CN-370000-HW689-CSS01A.pdf

PDF 6 MB Posted

Attached to
Master Agreement FL|HW689|a751b87398beb5bfc7861f19a403533e
Contract number
HW689
Issued by
Florida

About this file

This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Aptim Environmental & Infrastructure, LLC for site investigation activities at the Advanced Chemical Co. property located at 301 Zell Drive, Orlando, Florida (FDEP Site ERIC_15071). The services are being conducted using federal funds from the CERCLA Site Screening Program (CSS) cooperative agreement administered by the FDEP on behalf of the EPA. The Task Assignment is designated as TA CSS01A under master Contract HW689, with an effective completion date of August 31, 2022.

The scope of work consists of four subtasks valued at $24,434.16 total on a fixed unit rate basis: Subtask 1 (Project Management) at $2,133.68; Subtask 2 (Site Visit, Work Plan/QAPP, and Health and Safety Plan) at $3,018.46; Subtask 3 (SI Field Activities including installation of five temporary monitoring wells, soil and groundwater sampling) at $10,276.25; and Subtask 4 (Site Investigation Report preparation) at $9,005.77. Deliverables are due on a staggered schedule with the workplan due April 29, 2022, field activities completed by May 31, 2022, and the final Site Investigation Report due July 8, 2022. Payment is contingent upon FDEP approval of each deliverable phase. The scope includes installation of five one-inch diameter temporary monitoring wells to 15 feet below land surface with soil and groundwater sampling analyzed for VOCs, PAHs, TRPH, RCRA metals, PFAS, pesticides, and herbicides. Supporting subcontractors include ATI Drilling for well installation ($3,575.00), GPRS, Inc. for utility location services ($650.00), and various other service providers for drilling support and analysis.

View the file

Other files

File Type Posted
CN-370000-HW689-BF01A.pdf PDF
CN-370000-HW689-BF01C.pdf PDF
CN-370000-HW689-BF1ACO1.pdf PDF
CN-370000-HW689-BIL01CC1.pdf PDF
CN-370000-HW689-BIL01D.pdf PDF
CN-370000-HW689-BIL01E.pdf PDF
CN-370000-HW689-CSS2AC02.pdf PDF
CN-370000-HW689-DC005A.pdf PDF
CN-370000-HW689-DC007A.pdf PDF
CN-370000-HW689-DC008A.pdf PDF
CN-370000-HW689-DC012B.pdf PDF
CN-370000-HW689-DC013A.pdf PDF
CN-370000-HW689-DC015D.pdf PDF
CN-370000-HW689-DC016A.pdf PDF
CN-370000-HW689-DC016B.pdf PDF
CN-370000-HW689-DC020B.pdf PDF
CN-370000-HW689-DC020C.pdf PDF
CN-370000-HW689-DC021B.pdf PDF
CN-370000-HW689-DC022B.pdf PDF
CN-370000-HW689-DC023A.pdf PDF
CN-370000-HW689-DC024C.pdf PDF
CN-370000-HW689-DC024D.pdf PDF
CN-370000-HW689-DC030A.pdf PDF
CN-370000-HW689-DC033A.pdf PDF
CN-370000-HW689-DC03BCO2.pdf PDF
CN-370000-HW689-DC04CCO1.pdf PDF
CN-370000-HW689-DC05CCO3.pdf PDF
CN-370000-HW689-DC06BCO1.pdf PDF
CN-370000-HW689-DC10ACO1.pdf PDF
CN-370000-HW689-DC11CCO2.pdf PDF
CN-370000-HW689-DC11CCO3.pdf PDF
CN-370000-HW689-DC11CCO4.pdf PDF
CN-370000-HW689-DC11DCO1.pdf PDF
CN-370000-HW689-DC13BCO1.pdf PDF
CN-370000-HW689-DC13BCO3.pdf PDF
CN-370000-HW689-DC14BCO2.pdf PDF
CN-370000-HW689-DC15CCO1.pdf PDF
CN-370000-HW689-DC15CCO2.pdf PDF
CN-370000-HW689-DC15DCO1.pdf PDF
CN-370000-HW689-DC15DCO2.pdf PDF
CN-370000-HW689-DC17BCO4.pdf PDF
CN-370000-HW689-DC18BCO2.pdf PDF
CN-370000-HW689-DC20CCO1.pdf PDF
CN-370000-HW689-DC30ACO2.pdf PDF
CN-370000-HW689-DC32ACO1.pdf PDF
CN-370000-HW689-DC35ACO1.pdf PDF
CN-370000-HW689-FIL 3.pdf PDF
CN-370000-HW689-FIL12.pdf PDF
CN-370000-HW689-FIL19.pdf PDF
CN-370000-HW689-FIL20.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW689

CSS01A Completion August 31, 2022

This Task Assignment (TA) is issued in accordance with the Cost Proposal (CP) submitted by Aptim Environmental & Infrastructure, LLC (Aptim) on March 9, 2022, revised on March 25, 2022, revised again on March 28, 2022, and finally revised on April 5, 2022. This TA includes Project Management, Preparation of a workplan/quality assurance project plan, and fieldwork with temporary well installation and soil & groundwater sampling. The final deliverable is a site investigation report.

Andrew Smith (850) 245-8935 Consultant Consultant

Consultant Consultant

Consultant Consultant

Consultant

Aptim Environmental & Infrastructure, LLC

Aptim Environmental & Infrastructure, LLC

Eric Kramer (407) 287-3216

ERIC_15071

301 Zell Drive, Orlando, Florida

Advanced Chemical Co

✔ $ 24,434.16

$ 24,434.16

Scope of Work

Eric Kramer

Senior Environmental Engineer

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2022.04.08 17:17:34 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2022.04.06 12:16:08 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Site Inspection Workplan, QAPP, and Health and Safety Plan 04/29/2022

Field notes, MW installation logs, photos, GW sampling logs, soil sampling logs, COCs, Well Abandonment 05/31/2022

Final Site Inspection Report (SIR) / Project Management 07/08/2022

FDEP approval of SI Workplan, QAPP, and Health and Safety Plan (Subtask 2) $ 3,018.46

FDEP approval of Field notes, MW installation logs, photos, GW sampling logs, soil sampling logs, COCs, Well Abandonment (Subtask 3) $ 10,276.25

FDEP approval of Final SIR Report and Project Management (Subtask 1 & 4) $ 11,139.45

$ 24,434.16

HW689

CSS01A

www.FloridaDEP.gov

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Aptim Environmental & Infrastructure, LLC, HW689 Contract File

FROM: Andrew Smith, Contract Manager

DATE: April 6, 2022

SUBJECT: Negotiation Summary – CER21, TA CSS-01A

Site Investigation (SI) Activities Advanced Chemical Co.

ERIC_15071

This Task Assignment (TA) is intended for conducting Site Investigation activities at the Advanced Chemical Co property. The services are being conducted using federal funds from the CERCLA Site Screening Program (CSS) cooperative agreement that is administered by DEP on behalf of

EPA.

Subtask 1 Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, and fringe costs. The cost of this subtask is $2,133.68.

Subtask 2: Site Visit, Work Plan/QAPP, and Health and Safety Plan In accordance with an EPA directive, this subtask includes the completion of a Work Plan/Quality Assurance Project Plan (QAPP), a Health and Safety Plan (HASP) and site visit to determine possible soil boring and monitoring well locations. The SI QAPP Workplan will provide a brief summary of the scope of work and tables and figures showing the proposed sample locations. The agreed upon cost of this subtask is $3,018.46.

Subtask 3 SI Activities Under this subtask, Aptim will install five (5) temporary onsite shallow monitoring wells with soil borings occurring at the same locations. Vadose zone soil samples will be collected from the sample intervals of 0-2 and 2-4 ft bls, with the lower interval dependent on the depth to groundwater. Monitoring wells will be 1-inch diameter wells constructed of 10 feet of 0.010-inch slotted prepacked screens with 20/30 sand and 5 feet of casing to a total depth of 15 ft bls. Depth to water measurements will also be collected from all monitoring wells onsite. The soil samples and five new monitoring wells will be sampled and analyzed for VOCs by EPA Method 8260 (full list), PAHs by EPA Method 8270, TRPH, 8 RCRA metals (As, Bd, Cd, Cr, Pb, Hg, Se, and Ag), PFAS, Pesticides, and Herbicides by an FDEP lab. Per FDEP SOPs, at least 24 hours will be allowed to elapse prior to sampling the new wells. ATI Drilling has been selected as the drilling subcontractor contractor despite being the second lowest bidder due to availability and GPRS, Inc., will be the utility location services. The cost of this subtask is $10,276.25.

http://www.floridadep.gov/

Negotiation Summary – Task Assignment (TA) CSS01A Advanced Chemical Co

ERIC_15071

Orange County SI Activities April 6, 2022 www.FloridaDEP.gov

Subtask 4 SI Report A Site Investigation Report (SI) will be prepared detailing the field and laboratory results. The SI Report will summarize the current environmental conditions and any detected contamination in soil and groundwater, as well as identify potential exposure pathways. The report will include site background information, findings of previous investigations, identify the number of environmental samples and their locations that were evaluated to characterize the nature of the contamination. In addition, the report will describe the sampling methodologies, and present the results and findings of the investigation. The cost of this subtask is $9,005.77.

Summary DEP’s CSS Project Manager and Aptim’s Project Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $24,434.16. Documentation of these costs is included in the Level of Effort/Cost Proposal (LOE-CP) Form and LOE-CP letter provided by Aptim on April 5, 2022, as well as the Task Assignment Form for CSS-01A prepared by DEP. The final deliverable must be received by FDEP no later than August 31, 2022.

FDEP COST ESTIMATE

Contractor: Aptim Environmental & Infrastructure, LLC

Date: 4/5/2022

Task #: HW689-CSS-TBD ERIC_15071 SubTask 1 Project Management SubTask 6

Site: Advanced Chemical Co. SubTask 2 2-SI QAPP Workplan SubTask 7

Activity/Phase: Site Inspection (SI) SubTask 3 3-SI Field Activities SubTask 8

Project Manager: A. Smith (FDEP)/E. Kramer (APTIM) SubTask 4 4-SI Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$65.22 Project Manager E. Kramer 13 12.6 $60.24 Project Manager 1 M. Hawes 16 16 0 0 0 0 0 0 0 0 $65.22 Engineer/Scientist 5 E. Kramer 2 0 0 2 0 0 0 0 0 0 $61.98 Engineer/Scientist 5 G. Roberts 38 0 6 32 0 0 0 0 0 0 $34.53 Engineer/Scientist 2 K. Howard 70 2 38 30 0 0 0 0 0 0 $25.38 Engineer/Scientist 1 J. Harris 0 0 0 0 0 0 0 0 0 0 $32.56 Designer 2 S. Ferianc 9 3 0 6 0 0 0 0 0 0 $27.64 Technical Publications Spec H. Vining 5 1 0 4 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 Total Hours 153 13 22 44 74 0 0 0 0 0 0

Direct Labor $7,116.58 $818.72 $1,158.22 $1,684.02 $3,455.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 85.58% $6,090.36 $700.66 $991.20 $1,441.18 $2,957.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 19.38% $1,379.19 $158.67 $224.46 $326.36 $669.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 31.96% $2,274.46 $261.66 $370.17 $538.21 $1,104.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $16,860.59 $1,939.71 $2,744.05 $3,989.77 $8,187.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $480.00 $0.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $0.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $3,575.00 $0.00 $3,575.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $650.00 $0.00 $650.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $4,225.00 $0.00 $4,225.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $357.50 $0.00 $357.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $4,582.50 $0.00 $4,582.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $0.00 $160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $375.00 $0.00 $375.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF SHAW Page 1

FDEP COST ESTIMATE

Contractor: Aptim Environmental & Infrastructure, LLC

Date: 4/5/2022

Task #: HW689-CSS-TBD ERIC_15071 SubTask 1 Project Management SubTask 6

Site: Advanced Chemical Co. SubTask 2 2-SI QAPP Workplan SubTask 7

Activity/Phase: Site Inspection (SI) SubTask 3 3-SI Field Activities SubTask 8

Project Manager: A. Smith (FDEP)/E. Kramer (APTIM) SubTask 4 4-SI Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Equipment (Analytical related) $290.00 $0.00 $290.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $825.00 $0.00 $825.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $22,748.09 $1,939.71 $2,744.05 $9,877.27 $8,187.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,686.07 $193.97 $274.41 $398.98 $818.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $24,434.16 $2,133.68 $3,018.46 $10,276.25 $9,005.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF SHAW Page 2

SITE :

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager 1 M. Hawes 16

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard 2 Engineer/Scientist 1 J. Harris Designer 2 S. Ferianc Drafting 3

Technical Pub Specialist 3 H. Vining 1

TOTAL LABOR 22

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE USEAGE COST

Preferred Drilling Drilling Services 0 Lump $3,475.00 $0.00 GPRS, Inc. Utility Loction Services 0 Lump $650.00 $0.00 Erwin Remediation Non-Haz Soil/Water T&D 0 Drum $100.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 6020 (As) Groundwater $14.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 day 0 $0.00 Water Level Indicator $25.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

HASP Development

Report Document Production, Formating Text, Compilation into Adobe Format for Submittal

Advanced Chemical Co.

2-SI QAPP Workplan

4/5/2022

Development of QAPP and Work Plan Report

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager 1 M. Hawes Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 1 J. Harris Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 44

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 4 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE USEAGE COST

ATI Drilling Drilling Services 1 Lump $3,575.00 $3,575.00 GPRS, Inc. Utility Loction Services 1 Lump $650.00 $650.00 Atlantic Supply Well Installation Supplies 0 Lump $888.85 $0.00 Erwin Remediation Non-Haz Soil/Water T&D 0 Drum $100.00 $0.00

TOTAL $4,225.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8081 $105.00 0 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 4 $160.00 Monitoring Well Installation Kit $325.00 Day 1 $325.00 Shallow GW Sampling Kit $290.00 day 1 $290.00 Total Survey Station $50.00 Day 1 $50.00 55-gallon Drum $100.00 each 0 $0.00

TOTAL EQUIPMENT $825.00

Notes: Proposed sampling 5 proposed shallow wells, Sample Analysis by FDEP State Laboratory

Well Installation, GPR Bid Request Documents and Summaries (4 hrs), Submitting Markout Requests (1 hr), Coordinating Sampling and Oversight (1 hr)

Initial mobilization to White Line for Utility Survey Markouts (4 hrs), Oversee GPR Survey to Clear Proposed Drilling locations, including travel (8 hrs), Mobilization for Soil Sampling and Well Installations (2 hrs), Round Trip Travel for Soil Sampling and Drilling (2 hrs), Collection of Soil Samples and Installation of 5 monitoring wells (8 hrs), Site Restoration (1 hr).

Mobilization for Groundwater Sampling (1 hr), Round trip Travel to Site for Groundwater Sampling (2 hrs). Collect Depth to Groundwater Measurements and prepare work areas for GW sampling (1 hr). Preparation and Testing/Calibration of GW Sampling Field Equipment (1 hr). Collection of Groundwater Samples from 5 temporary monitoring wells (5 hrs). Chain of custody preparation, Sample Packaging, Shipping to State Laboratory (1 hr).

Abandonment of Temporary Monitoring Wells, including travel (2 hrs).

Advanced Chemical Co.

3-SI Field Activities

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager 1 M. Hawes

Engineer/Scientist 5 E. Kramer Technical SI Report Review, Recommendations 2 Engineer/Scientist 5 G. Roberts Preparation of SI Report, Maps 32

Engineer/Scientist 2 K. Howard

Engineer/Scientist 1 J. Harris Designer 2 S. Ferianc SI Report Drafting 6

Technical Pub Specialist 3 H. Vining 4

TOTAL LABOR 74

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE USEAGE COST

Preferred Drilling Drilling Services 0 Lump $3,475.00 $0.00 GPRS, Inc. Utility Loction Services 0 Lump $650.00 $0.00 Erwin Remediation Non-Haz Soil/Water T&D 0 Drum $100.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 6020 (As) Groundwater $14.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 day 0 $0.00 Water Level Indicator $25.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Advanced Chemical Co.

Research and Preparation of SI Tables (Water Wells, Population Density, Sampling Rational, Sample Location Coordinates, Analytical Results and Background Reference Calculations, Well Completion Specifics, Field Sample Parameters, Field GW Measurements, Construction Logs), Preparation of Associated Figures

Report Document Production, Formating and Data Checking Tables Figures and Text, Compilation into Adobe Format for Submittal

4-SI Reporting

Proposed Scope of Work Advanced Chemical Co. Inc.

Site Investigation and Reporting Task Assignment CSS-TBD ERIC_15071 (Former COM_148838) Aptim Environmental & Infrastructure, LLC April 5, 2022

The following Task Assignment (TA) scope of work for the former Advanced Chemical Co. Inc. facility, located in Orlando, Orange County, Florida has been prepared to summarize the proposed Site Investigation site activities in accordance with the FDEP Recommendations provided by email on March 9, 2022 and the clarifications email dated March 25, 2022. Bid summaries for the drilling services, including proposed installation dates, and quotes for well supplies are attached.

Subtask 2 SSA Work Plan/WAPP, and Health and Safety Plan

As required by the FDEP and EPA, Subtask 2 includes the preparation of a Work Plan and Quality Assurance Project Plan (QAPP), and a Health and Safety Plan (HASP).

Subtask 3: SSA Field Activities:

Subtask 3 includes the collection of vadose zone soil samples from the sample intervals of 0-2 and 2-4 ft bls, with the lower interval dependent on the depth to groundwater. The depth to groundwater reported at a nearby site (Brenntag site) located less than ½ mile north of the former Advanced Chemical site ranged from 2 to 4.5 ft bls but was most frequently reported near the depth of 2 ft bls. Soil samples will be sent to the FDEP Laboratory in Tallahassee, to be analyzed for VOCs by EPA Method 8260 (full list), PAHs by EPA Method 8270, TRPH, 8 RCRA metals (As, Bd, Cd, Cr, Pb, Hg, Se, and Ag), PFAS, Pesticides, and Herbicides.

Following the collection of the soil samples, the scope included the installation of five (5) shallow temporary monitoring wells comprised of two (2) background wells and three (3) onsite temporary wells, at the locations specified by the FDEP. The proposed 1-inch diameter wells will be constructed of 10 feet of prepacked screens slotted to 0.010-inch with 20/30 sand pack that is threaded to 5 feet of casing for a total depth of 15 ft bls. The actual depth of the installation will be dependent on the depth to groundwater.

The specifics of the proposed monitoring well installations are provided in the monitoring well drilling bid documents. Following installation and prior to the collection of groundwater samples, the temporary wells will be surveyed for relative casing elevations and depth to groundwater measurements will be collected.

The second lowest bidder (ATI Drilling) was selected for the drilling services due to the lowest bidder (Preferred Drilling) having scheduling conflicts that pushed the first available date for drilling to late June.

ATI has an opening to perform the drilling beginning on April 27.

Approximately 24 hours after completion of the well developments, groundwater samples will be collected from the temporary monitoring wells. The groundwater samples will also be sent to the FDEP Laboratory in Tallahassee, to be analyzed for VOCs by EPA Method 8260 (full list), PAHs by EPA Method 8270, TRPH, 8 RCRA metals (As, Bd, Cd, Cr, Pb, Hg, Se, and Ag), PFAS, Pesticides, and Herbicides. The temporary wells will be abandoned by the tremie method with grout upon completion of samling.

Subtask 4: SSA Reporting:

A Site Investigation (SI) Report will be prepared detailing the field and laboratory results. The SI Report will summarize the current environmental conditions and any detected contamination in soil and groundwater and identify any exposure pathways. The report will include site background information, findings of previous investigations, identify the number of environmental samples and locations that were evaluated to characterize the nature of the contamination, describe the sampling methodologies, and present the results and findings of the investigation.

Field activities will commence, upon approval of the task assignment with submittal of the Work Plan within 30 days, or around April 29, 2022. The field work will be scheduled for completion in May 2022, which allows submittal of the completed SSA Report by July 8, 2022. A Task Completion date should be set for August 31, 2022, to allow for review and approval of the SI Report.

APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC, and Florida Department of Environmental Protection contract number HW689. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.

If you have any questions, please contact APTIM for clarification, thank you.

Groundwater Protection

Earth Tech Drilling, Inc.

Preferred Drilling Solutions ATI Drilling

Item Description Total Amount Total Amount Total Amount Total Amount Scope of Work Services $4,875.00 $5,400.00 $3,475.00 $3,575.00 Number of Drums 0 0 0 0 Days for Completion of Scope 1.5 1 1 1

Total $4,875.00 $5,400.00 $3,475.00 $3,575.00

March 17, 2022

DPT Well Installation Bid Summary Advanced Chemical Co. Incorporated

301 Zell Drive

FDEP Site ERIC_15071 (COMET_148838) Orlando, Orange County, Florida 32824

Roberts, Gregg

From: Roberts, Gregg Sent: Monday, March 14, 2022 4:48 PM To: Todd Hodgson Cc: Kramer, Eric Subject: Request for Proposal - DPT Drilling Services, CERCLA Site Advanced Chemical-Orlando Attachments: DPT Drilling RFQ 0322.pdf

Hello Todd:

Please find the attached FDEP CERCLA Site Screening Section Request for Quotation for the installation of five shallow temporary monitoring wells at the remote former Advanced Chemical facility in Orlando. I apologize for the requested quick turn for the estimate. Also, please provide approximate dates that your company would be available to schedule these services. An email response is fine.

Please call should you have any questions and thank you, Gregg

GREGG ROBERTS, PG

Project Manager

APTIM | ENVIRONMENT & SUSTAINABILITY

O 813 612 3687 M 863 670 0215 E gregg.roberts@aptim.com

725 US Highway 301 South Tampa, FL 33619

APTIM.com

GROUNDWATER

11111111 I II 111111111 I 11111111111 'I

Sonic Auger DPT Injection Well Abandonment

DATE: 3/17/2022

ESTIMATE#: 322063

I

PROJECT

1 I I i

Former Advanced Chemicals 301 Zell Drive Orlando, Orange County, Florida

PROTECTION

A Division of DRJLLPRO# LLC

CUSTOMER

I I

Gregg Roberts

APTIM

725 US 301 South Tampa, Florida 33619

(813) 612-3687 J , DPT Combo Rig Well Installation

PROJECT DESCRIPTION:

(5) 1" x 15' PVC Well w/10' of .010 Slot Prepack Screen, No Completion, No Soil Sampling (Wells will be pulled after Client Sampling within 30 days of Installation.)

Note: It is Groundwater Protection policy that if 'Pea Gravel' is encountered, ANY type of boringldrilling will be terminated immediately and the boring location will need to be relocated to a clear location by the client.

Utility Locates on Private Property are the responsibility of the client

Borehole clearance to 5' bgs beyond 20 minutes willrequire a change order for additional time and additional cost

Damages to utilities on private property during borehole clearance are the rsponsibility of the client _______ . __ _ __ I_QTY __ ~it I Rate _!QTAL !

--t--.J. -,I!.--n-'I'glc:..sh-t-+i $ 50X- __ 1,ooO~OOj ____ ...._. : $ 225.00 i $

I ~ 31 DPT Rig and Cre~ (Install) . day L$ 1,500.00 I $ 1,500.00 I 13a jDPT Rig and Crew (Pull Wells/Grout up Boring~)_ __ :~~~-t~-1-/2-d-'-a-y-iI_$=~~~_1-'-,,-1-,-00,-.0-,-0'-l-1.;_$ 1.:_,1..;..O-'-O . ...;..00"---l.

I 41 Materials: 1" PVC Well Installation (DPT) . 75 foo!__p 4.00 $ 300.00 I !. 5lMaterialsJ2) 1" x 5' PVC 010 Prepack Screen, 3" Exp.~.!:!._1_5 _, ea~~ _ 170.00 I $ __ 850.00J

~~terials: Temp Well Boring Groutin9 _ _ I 5 I each 1 $ 25.00 -U 125.00 I L 712' x 2' Concrete Pad w.8" Flush Manhole -T: 5_-l-.I..........:e:.::a:.:.:ch~-lI...:$:...__..........:10:.::0...:.0:.::0-t1...::$:........ - I

~ 8 Well Development (up to 1/2 hour with Pump) 9! Drum (Soil) (As Needed) -------1--1-

I I ----~~~~------------ 110lDrum (Development Water) (As Needed) H I ,I Permits:Orange County- Not Applicable, Wells will be pulled after - - I 11. Client Sampling within 30 days of installation. __ ~j_ _

: 10 lDESCRIPTION

I 11 Mobilization/Demobilization , I

(Install and We~ Removal)

I 21Per Diem '-- __ - - -- _-

J --each 1$ 75.00 I Included each 1$ 65.00 $ - I I each 1$ 65.00 $ - I I each 1$ 44.00 $ - - -- Completion: 1 Day

THANK YOU FOR YOUR BUSINESS!

Subtotal! $

4,875.00 , "Actual quantities used and days onslte will be Invoiced" , I

Todd Hodgson Project Manager

TOTAL l $ _;4~.8-,-75:..:_0.:...:o,-,i

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

~\.APTIM

SECTION 7

DPT Drilling Services OPT Monitoring Well Installations

Former Advanced Chemical Co.

301 Zell Drive

Orlando, Orange County, Florida COMET Site ID COM_148838

Make and Model of Rig = ~ '2 '2 A Number of days to complete OPT monitoring well installations including mobe/demobe - ("1 L ~J's

Estimated Availability Dates for Proposed Scope of Work - f'J\. A'i \ 1- '10 J MAi 23- 27

Lump Sum Price Quotation for Scope of Work: y 1]1 5" I ~ ILump

(Please also provide Price Buildup Spreadsheet with Company Letterhead)

Proposal valid of 120 days

Terms and Conditions in accordance with APTIM's RFQ

Signed:_~=~;.,__.,;,..___;l;""~~---IIr~ _

Name: __ ..:r..\ .lJ.o •••• L>::.:Io\::>"--..l...tk~~=b;...,jS:.::u::J= _

Title: B'(Vrc.:?~ Company: G~.,..:::e,w~L- et4-ztz.,Tl~

Date: 11 111 ~2-

From: Roberts, Gregg Sent: Monday, March 14, 2022 4:48 PM To: 'borlando'; cbucher@earthtechdrilling.com Cc: Kramer, Eric Subject: Request for Proposal - DPT Drilling Services, CERCLA Site Advanced Chemical-Orlando Attachments: DPT Drilling RFQ 0322.pdf

Hello Bob and Charles:

Please find the attached FDEP CERCLA Site Screening Section Request for Quotation for the installation of five shallow temporary monitoring wells at the remote former Advanced Chemical facility in Orlando. I apologize for the requested quick turn for the estimate. Also, please provide approximate dates that your company would be available to schedule these services. An email response is fine.

Please call should you have any questions and thank you, Gregg

GREGG ROBERTS, PG

Project Manager

APTIM | ENVIRONMENT & SUSTAINABILITY

O 813 612 3687

From: Roberts, Gregg Sent: Monday, March 14, 2022 4:48 PM To: Kevin Bonacum Cc: Kramer, Eric Subject: Request for Proposal - DPT Drilling Services, CERCLA Site Advanced Chemical-Orlando Attachments: DPT Drilling RFQ 0322.pdf

Hello Kevin:

Please find the attached FDEP CERCLA Site Screening Section Request for Quotation for the installation of five shallow temporary monitoring wells at the remote former Advanced Chemical facility in Orlando. I apologize for the requested quick turn for the estimate. Also, please provide approximate dates that your company would be available to schedule these services. An email response is fine.

Please call should you have any questions and thank you, Gregg

GREGG ROBERTS, PG

Project Manager

APTIM | ENVIRONMENT & SUSTAINABILITY

O 813 612 3687

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 3/15/22

Unit Unit Rate Number of Units Extended Price whole day $1,675.00 1 $1,675.00 half day $1,300.00 $0.00 per foot $17.00 $0.00 each $95.00 10 $950.00 each $45.00 $0.00 each $20.00 10 $200.00 per well $110.00 $0.00 roundtrip $650.00 1 $650.00 per crew / per night $0.00 $0.00 each $70.00 $0.00 each $0.00 $0.00

$0.00

$0.00

$0.00

TOTAL QUOTE PRICE $3,475.00

Notes: 1. Includes expendables, tubing, points, liners, caps, plugs, saw cuts, development, standby time, steam cleaning decon, and grouting.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Estimator Date: 3/15/22

Install via 3.25" rods

Wells to be pulled and boreholes abandoned by client within 72 hours of installation

301 Zell Dr, Orlando, FL

Well Completion (includes MH w/ cover, concrete pad, and locking well cap)

Well Riser (includes all materials) ID 1" 5' Length

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"

Auger Attachment, 2" Well Install

Direct Push Half-Day Rate 1 - on-site half day

Site Name and Location: Advanced Chemical Co., Inc

Consultant Name: APTIM

PROPOSED SCOPE OF WORK:

(5) 1" x 15' temp MW's with 10' .010 prepacked screen, soil sampling as needed, backfill and restore grade, spread excess cuttings

All locations will need to be hand cleared to 10' or refusal, but no less than 5'

Days to Complete Scope of Work: 1

Direct Push Daily Rate 1 - on-site day

Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Other (specify)

Other (specify)

Other (specify)

Permits

DOT Approved 55-gal Drum

Per Diem Mobilization

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

SECTION 7

DPT Drilling Services DPT Monitoring Well Installations

Former Advanced Chemical Co.

301 Zell Drive

Orlando, Orange County, Florida COMET Site ID COM_148838

Make and Model of Rig =

Number of days to complete DPT monitoring well installations including mobe/demobe -

Estimated Availability Dates for Proposed Scope of Work -

Lump Sum Price Quotation for Scope of Work :________________________/Lump

(Please also provide Price Buildup Spreadsheet with Company Letterhead)

Proposal valid of 120 days

Terms and Conditions in accordance with APTIM’s RFQ

Signed:___________________________________

Name:____________________________________

Title:____________________________________

Company:________________________________

Date:____________________________________

Geoprobe 7822DT

4/28/22

$3,475.00

Kevin Bonacum

Estimator

Preferred Drilling Solutions, Inc.

3/15/22

From: Roberts, Gregg Sent: Monday, March 14, 2022 4:48 PM To: 'Marcelo Reis MSc' Cc: Kramer, Eric Subject: Request for Proposal - DPT Drilling Services, CERCLA Site Advanced Chemical-Orlando Attachments: DPT Drilling RFQ 0322.pdf

Hello Marcelo:

Please find the attached FDEP CERCLA Site Screening Section Request for Quotation for the installation of five shallow temporary monitoring wells at the remote former Advanced Chemical facility in Orlando. I apologize for the requested quick turn for the estimate. Also, please provide approximate dates that your company would be available to schedule these services. An email response is fine.

Please call should you have any questions and thank you, Gregg

GREGG ROBERTS, PG

Project Manager

APTIM | ENVIRONMENT & SUSTAINABILITY

O 813 612 3687

Contractor: Aptim Proposal No.: 22203018 Contact Name: Gregg Roberts

Contact Phone: 813 612-3687 Date: 3/16/2022 Contact Email: gregg.roberts@aptim.com

Site Address: FDEP ID#:

PROPOSED SCOPE OF WORK: Estimator: MR

Direct Push Rig Daily Rate - (maximum 10 hours) whole day $1,525.00 1 $1,525.00 Direct Push Rig Half-Day Rate 1 - (maximum 5 hours) half day $1,325.00 $0.00 Prepack Well Screen (includes all materials) Length 5ft ID __1_"____ each $80.00 10 $800.00 Well Riser (includes all materials) ID-1" 5' Length each $35.00 5 $175.00 per well $100.00 5 $500.00

Borehole clearance using geophysics (GPR and Electronics) LS $0.00

Mobilization (one rig) Miles round trip: round trip $575.00 1 $575.00 Daily travel- Automatic when travel distances are 100 to 150 miles round trip day $50.00 $0.00 Per Diem - Automatic when field work is longer than 9hr/day or round trip over 150 miles per crew/night $350.00 $0.00 DOT Approved 55-gal Drum - SOIL each $65.00 $0.00 Special Order Closed Top Drums- WATER each $95.00 $0.00

Permits 2 (Drilling and abandonment only; cost according to WMD & Local Municipalities)-SB each $0.00

Permits 2 (Drilling and abandonment only; cost according to WMD & Local Municipalities)-MW each $0.00 Pre-drilling conference call- 30 minutes LS included

Extra hour rate 5 hour $175.00 $0.00

TOTAL QUOTE PRICE $3,575.00

NOTES: This proposal is only valid for this specific scope of work. Any changes, prices shall be revised. Actual field days, materials and hours will be invoiced

Days to Complete Scope of Work: approx.1 day(s) (depends on access, client sampling time or other restrictions) " Subcontractor Company Name: ATI Companies, LLC Subcontractor Mailing Address: 4610 Central Av. St. Petersburg FL 33711

Signature:___________________________ Reviewer:____________________________ Date: 3/16/2022

NOTE: to schedule work, contact 727-328-0268 Bid Valid for 90 Days

Payment terms: Net 60 days

This proposal acceptance includes ATI's standard Terms and Conditions

Name of Firm:__________________________________________________ Date: ______________

Signature of Representative: _________________________________________

Print name of signing Representative:________________________________

NOTE: This proposal needs to be signed once job is awarded to ATI Companies, LLC

301 Zell Dr, Orlando, FL

Client is responsible for any ROW or access permits and MOT for the work to be performed, if needed.

• DPT install five (5) Temp. Wells to 15ft. Wells are 1" with 10ft of prepack screens. Hand clear to 5ft and macrocore to TD.

• Abandon/remove once sampled (same mob)

SAFETY

DRILLING DOUBLE CASED WELL

ABANDONMENT

DRILLING ACTIVITIES

6. A perdiem will automatically be charged when field work is longer than 9hr/day or round trip over 150 miles

1. Includes expendables, tubing, points, liners, caps, plugs, sawcuts, steam cleaning decon, well development, and grouting.

MISCELLANEOUS

2. Well Permits -Requires 5 days Notice to Water Management District - Actual cost only.

3. Utility Clearance - Requires 72 Hour Notice Prior to Drilling. ATI will complete notification to Sunshine State One Call (Sunshine) prior to initiating drilling. Sunshine will not perform locates on private property (only right of ways and easements). It is the client and/or owners responsibility to provide information from private property. Damage repairs (time and materials) caused to any underground utilities on private property is client responsibility.

ATI will review information provided regarding underground utilities to confirm clearance at boring locations. As another safety precaution, ATI will perform hand clear to approximately 5 feet below ground surface to check for utilities prior to drilling. If the client anticipates the potential for multiple utilities underground but has no information on location, we can provide private utility locating services at an additional cost. Please advise us of your needs prior to date of drilling.

4. Price assumes no rock will be encountered in the depth of penetration. Add $15/foot for rock drilling if required.

5. DPT Daily and Half-Day Rate: Hours over Half-day and Full Day Rate - $175 / hour

Temp. Well Completion (incl. sand pack, seal, development, locking cap and abandonment) mailto:gregg.roberts@aptim.com

Request for Quotation (RFQ) FDEP CERCLA Site Screening Section

DPT Shallow Well Installations

RE: Advanced Chemical Co., Incorporated 301 Zell Drive Orlando, Orange County, Florida 32824 Compliance Enforcement Tracking System (COMET) Site ID No. COM_148838 Hazardous Waste ID No. FLR000050989

Vendors:

SECTION 1

You are hereby invited to submit a quotation in accordance with the instructions and items below in support of Aptim Environmental & Infrastructure, LLC (APTIM), www.aptim.com.

Please submit your complete proposal, prepared as specified herein, to APTIM by close of business 13/16/22, if possible. Proposal submission before or on the required date by e-mail is acceptable.

SECTION 2

YOUR PROPOSAL SHOULD INCLUDE THE FOLLOWING: The omission of any of the following may deem your response as non-responsive. Note, for regular bidders only provide the following red highlighted, if the information has not been submitted within the last month.

A. Submit your proposal on the Attached Lump Sum DPT Drilling Quote Form. You may include additional backup as required.

B. Schedule of values (individual hourly rates) C. Your proposal is valid for 120 days.

D. Provide Insurance Certificate, show evidence that your Workman’s Comp insurance is valid in

Florida (if not on file with APTIM).

E. Provide Experience Modification Rate (EMR) certified by your carrier for Workmen’s Comp (if not on file with APTIM).

F. Please identify any restrictions on your ability to meet the period of performance.

SECTION 3

REQUIREMENT AND SCHEDULE:

Technical issues will be addressed by the Project Manager, Gregg Roberts at 813-612-3687 or gregg.roberts@aptim.com.

General

1. Drilling locations have the potential for exposure to numerous and unknown contaminants, in particular solvents. Assume Level D PPE, with APTIM conducting health and safety monitoring.

2. Although the drill locations are on private property, Sunshine utility mark outs must be requested prior to the work being performed. In addition, the drilling contractor will also hand auger each location to a depth of 10 feet or to refusal (but not less than 5 ft bls) below the surface to check for utilities. A private locate for utilities will be requested from the FDEP, and will likely be performed in the vicinity of each borehole prior to the scheduled drilling event.

3. The subject property access arrangements will be arraigned by the FDEP. The drilling contractor is responsible for any necessary State or Local drilling permits, including Water Management District requirements, although, please note the wells will be removed/abandoned upon completion of sampling, to be performed approximately 24 hours following the installation.

4. The former Advanced Chemical Co. is currently a truck maintenance and repair facility.

Although an active facility, it is unknown if the owner will allow access to tap water or power at the site during drilling operations. APTIM should have more information regarding the access to water and power onsite before the work begins, however plan to transport and provide any necessary equipment decontamination water or drilling fluids.

6. Drillers are to provide and utilize safety vests and cones, if necessary. See the attached proposed well location map.

7. Drilling equipment must be property decontaminated between locations in accordance with FDEP 2017 DEP-SOP-001/01 Standard Operating Procedures for Field Activities procedures. All decontamination fluids will not be captured, and should be allowed to discharge over a permeable onsite location.

9. Drilling activities IDW (soil and decontamination or purge water will not be captured.

11. Approximate start and completion date of the project is May 2022, if possible. Please provide a possible available time frame for the work with the bid response (email is acceptable).

Specific

The site location:

The FDEP conducted an inspection on November 23, 1998 and found various types of chemical products used in the janitorial industry stored without proper containment. The owner stated that the business was closed and that he was in the process of selling off the remaining product. He was advised that all product not sold should be properly identified and disposed of according to applicable laws. Photographs from the inspection show liquids and powders spilled on the floor, staining of the floor, and distressed vegetation adjacent to a drainage ditch that runs beside property.

The file did not mention specific types of chemicals that were at the facility, but some chemicals that are commonly associated with cleaning products include tetrachloroethylene (PCE), trichloroethylene (TCE), 1,4-dioxane, naphthalene, and acetone.

The FDEP conducted a followup site inspection on September 29, 2010, but found Advanced Chemicals no longer in operation and AB Truck Services occupying the property.

This site was discovered by the FDEP CERCLA Site Screening Section (CSSS) from an inventory database of former chemical manufacturers. Emphasis was on finding non-active RCRA sites with previous violations, complaints and/or poor housekeeping

Scope-of-Work: For bidding purposes, please consider the following scope of work for the site:

1. DPT Installation of five (5) shallow 1-inch diameter monitoring wells, as follows:

a. DPT installation of five (5) 15-ft shallow temporary monitor wells with the following specifications:

b. Utilize 3 1/4 inch OD or equivalent rods

c. 1-inch diameter, schedule 40, PVC well riser and 0.010” slotted screen installed to a total depth not to exceed 15 feet bls.

d. Ten (10) feet Pre-Packed Well Screen with a 20/30 grade sand pack.

e. Flush-threaded PVC bottom caps and well riser piping.

f. Allow for borehole collapse to top of screen at 5 feet bls, then place silica sand seal

(20/30 grade or equivalent) to 3 ft bls (2 foot above top of screen).

g. Place one (1) foot of a fine silica sand seal (30/65 grade or equivalent) from 3 ft bls to 2 ft bls.

h. Grout borehole to within 0.5 feet bls or less,

i. At surface, riser pipe will be allowed to remain above ground, therefore a manhole will not be required.

j. Concrete will be placed surrounding the riser to the approximate surface.

k. A water-tight lockable expandable plug will be installed at the top of the well riser.

l. Development by rigorously over-pumping and surging.

m. The proposed locations for the five (5) shallow well locations are shown on the attached Figure.

Provide the following:

1. All bidders please include the make and model of the rig intended to perform this scope-of-work.

2. Note that the actual construction and depth of the shallow wells may be dependent on the depth to shallow groundwater determined in the field, but will not exceed 15 ft bls

3. Also note that IDW will not be captured but will be allowed to percolate back into the ground in a permeable area adjacent to the location of each well.

3. All bidders please include an estimated time required to complete the scope at the site.

5. Note, any uncompleted bores will be properly abandoned by tremie-grouting the hole under pressure from the bottom up.

6. Please note that during the performance of the scope of work, any cost exceedances must be approved in advance, in accordance with the FDEP Waste Cleanup Contract.

7. Please provide an all-inclusive price quote by close of business Wednesday, March 14, 2022, if possible.

Please call Gregg Roberts at (863) 670-0215 should you have any questions.

SECTION 4

This request for proposal does not constitute a commitment on the part of APTIM. Offeror's proposal shall in no way be binding upon APTIM unless and until it is accepted in writing. APTIM reserves the right to reject any and/or all proposals received, and to negotiate separately with any offeror if such action is considered to be in the best interest of APTIM. APTIM shall not be liable to Offeror for any costs incurred by Offeror in the submission of its proposal in reply hereto. Offerors are cautioned to initially submit their most favorable proposal price and other factors considered. The possibility exists that APTIM may award a Purchase Order without holding discussion with any Offeror prior to award.

APTIM reserves the right to consider for award any alternate proposal if it appears to be in the best interest of APTIM. An alternate proposal providing for technical improvements and/or cost reduction considerations may be submitted. Any alternate proposal must be separately packaged and clearly marked Alternate Proposal.

Deviations and/or assumptions pursuant to the requirements stated herein shall be accompanied by rationale and explanation and clearly identified. APTIM will, if no deviations and/or assumptions are submitted, assume full compliance to the requirements set forth herein. Award will be made to that proposal determined to be most advantageous to APTIM and as a result the award may be made to other than the Offeror with the lowest proposed price. Any Purchase Order resulting from this RFQ shall be subject to the Terms and Conditions as stated below:

SECTION 5

The selected subcontractor by signing a purchase order will agree to perform the approved scope of work at the approved costs. Any changes to the scope of work or cost must be approved in writing by APTIM prior to the completion of the project. Subcontractor must notify APTIM immediately either verbally or in writing once a change in scope is identified.

No first tier contractor or vendor awarded work under this purchase order shall further subcontract, assign, or transfer any work that costs $2,500 or more without the prior written consent of APTIM. Violations of this provision shall result in forfeiture of payment for the associated work.

The contractor represents it services and installations shall be performed in a manner consistent with the level of care and skill ordinarily exercised by other professionals under similar circumstances at the time of services are performed and that the services meet the requirements as required by State statute.

The contractor agrees to be responsible for the fulfillment of all work elements included in any subcontract consented to by APTIM and agrees to be responsible for the payment of all monies due under any subcontract in accordance with Section 287.0585, F.S. It is understood and agreed by the contractor that APTIM shall not be liable to any subcontractor or vendor for any expenses or liabilities incurred under the subcontract and that the contractor shall be solely liable to the subcontractor or vendor for all expenses and liabilities incurred under the subcontract.

This purchase order does not relieve the contractor or vendor from liability for harm or injury to human health or welfare, animal or plant life, or property, caused by its activities or from penalties.

This work is being performed by the State of Florida's Waste Site Cleanup Program and as such, the State of Florida's performance and obligation to pay for services under a Work Order to the Prime Contractor (APTIM) is contingent upon appropriations by the Legislature in effect at the time of execution.

Authorization for continuation and completion of this work and payment may be rescinded with proper notice at the discretion of APTIM if Legislative appropriations are reduced.

If the contractor fails to perform the required scope of work, fails to perform the work in a satisfactory manner, or makes misrepresentations to APTIM, then payment for that work will be forfeited.

SECTION 6

A. Terms of Payment: Net 45 days B. Terms and Conditions:

APTIM Work Agreement Client flow downs as applicable

Should you have any questions please call Gregg Roberts at 813-612-3687.

Attachments: Figure

SECTION 7

DPT Drilling Services DPT Monitoring Well Installations

Former Advanced Chemical Co.

301 Zell Drive

Orlando, Orange County, Florida COMET Site ID COM_148838

Make and Model of Rig =

Number of days to complete DPT monitoring well installations including mobe/demobe -

Estimated Availability Dates for Proposed Scope of Work -

Lump Sum Price Quotation for Scope of Work :________________________/Lump

(Please also provide Price Buildup Spreadsheet with Company Letterhead)

Proposal valid of 120 days

Terms and Conditions in accordance with APTIM’s RFQ

Signed:___________________________________

Name:____________________________________

Title:____________________________________

Company:________________________________

Date:____________________________________

State of Florida, Maxar, Microsoft

Advanced Chemical Sampling Locations - 3/8/2022 0 50 100 15025

Feet

Item Description Units Unit Price Total

Amount Units Unit Price Total

Amount Units Unit Price Total…

This is the start of the file's text. The full file is on GovTribe.