This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection under Contract Number HW689. The parties to this agreement are the State of Florida Department of Environmental Protection (represented by Department Project Manager Skylar Schwed) and Aptim Environmental & Infrastructure, LLC (APTIM) (represented by Project Manager Eric Kramer). The task assignment authorizes work at the Green Tree Dry Cleaners site located at 3517 West Boynton Beach Boulevard in Boynton Beach, Florida, under Project Number ERIC_5119.
APTIM is contracted to generate a Site Assessment Work Plan (SAWP) for the Green Tree Dry Cleaners site on a fixed unit rate basis with a total task assignment value of $5,000.00. The deliverable—Site Assessment Work Plan and Project Management—is due June 27, 2023, with a task assignment completion date of August 15, 2023. Invoice payment of the full $5,000.00 is due upon submittal and Florida Department of Environmental Protection approval of the Site Assessment Work Plan and Project Management deliverables. The SAWP must include site review activities (information portal and document review), a site visit with completion of a drycleaning site visit checklist, and development of a comprehensive work plan including site narrative, figures, sampling plan, proposed schedule, and cost estimate worksheets. The scope explicitly excludes ERIC or HASP documents, Environmental Due Diligence Reports, offsite property surveys, potable well surveys, and requires PFAS screening inclusion.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW689
DC021A Completion August 15, 2023
This Task Assignment authorizes Aptim Environmental & Infrastructure, LLC (APTIM) to to generate a Site Assessment Work Plan for Green Tree Dry Cleaners site located in Boynton Beach FL in accordance with the attached Site Assessment Work Plan Task List.
Skylar Schwed 850-245-8795 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Aptim Environmental & Infrastructure, LLC (APTIM)
Aptim Environmental & Infrastructure, LLC (APTIM)
Eric Kramer 407-287-3216
ERIC_5119
3517 West Boynton Beach Blvd
Green Tree Dry Cleaners
✔ $ 5,000.00
$ 5,000.00
Scope of Work
Eric Kramer Digitally signed by Eric Kramer Date: 2023.05.31 10:28:15 -04'00' Kelly Crain Digitally signed by Kelly Crain
Date: 2023.05.31 08:53:20 -04'00'
N/A
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Assessment Work Plan and Project Management 06/27/2023
Subtasks 1 & 2: Upon submittal and FDEP approval of the Site Assessment Work Plan + Project Management $ 5,000.00
$ 5,000.00
HW689
DC021A
Site Assessment Work Plan (SAWP) Task List
Site Review:
1. Information Portal/ERIC/OCULUS Review
a. Review applicable documents
b. Application
c. Site Screening Report
d. Other assessment data
e. Permitting/Compliance/Enforcement history
2. Additional information as available and as needed
a. Google maps, aerial photographs, topographical maps, building/planning department records, land use maps, insurance maps
b. Other regulatory agency records
c. Contact DC operator for operations history. May be able to find operator even if DC is no longer operating
Site Visit:
1. Complete Drycleaning Site Visit Checklist
2. Verify Site Screening Report information, especially sample location(s)
3. Identify likely source/release areas (machine location, service door, floor drains, lint trap, sewer line, septic tank, dumpster, ASTs/USTs). Look for evidence on floors/walls for former machine location.
4. Identify above/below ground utilities and potential impediments to assessment activities
5. Verify accuracy of site map, revise as necessary
6. Interview operator/owner for site history
7. Discuss work plan elements with property owner and get direction regarding approach to tenants, and schedule.
SAWP:
1. Completed Drycleaning Site Visit Checklist
2. Site summary/narrative – Initial conceptual site model (brief text)
- Current status and history of DC operations
- Primary solvents used both prior to and after eligibility determination
- Owner/operator/tenant information
- Status of site structures (original, renovated, razed/redeveloped, vacant)
- Historical site assessment/remediation information
- Anticipated lithology, depth to water, and groundwater flow direction
- Known or anticipated source areas -Site Assessment Approach
3. Figures
- Topo
- Site features, aerial view, facility layout, waste storage areas, utilities, etc.
- Proposed sampling locations (soil, MAGS, DPT profiling, MWs, sediment, surface water, sewer/septic/lint trap)
4. Sampling Plan/Checklist (templated, see Word SAWP Summary Checklist) - Including proposed number of samples for soil, MAGs, groundwater, etc.
5. Proposed schedule from approval of SAWP to submittal of SAR
6. Cost Estimate (CE)/Level of Effort (LOE) Worksheets, including subcontractor quotes, as appropriate. The CE/LOE should be submitted upon approval of the SAWP and under separate cover.
Notes: 1) No documents that are available in ERIC or HASPs should be included with the SAWP, 2) No EDR or other ESA-like reports are required, 3) No offsite property owner/use or well survey information is required, 4) No potable well survey, 5) SOW should include PFAS screening (see guidance)
| HW689 DC017A TA.pdf |
| SAWP TaskList 7-5-2022.pdf |
File details come from the government source that posted it. Updated .