Compilation into Adobe Format for Submittal

SUBTASK:

DATE: April 15, 2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 B. Blount

Engineer/Scientist 1 Engineer Scientist 1 R. Lindsay Designer 2 S. Ferianc Technical Publications SpecialisH. Vining Technical Publications SpecialisL. Houser

TOTAL LABOR 11

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $150.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

GW Protection Well Installations $4,766.00 LS 0 $0.00 Erwin Remediation IDW T&D Soil IDW Drums $110.00 LS 0 $0.00 Erwin Remediation IDW T&D Liquid IDW Drums $125.00 LS 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Full List) Wells $110.00 0 0 $0.00 EPA Method 8260 (Full List) IDW $110.00 0 0 $0.00 State Laboratory DEP SOP: LC-001-3 (PFAS) GWTallahassee $0.00 4 1 Fld Regent Blk $0.00 State Laboratory DEP SOP: LC-001-3 (PFAS) IDWTallahassee $0.00 1 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

PFAS Samples by FDEP Laboratory Method DEP SOP: LC-001-3, Wells not Selected to Date, Includes IDW and Field Regent Blank Samples

Develop PFAS Well Recommendations for Sampling and Order Kit from FDEP Laboratory (2 hrs), Develop PFAS Table and Map, Compile Field Notes, Sample Logs and Analytical for Reporting (3 hrs), Preparation of Findings email with Recommendations (1 hr)

Additional Purging and Collection of PFAS Groundwater Samples (3-4 wells), Collection and document PFAS Field Regent Blank and Collection of PFAS Drum purge Water IDW Sample (3 hrs), Chain of Custody Completion and Packaging for FDEP Lab samples (1 hr) and Delivery of FDEP PFAS Samples to Shipper (2 hrs).

6-Additional PFAS Sampling & Reporting

6-Additional PFAS Sampling Page 6 of 6 Copy of Proposal Care Cleaners DC-TBD rev 4-16-25

SUBTASK:

DATE: August 13, 2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 1 Engineer/Scientist 5 G. Roberts

Engineer/Scientist 4 S. Flynn

Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 2 D. McConnaughey Engineer/Scientist 1 K. Ranck Engineer/Scientist 1 B. Blount Engineer/Scientist 1 N. Jennings Engineer Scientist 1 R. Lindsay Engineer Scientist 1 K. Gartland Engineering Technician 3 B. Skipper

Engineering Technician 1 C. Rardon

Designer 2 S. Ferianc Technical Publications SpecialisH. Vining Technical Publications SpecialisL. Houser

TOTAL LABOR 15

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $150.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

OEM Laundry Parts Commercial Laundry Equipment Inspection $500.00 LS 1 $500.00

TOTAL $500.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Full List) Wells $110.00 0 0 $0.00 EPA Method 8260 (Full List) IDW $110.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Round trip travel to site (6 hrs.), trouble shoot equipment malfunctions and perform oversight of vender specialized in dry cleaner equipment (5 hrs.)

Preparation and Attendance of FDEP Conference Call regarding the Equipment Issues.

Research company specializing in dry cleaning equipment operation and repair, coordinate remedy with tenant (3 hrs.)

7-WCD #3

7-Total Page 4 of 10 HW689 DC030A TACO #1 (002)

C

OS

T

ES

TI

MA

TE

C on tra ct or

A pt im

E nv iro nm en ta l & In fra st ru ct ur e, /2

H W

D C

0A

T A

C O

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

6- A dd iti on al

P

FA

S S am pl in g

R ep or tin g

S ite

C ar e

C le an er s of

J ac ks on vi lle

E R

IC

_4

S ub

Ta sk

2-

S ite

M ee tin g, M A

G S

/S oi l, In te rio r W el l S ub Ta sk

7- W

C D

A ct iv ity

/P ha se

S A

R S ub Ta sk

3- D

P T an d

G ro un dw at er

F ie ld A ct iv iti es

S ub

Ta sk

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Fi na l W el l I ns ta lla tio ns S ub Ta sk

S ub

Ta sk

5-

R ep or tin g S ub Ta sk

T To ta ls

La bo r

R at e C at eg or y

$7 3.

P P ro je ct M an ra m er

1.

$7 3.

En gi ne er /S ci en tis t 5

E . K ra m er

$6

8.

En gi ne er

/S ci en tis t 5 G

. R ob er ts

$6 5.

En gi ne er /S ci en tis t 4

S . F ly nn

$3 7.

En gi ne er /S ci en tis t 3

K . H ow ar d

$3

7.

En gi ne er

/S ci en tis t 2 K

. M cD on al d -3

-3

$3

1.

En gi ne er

/S ci en tis t 2 D

. M cC on na u

$2

5.

En gi ne er

/S ci en tis t 1 K

. R an ck

$2

6.

En gi ne er

/S ci en tis t 1 B

. B lo un t

$2 8.

En gi ne er /S ci en tis t 1

N . J en ni ng s

-5

-5

$3 3.

En gi ne er S ci en tis t 1

R . L in ds ay

$2

6.

En gi ne er

S ci en tis t 1 K

. G ar tla nd

$3 2.

En gi ne er in g Te ch ni ci an

B

. S ki pp er

$2 4.

En gi ne er in g Te ch ni ci an

C

. R ar do n

$4 4.

G eo sp at ia l A na lys t 3

H . V ol lm er

$3

5.

D es ig ne r 2 S

. F er ia nc

$3 0.

Te ch ni ca l P ub lic at io ns S pe ci al is t 3 H

. V in in g

$2 8.

Te ch ni ca l P ub lic at io ns S pe ci al is t 3 L.

H ou se r

$0 .0

To ta l H ou rs

D ire ct L

$9

.9

$1

.7

$3

.7

$0

.0

$0 .0

$0

.0

$0 .0

$5

.5

$0

.0

$0 .0

$0

.0

O ve rh ea d

.5 8%

$8

.6

$9 6.

$2

.9

$0

.0

$0 .0

$0

.0

$0 .0

$4

.2

$0

.0

$0 .0

$0

.0

G en

A dm in

.3

8% $1

.9

$2

1.

$6 2.

$0

.0

$0 .0

$0

.0

$0 .0

$1

.1

$0

.0

$0 .0

$0

.0

Fr in ge

.9 6%

$3

.2

$3 6.

$1

.7

$0

.0

$0 .0

$0

.0

$0 .0

$1

.3

$0

.0

$0 .0

$0

.0

To ta l L

$2 ,3

.7

$2

.1

$7

.3

$0

.0

$0 .0

$0

.0

$0 .0

$1

,2

.3

$0 .0

$0

.0

$0 .0

Tr av el V eh ic le R en ta l $3

.0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$6

.6

$6

.6

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$9

.6

$8

.6

$0 .0

$0

.0

$0 .0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m l M at er ia ls

.3 0)

.3 0)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

.3 0)

.3 0)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

1.

1.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

.5 3)

.5 3)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pa

C

OS

T

ES

TI

MA

TE

C on tra ct or

A pt im

E nv iro nm en ta l & In fra st ru ct ur e, /2

H W

D C

0A

T A

C O

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

6- A dd iti on al

P

FA

S S am pl in g

R ep or tin g

S ite

C ar e

C le an er s of

J ac ks on vi lle

E R

IC

_4

S ub

Ta sk

2-

S ite

M ee tin g, M A

G S

/S oi l, In te rio r W el l S ub Ta sk

7- W

C D

A ct iv ity

/P ha se

S A

R S ub Ta sk

3- D

P T an d

G ro un dw at er

F ie ld A ct iv iti es

S ub

Ta sk

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Fi na l W el l I ns ta lla tio ns S ub Ta sk

S ub

Ta sk

5-

R ep or tin g S ub Ta sk

TTo ta ls

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O

E M

L au nd ry

$5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$5

.0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $5

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$5

0.

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $ $5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$5

.0

$0 .0

$0

.0

$0 .0

La bo ra ly tic al

C os ts $5

4.

$5 4.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$5 4.

$5

4.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

.0 0)

.0 0)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

.0 0)

.0 0)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l $3

,8

.9

$2

.1

$1 ,6

.4

$0

.0

$0 .0

$0

.0

$0 .0

$1

,9

.3

$0 .0

$0

.0

$0 .0

C om pl et io n Fe e $2

.1

$2

6.

$7 6.

$0

.0

$0 .0

$0

.0

$0 .0

$1

.5

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$4 ,0

.0

$2

.8

$1

,7

.3

$0 .0

$0

.0

$0 .0

$0

.0

$2 ,0

.8

$0

.0

$0 .0

$0

.0

Pa

SUBTASK:

DATE: August 13, 2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald -33

Engineer/Scientist 2 D. McConnaughe

Engineer/Scientist 1 K. Ranck

Engineer/Scientist 1 B. Blount

Engineer/Scientist 1 N. Jennings -56

Engineer Scientist 1 R. Lindsay 26

Engineer Scientist 1 K. Gartland Engineering Technician 3 B. Skipper

Engineering Technician 1 C. Rardon

Designer 2 S. Ferianc Technical Publications Speciali H. Vining Technical Publications Speciali L. Houser

TOTAL LABOR 28

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 2 $240.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $240.00

PER DIEM STAFF DESCRIPTION RATE UNIT USEAGE ACTUAL TOTALS

Hotel 2 MAGS/Soil Blount, Ranck $150.00 Day 1 $249.70 ($50.30)

2 MAGS Lindsay, Ranck $150.00 Day 1 $249.70 ($50.30) 2 Add Soil Blount, Ranck $150.00 Day 1 $249.70 ($50.30)

Hotel 1 MAGS/Soil Blount $124.85 Day 1 $124.85 $124.85 1 MAGS/Soil Lindsay $124.85 Day 2 $249.70 $249.70

Day 1-leave before 6:00 AM $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon $30.00 Day 3 $90.00 Day 1-leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 9 $324.00

TOTAL PER DIEM $637.65

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE ACTUAL TOTALS

Survtech Solutions Survey and Benchmark Placement $4,995.00 LS 0 $4,995.00 $0.00 GeoTek Utility Locate Services $750.00 LS 0 $750.00 $0.00 Hole Products MAGS Well Supplies (Casing, Screen, Sand) $932.14 LS 1 $919.84 ($12.30)

TOTAL ($12.30)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Full List) Soil $110.00 -3 0 ($330.00) EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 3 0 Contingency $165.00 EPA Method 8260 (VOHs) Leachate $73.00 3 0 Contingency $219.00 EPA Method 8260 (Full List) Well $110.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $54.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 MAGS Investigation Kit $500.00 Day 0 $0.00 Tedlar Bags $20.00 bag 0 (3 Included w/Kit) $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each -3 ($48.00) 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT ($48.00)

Add Hours: MAGS Testing and Soil Sampling Mobilization and Field Event Preparation (2 hrs), Round Trip Travel for two days to site for MAGS Soil Sampling and MAGS well Installations (8 hrs), Attend Onsite H&S and Scoping meeting (1 hr), Assist with collection of 7 MAGS Soil Borings for the collection of 28 soil samples at depths of 6", 2', 4', 6' (8 hrs), Assistance with Installation and Construction of 7 MAGS Testing Wells (4 hrs), Assistance with Installation of two Vapor Monitoring Points (2 hr), core concrete and install, using a hand auger, one groundwater monitor well as deep as possible, construct a 5-inch manhole into the floor slab for access to the well (3 hrs). MAGS Soil Sample Delivery to Laboratory (1 hr). Travel to site (4 hrs), Collect Remaining Soil Samples at 11 locations, Coring, Collection of 44 Soil Samples (16 hrs), Daily delivery of Soil Samples to Laboratory (2 hrs), Site Restoration (2 hrs), Drum Handling and Demobilization (3 hrs)

Remove Hours: MAGS Testing Mobilization and Equipment Preparation (1 hrs), Round Trip Travel for MAGS Testing with Equipment (5 hrs), Perform MAGS Tests at 7 locations and collection of 7 Vapor Samples (12 hrs), Surface and Site Restoration, Equipment Demobilization (3 hrs), Total Removed Hours (-21 hrs). Add Hours: MAGS Testing Mobilization and Equipment Preparation (2 hrs), Travel Round Trip for MAGS Well Installations (6 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Installation and Construction of 7 MAGS Testing Wells, including coring (7 hrs), Installation of 2 Vapor Monitoring Point Locations, including coring (2 hrs), Perform MAGS Tests at 7 locations and collection of 7 Vapor Samples (12 hrs), Surface and Site Restoration (2 hrs).

Delivery of Vapor Samples to Laboratory (1 hrs). WCD #2 Additional time needed for MAGS crew to mitigate the sub-slab depresurizing system (SSDS). Difficulty in coring of MAGS wells and soil borings due to subsurface obstacles, lithology and slab thickness required additional labor hours (14 hrs)

Remove Hours: MAGS Testing Mobilization and Equipment Preparation (2 hrs), Travel Round Trip for MAGS Well Installations (6 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Installation and Construction of 7 MAGS Testing Wells, including coring (7 hrs), Installation of 2 Vapor Monitoring Point Locations, including coring (2 hrs), Perform MAGS Tests at 7 locations and collection of 7 Vapor Samples (12 hrs), Surface and Site Restoration (2 hrs). Delivery of Vapor Samples to Laboratory (1 hrs).

Add Hours: MAGS Testing Mobilization and Equipment Preparation (1 hrs), Round Trip Travel for MAGS Testing with Equipment (5 hrs), Perform MAGS Tests at 7 locations and collection of 7 Vapor Samples (12 hrs), Surface and Site Restoration, Equipment Demobilization (3 hrs) Additional time needed for MAGS crew to mitigate the sub-slab depresurizing system (SSDS). Difficulty in coring of MAGS wells and soil borings due to subsurface obstacles, lithology and slab thickness required additional labor hours (14 hrs)

Remove Hours: MAGS Testing and Soil Sampling Mobilization and Field Event Preparation (2 hrs), Round Trip Travel for two days to site for MAGS Soil Sampling and MAGS well Installations (8 hrs), Attend Onsite H&S and Scoping meeting (1 hr), Assist with collection of 7 MAGS Soil Borings for the collection of 28 soil samples at depths of 6", 2', 4', 6' (8 hrs), Assistance with Installation and Construction of 7 MAGS Testing Wells (4 hrs), Assistance with Installation of two Vapor Monitoring Points (2 hr), core concrete and install, using a hand auger, one groundwater monitor well as deep as possible, construct a 5-inch manhole into the floor slab for access to the well (3 hrs). MAGS Soil Sample Delivery to Laboratory (1 hr). Travel to site (4 hrs), Collect Remaining Soil Samples at 11 locations, Coring, Collection of 44 Soil Samples (16 hrs), Daily delivery of Soil Samples to Laboratory (2 hrs), Site Restoration (2 hrs), Drum Handling and Demobilization (3 hrs), 2-SiteMeeting, MAGS/Soil, Interior Well

2-Delta Page 7 of 10 HW689 DC030A TACO #1 (002)

SUBTASK:

DATE: August 13, 2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 1 Engineer/Scientist 5 G. Roberts

Engineer/Scientist 4 S. Flynn

Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 2 D. McConnaughey Engineer/Scientist 1 K. Ranck Engineer/Scientist 1 B. Blount Engineer/Scientist 1 N. Jennings Engineer Scientist 1 R. Lindsay Engineer Scientist 1 K. Gartland Engineering Technician 3 B. Skipper

Engineering Technician 1 C. Rardon

Designer 2 S. Ferianc Technical Publications SpecialisH. Vining Technical Publications SpecialisL. Houser

TOTAL LABOR 15

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $150.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

OEM Laundry Parts Commercial Laundry Equipment Inspection $500.00 LS 1 $500.00

TOTAL $500.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Full List) Wells $110.00 0 0 $0.00 EPA Method 8260 (Full List) IDW $110.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Soil Sampling Kit (concrete) $235.00 Day 0 $0.00 Monitor Well Installation Kit $325.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 0 $0.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Round trip travel to site (6 hrs.), trouble shoot equipment malfunctions and perform oversight of vender specialized in dry cleaner equipment (5 hrs.)

Preparation and Attendance of FDEP Conference Call regarding the Equipment Issues.

Research company specializing in dry cleaning equipment operation and repair, coordinate remedy with tenant (3 hrs.)

7-WCD #3

7-Delta Page 8 of 10 HW689 DC030A TACO #1 (002)

C

OS

T

ES

TI

MA

TE

C on tra ct or

A pt im

E nv iro nm en ta l & In fra st ru ct ur e, 4/

/2

H W

D C

-T B

D S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

6-

A dd iti on al P

FA

S

S am pl in g

R ep or tin g

S ite

C ar e

C le an er s of

J ac ks on vi lle

E R

IC

_4

S ub

Ta sk

2-

S ite

M ee tin g, M A

G S

/S oi l, In te rio r W el l S ub Ta sk

7- W

C D

A ct iv ity

/P ha se

S A

R S ub Ta sk

3- D

P T an d

G ro un dw at er

F ie ld A ct iv iti es

S ub

Ta sk

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Fi na l W el l I ns ta lla tio ns S ub Ta sk

S ub

Ta sk

5-

R ep or tin g S ub Ta sk

T To ta ls

La bo r

R at e C at eg or y

$7 3.

PP

ro je ct M an ra m er

.0

$7 3.

En gi ne er /S ci en tis t 5

E . K ra m er

$6

8.

En gi ne er

/S ci en tis t 5 G

. R ob er ts

$6 5.

En gi ne er /S ci en tis t 4

S . F ly nn

$3 7.

En gi ne er /S ci en tis t 3

K . H ow ar d

$3

7.

En gi ne er

/S ci en tis t 2 K

. M cD on al d

$3

1.

En gi ne er

/S ci en tis t 2 D

. M cC on na ug

$2

5.

En gi ne er

/S ci en tis t 1 K

. R an ck

$2

6.

En gi ne er

/S ci en tis t 1 B

. B lo un t

$2

8.

En gi ne er

/S ci en tis t 1 N

. J en ni ng s

$3

3.

En gi ne er

S ci en tis t 1 R

. L in ds ay

$2 6.

En gi ne er S ci en tis t 1

K . G ar tla nd

$3

2.

En gi ne er in g

Te ch ni ci an

B . S ki pp er

$2

4.

En gi ne er in g

Te ch ni ci an

C . R ar do n

$3

5.

D es ig ne r 2 S

. F er ia nc

$3 0.

Te ch ni ca l P ub lic at io ns S pe ci al is t 3 H

. V in in g

$2 8.

Te ch ni ca l P ub lic at io ns S pe ci al is t 3 L.

H ou se r

$0 .0

To ta l H ou rs

D ire ct L

$1

9, 0.

$2 ,2

.2

$6

,8

.9

$2 ,4

.6

$1

,9

.5

$5 ,5

.1

$5

.8

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

.5 8%

$1 6, 1.

$1

,9

.6

$5 ,8

.5

$2

,1

.9

$1 ,7

.0

$4

,7

.2

$4

.6

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

.3

8% $3

,8

.0

$4

.0

$1 ,3

.3

$4

.4

$3

.3

$1

,0

.6

$1

.2

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.9 6%

$6 ,2

.0

$7

.9

$2

,1

.2

$7

.5

$6

.1

$1 ,7

.6

$1

.5

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L

$4

6, 0.

$5 ,3

.8

$1

6, 8.

$5 ,8

.6

$4

,7

.0

$1 3, 5.

$1

,2

.1

$0 .0

$0

.0

$0 .0

$0

.0

Tr av el V eh ic le R en ta l $1

,9

.0

$9

.0

$4

.0

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$1 ,6

.0

$9

.0

$4

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $3

,5

.0

$1 ,8

.0

$9

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m l M at er ia ls

$9

.1

$9

.1

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$9

.1

$9

.1

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$9 3.

$9

3.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$1 ,0

.3

$1

,0

.3

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$1 7, 2.

$0

.0

$1 2, 7.

$5

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$4 ,9

.0

$4

,9

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$9

.0

$0 .0

$0

.0

$9

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$7

.0

$7

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$2 4, 7.

$5

,7

.0

$1 2, 7.

$6

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $2

,4

.7

$5

.5

$1 ,2

.7

$6

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $2

7, 0.

$6 ,3

.5

$1

3, 4.

$7 ,2

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra ly tic al

C os ts $1

3, 4.

$9 ,4

.0

$3

,3

.0

$1 ,1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$1 3, 4.

$9

,4

.0

$3 ,3

.0

$1

,1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $6

.0

$3

.0

$1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $1

,0

.0

$0 .0

$3

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pa

C

OS

T

ES

TI

MA

TE

C on tra ct or

A pt im

E nv iro nm en ta l & In fra st ru ct ur e, 4/

/2

H W

D C

-T B

D S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

6-

A dd iti on al P

FA

S

S am pl in g

R ep or tin g

S ite

C ar e

C le an er s of

J ac ks on vi lle

E R

IC

_4

S ub

Ta sk

2-

S ite

M ee tin g, M A

G S

/S oi l, In te rio r W el l S ub Ta sk

7- W

C D

A ct iv ity

/P ha se

S A

R S ub Ta sk

3- D

P T an d

G ro un dw at er

F ie ld A ct iv iti es

S ub

Ta sk

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Fi na l W el l I ns ta lla tio ns S ub Ta sk

S ub

Ta sk

5-

R ep or tin g S ub Ta sk

T To ta ls

E qu ip m en t ( A na ly tic al re la te d)

$3 ,8

.0

$2

,6

.0

$8

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$3

.0

$2

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $$5

,8

.0

$3 ,2

.0

$1

,4

.0

$1 ,2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $9

8, 7.

$5 ,3

.8

$3

8, 4.

$2 5, 0.

$1

5, 3.

$1 3, 5.

$1

,2

.1

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$4 ,6

.0

$5

.6

$1

,6

.8

$5

.0

$4

.3

$1 ,3

.5

$1

.6

$0

.0

$0 .0

$0

.0

$0 .0

To ta l E st im at ed…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .