CN-370000-HW689-DC29ACO2.pdf
PDF 1 MB Posted
- Contract number
- HW689
- Issued by
- Florida
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department) Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC029A 2 HW689
Gabriel Sostre 850-245-8749 APTIM Environmental & Infrastructure, LLC
Eric Kramer 407-287-3216
ERIC_5381
Spring Lake Cleaners, Inc. (Former)
$ 128,577.17 $ 131,202.50
$ 128,577.17 $ 131,202.50
01/16/2026 04/17/2026 91
1 1 2
APTIM Environmental & Infrastructure, LLC
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.11.10 08:28:57 -05'00' Tim Bahr Digitally signed by Tim Bahr
Date: 2025.11.07 15:28:04 -05'00'
N/A
This TACO authorizes a Change in Cost as well as a change in the completion date of the TA.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
Memorandum
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : Spring Lake Cleaners Inc.
SUBTASK:
DATE: July 30, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5 G. Roberts 14
Engineer/Scientist 4 S. Flynn
Engineer/Scientist 2 K. Howard 67
Engineer/Scientist 2 K. McDonald 28
Engineer/Scientist 1 B. Blount 54
Engineer Scientist 1 R. Lindsay 18
Designer 2 S. Ferianc
Technical Publications Specialis H. Vining
Technical Publications Specialis L. Houser 3
TOTAL LABOR 186
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 1 $80.00
Van or Truck $120.00 Day 4 $480.00
Van or Truck $480.00 Week 1 $480.00
TOTAL VEHICLE $1,040.00
PER DIEM STAFF DESCRIPTION RATE UNIT USEAGE TOTALS
Hotel 0 $150.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE ACTUAL TOTALS
Survtech Solutions Survey and Benchmark Placement $9,985.00 LS 1 $9,985.00 $9,985.00
GeoTek Utility Locate Services $750.00 LS 1 $750.00 $750.00
Atlantic Supply MAGS Well Supplies (Casing, Screen, Sand) $1,097.43 LS 1 $919.84 $919.84
TOTAL $11,654.84
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 7 0 $1,400.00
EPA Method 8260 (Full List) Soil $110.00 66 0 $7,260.00
EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 1 0 Contingency $55.00
EPA Method 8260 (VOHs) Leachate $73.00 1 0 Contingency $73.00
EPA Method 8260 (Full List) Well $110.00 0 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $8,788.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 9 $360.00
Soil Sampling Kit (concrete) $235.00 Day 3 $705.00
MAGS Investigation Kit $500.00 Day 1 $500.00
Tedlar Bags $20.00 bag 4 (3 Included w/Kit) $80.00
Shallow GW Sampling Kit $290.00 Day 0 $0.00
Encore Sampler $16.00 each 63 $1,008.00
55 Gallon Drums $100.00 each 1 $100.00
TOTAL EQUIPMENT $2,753.00
2-SiteMeeting, MAGS/Soil
MAGS Analytical Data and Graph Reviews for Reporting to FDEP (2 hrs) Onsite Meeting with Property Owner/Property Manager/Maintenance Technician and/or tenant and perform Utility White-lines for Markouts including travel (4 hrs), Research and Prepare Site Access Agreement for Adjacent Properties (1 property) south of Shopping Center (1 hr), Site Work Notifications (1 hr), Submit Sunshine One Markout Requests (2 hrs), Summarize MAGS and MAGS Soil Data for Preliminary Reporting to FDEP (3 hrs). Compilation of Field Soil Analytical Data, Preparation of Soil Summary Maps for FDEP (3 hrs), MAGS Testing Mobilization and Equipment Preparation (2 hrs), Round Trip Travel for MAGS Testing (3 hrs), Perform MAGS Tests at 7 locations and collection of 7 Vapor Samples (10 hrs), Surface and Site Restoration, Equipment Demobilization (3 hrs).
Onsite Meeting with Property Owner/Property Manager/Maintenance Technician and/or tenant and perform Utility White-lines for Markouts including travel (6 hrs), Oversight of GPR Utility Subcontract Survey including travel (8 hrs), MAGS Testing and Soil Sampling Mobilization and Field Event Preparation (2 hrs), Round Trip Travel for two days to site for MAGS Soil Sampling and MAGS well Installations (6 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Advancement of 7 MAGS Soil Borings for the collection of 63 soil samples at depths of 6", 2', 4', 6', 8', 10', 15', 20' and 25' (16 hrs), Assistance with Installation and Construction of 7 MAGS Testing Wells (4 hrs), Assistance with Installation of one Vapor Monitoring Point Location, including coring (1 hr), Preparation of Soil Boring Logs and MAGS Well Constuction Logs (3 hrs). Remaining Soil Sampling Field Event Preparation and Mobilization (2 hrs), Round Trip Travel to site (2 hrs), Collect Remaining Soil Samples at 4 locations including, Coring, Collection of 36 Soil Samples (10 hrs). Site visit to redeveop and repair existing monitring wells MW-1 and MW-2 (6 hrs).
MAGS Testing Mobilization and Equipment Preparation (2 hrs), Travel Round Trip for MAGS Well Installations (3 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Installation and Construction of 7 MAGS Testing Wells, including coring (7 hrs), Installation of 1 Vapor Monitoring Point Locations, including coring (1 hr), Perform MAGS Tests at 7 locations and collection of 7 Vapor Samples (10 hrs), Surface and Site Restoration (2 hrs). Delivery of Vapor Samples to Laboratory (2 hrs)
MAGS Testing and Soil Sampling Mobilization and Field Event Preparation (2 hrs), Round Trip Travel for two days to site for MAGS Soil Sampling and MAGS well Installations (6 hrs), Attend Onsite H&S and Scoping meeting (1 hr), Assist with collection of 7 MAGS Soil Borings for the collection of 63 soil samples at depths of 6", 2', 4', 6', 8', 10', 15', 20' and 25' (16 hrs), Assistance with Installation and Construction of 7 MAGS Testing Wells (4 hrs), Assistance with Installation of one Vapor Monitoring Point Location (1 hr), Daily MAGS Soil Sample Deliveries to Laboratory (2 hrs). Collect Remaining Soil Samples at 4 locations including Travel, Coring, Collection of Soil Samples (10 hrs), Site Restoration (2 hrs), Drum Handling and Demobilization (3 hrs), Delivery of Remaining Soil Samples to Laboratory (1 hr). Site visit to redeveop and repair existing monitring wells MW-1 and MW-2 (6 hrs).
Note: Air Analysis by TO-15, Soil Samples by VOCs by EPA Method 8260 (Full List) Preparation of Site Specific Health and Safety Plan (3 hrs)
2-Total Page 3 of 12 HW689 DC029A TACO #1 est (002)
SUBTASK:
DATE: October 16, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5 G. Roberts 7
Engineer/Scientist 4 S. Flynn
Engineer/Scientist 2 K. Howard 88
Engineer/Scientist 2 K. McDonald
Engineer/Scientist 1 B. Blount 16
Engineer Scientist 1 R. Lindsay
Designer 2 S. Ferianc
Technical Publications SpecialisH. Vining
Technical Publications SpecialisL. Houser
TOTAL LABOR 113
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 2 $240.00
Van or Truck $480.00 Week 1 $480.00
TOTAL VEHICLE $720.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $150.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
GW Protection DPT Drilling $15,890.00 Lump 1 $15,890.00
TOTAL $15,890.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Full List) DPT Groundwater $110.00 24 0 $2,640.00
EPA Method 8260 (Full List) Wells/Piezometers $110.00 5 0 $550.00
EPA Method 8260 (Full List) IDW $110.00 0 0 $0.00
EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 0 0 $0.00
EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Solid $55.00 0 0 $0.00
EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals)-Solid $45.00 0 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $3,190.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 7 $280.00
Monitor Well Installation Kit $325.00 Day 2 $650.00
Total Survey Station $50.00 Day 1 $50.00
Shallow GW Sampling Kit $290.00 Day 4 $1,160.00
55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $2,140.00
Groundwater Samples by VOCs by EPA Method 8260 (Full List)
Groundwater Sampling and Survey of Piezometers and Existing Wells (5 total) with Travel (9 hrs), delivery of samples to laboratory (1 hr). Daily delivery of DPT Groundwater Samples to Laboratory (6 hrs), Finalize Proposed DPT Locations (1 hr), Finalize Proposed Piezometer Locations (1 hr).
Contacting Property Owner, Property Manager, Maintenance Technician, Tenant of Proposed Sampling Schedule and Confirming Access (1 hr), Preparation and Review of Cross Section from DPT Cores for Recommendations of Proposed GW Sampling Depths with FDEP (3 hrs), Calculation of Well and Watertable Elevations for Flow Direction and Preparartion of Map (2 hrs.), Prepare Map of Final Proposed DPT Locations (1 hr).
DPT Drilling Field Event Preparation and Mobilization (2 hrs), Travel to Site over 3 days (9 hrs), Installation of two DPT Macrocore to 75 ft bls, installation of 3 Piezometers, DPT Groundwater Sampling at 8 locations (40 hrs), Assist with Survey Piezometers and Existing Wells (2 hrs), Daily DPT Groundwater Sample Chain of Custody preparation, Sample Packaging (3 hrs), Preparation of Soil Boring and Well Construction Logs (4 hrs), Preparation of Summary Tables and Figures of Groundwater Sampling Results for Preliminary Reporting to FDEP (6 hrs). Additional hours for DPT Drilling and Groundwater Sampling for two additional days, Additional Travel to Site for 2 days (6 hrs), Additional DPT Drilling for installation of Piezometers and DPT Groundwater Sampling (16 hrs).
3-DPT and Groundwater Field Activities
3-Total Page 1 of 1 HW689 DC029A TACO #2 est
SUBTASK:
DATE: July 30, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5 G. Roberts 8
Engineer/Scientist 4 S. Flynn
Engineer/Scientist 2 K. Howard 44
Engineer/Scientist 2 K. McDonald
Engineer/Scientist 1 B. Blount 10
Engineer Scientist 1 R. Lindsay Designer 2 S. Ferianc Technical Publications Speciali H. Vining Technical Publications Speciali L. Houser
TOTAL LABOR 64
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00
Van or Truck $480.00 Week 1 $480.00
TOTAL VEHICLE $600.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $150.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
GW Protection Well Installations $13,932.00 LS 1 $13,932.00 Erwin Remediation IDW T&D Soil IDW Drums $110.00 LS 13 $1,430.00 Erwin Remediation IDW T&D Liquid IDW Drums $125.00 LS 7 $875.00
TOTAL $16,237.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Full List) Wells $110.00 9 0 $990.00
EPA Method 8260 (Full List) IDW $110.00 2 0 $220.00
EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 2 0 $104.00
EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $55.00 1 0 $55.00
EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 1 0 $45.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $1,414.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 3 $120.00
Soil Sampling Kit (concrete) $235.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 2 $650.00
Total Survey Station $50.00 Day 1 $50.00
Shallow GW Sampling Kit $290.00 Day 1 $290.00
Encore Sampler $16.00 each 0 $0.00
55 Gallon Drums $100.00 each 1 $100.00
TOTAL EQUIPMENT $1,210.00
4-Final Well Installations
Prepare Recommendations for Final Well Locations (2 hrs)
Property Owner, Property Manager, Tenant Site Work Notifications (2 hrs), Development of Sunshine Markout Request (1 hr), Prepare Proposed Well Location Maps and Recommendations (3 hrs), Characterization and Waste Profile for Transportation and Disposal of IDW Drums (2 hours).
Whiteline Final Well Locations for Markouts including travel (6 hrs), Installation of final well network of 3 shallow/1 deep, including Travel (24 hrs). Collection of Final Groundwater Samples from 9 wells with Travel and Survey Wells (10 hrs), Deliver final samples to laboratory (2 hrs), Preparation of Well Construction Logs (2 hrs).
Assist with Collection of Final Groundwater Samples from 9 wells, with Travel, Assist with Survey Wells, Site Restoration and Collection IDW Samples, Drum Handling (10 hrs)
Groundwater Samples by VOCs by EPA Method 8260 (Full List), PFAS Samples by FDEP Laboratory Method DEP SOP: LC-001-3
4-Total Page 5 of 12 HW689 DC029A TACO #1 est (002)
SITE :
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 10
Engineer/Scientist 5 G. Roberts 24
Engineer/Scientist 4 S. Flynn 40
Engineer/Scientist 2 K. Howard
Engineer/Scientist 2 K. McDonald 6
Engineer/Scientist 1 B. Blount Engineer Scientist 1 R. Lindsay
Designer 2 S. Ferianc 6
Technical Publications SpeciaH. Vining
Technical Publications SpeciaL. Houser
TOTAL LABOR 90
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 8270 (PAHs) Soil $110.00 0 0 $0.00 EPA Method 8290 (Dioxins&Furans) Soil $950.00 0 0 $0.00 EPA Method 6010 (Total Arsenic) Soil $13.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Global Positioning System (Handheld G $175.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
Vapor Data Tabulation (3 hrs), Step Test and Radius of Influence calculations and graphs (3 hrs)
Report Drafting, including Site Location Map, Local Land Use Map, Site Layout Map, Utility Location Map, MAGS Location Map. Soil Boring Location Map, DPT Push Groundwater Sample Location Map, Piezometer and Monitoring Well Location Map, Lithologic Cross Section, MAGS Analtyical Summary Map, Soil Analytical Summary Map for several depth intervals, Groundwater Elevation Contour Maps, DPT Analytical Summary Map (3 depths), Monitoring Well and Piezometer Groundwater Analytical Map (6 hrs)
Report Document Production, Formating Tables and Text, Compilation into Adobe Format for Submittal
Compilation of Logs and Prepartion of SAR Cross Sections, Preparation of Physiography, Regional Geology and Regional Hydrogeology Sections, Preparation of Conceptual Model based on Findings, Preparation of Laboratory QA/QC Summary and Data Recommendations, Preparation of Site Assessment Conclusions, Recommendations for Assessment (24 hrs).
Spring Lake Cleaners Inc.
Preparation of MAGS Assessment Findings text (4 hrs), Revise and Provide Edits to Site Assessment Report (5 hrs), Preparation of Deliverable Email and Submittal of Report (1 hr)
Preparation of SAR text including, Operational History, Previous Investigations, Site Specific Soil and Groundwater Site Characterization, Preparation of Tables, Preparation of Draft Soil and Analytical Summary Figures, Preparation of Assessment Findings (lithologic borings, soil borings, DPT Sampling, Piezometer and Monitoring Well Installations, Groundwater Sampling) (40 hrs).
5-Reporting 3/18/2025
SUBTASK:
DATE: March 18, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts 6
Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1
Engineer/Scientist 1 B. Blount 5
Engineer Scientist 1 R. Lindsay Designer 2 S. Ferianc Technical Publications SpecialisH. Vining Technical Publications SpecialisL. Houser
TOTAL LABOR 11
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $150.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
GW Protection Well Installations $4,766.00 LS 0 $0.00
Erwin Remediation IDW T&D Soil IDW Drums $110.00 LS 0 $0.00
Erwin Remediation IDW T&D Liquid IDW Drums $125.00 LS 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Full List) Wells $110.00 0 0 $0.00
EPA Method 8260 (Full List) IDW $110.00 0 0 $0.00
State Laboratory DEP SOP: LC-001-3 (PFAS) GWTallahassee $0.00 4 1 Fld Regent Blk $0.00
State Laboratory DEP SOP: LC-001-3 (PFAS) IDWTallahassee $0.00 1 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Soil Sampling Kit (concrete) $235.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Total Survey Station $50.00 Day 0 $0.00
Shallow GW Sampling Kit $290.00 Day 0 $0.00
Encore Sampler $16.00 each 0 $0.00
55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
PFAS Samples by FDEP Laboratory Method DEP SOP: LC-001-3, Wells not Selected to Date, Includes IDW and Field Regent Blank Samples
Develop PFAS Well Recommendations for Sampling and Order Kit from FDEP Laboratory (2 hrs), Develop PFAS Table and Map, Compile Field Notes, Sample Logs and Analytical for Reporting (3 hrs), Preparation of Findings email with Recommendations (1 hr)
Additional Purging and Collection of PFAS Groundwater Samples (4-5 wells), Collection and document PFAS Field Regent Blank and Collection of PFAS Drum purge Water IDW Sample (3 hrs), Chain of Custody Completion and Packaging for FDEP Lab samples (1 hr) and Delivery of FDEP PFAS Samples to Shipper (2 hrs).
6-Additional PFAS Sampling & Reporting
6-Additional PFAS Sampling Page 7 of 7 HW689 DC-TBD est (SpringLk) (002)
F D E P
C O S T
E S T I M A T E
C on tr ac to r:
A pt im
E nv ir on m en ta l &
In fr a st ru ct ur e, L
LC
D at e
/1
/2
T a sk
H
W
D
C
9A T
A C
O
S ub T as k
P ro je ct M a na g em en t
S ub
T as k
6- A d di tio n al P
F A
S S am pl in g
R ep o rt in g
S ite
S pr in g La ke C le an e rs
I nc
E
R
IC
_5
S ub T as k
2-
S ite
M ee tin g
, M A
G S
/S o il S ub T as k
A ct iv ity
/P ha se
S A
R S ub T as k
3-
D P
T a nd G ro un d w at er
F ie ld A ct iv iti es
S ub
T as k
P ro je ct
M a na g er
N ik ki
K nu ts o n (F
D E
P
E ri c K ra m er
A P
T
IM
S ub T as k
4-
F in a l W e ll
In st al la tio ns
S ub
T as k
S ub
T as k
5- R e po rt in g S ub T as k
T o ta ls
L a b o r R at e
C at e g o ry
$7 3.
P ro je ct
M an ag er
E
. K ra m e r -2
-1 .6
$7 3.
E ng in e er /S ci en tis t 5
E . K ra m e r
$6 8.
E ng in e er /S ci en tis t 5
G . R ob er ts
$6
5.
E ng in e er
/S ci en tis t 4 S
. F ly n n
$3 7.
E ng in e er /S ci en tis t 3
K . H ow a rd
$3
7.
E ng in e er
/S ci en tis t 2 K
. M cD on al d
$2
6.
E ng in e er
/S ci en tis t 1 B
. B lo un t
-3
-3
$3 3.
E ng in e er S ci en tis t 1
R . L in d sa y
$3 5.
D es ig n er
S . F e ria nc
$3
0.
T e ch n ic al P u bl ic a tio n s S p ec ia lis t
H . V in in g
$2
8.
T e ch n ic al P u bl ic a tio n s S p ec ia lis t
L.
H o us er
$0 .0
T o ta l H o u rs
-3
-2
-3
D ire ct L ab o r
,0
7.
.8
9) $0
.0
.4
8) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
.5
.1 1)
9.
$0
.0
.9
3) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
.3
.2
3)
2.
6)
$0 .0
.7 7)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
F rin ge
.9
.9 6)
7.
$0
.0
.9
2) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l L a b o r
,3
6.
.5 7)
$0 .0
,1
2.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ra v el
V eh ic le
R e nt al
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile a ge
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir
F ar e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H o te l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l T ra ve l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S u b c o n tr ac to r
(E q u ip m en t P ro cu re m en t)
W e ll M at e ria ls
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F e e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S u b c o n tr ac to r
(S er v ic es P ro cu re m ril lin g
C on ve n tio na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M o bi le
L ab o ra to ry
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti e s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
L a b o ra ry na ly tic al C o st s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
F a st T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l L ab or at o ry $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
F ie ld E x p en s es
P so n al P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da b le s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
D ril lin g r el at ed
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
A na ly tic a l r e la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W r e la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l F ie ld
E xp en se s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S u b to ta l
,3
6.
.5 7)
$0 .0
,1
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C o m p le ti o n
F ee
.6
7)
7.
6)
$0 .0
.2 1)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l E st im at e d C o st
,6
5.
.0 3)
$0 .0
,3
.3
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P a g
SUBTASK:
DATE: October 16, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 4 S. Flynn
Engineer/Scientist 2 K. Howard
Engineer/Scientist 2 K. McDonald
Engineer/Scientist 1 B. Blount -34
Engineer Scientist 1 R. Lindsay
Designer 2 S. Ferianc
Technical Publications SpecialisH. Vining
Technical Publications SpecialisL. Houser
TOTAL LABOR -34
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $150.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE ACTUAL TOTALS
GW Protection DPT Drilling $15,890.00 Lump 1 $15,890.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method 8260 (Full List) DPT Groundwater $110.00 0 0 $0.00
EPA Method 8260 (Full List) Wells/Piezometers $110.00 0 0 $0.00
EPA Method 8260 (Full List) IDW $110.00 0 0 $0.00
EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 0 0 $0.00
EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Solid $55.00 0 0 $0.00
EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals)-Solid $45.00 0 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Total Survey Station $50.00 Day 0 $0.00
Shallow GW Sampling Kit $290.00 Day 0 $0.00
55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
3-DPT and Groundwater Field Activities
Groundwater Samples by VOCs by EPA Method 8260 (Full List)
Remove: Assist with DPT Drilling Field Event DPT Groundwater Sampling at 8 locations (34 hrs)
3-Delta Page 1 of 1 HW689 DC029A TACO #2 est
F
E P
C O S T
E S T I M A T E
C on tr ac r:
pt im
E nv ir on m en ta l &
In fr a st ru ct ur e, L
LC
at e
7/
/2
T a sk
H
W
D
C
9A T
A C
O
S ub T as k
P ro je ct M a na g em en t
S ub
T as k
6- A d di tio n al P
F A
S S am pl in g
R ep o rt in g
S ite
S pr in g La ke C le an e rs
I nc
E
R
IC
_5
S ub T as k
2-
S ite
M ee tin g
, M A
G S
/S o il S ub T as k
A ct iv ity
/P ha se
S A
R S ub T as k
3-
D P
T a nd G ro un d w at er
F ie ld A ct iv iti es
S ub
T as k
P ro je ct
M a na g er
N ik ki
K nu ts o n (F
D E
P
E ri c K ra m er
A P
T
IM
S ub T as k
4-
F in a l W e ll
In st al la tio ns
S ub
T as k
S ub
T as k
5- R e po rt in g S ub T as k
T o ta ls
L a b o r R at e
C at e g o ry
$7 3.
P ro je ct
M an ag
E
. K ra m e r
.9
$7 3.
E ng in e er /S ci en tis t 5
E . K ra m e r
$6 8.
E ng in e er /S ci en tis t 5
G . R ob er ts
$6
5.
E ng in e er
/S ci en tis t 4 S
. F ly n n
$3 7.
E ng in e er /S ci en tis t 3
K . H o w a rd
$3
7.
E ng in e er
/S ci en tis t 2 K
. M cD o na ld
$2
6.
E ng in e er
/S ci en tis t 1 B
. B lo un t
$3
3.
E ng in e er
S ci en tis t 1 R
. L in d sa y
$3
5.
D es ig n er
S
. F er ia nc
$3 0.
T e ch n ic al
P u bl ic a tio n s
S p ec ia lis t
H
. V in in g
$2 8.
T e ch n ic al
P u bl ic a tio n s
S p ec ia lis t
L.
H ou se r
$0 .0
T o ta l H o u rs
D ire ct L ab o r $2
3, .3
$2
,7
1.
$6 ,7
.1
$5
,2
.9
$2 ,6
.2
$5
,5
.1
$5
.8
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
.5
$2
0, .8
$2
,3
.5
$5 ,8
.1
$4
,5
.6
$2 ,2
.6
$4
,7
.2
$4
4.
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in
.3
$4 ,5
0.
$5
.4
$1
,3
.0
$1 ,0
.9
$5
.7
$1
,0
.6
$1
.2
$0 .0
$0
.0
$0 .0
$0
.0
F rin ge
.9
$7
,5
3.
$8
.2
$2 ,1
.0
$1
,6
.2
$8
.0
$1 ,7
.6
$1
.5
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l L a b o r
$5 5, .9
$6 ,3
9.
$1
6, .3
$1
2, .7
$6
,2
.6
$1 3, 5.
$1 ,2
.1
$0
.0
$0 .0
$0
.0
$0 .0
T ra v el
V eh ic le
R e nt al
$2 ,3
0.
$1
,0
0.
$7
.0
$6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile a ge
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir
F ar e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H o te l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l T ra ve l $2
,3
0.
$1 ,0
0.
$7
.0
$6
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S u b c o n tr ac to r
(E q u ip m en t P ro cu re m
W ll M at e ria ls
$9
.8
$9
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$9
.8
$9
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F e e $9
1.
$9
1.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l S ub co nt ra ct or
C os t $1
,0
1.
$1 ,0
1.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S u b c o n tr ac to r
(S er v ic es P ro cu re m ril lin g
C on ve n tio na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
N on -c on ve nt io na l)
$2 9, 2.
$0 .0
$1
5, .0
$1
3, .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M o bi le
L ab o ra to ry
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $9
,9
5.
$9 ,9
5.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W
$2 ,3
5.
$0
.0
$0 .0
$2
,3
5.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti e s $7
.0
$7
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$4 2, .0
$1 0, .0
$1 5, 0.
$1 6, 7.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g F ee $4
,2
6.
$1 ,0
3.
$1
,5
.0
$1 ,6
.7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l S ub co nt ra ct or
C os t $4
7, .2
$1
1, .5
$1
7, .0
$1
7, .7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
L a b o ra ry na ly tic al C o st s $1
3, .0
$8
,7
8.
$3 ,1
0.
$1
,4
4.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
F a st T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T o ta l L ab or at o ry $1
3, .0
$8
,7
8.
$3 ,1
0.
$1
,4
4.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
F ie ld E x p en s es
P so n al P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da b le s $7
.0
$3
.0
$2
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
D ril lin g r el at ed
$1
,4
.0
$0 .0
$7
.0
$7
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
A na ly tic a l r e la te d)
$3 ,7
3.
$2
,2
3.
$1 ,1
0.
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W r e la te
d) $2
.0
$1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l F ie ld
E xp en se s $6
,1
3.
$2 ,7
3.
$2
,1
0.
$1 ,2
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S u b to ta l
$1
,6
.0
$6 ,3
9.
$4
1, .6
$3
6, 1.
$2
7, 4.
$1
3, 5.
$1
,2
.1
$0 .0
$0
.0
$0 .0
$0
.0
C o m p le ti o n
F ee
$5 ,5
2.
$6
.9
$1
,6
0.
$1 ,2
.2
$6
.9
$1
,3
.5
$1
.6
$0 .0
$0
.0
$0 .0
$0
.0
T o ta l E st im at e d C o st
$1
,2
.5
$7 ,0
9.
$4
3, .8
$3
7, 0.
$2
7, 6.
$1
4, 8.
$1
,4
.8
$0 .0
$0
.0
$0 .0
$0
.0
P a g
Proposed Scope of Work Spring Lake Cleaners Inc. (Former) Spring Lake Plaza 1120 Havendale Boulevard NW Winter Haven, Polk County, FL 33881 Site Assessment and Reporting Task Assignment DC029A TACO #2 ERIC_5381 (Former Facility No. 539502466) Aptim Environmental & Infrastructure, LLC October 16, 2025
The following Task Assignment Change Order (TACO) #2 has been prepared to adjust costs for the former Spring Lake Cleaners site located in Winter Haven, Polk County, Florida. The proposed scope of work under this TACO reconciles Subtask 3 for invoicing.
Subtask 1-Project Management Project management hours are calculated based on the labor hours in the scope of work.
Subtask 2-Meeting & MAGS/Soil Sampling: No Changes
Subtask 3-DPT & GW Sampling Field Activities Labor hours associated with the geologist proposed to provide assistance with the DPT groundwater sampling was not available at the time the work was performed; therefore, the associated hours have been removed from the Subtask.
Subtask 4-Well Installations: No Changes Subtask 5-SAR Reporting: No Changes Subtask 6-Additional PFAS Sampling: No Changes
To allow for FDEP review of the DPT findings and recommendations submitted on September 23, 2025, completion of the site work and preparation of the Site Assessment, a deliverable extension for the Site Assessment Report (Subtasks 4,5 and 1) and FPAS Reporting (Subtask 6) of 90 days is requested. The extension would change the Site Assessment Report and PFAS Reporting deliverable dates to February 12, 2026. The extension would adjust the Task Assignment Completion date to April 16, 2026.
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC and Florida Department of Environmental Protection No. HW689. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.
If you have any questions, please contact us for clarification.
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department�s Project Manager: Department�s Project Manager Phone:
Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC029A 1 HW689
Nicole Knutson 850-245-8763 Contractor APTIM Environmental & Infrastructure, LLC Contractor
Contractor Eric Kramer Contractor 407-287-3216
ERIC_5381
Spring Lake Cleaners, Inc. (Former)
$ 131,202.50 $ 125,618.19
$ 131,202.50 $ 125,618.19
Completion Completion 01/16/2026 01/16/2026 0
1 1 1
Contractor
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.08.04 10:15:36 -04'00' Tim Bahr Digitally signed by Tim Bahr
Date: 2025.08.04 08:22:59 -04'00'
This Change Order reconciles WCDs 1 & 2 and increases drilling costs based on updated rates.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW689
DC029A
$ 131,202.50
Subtask 2 - MAGS and Soil Sampling Field Notes Package, including vapor and soil sampling results
Subtask 3 - DPT Field Notes Package, including boring logs, DPT groundwater sampling results, and sampling results from existing monitoring wells
Subtasks 4, 5, & 1 - Site Assessment Report & PM
Subtask 6 - PFAS Email Deliverable
Upon DEP Approval of Subtask 2 - MAGS and Soil Sampling Field Notes Package, including vapor and soil sampling results
Upon DEP Approval of Subtasks 4, 5, & 1 - Site Assessment Report & PM
Upon DEP Approval of Subtask 6 - PFAS Email Deliverable
Upon DEP Approval of Subtask 3 - DPT Field Notes Package, including boring logs, DPT groundwater sampling results, and sampling results from existing monitoring wells
08/29/2025
09/26/2025
11/14/2025
11/14/2025
$ 37,270.99
$ 43,112.83
$ 49,403.87
$ 1,414.81
File details come from the government source that posted it. Updated .