This is a Task Assignment (TA) issued under Contract Number HW689 between the State of Florida Department of Environmental Protection (FDEP) and Aptim Environmental & Infrastructure, LLC (Aptim). The task assignment, numbered BIL01A, was executed on February 15, 2023, and involves supplemental site assessment activities at the Town of Esto former Lamb's Recycling facility located at 1067 North Highway 79, Esto, Holmes County, Florida. The work is being conducted using federal funds from the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) funding cooperative agreement administered by FDEP on behalf of the U.S. Environmental Protection Agency (EPA). Andrew Smith serves as the FDEP Project Manager, while Eric Kramer serves as Aptim's Project Manager.
The task assignment requires Aptim to perform project management, prepare a Quality Assurance Project Plan (QAPP) and Health and Safety Plan (HASP), conduct supplemental site assessment field activities including soil sampling at 39 boring locations at three depth intervals, and prepare a comprehensive Supplemental Site Assessment Report. The work is structured in four subtasks: Subtask 1 covers project management at $2,378.56; Subtask 2 covers Work Plan/QAPP preparation at $3,664.31; Subtask 3 covers SSA field activities including soil sampling, laboratory analysis, and groundwater measurements at $47,639.23; and Subtask 4 covers reporting at $5,823.64. The total task assignment value is $59,743.60 with a fixed unit rate payment structure. Deliverables are due by June 30, 2023, with a final task completion date of August 31, 2023. Invoicing is contingent upon FDEP approval of work products at each subtask phase.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW689
BIL01A Completion August 31, 2023
This Task Assignment (TA) is issued in accordance with the Cost Proposal (CP) submitted by Aptim Environmental & Infrastructure, LLC (Aptim) on February 1, 2023. This TA involves Project Management, preparing a Quality Assurance Project Plan (QAPP), Supplemental Site Assessment (SSA) Field Activities, and SSA reporting.
Andrew Smith 850-245-8935 Consultant Consultant
Consultant Consultant
Consultant Consultant
Consultant
Aptim Environmental & Infrastructure, LLC
Aptim Environmental & Infrastructure, LLC
Eric Kramer 407-287-3216
ERIC_7390
1067 North Highway 79, Esto, FL
Town of Esto - Lamb's Recycling
✔ $ 59,743.60
$ 59,743.60
Scope of Work
Eric Kramer
Senior Environmental Engineer
Eric Kramer Digitally signed by Eric Kramer Date: 2023.02.15 17:14:20 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2023.02.15 15:46:01 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Submittal of Work Plan/QAPP 04/07/2023
Field notes, boring logs, laboratory chain of custody (COC) 05/26/2023
Supplemental Site Assessment Report/PM 06/30/2023
DEP approval of Work Plan/QAPP (Subtask 2) $ 3,664.31
DEP approval of Field notes, sampling logs, coc (Subtask 3) $ 47,639.23
DEP approval of SSAR/Project Management (Subtasks 1 & 4) $ 8,440.06
$ 59,743.60
HW689
BIL01A
www.FloridaDEP.gov
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Aptim Environmental & Infrastructure, LLC HW689 Contract File
FROM: Andrew Smith, Contract Manager
DATE: February 9, 2023
SUBJECT: Negotiation Summary – BIL22 Task Assignment (TA) BIL01A
Town of Esto former Lamb’s Recycling – Site ID ERIC_7390 Supplemental Site Assessment (SSA) activities
This Task Assignment (TA) is intended for conducting Supplemental Site Assessment (SSA) activities at the Town of Esto former Lamb’s Recycling site, located at 1067 North Highway 79, Esto, Holmes County, FL. The services under this task are being conducted using federal funds from the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) funding cooperative agreement that is administered by the Department on behalf of the U.S. Environmental Protection Agency (EPA).
Subtask 1 Project Management This subtask is a percentage of the overall project fees and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, and fringe. The agreed upon cost of this subtask is $2378.56.
Subtask 2: Work Plan/QAPP, and Health and Safety Plan In accordance with an EPA directive, this subtask includes the completion of a Work Plan/Quality Assurance Project Plan (QAPP), a Health and Safety Plan (HASP). The QAPP Workplan will provide a brief summary of the scope of work and tables and figures showing the proposed sample locations. The agreed upon cost of this subtask is $3,664.31.
Subtask 3: SSA Assessment Field Activities Under this subtask, soil sampling shall be performed at three (3) sample depths of 0.0 to 0.5 ft.
below the land surface (bls), 0.5 to 2.0 ft bls, and 2 to 4 ft bls, or above the clay stratum if encountered. Thirty-nine (39) soil boring locations for the collection and sampling of RCRA 8 metals As, Ba, Cd, Cr, Pb, Hg, Se and Ag samples are shown on the proposed arsenic sample location map (red grid locations). The metal samples will be analyzed by EPA Method 6010 for (As, Ba, Cd, Cr, Pb, Se, Ag) and EPA Method 7471 for Hg. Six additional borings will be installed for the collection of 18 samples (at the 5 blue locations and the Drum 12 sub-slab area) for analysis by EPA Method 8260 (VOCs), EPA Method 8270 (PAHs), EPA Method 8081 (Pesticides), FL-Pro (TRPH), RCRA-8 Metals and PFAS Constituents by Method 537.1 Modified.
http://www.floridadep.gov/
Negotiation Summary – Task Assignment (TA) BIL01A Town of Esto – Lamb’s Recycling
ERIC_14973
Calhoun County SSA Activities February 9, 2023 www.FloridaDEP.gov
Ten soil samples that had lead concentrations reported in the SAR above leachability standards were detected in ten soil samples (SB-1, SB-1E, SB-1N, SB-1W, SB-3, SB-4, SB-4W, SB-5, SB-8, SB-11) in the 0 ft to 0.5 ft bg sample interval above 100 mg/kg indicating a potential for leaching and RCRA Management/Characterization. Additional soil samples will be collected at those boring locations from the same depth interval of (0 to 0.5 ft bls) for leachability testing using EPA Method 1312 SPLP extraction and analysis of the leachate by EPA Method 6010 for the presence of lead. Total lead samples will also be collected for confirmation of the lead concentrations by EPA Method 6010 at each boring location. The results will be reviewed in accordance with the FDEP Guidance for Determining Leachability by Analysis of SPLP Results document and should provide a statistically significant data group.
Soil samples will be collected in locations that had chromium concentrations exceeding leachability standards in the previous SAR (SB-2 and SB-10) for leaching using SPLP extraction by EPA Method 1312. The extracted leachate will be analyzed for chromium by EPA Method 6010. The samples will be collected at the previously sampled depths of 0 to 0.5 ft bls and 0.5 to 2 ft bls. Total chromium samples will also be collected for confirmation of the concentrations by EPA Method 6010 at each of the boring locations.
During the collection of the shallow soil samples at the location of SB-8, additional material will be collected for TCLP extraction by EPA Method 1311 and leachate analysis by EPA Method 7196 (colorimetric) to test for the chromium speciation and identify the contaminant valence Cr 6+, if present. These speciation samples will be collected the location of SB-8 from a depth of 0 to 0.5 ft bls and 0.5 to 2 ft bls.
Prior to leaving the site, the existing seven (7) monitoring wells will be located and depth to groundwater measurements will be taken to evaluate the current groundwater elevations and seasonal groundwater fluctuations at the site. The agreed upon cost for this subtask is $47,639.23.
Subtask 4: SSA Reporting A Supplemental Site Assessment Report (SSAR) will be prepared detailing the field and laboratory results. The SSAR will summarize the current environmental conditions and any detected contamination in soil. The report will include site background information, findings of previous investigations, and identify the number of environmental samples and locations that were evaluated to characterize the nature of the contamination, describe the sampling methodologies, present the results and findings of the investigation, and recommendations for future site activiites. The agreed upon cost for this subtask is $5,823.64
Summary DEP’s BIL Project Manager and Aptim’s Project Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $59,743.60. Documentation of these costs is included in the Level of Effort/Cost Proposal (LOE-CP) Form and LOE-CP letter provided by Aptim on February 1, 2023 and February 9, 2023, as well as the Task Assignment Form for BIL-01A prepared by DEP. The final deliverable must be received by FDEP no later than June 30, 2023.
FDEP COST ESTIMATE
Contractor: Aptim Environmental & Infrastructure, LLC
Date: 2/1/2023
Task #: HW689 BIL01A ERIC_7390 SubTask 1 Project Management SubTask 6
Site: Former Lamb's Recycling Facility SubTask 2 2-SSA QAPP Workplan SubTask 7
Activity/Phase: Supplemental Site Assessment (SSA) SubTask 3 3-SSA Field Activities SubTask 8
Project Manager: Andrew Smith (FDEP)/Eric Kramer (APTIM) SubTask 4 4-SSA Reporting SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$65.22 Project Manager E. Kramer 15 15.4 $65.22 Engineer/Scientist 5 E. Kramer 3 0 0 3 0 0 0 0 0 0 $61.98 Engineer/Scientist 5 G. Roberts 32 14 2 16 0 0 0 0 0 0 $29.81 Engineer/Scientist 2 M. Donelick 112 12 70 30 0 0 0 0 0 0 $29.24 Engineer/Scientist 2 P. Davis 64 0 64 0 0 0 0 0 0 0 $32.56 Designer 2 S. Ferianc 6 3 0 3 0 0 0 0 0 0 $27.64 Technical Publications Specialist 3 H. Vining 5 3 0 2 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 Total Hours 237 15 32 136 54 0 0 0 0 0 0
Direct Labor $8,726.61 $1,003.95 $1,406.04 $4,082.02 $2,234.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 85.58% $7,468.23 $859.18 $1,203.29 $3,493.39 $1,912.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 19.38% $1,691.23 $194.57 $272.49 $791.10 $433.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 31.96% $2,789.02 $320.86 $449.37 $1,304.61 $714.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $20,675.09 $2,378.56 $3,331.19 $9,671.12 $5,294.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $960.00 $0.00 $960.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $1,298.00 $0.00 $1,298.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $2,258.00 $0.00 $2,258.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $32,079.00 $0.00 $32,079.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $339.00 $0.00 $339.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $32,418.00 $0.00 $32,418.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF SHAW Page 1
FDEP COST ESTIMATE
Contractor: Aptim Environmental & Infrastructure, LLC
Date: 2/1/2023
Task #: HW689 BIL01A ERIC_7390 SubTask 1 Project Management SubTask 6
Site: Former Lamb's Recycling Facility SubTask 2 2-SSA QAPP Workplan SubTask 7
Activity/Phase: Supplemental Site Assessment (SSA) SubTask 3 3-SSA Field Activities SubTask 8
Project Manager: Andrew Smith (FDEP)/Eric Kramer (APTIM) SubTask 4 4-SSA Reporting SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Field Expenses
Personal Protection $350.00 $0.00 $350.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $200.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,775.00 $0.00 $1,775.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,325.00 $0.00 $2,325.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $57,676.09 $2,378.56 $3,331.19 $46,672.12 $5,294.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,067.51 $237.86 $333.12 $967.11 $529.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $59,743.60 $2,616.42 $3,664.31 $47,639.23 $5,823.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF SHAW Page 2
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : Former Lamb's Recycling Facility
SUBTASK:
DATE: February 01, 2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts 14
Engineer/Scientist 2 M. Donelick 12 Engineer/Scientist 2 P. Davis Designer 2 S. Ferianc Drafting 3 Technical Pub Specialist 3 H. Vining 3
TOTAL LABOR 32
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 6020 (As) Groundwater $14.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 day 0 $0.00 Water Level Indicator $25.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
2-SSA QAPP Workplan
Prepare Supplemental Site Assessment Work Plan (10 hrs), Completion and Submittal of QAPP Plan, Tables, Figures, Work Plan and HASP in Email Deliverable (4 hrs) Prepare QAPP Plan Report, prepare site specific HASP
Report Document Production, Formating Text, Compilation into Adobe Format for Submittal
2-Work Plan&QAPP Page 3 of 5 Copy of Lambs Recycling BF02A est v2
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : Former Lamb's Recycling Facility
SUBTASK:
DATE: February 01, 2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts 2
Engineer/Scientist 2 M. Donelick
Engineer/Scientist 2 P. Davis
Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining
TOTAL LABOR 136
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 2 $960.00
TOTAL VEHICLE $960.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 2 $95.00 Day 10 $950.00 Day 1-leave before 6:00 AM $36.00 Day $0.00 Day 1-Leave between 6 - Noon 2 $30.00 Day 2 $60.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 $36.00 Day 8 $288.00
TOTAL PER DIEM $1,298.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 6010 and 7471 (RCRA 8/Soil) (As, Ba, Cd, Cr, Pb, Hg, Se, Ag) $119.00 117 4 Equip(2), Field (2) $14,399.00 EPA Method 8260 (VOCs - Full List) Soil $150.00 18 0 $2,700.00 EPA Method 8270 (PAHs) Soil $110.00 18 0 $1,980.00 EPA Method 8081 (Organochlorine Hydrocarbons) Soil $105.00 18 0 $1,890.00 FL-Pro (TRPH) Soil $88.00 18 0 $1,584.00 EPA Method 6010 and 7471 (RCRA 8/Soil) (As, Ba, Cd, Cr, Pb, Hg, Se, Ag) $119.00 18 0 $2,142.00 PFAS EPA Method 537.1M (PFOA/PFOS) Soil $315.00 18 0 $5,670.00 EPA Method 6010 (Lead/Soil) $13.00 10 1 Equipment(1) $143.00 SPLP Extraction Method 1312 (Lead/Soil) $45.00 10 $450.00 EPA Method 6010 (Lead/Leachate) $13.00 10 $130.00 EPA Method 6010 (Chromium/Soil) $13.00 28 1 Equipment(1) $377.00 SPLP Extraction Method 1312 (Chromium/Soil) $45.00 8 $360.00 EPA Method 6010 (Chromium/Leachate) $13.00 8 $104.00 EPA Method 7196 (Cr6+/Leachate) $30.00 2 $60.00 TCLP Extraction Method 1311 (Cr6+/Soil) $45.00 2 $90.00 Sample Shipping (Small Cooler) $104.00 0 $0.00 Sample Shipping (Large Cooler) $150.00 2 $300.00 Ice (Bag/Day) $6.50 6 $39.00
TOTAL LAB $32,418.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personnel Protection Equipment (2 man crew $35.00 Day 10 $350.00 Expendables $40.00 Day 5 $200.00 Soil Assessment Sampling Kit $175.00 day 5 $875.00 Water Level Indicator $25.00 Day 1 $25.00 Global Positioning System $175.00 Day 5 $875.00
TOTAL EQUIPMENT $2,325.00
GIS Research to Determine Lat/Long of each Grid Sample location, assign Lat/Long locations to Existing Sample locations (6 hrs), Preparation of field equipment and sample materials for site work (2 hrs.), Round trip Travel to Site (4 hrs). Perform Onsite H&S and Scoping meetings, Lay out sampling grid, Locate 7 existing monitoring wells and gauge (8 hrs), Collection of 117 RCRA-8 Metals Grid soil samples at 39 locations for anlysis by EPA Method 6010 (As, Ba, Cd, Cr, Pb, Se, Ag) and EPA Method 7471) Hg (20 hrs). Collect 18 soil samples from 6 locations, including Drum 12 sub-slab area for analysis by EPA Method 8260 (VOCs), EPA Method 8270 (PAHs), EPA Method 8081 (Pesticides), FL-Pro (TRPH), RCRA-8 Metals and PFAS Constituents by Method
537.1 Modified (10 hrs). Collect 10 soil samples for total lead and SPLP extraction (EPA Method 1312) and analysis of lead using EPA method 6010 (8 hrs), collect 4 samples from 2 locations (SB- 2 and SB-10) for total chromium and SPLP extraction (EPA Method 1312) and analysis of chromium using EPA method 6010 (3 hrs), Collect 20 samples from 5 locations for total chomium by EPA Method 6010 at the location of SB-8, also collect 2 samples for Cr6+ by TCLP extraction and Cr6+ by EPA 7196 (6 hrs), Site Cleanup, Chain of custody preparation, Sample Packaging, and shipping to Laboratory (3 hrs).
Round trip Travel to Site (6 hrs). Perform Onsite H&S and Scoping meetings, Lay out sampling grid, Locate 7 existing monitoring wells and gauge (8 hrs), Collection of 117 RCRA-8 Metals Grid soil samples at 39 locations for anlysis by EPA Method 6010 (As, Ba, Cd, Cr, Pb, Se, Ag) and EPA Method 7471) Hg (20 hrs). Collect 18 soil samples from 6 locations, including Drum 12 sub-slab area for analysis by EPA Method 8260 (VOCs), EPA Method 8270 (PAHs), EPA Method 8081 (Pesticides), FL-Pro (TRPH), RCRA-8 Metals and PFAS Constituents by Method 537.1 Modified (10 hrs). Collect 10 soil samples for total lead and SPLP extraction (EPA Method 1312) and analysis of lead using EPA method 6010 (8 hrs), collect 4 samples from 2 locations (SB-2 and SB-10) for total chromium and SPLP extraction (EPA Method 1312) and analysis of chromium using EPA method 6010 (3 hrs), Collect 20 samples from 5 locations for total chomium by EPA Method 6010 at the location of SB-8, also collect 2 samples for Cr6+ by TCLP extraction and Cr6+ by EPA 7196 (6 hrs), Collect depth to groundwater measurements from 7 wells (2 hrs), Site Cleanup (1 hr).
3-SSA Field Activities
Site Work Notifications and Access (1 hr), Order Sampling Kits (1 hr)
39 locations and 117 total samples for anlysis by EPA Method 6010 (As, Ba, Cd, Cr, Pb, Se, Ag) and EPA Method 7471) Hg, 18 soil samples from 6 locations, including Drum 12 sub-slab area for analysis by EPA Method 8260 (VOCs), EPA Method 8270 (PAHs), EPA Method 8081 (Pesticides), FL-Pro (TRPH), RCRA-8 Metals and PFAS Constituents by Method 537.1 Modified, 10 locations and 10 samples for Total Lead Analysis (EPA 6010) and SPLP Extraction/Lead analysis (EPA 1312/6010), SB-2 and SB-10 locations and 8 total samples for Total Chromium (EPA 6010) and SPLP Extraction/Lead analysis (EPA 1312/6010), SB-8 and four surrounding locations total 20 samples for Total Chromium (EPA 6010), two (2) samples will be additionally analyzed for Cr6+ by TCLP extraction and Cr6+ by EPA 7196.
3-SSA Field Activities Page 4 of 5 Copy of Lambs Recycling BF02A est v2
SITE :
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 3 Engineer/Scientist 5 G. Roberts 16 Engineer/Scientist 2 M. Donelick 30 Engineer/Scientist 2 P. Davis Designer 2 S. Ferianc 3
Technical Pub Specialist 3 H. Vining 2
TOTAL LABOR 54
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 6020 (As) Groundwater $14.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 day 0 $0.00 Water Level Indicator $25.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
Former Lamb's Recycling Facility
Report Document Production, Formating Tables and Text, Compilation into Adobe Format for Submittal
SSA Report Drafting
Preparation of Conclusions and Recommendations, Preparation of Final SSA Report Preparation of SSA Report and Maps Preparation of SSA Tables (Analytical Results, boring logs, field notes), report text
4-SSA Reporting 2/1/2023
Proposed Scope of Work (Version 2) Former Lamb’s Recycling Facility ERIC_7390 Supplemental Soil Sampling Task Assignment BIL01A APTIM Environmental & Infrastructure, LLC (APTIM) 2/9/23
The following is a proposed scope of work for the former Lamb’s Recycling Facility, located in Esto, Florida to perform supplemental soil sampling to fill in data gaps remaining after completion of a Site Assessment completed on behalf of the FDEP. The proposed scope of work is based on the information provided in the Site Assessment Report completed by others, with additional comment from the FDEP. The scope of work includes the collection of soil samples in a grid pattern at three depth intervals for most of the samples (RCRA 8 metals); however, locations near former boring locations are also proposed for the collection of total confirmation samples and SPLP extraction and leachability analysis (lead and chromium).
Subtask - 1: Project Management This task includes project management activities associated with the completion of Tasks 2 through 5, as calculated in accordance with Contract HW689.
Subtask 2 SSA Work Plan/WAPP, and Health and Safety Plan
As requested by the FDEP, Subtask 2 includes preparing a Supplemental Site Assessment Work Plan and Quality Assurance Project Plan (SSAWP/QAPP), and Health and Safety Plan (HASP).
In addition to the scoping details, the report will include EPA review (Nichole Rodgers) and approval prior to commencement of the work, as necessary.
Subtask - 3: Soil Sampling Arsenic exceedances were detected in soil borings SB-7 through SB-11, which are located in the eastern portion of the site that is more heavily vegetated. Therefore, APTIM recommended soil sampling in a 50 feet grid pattern between the Areas of Concern to define the limits of the impacts, and some locations were eliminated by the FDEP. Soil sampling shall be performed at three (3) sample depths of 0.0 to 0.5 ft. below the land surface (bls), 0.5 to 2.0 ft bls, and 2 to 4 ft bls, or above the clay stratum if encountered. Thirty-nine (39) soil boring locations for the collection and sampling of RCRA 8 metals As, Ba, Cd, Cr, Pb, Hg, Se and Ag samples are shown on the proposed arsenic sample location map (red grid locations). The metal samples will be analyzed by EPA Method 6010 for (As, Ba, Cd, Cr, Pb, Se, Ag) and EPA Method 7471 for Hg.
Six additional borings will be installed for the collection of 18 samples (at the 5 blue locations and the Drum 12 sub-slab area) for analysis by EPA Method 8260 (VOCs), EPA Method 8270 (PAHs), EPA Method 8081 (Pesticides), FL-Pro (TRPH), RCRA-8 Metals and PFAS Constituents by Method 537.1 Modified. The yellow locations shown on the arsenic map have been eliminated from sampling.
Lead concentrations reported in the SAR were detected in ten soil samples (SB-1, SB-1E, SB-1N, SB-1W, SB-3, SB-4, SB-4W, SB-5, SB-8, SB-11) in the 0 ft to 0.5 ft bg sample interval above 100 mg/kg indicating a potential for leaching and RCRA Management/Characterization. APTIM proposes the collection of additional soil samples at those boring locations from the same depth interval of (0 to 0.5 ft bls) for leachability testing using EPA Method 1312 SPLP extraction and analysis of the leachate by EPA Method 6010 for the presence of lead. Total lead samples will also be collected for confirmation of the lead concentrations by EPA Method 6010 at each boring location. The results will be reviewed in accordance with the FDEP Guidance for Determining Leachability by Analysis of SPLP Results document and should provide a statistically significant data group.
In the SAR, chromium was detected in SB-2 and SB-10 exceeding the leachability standards. In general, the site lithology consists of unconsolidated granular material down to 4 ft bls that transitions to a sandy clay extending downward for over 30 ft bg. Based on this lithology the downward vertical migration of any leaching contaminant would be retarded and most likely migrate horizontally thereby masking potential leaching. Although chromium was not detected in any onsite monitoring well above the respective GCTL, APTIM proposes collection of a soil sample in both locations (SB-2 and SB-10) and intervals to test for leaching using SPLP extraction by EPA Method 1312. The extracted leachate will be analyzed for chromium by EPA Method 6010. The samples will be collected at the previously sampled depths of 0 to 0.5 ft bls and 0.5 to 2 ft bls. Total chromium samples will also be collected for confirmation of the concentrations by EPA Method 6010 at each of the boring locations.
Chromium was also detected in SB-8 (0.5 ft to 2.0 ft) exceeding the Residential SCTL but less than the Industrial SCTL for the Direct Exposure criteria. APTIM proposes the collection of soil samples at the location of this boring at the intervals of 0 to 0.5 ft bls, 0.5 to 2 ft bls, 2 to 4 ft bls and possibly 4 to 6 ft bls in the event the top of the clay stratum is below 4 ft bls, for analysis of total chromium by EPA Method 6010. Additional material will be collected for SPLP extraction (EPA Method 1312) and analysis of the leachate for chromium by EPA Method 6010, based on the total chromium results. In addition, four step out borings approximately 10 feet from the center boring are recommended with samples collected and analyzes similar to the SB-8 soil boring samples.
During the collection of the shallow soil samples at the location of SB-8, additional material will be collected for TCLP extraction by EPA Method 1311 and leachate analysis by EPA Method 7196 (colorimetric) to test for the chromium speciation and identify the contaminant valence Cr 6+, if present. These speciation samples will be collected the location of SB-8 from a depth of 0 to 0.5 ft bls and 0.5 to 2 ft bls.
Prior to leaving the site, the existing seven (7) monitoring wells will be located and depth to groundwater measurements will be taken to evaluate the current groundwater elevations and seasonal groundwater fluctuations at the site.
Subtask - 4: Supplemental Soil Sampling Reporting At the conclusion of the soil sampling event and upon receipt of the analytical report from the fixed base laboratory, a Supplemental Soil Sampling Report documenting the sampling activities and results will be prepared and include conclusions and recommendations for future site activities.
APTIM recommends the following schedule:
Description Due Date
Submittal of Supplemental Site Assessment Work Plan and QAPP Plan 4/7/23
Perform the soil sampling 5/26/23
Submit Supplemental Soil Assessment Report 6/30/23
Task expiration date 8/31/23
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the Contract between the Florida Department of Environmental Protection and APTIM dated December 21, 2021 (DEP Contract No. HW689). APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.
If you have any questions, please contact us for clarification.