About this file

This document is a Task Assignment Change Order (TACO #2) issued by the State of Florida Department of Environmental Protection (FDEP) to APTIM Environmental & Infrastructure, LLC for environmental remediation services at the Blue Ribbon Cleaners (former) site located at 160 South U.S. Highway 17-92 in Longwood, Seminole County, Florida. The change order amends the existing Task Assignment (TA) DC009C under Contract HW689, dated December 21, 2021. The project is identified by ERIC_5462 and involves groundwater monitoring and remediation activities. The department's project manager is Alyssa Lamb (later Nicole Knutson), and the contractor's project manager is Eric Kramer.

The change order reduces the total task amount from $29,361.53 to $27,655.85, a decrease of $1,705.68, reflecting the removal of Industrial Waste Disposal (IDW) treatment and disposal costs from Subtask 5 and a reduction in sampling and reporting scope for Subtasks 6 and 7. Specifically, the IDW buckets generated during Quarter 2 sampling could not be located for disposal, and at FDEP's request, the sampling of the downgradient well MW009 was removed from Quarters 3 and 4, with reporting reduced to email summaries. The amended task cost is $27,655.85 on a fixed unit rate basis, with an extended completion date of August 28, 2026. Deliverables include quarterly PARM sampling reports with due dates ranging from November 28, 2025 to May 29, 2026, with invoicing structured upon FDEP approval of each subtask deliverable.

View the file

Other files

File Type Posted
CN-370000-HW689-BF01A.pdf PDF
CN-370000-HW689-BF01C.pdf PDF
CN-370000-HW689-BF1ACO1.pdf PDF
CN-370000-HW689-BIL01CC1.pdf PDF
CN-370000-HW689-BIL01D.pdf PDF
CN-370000-HW689-BIL01E.pdf PDF
CN-370000-HW689-CSS2AC02.pdf PDF
CN-370000-HW689-DC005A.pdf PDF
CN-370000-HW689-DC007A.pdf PDF
CN-370000-HW689-DC008A.pdf PDF
CN-370000-HW689-DC012B.pdf PDF
CN-370000-HW689-DC013A.pdf PDF
CN-370000-HW689-DC015D.pdf PDF
CN-370000-HW689-DC016A.pdf PDF
CN-370000-HW689-DC016B.pdf PDF
CN-370000-HW689-DC020B.pdf PDF
CN-370000-HW689-DC020C.pdf PDF
CN-370000-HW689-DC021B.pdf PDF
CN-370000-HW689-DC022B.pdf PDF
CN-370000-HW689-DC023A.pdf PDF
CN-370000-HW689-DC024C.pdf PDF
CN-370000-HW689-DC024D.pdf PDF
CN-370000-HW689-DC030A.pdf PDF
CN-370000-HW689-DC033A.pdf PDF
CN-370000-HW689-DC03BCO2.pdf PDF
CN-370000-HW689-DC04CCO1.pdf PDF
CN-370000-HW689-DC05CCO3.pdf PDF
CN-370000-HW689-DC06BCO1.pdf PDF
CN-370000-HW689-DC10ACO1.pdf PDF
CN-370000-HW689-DC11CCO2.pdf PDF
CN-370000-HW689-DC11CCO3.pdf PDF
CN-370000-HW689-DC11CCO4.pdf PDF
CN-370000-HW689-DC11DCO1.pdf PDF
CN-370000-HW689-DC13BCO1.pdf PDF
CN-370000-HW689-DC13BCO3.pdf PDF
CN-370000-HW689-DC14BCO2.pdf PDF
CN-370000-HW689-DC15CCO1.pdf PDF
CN-370000-HW689-DC15CCO2.pdf PDF
CN-370000-HW689-DC15DCO1.pdf PDF
CN-370000-HW689-DC15DCO2.pdf PDF
CN-370000-HW689-DC17BCO4.pdf PDF
CN-370000-HW689-DC18BCO2.pdf PDF
CN-370000-HW689-DC20CCO1.pdf PDF
CN-370000-HW689-DC30ACO2.pdf PDF
CN-370000-HW689-DC32ACO1.pdf PDF
CN-370000-HW689-DC35ACO1.pdf PDF
CN-370000-HW689-FIL 3.pdf PDF
CN-370000-HW689-FIL12.pdf PDF
CN-370000-HW689-FIL19.pdf PDF
CN-370000-HW689-FIL20.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC009C 2 HW689

Alyssa Lamb 850-245-8791 Contractor APTIM Environmental & Infrastructure, LLC Contractor

Contractor Eric Kramer Contractor 813-205-4703

ERIC_5462

Blue Ribbon Cleaners (former)

✔ $ 27,655.85 $ 29,361.53

$ 27,655.85 $ 29,361.53 ✔ Completion

Completion 08/28/2026 08/28/2026 0

1 1

Contractor

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2026.02.09 08:11:02 -05'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.02.06 20:06:41 -05'00'

This Change Order removes the cost of IDW from subtask 5 and reduces the sampling and reporting in subtasks 6 and 7.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

$ 3,098.12

$ 2,485.74

$ 2,485.74

FFLORIDA DEPARTMENT OF

EEnvironmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jay Collins Lt. Governor

Alexis Lambert Secretary

Memorandum

TO:

FROM:

SUBJECT:

DATE:

ERIC_

Cleaners

, Project Manager

Negotiation Summary HW68

DC0

Total task amount time, labor, and subcontractor costs for these activities have been reviewed and are appropriate.

The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is . Task completion date is .

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

A pt im E nv iro nm en ta l &

In fra st ru ct ur e, L

LC

D at e:

1/

/2

Ta sk

H W

D C

9C

T A

C O

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

6- Q

G

W S am pl in g

(V O

H s) a nd

R ep or tin g

S ite

B lu e

R ib bo n

C le an er s E

R

IC

_5

S ub Ta sk

2- Q ua rte r 1 G

W S am pl in g

(V O

H s)

S ub

Ta sk

7-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

A ct iv ity

/P ha se

Q ua rte rly

G ro un dw at er

M on ito rin g S ub Ta sk

3- Q

1/ A nn ua l G W

R pt

(V O

H s) a nd

N ot ic in g S ub Ta sk

8- A dd iti on al

A nn ua l &

S R

C R

R ep or tin g

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Q

A dd iti on al

P

FA

S S am pl in g/

R ep or tin g S ub Ta sk

S ub

Ta sk

5-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

S ub

Ta sk

TTo ta ls

La bo r

R at e C at eg or y

$7 3.

P P ro je ct M an ag er

E . K ra m er

.1

$7 3.

En gi ne er /S ci en tis t 5

E . K ra m er

$6

8.

En gi ne er

/S ci en tis t 5 G

. R ob er ts

$3 7.

En gi ne er /S ci en tis t 2

K . H ow ar d

$3

5.

D es ig ne r 2 S

. F er ia nc

$3 0.

Te ch ni ca l P ub lic at io ns S pe ci al is t 3 H

. V in in g

$2 8.

Te ch ni ca l P ub lic at io ns S pe ci al is t 3 L.

H ou se r

$0 .0

To ta l H ou rs

D ire ct L ab or

$9

,6

.9

$1 ,1

.5

$6

.8

$2

,5

.4

$6

.4

$9

.0

$7

.0

$7

.0

$2 ,3

.4

$0

.0

$0 .0

O ve rh ea d

.5 8%

$8 ,2

.1

$9

.5

$5

.5

$2

,1

.8

$5

.1

$8

.6

$6

.2

$6

.2

$2 ,0

.9

$0

.0

$0 .0

G en

A dm in

.3 8%

$1 ,8

.2

$2

.0

$1

.7

$4

.6

$1

.7

$1

.0

$1

.1

$1

.1

$4

.5

$0

.0

$0 .0

Fr in ge

.9

6% $3

,0

.5

$3

.6

$1

.8

$8

.8

$2

.5

$3

.8

$2

.8

$2

.8

$7

.0

$0 .0

$0

.0

To ta l L

$2 2, 0.

$2

,6

.8

$1 ,4

.0

$5

,9

.8

$1 ,5

.7

$2

,2

.6

$1 ,6

.3

$1

,6

.3

$5 ,5

.9

$0

.0

$0 .0

Tr av el V eh ic le R en ta l $4

.0

$1

.0

$0

.0

$0 .0

$1

.0

$1

.0

$1

.0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$4

.0

$1

.0

$0 .0

$0

.0

$1

.0

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m en t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$9 5.

$9

5.

$0 .0

$0

.0

$0 .0

U til iti es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$9

5.

$9 5.

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $1

9.

$0 .0

$0

.0

$0 .0

$0

.0

$9 .5

$9

.5

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$1

.5

$1

.5

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

SH

AW

Pa ge

C O

ST

E

ST

IM

A

TE

C on tra ct or

A pt im E nv iro nm en ta l &

In fra st ru ct ur e, /2

H W

D C

9C

T A

C O

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

6- Q

G

W S am pl in g

(V O

H s) a nd

R ep or tin g

S ite

B lu e

R ib bo n

C le an er s E

R

IC

_5

S ub Ta sk

2- Q ua rte r 1 G

W S am pl in g

(V O

H s)

S ub

Ta sk

7-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

A ct iv ity

/P ha se

Q ua rte rly

G ro un dw at er

M on ito rin g S ub Ta sk

3- Q

1/ A nn ua l G W

R pt

(V O

H s) a nd

N ot ic in g S ub Ta sk

8- A dd iti on al

A nn ua l &

S R

C R

R ep or tin g

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Q

A dd iti on al

P

FA

S S am pl in g/

R ep or tin g S ub Ta sk

S ub

Ta sk

5-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

S ub

Ta sk

TTo ta ls

LLa bo ra to ry

A na ly tic al

C os ts $5

.0

$2

.0

$0

.0

$0 .0

$1

.0

$7

3.

$7 3.

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $ $5

.0

$2

.0

$0

.0

$0 .0

$1

.0

$7

3.

$7 3.

$0

.0

$0 .0

$0

.0

Fi el d E xp en se s

P so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $1

.0

$4

0.

$0 .0

$0

.0

$4 0.

$4

0.

$4 0.

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$8

.0

$0 .0

$0

.0

$0 .0

$2

.0

$2

.0

$2

.0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $2

.0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $1

,3

.0

$3

.0

$0 .0

$0

.0

$3

.0

$3

.0

$3

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $2

5, 0.

$2 ,6

.8

$2

,1

.0

$5 ,9

.8

$1

,5

.7

$2 ,8

.6

$2

,3

.8

$2 ,3

.8

$5

,5

.9

$0 .0

$0

.0

C om pl et io n

Fe e

$2 ,2

.0

$2

.8

$1

.2

$5

.3

$1

.7

$2

.4

$1

.9

$1

.9

$5

.5

$0

.0

$0 .0

To ta l E st im at ed C os t

$2 7, 5.

$2

,8

.7

$2 ,2

.2

$6

,5

.2

$1 ,7

.5

$3

,0

.1

$2 ,4

.7

$2

,4

.7

$6 ,0

.4

$0

.0

$0 .0

C os t f ro m P rio r C

E F:

$2 9, 1.

M an ua l E nt ry C os t f ro m

D el ta C

E F;

1, 5.

M an ua l E nt ry

C os t ( P rio r +

D el ta

$2 7, 5.

Au to -C al cu la te d R ou nd in g

E rr or

0.

Au to

-C al cu la te d

Fi na l T ot al C os t:

$2 7, 5.

Au to -C al cu la te d

RE

V:

2/

CE

F

SH

AW

Pa

C O

ST

E

ST

IM

A

TE

C on tra ct or

A pt im E nv iro nm en ta l &

In fra st ru ct ur e, /2

H W

D C

9C

T A

C O

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

6- Q

G

W S am pl in g

(V O

H s) a nd

R ep or tin g

S ite

B lu e

R ib bo n

C le an er s E

R

IC

_5

S ub Ta sk

2- Q ua rte r 1 G

W S am pl in g

(V O

H s)

S ub

Ta sk

7-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

A ct iv ity

/P ha se

Q ua rte rly

G ro un dw at er

M on ito rin g S ub Ta sk

3- Q

1/ A nn ua l G W

R pt

(V O

H s) a nd

N ot ic in g S ub Ta sk

8- A dd iti on al

A nn ua l &

S R

C R

R ep or tin g

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Q

A dd iti on al

P

FA

S S am pl in g/

R ep or tin g S ub Ta sk

S ub

Ta sk

5-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

S ub

Ta sk

TTo ta ls

LLa bo ra ly tic al

C os ts $5

.0

$2

.0

$0

.0

$0 .0

$1

.0

$7

3.

$7 3.

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $ $5

.0

$2

.0

$0

.0

$0 .0

$1

.0

$7

3.

$7 3.

$0

.0

$0 .0

$0

.0

Fi el d E xp en so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $1

.0

$4

0.

$0 .0

$0

.0

$4 0.

$4

0.

$4 0.

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$8

.0

$0 .0

$0

.0

$0 .0

$2

.0

$2

.0

$2

.0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $2

.0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $1

,3

.0

$3

.0

$0 .0

$0

.0

$3

.0

$3

.0

$3

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $2

5, 0.

$2 ,6

.8

$2

,1

.0

$5 ,9

.8

$1

,5

.7

$2 ,8

.6

$2

,3

.8

$2 ,3

.8

$5

,5

.9

$0 .0

$0

.0

C om pl et io n

Fe e

$2 ,2

.0

$2

.8

$1

.2

$5

.3

$1

.7

$2

.4

$1

.9

$1

.9

$5

.5

$0

.0

$0 .0

To ta l E st im at ed C os t

$2 7, 5.

$2

,8

.7

$2 ,2

.2

$6

,5

.2

$1 ,7

.5

$3

,0

.1

$2 ,4

.7

$2

,4

.7

$6 ,0

.4

$0

.0

$0 .0

C os t f ro m P rio r C

E F:

$2 9, 1.

M an ua l E nt ry C os t f ro m

D el ta C

E F;

1, 5.

M an ua l E nt ry

C os t ( P rio r +

D el ta

$2 7, 5.

Au to -C al cu la te d R ou nd in g

E rr or

0.

Au to

-C al cu la te d

Fi na l T ot al C os t:

$2 7, 5.

Au to -C al cu la te d

RE

V:

2/

CE

F

SH

AW

Pa

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE :

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Designer 2 S. Ferianc Technical Publications SpeciaH. Vining Technical Publications SpeciaL. Houser Update H&S Plan 1

TOTAL LABOR 14

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST TOTALS

Erwin Remdication Liquid IDW $190.00 Drum 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 8260 (VOHs) Wells $73.00 2 0 $146.00 EPA Method 8260 (VOHs) GW IDW $73.00 1 0 $73.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $219.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Water Level Indicator $25.00 each 0 $0.00 Poly Drum $75.00 each 0 $0.00

TOTAL EQUIPMENT $330.00

Notes: Proposed VOH Grounwater Samples from two NAM wells MW006 and MW009 for EPA Method 8260 (VOHs Only) Analysis. Composite IDW Sample for VOHs by EPA Method 8260.

Blue Ribbon Cleaners 2-Quarter 1 GW Sampling (VOHs)

9/8/2025

Notification of Property Owner and Tenant for Access (1 hr), Preparation for GW Sampling Field Event and Order VOC Laboratory Kit (1 hr), Preparation of IDW manifest and profile (1 hr)

Travel Preparation, Loading and Mobilization for Groundwater Sampling (1 hr), Travel Round Trip for Groundwater Sampling (2 hrs), Open and Collect Depth to Groundwater Measurements from all wells (2 hrs), Calibrate YSI and Sample two wells MW006 and MW009 for VOHs by EPA Method 8260 (3 hrs). Collection of Composite IDW Sample for VOHs Analysis and Site Restoration IDW Handling and Cleanup (1 hr), Fixed Laboratory VOHs Samples preparation, Chain of custody preparation, Sample Packaging and Delivery to Laboratory (1 hr), 2-Total Page 3 of 14 HW689 DC009C TACO #1 est (Blue Ribbon)

SUBTASK:

DATE: April 22, 2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Designer 2 S. Ferianc

Technical Publications SpecialistH. Vining

Technical Publications SpecialistL. Houser

TOTAL LABOR: 41

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST TOTALS

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 8260 (VOHs) GW $73.00 0 0 $0.00 EPA Method 8260 (Full List) Well $150.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Blue Ribbon Cleaners

Evaluate Data and Trends, Preparation of Q1/Annual Report Recommendations, Preparation of Final Report (2 hrs), Compile Noticing Package and Submittal (1 hr) Preparation of Shallow and Intermediate GW Flow Maps and GW Analytical Summary Results Maps (4 hrs). Update of GW Elevation, Analytical Summary Tables (3 hrs), Preparation of Groundwater Sampling Report Text and Conclusions (17 hrs), Preparation of Noticing Documents for offsite Contamination: Compilation of Backup Documents for Noticing (1 hr), Research and Compile Information for Surrounding Properties, Preparation and Review of Noticing Maps and Table (2 hrs), Preparation of Initial Notice of Contamination Forms (1 hr), Revisions to initial Package based on review (1 hr).

3-Q1/Annual GW Rpt (VOHs) and Noticing

Q1/Annual Report Drafting and Map Preparation VOCs (4 hrs), Preparation of Noticing Maps, Upload Appraiser Data to Base Map (3 hrs)

Report Document Production and Formatting Tables and Text, Compilation into Adobe Format for Submittal (2 hrs)

3-Q1 & Annual Rpt VOHs Page 4 of 14 HW689 DC009C TACO #1 est (Blue Ribbon)

SUBTASK: 4-Q1 Additional PFAS Sampling/Reporting

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Designer 2 S. Ferianc 1

Technical Publications SpeciaH. Vining

Technical Publications SpeciaL. Houser

TOTAL LABOR 14

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST TOTALS

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

State Laboratory DEP SOP: LC-001-3 (PFAS) GW $0.00 5 1 Fld Regent Blk $0.00 State Laboratory DEP SOP: LC-001-3 (PFAS) IDW $0.00 1 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 55-Gallon Drum $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Blue Ribbon Cleaners

4/22/2025

Fieldwork Preparation and PFAS Kit Order with FDEP Laboratory (1 hr), Preparation and Incorporation of PFAS Text, Tables, and Figure into Annual Reporting (4 hrs)

Collection an documentation of PFAS Samples from one well being sampled for VOHs, also Purge and collection of PFAS samples from additional wells MW001, MW002, MW003 and MW013 (5 hrs), Collection and documentation PFAS Field Regent Blank and Collection of PFAS Drum purge Water IDW Sample and Document (1 hr), Sample preparation, Chain of custody preparation, PFAS Sample Packaging and Delivery to Shipper (1 hr).

PFAS Report Drafting and Map Preparation

Report Document Production and Formatting PFAS Tables and Text, including PFAS Summary Tables, Compilation into Adobe Format for Submittal, Conversion of Text Files to Excel and Formatting of State Laboratory Files for FDEP (1 hr)

Notes: Previously sampled PFAS Wells included MW002, MW003 and MW013 and all exceeded the PGCTLs. Recommended Expanded Sampling includes addtional wells MW001 (upgradient) and MW006 (downgradient). An IDW and Field Regent Blank will also be collected. The PFAS samples will be submitted to the FDEP Tallahassee Laboratory for PFAS analysis by DEP SOP: LC-001-3.

4-Additional PFAS Sampling Page 5 of 14 HW689 DC009C TACO #1 est (Blue Ribbon)

SUBTASK: 5-Q2 GW Sampling (VOHs) and Reporting

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Designer 2 S. Ferianc Q2 Report Drafting and Map Preparation VOCs (3 hrs) 3 Technical Publications SpeciaH. Vining Technical Publications SpeciaL. Houser

TOTAL LABOR 19

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST TOTALS

Erwin Remdication Liquid IDW $95.00 Bucket 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 8260 (VOHs) Wells $73.00 2 0 $146.00 EPA Method 8260 (VOHs) GW IDW $73.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $146.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Water Level Indicator $25.00 each 0 $0.00 Poly Drum $75.00 each 0 $0.00

TOTAL EQUIPMENT $330.00

Blue Ribbon Cleaners

1/28/2026

Notification of Property Owner and Tenant for Access (1 hr), Preparation for GW Sampling Field Event and Order VOC Laboratory Kit (1 hr), Preparation of IDW manifest and profile (1 hr), Update Analytical Summary Map and PCE Plume Maps (1 hr), Update Analytical DTW, Analytical, and Geochemical Tables (1 hr), Prepare brief GW Analytical Results Statement Letter and Recommendations (2 hrs), Compile backup and build Letter Deliverable with Attachments (1 hr).

Travel Preparation, Loading and Mobilization for Groundwater Sampling (1 hr), Travel Round Trip for Groundwater Sampling (2 hrs), Calibrate YSI and Sample two wells MW006 and MW009 for VOHs by EPA Method 8260 (3 hrs). Fixed Laboratory VOHs Samples preparation, Chain of custody preparation, Sample Packaging and Delivery to Laboratory (1 hr), Site Restoration IDW Handling and Cleanup (1 hr)

Notes: Proposed VOH Grounwater Samples from two NAM wells MW006 and MW009 for EPA Method 8260 (VOHs Only) Analysis.

5-Total Page 3 of 10 DC009C TACO #2 est

SUBTASK: 6-Q3 GW Sampling (VOHs) and Reporting

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Designer 2 S. Ferianc Q3 Drafting Map Preparation VOCs (1 hr) 1 Technical Publications Specia H. Vining Technical Publications Specia L. Houser

TOTAL LABOR 14

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST TOTALS

Erwin Remdication Liquid IDW $95.00 Bucket 1 $95.00

TOTAL $95.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 8260 (VOHs) Wells $73.00 1 0 $73.00 EPA Method 8260 (VOHs) GW IDW $73.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $73.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Water Level Indicator $25.00 each 0 $0.00 Poly Drum $75.00 each 0 $0.00

TOTAL EQUIPMENT $330.00

Blue Ribbon Cleaners

1/28/2026

Notification of Property Owner and Tenant for Access (1 hr), Preparation for GW Sampling Field Event and Order VOC Laboratory Kit (1 hr), Preparation of IDW manifest and profile (1 hr), Update Analytical Summary Map and PCE Plume Maps (1 hr), Update Analytical DTW, Analytical, and Geochemical Tables (1 hr), Prepare and Submit Recommendations Email (1 hr).

Travel Preparation, Loading and Mobilization for Groundwater Sampling (1 hr), Travel Round Trip for Groundwater Sampling (2 hrs), Calibrate YSI and Sample two wells MW006 for VOHs by EPA Method 8260 (2 hrs). Fixed Laboratory VOHs Samples preparation, Chain of custody preparation, Sample Packaging and Delivery to Laboratory (1 hr), Site Restoration IDW Handling and Cleanup (1 hr)

Notes: Proposed VOH Grounwater Samples from two NAM wells MW006 for EPA Method 8260 (VOHs Only) Analysis.

6-Total Page 4 of 10 DC009C TACO #2 est

SUBTASK: 7-Q4 GW Sampling (VOHs) and Reporting

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Designer 2 S. Ferianc Q4 Drafting Map Preparation VOCs (1 hr) 1 Technical Publications SpeciaH. Vining Technical Publications SpeciaL. Houser

TOTAL LABOR 14

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST TOTALS

Erwin Remdication Liquid IDW $95.00 Bucket 1 $95.00

TOTAL $95.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 8260 (VOHs) Wells $73.00 1 0 $73.00 EPA Method 8260 (VOHs) GW IDW $73.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $73.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Water Level Indicator $25.00 each 0 $0.00 Poly Drum $75.00 each 0 $0.00

TOTAL EQUIPMENT $330.00

Blue Ribbon Cleaners

1/28/2026

Notification of Property Owner and Tenant for Access (1 hr), Preparation for GW Sampling Field Event and Order VOC Laboratory Kit (1 hr), Preparation of IDW manifest and profile (1 hr), Update Analytical Summary Map and PCE Plume Maps (1 hr), Update Analytical DTW, Analytical, and Geochemical Tables (1 hr), Prepare and Submit Recommendations Email (1 hr).

Travel Preparation, Loading and Mobilization for Groundwater Sampling (1 hr), Travel Round Trip for Groundwater Sampling (2 hrs), Calibrate YSI and Sample two wells MW006 for VOHs by EPA Method 8260 (2 hrs). Fixed Laboratory VOHs Samples preparation, Chain of custody preparation, Sample Packaging and Delivery to Laboratory (1 hr), Site Restoration IDW Handling and Cleanup (1 hr)

Notes: Proposed VOH Grounwater Samples from two NAM wells MW006 for EPA Method 8260 (VOHs Only) Analysis.

7-Total Page 5 of 10 DC009C TACO #2 est

SUBTASK:

DATE: April 22, 2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Designer 2 S. Ferianc

Technical Publications SpecialistH. Vining

Technical Publications SpecialistL. Houser

TOTAL LABOR: 37

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST TOTALS

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 8260 (VOHs) GW $73.00 0 0 $0.00 EPA Method 8260 (Full List) Well $150.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Blue Ribbon Cleaners 8-Additional Annual & SRCR Reporting

Preparation of Report SRCO Recommendations, Preparation and Compilation of Final Report (2 hrs)

In the event of favorable groundwater analytical results after sampling in any quarter and achieving NFA conditions, the Quarterly Report will be converted to a full Annual Report Including development of Shallow and Intermediate GW Flow Maps (2 hrs).

Incorporation of updated and reformated historical soil analytical Maps and Tables (3 hrs), Preparation of Full Annual Groundwater Sampling Report Text with Conclusions (24 hrs), The Report Recommendations will be developed as Site Rehabilitation Completion Report with No Furter Action Proposal, and include the additional documentation required in Paragraph 62-780.750(4)(f) FAC

Preparation GW Flow Maps (2 hrs), Update/Create Soil Maps for SRCR Report (2 hrs)

Report Document Production and Formatting Tables and Text, Compilation into Adobe Format for Submittal (2 hrs)

8-Additional Reporting Page 9 of 14 HW689 DC009C TACO #1 est (Blue Ribbon)

C

OS

T

ES

TI

MA

TE

C on tra ct or

A pt im

E nv iro nm en ta l & In fra st ru ct ur e, /2

H W

D C

9C

T A

C O

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

6- Q

G

W S am pl in g

(V O

H s) a nd

R ep or tin g

S ite

B lu e

R ib bo n

C le an er s E

R

IC

_5

S ub Ta sk

2- Q ua rte r 1 G

W S am pl in g

(V O

H s)

S ub

Ta sk

7-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

A ct iv ity

/P ha se

Q ua rte rly

G ro un dw at er

M on ito rin g S ub Ta sk

3- Q

1/ A nn ua l G W

R pt

(V O

H s) a nd

N ot ic in g S ub Ta sk

8- A dd iti on al

A nn ua l &

S R

C R

R ep or tin g

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Q

A dd iti on al

P

FA

S S am pl in g/

R ep or tin g S ub Ta sk

S ub

Ta sk

5-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

S ub

Ta sk

TTo ta ls

La bo r

R at e C at eg or y

$7 3.

P P ro je ct M an ra m er -1

-0 .9

$7 3.

En gi ne er /S ci en tis t 5

E . K ra m er

$6

8.

En gi ne er

/S ci en tis t 5 G

. R ob er ts

-4

-2

-2

$3 7.

En gi ne er /S ci en tis t 2

K . H ow ar d -2

-1 -1

$3

5.

D es ig ne r 2 S

. F er ia nc

-4

-2

-2

$3 0.

Te ch ni ca l P ub lic at io ns S pe ci al is t 3 H

. V in in g

$2 8.

Te ch ni ca l P ub lic at io ns S pe ci al is t 3 L.

H ou se r

$0 .0

To ta l H ou rs

-1

-1

-5

-5

D ire ct L

8.

.2 4)

$0 .0

$0

.0

$0 .0

$0

.0

7.

7.

$0 .0

$0

.0

$0 .0

O ve rh ea d

.5 8%

7.

.9

8) $0

.0

$0 .0

$0

.0

$0 .0

1.

1.

$0

.0

$0 .0

$0

.0

G en

A dm in

.3

8%

8.

.4 5)

$0 .0

$0

.0

$0 .0

$0

.0

.8 8)

.8 8)

$0 .0

$0

.0

$0 .0

Fr in ge

.9

6%

8.

.5 3)

$0 .0

$0

.0

$0 .0

$0

.0

.9 6)

.9 6)

$0 .0

$0

.0

$0 .0

To ta l L

1, 2.

2.

$0 .0

$0

.0

$0 .0

$0

.0

5.

5.

$0 .0

$0

.0

$0 .0

Tr av el V eh ic le R en ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

.0 0)

$0 .0

$0

.0

$0 .0

.0

0) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

.0 0)

$0 .0

$0

.0

$0 .0

.0

0) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e

9.

$0

.0

$0 .0

$0

.0

9.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

RE

V:

2/

CE

F

SH

AW

Pa

C

OS

T

ES

TI

MA

TE

C on tra ct or

A pt im

E nv iro nm en ta l & In fra st ru ct ur e, /2

H W

D C

9C

T A

C O

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

6- Q

G

W S am pl in g

(V O

H s) a nd

R ep or tin g

S ite

B lu e

R ib bo n

C le an er s E

R

IC

_5

S ub Ta sk

2- Q ua rte r 1 G

W S am pl in g

(V O

H s)

S ub

Ta sk

7-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

A ct iv ity

/P ha se

Q ua rte rly

G ro un dw at er

M on ito rin g S ub Ta sk

3- Q

1/ A nn ua l G W

R pt

(V O

H s) a nd

N ot ic in g S ub Ta sk

8- A dd iti on al

A nn ua l &

S R

C R

R ep or tin g

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Q

A dd iti on al

P

FA

S S am pl in g/

R ep or tin g S ub Ta sk

S ub

Ta sk

5-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

S ub

Ta sk

TTo ta ls

To ta l S ub co nt ra ct or

C os t

4.

$0 .0

$0

.0

$0 .0

4.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

L La bo ra ly tic al

C os ts

6.

$0 .0

$0

.0

$0 .0

$0

.0

.0 0)

.0 0)

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

6.

$0

.0

$0 .0

$0

.0

$0 .0

.0

0)

.0

0) $0

.0

$0 .0

$0

.0

Fi el d E xp en so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l

1, 3.

2.

$0 .0

$0

.0

$0 .0

4.

8.

8.

$0 .0

$0

.0

$0 .0

C om pl et io n Fe e

2.

.2 2)

$0 .0

$0

.0

$0 .0

$0

.0

.5 3)

.5 3)

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

1, 5.

7.

$0

.0

$0 .0

$0

.0

4.

6.

6.

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

SH

AW

Pa

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 2 K. Howard Designer 2 S. Ferianc Technical Publications SpeciaH. Vining Technical Publications SpeciaL. Houser

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST ACTUAL TOTALS

Erwin Remdication Liquid IDW $95.00 Bucket -1 ($95.00)

TOTAL ($95.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 8260 (VOHs) Wells $73.00 0 0 $0.00 EPA Method 8260 (VOHs) GW IDW $73.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Water Level Indicator $25.00 each 0 $0.00 Poly Drum $75.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Blue Ribbon Cleaners 5-Q2 GW Sampling (VOHs) and Reporting

1/28/2026

5-Delta Page 8 of 10 DC009C TACO #2 est

SUBTASK: 6-Q3 GW Sampling (VOHs) and Reporting

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts -2

Engineer/Scientist 2 K. Howard -1 Designer 2 S. Ferianc Reduce Q3 Report Drafting to Summary Map Only (-2 hrs) -2 Technical Publications SpeciaH. Vining Technical Publications SpeciaL. Houser

TOTAL LABOR -5

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST TOTALS

Erwin Remdication Liquid IDW $95.00 Bucket 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 8260 (VOHs) Wells $73.00 -1 0 ($73.00) EPA Method 8260 (VOHs) GW IDW $73.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB ($73.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Water Level Indicator $25.00 each 0 $0.00 Poly Drum $75.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Blue Ribbon Cleaners

1/28/2026

Remove brief GW Analytical Results Statement Letter (-2 hrs), Remove Compile backup and build Letter Deliverable with Attachments (-1 hr), Prepare and Submit Recommendations Email (1 hr) Remove Sampling of Sample one well MW009 for VOHs by EPA Method 8260 (-1 hr)

Notes: Remove Ongoing VOH Grounwater Sampling of MW009 for EPA Method 8260 (VOHs Only) Analysis, at the request of the FDEP.

6-Delta Page 9 of 10 DC009C TACO #2 est

SUBTASK: 7-Q4 GW Sampling (VOHs) and Reporting

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts -2

Engineer/Scientist 2 K. Howard -1 Designer 2 S. Ferianc Reduce Q3 Report Drafting to Summary Map Only (-2 hrs) -2 Technical Publications SpeciaH. Vining Technical Publications SpeciaL. Houser

TOTAL LABOR -5

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST TOTALS

Erwin Remdication Liquid IDW $95.00 Bucket 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 8260 (VOHs) Wells $73.00 -1 0 ($73.00) EPA Method 8260 (VOHs) GW IDW $73.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB ($73.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Water Level Indicator $25.00 each 0 $0.00 Poly Drum $75.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Blue Ribbon Cleaners

1/28/2026

Remove brief GW Analytical Results Statement Letter (-2 hrs), Remove Compile backup and build Letter Deliverable with Attachments (-1 hr), Prepare and Submit Recommendations Email (1 hr) Remove Sampling of Sample one well MW009 for VOHs by EPA Method 8260 (-1 hr)

Notes: Remove Ongoing VOH Grounwater Sampling of MW009 for EPA Method 8260 (VOHs Only) Analysis, at the request of the FDEP.

7-Delta Page 10 of 10 DC009C TACO #2 est

C O

ST

E

ST

IM

A

TE

C on tra ct or

A pt im E nv iro nm en ta l &

In fra st ru ct ur e, 9/ 8/

H W

D C

9C

T A

C O

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

6- Q

G

W S am pl in g

(V O

H s) a nd

R ep or tin g

S ite

B lu e

R ib bo n

C le an er s E

R

IC

_5

S ub Ta sk

2- Q ua rte r 1 G

W S am pl in g

(V O

H s)

S ub

Ta sk

7-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

A ct iv ity

/P ha se

Q ua rte rly

G ro un dw at er

M on ito rin g S ub Ta sk

3- Q

1/ A nn ua l G W

R pt

(V O

H s) a nd

N ot ic in g S ub Ta sk

8- A dd iti on al

A nn ua l &

S R

C R

R ep or tin g

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Q

A dd iti on al

P

FA

S S am pl in g/

R ep or tin g S ub Ta sk

S ub

Ta sk

5-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

S ub

Ta sk

T To ta ls

La bo r

R at e C at eg or y

$7 3.

P P ro je ct M an ra m er

.0

$7 3.

En gi ne er /S ci en tis t 5

E . K ra m er

$6

8.

En gi ne er

/S ci en tis t 5 G

. R ob er ts

$3 7.

En gi ne er /S ci en tis t 2

K . H ow ar d

$3

5.

D es ig ne r 2 S

. F er ia nc

$3 0.

Te ch ni ca l P ub lic at io ns S pe ci al is t 3 H

. V in in g

$2 8.

Te ch ni ca l P ub lic at io ns S pe ci al is t 3 L.

H ou se r

$0 .0

To ta l H ou rs

D ire ct L

$1

0, 3.

$1 ,1

.8

$6

.8

$2

,5

.4

$6

.4

$9

.0

$9

.0

$9

.0

$2 ,3

.4

$0

.0

$0 .0

O ve rh ea d

.5 8%

$8 ,7

.9

$1

,0

.5

$5

.5

$2 ,1

.8

$5

.1

$8

.6

$8

.6

$8

.6

$2

,0

.9

$0 .0

$0

.0

G en

A dm in

.3

8% $1

,9

.4

$2

.4

$1

.7

$4

.6

$1

.7

$1

.0

$1

.0

$1

.0

$4

.5

$0 .0

$0

.0

Fr in ge

.9 6%

$3 ,2

.9

$3

.1

$1

.8

$8

.8

$2

.5

$3

.8

$3

.8

$3

.8

$7

.0

$0

.0

$0 .0

To ta l L

$2

4, 3.

$2 ,7

.0

$1

,4

.0

$5 ,9

.8

$1

,5

.7

$2 ,2

.6

$2

,2

.6

$2 ,2

.6

$5

,5

.9

$0 .0

$0

.0

Tr av el V eh ic le R en ta l $4

.0

$1

.0

$0

.0

$0 .0

$1

.0

$1

.0

$1

.0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$4

.0

$1

.0

$0 .0

$0

.0

$1

.0

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$2

.0

$0 .0

$0

.0

$0 .0

$9

5.

$9 5.

$9

5.

$0 .0

$0

.0

$0 .0

U til iti es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $2

.0

$0

.0

$0 .0

$0

.0

$9 5.

$9

5.

$9 5.

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $2

8.

$0 .0

$0

.0

$0 .0

$9

.5

$9 .5

$9

.5

$0 .0

$0

.0

$0 .0

RE

V:

2/

CE

F

SH

AW

Pa

C O

ST

E

ST

IM

A

TE

C on tra ct or

A pt im E nv iro nm en ta l &

In fra st ru ct ur e, 9/ 8/

H W

D C

9C

T A

C O

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

6- Q

G

W S am pl in g

(V O

H s) a nd

R ep or tin g

S ite

B lu e

R ib bo n

C le an er s E

R

IC

_5

S ub Ta sk

2- Q ua rte r 1 G

W S am pl in g

(V O

H s)

S ub

Ta sk

7-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

A ct iv ity

/P ha se

Q ua rte rly

G ro un dw at er

M on ito rin g S ub Ta sk

3- Q

1/ A nn ua l G W

R pt

(V O

H s) a nd

N ot ic in g S ub Ta sk

8- A dd iti on al

A nn ua l &

S R

C R

R ep or tin g

P ro je ct

M an ag er

N ik ki

K nu ts on

(F D

E P

)/E ric

K ra m er

(A P

TI

M

S ub Ta sk

4- Q

A dd iti on al

P

FA

S S am pl in g/

R ep or tin g S ub Ta sk

S ub

Ta sk

5-

Q

G W

S am pl in g (V

O H

s) a nd R ep or tin g

S ub

Ta sk

TTo ta ls

To ta l S ub co nt ra ct or

C os t $ $3

.5

$0

.0

$0 .0

$0

.0

$1

.5

$1

.5

$1

.5

$0 .0

$0

.0

$0 .0

L La bo ra ly tic al

C os ts $6

.0

$2

.0

$0

.0

$0 .0

$1

.0

$1

.0

$1

.0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $ $6

.0

$2

.0

$0

.0

$0 .0

$1

.0

$1

.0

$1

.0

$0

.0

$0 .0

$0

.0

Fi el d E xp en so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $1

.0

$4

0.

$0 .0

$0

.0

$4 0.

$4

0.

$4 0.

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$8

.0

$0 .0

$0

.0

$0 .0

$2

.0

$2

.0

$2

.0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $2

.0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $1

,3

.0

$3

.0

$0 .0

$0

.0

$3

.0

$3

.0

$3

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $2

6, 4.

$2 ,7

.0

$2

,1

.0

$5 ,9

.8

$1

,5

.7

$2 ,9

.1

$2

,9

.1

$2 ,9

.1

$5

,5

.9

$0 .0

$0

.0

C om pl et io n

Fe e

$2 ,4

.3

$2

.1

$1

.2

$5

.3

$1

.7

$2

.4

$2

.4

$2

.4

$5

.5

$0

.0

$0 .0

To ta l E st im at ed C os t

$2 9, 1.

$3

,0

.1

$2 ,2

.2

$6

,5

.2

$1 ,7

.5

$3

,2

.6

$3 ,2

.6

$3

,2

.6

$6 ,0

.4

$0

.0

$0 .0

C os t f ro m P rio r C

E F:

$2 9, 1.

M an ua l E nt ry C os t f ro m

D el ta C

E F;

9.

M an ua l E nt ry C os t (

P rio r + D el ta

$2

9, 1.

Au to

-C al cu la te d

R ou nd in g E rr or

$0

.0

Au to

-C al cu la te d

Fi na l T ot al C os t:

$2 9, 1.

Au to -C al cu la te d

RE

V:

2/

CE

F

SH

AW

Pa

Proposed Scope of Work Blue Ribbon Cleaners (former) 160 South U.S. Highway 17-92 Longwood, Seminole County, Florida 32750 Groundwater Monitoring Proposal Task Assignment DC009C TACO #2 ERIC_5462 (Former FAC ID No. 519502401) APTIM Environmental & Infrastructure, LLC (APTIM) 1/28/26

The following is the proposed scope of work for Task Assignment Change Order (TACO) DC009C TACO #2 to reconcile Subtask 5 and adjust the future scope of the Task Assignment

(TA).

Subtask - 1: Project Management This task includes project management activities associated with the completion of the following Subtasks, as calculated in accordance with Contract HW689.

Subtask - 2: Quarter 1 Monitoring Well Sampling – VOHs: Previously Reconciled Subtask - 3: Quarter 1/Annual Groundwater Reporting (VOHs) and Noticing Documents

Preparation: Previously Reconciliation Subtask - 4: Quarter 1 Additional PFAS Sampling and Reporting: Previously Reconciled

Subtask - 5: Quarter 2 Monitoring Well Sampling (VOHs) and Reporting:

The two (2) buckets generated during the quarter 2 sampling event could not be located by the subcontracted IDW transportation and disposal company requested to remove the IDW waste, therefore the drum disposal has been removed from the Subtask. The adjustment reconciles Subtask 5.

Subtask - 6: Quarter 3 Monitoring Well Sampling (VOHs) and Reporting:

At the request of the FDEP (see attached email), the quarterly 3 sampling scope has been reduced to remove the sampling of the downgradient well MW009. In addition, the reporting has also been reduced to the preparation and submittal of an email to include any recommendations for the site.

Subtask - 7: Quarter 4 Monitoring Well Sampling (VOHs) and Reporting:

The quarterly 4 sampling scope has also been reduced to remove the sampling of the downgradient well MW009 and change the reporting.

Subtask - 8: Additional Annual and SRCR Reporting: No Changes

No deliverable or cost to completion extensions should be necessary at this time.

APTIM proposes to perform this scope of work in accordance with the terms and conditions of the Contract between the Florida Department of Environmental Protection and APTIM dated December 21, 2021 (DEP Contract No. HW689). APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.

If you have any questions, please contact us for clarification.

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC009C 1 HW689

Nicole Knutson 850-245-8763 APTIM Environmental & Infrastructure, LLC

Eric Kramer 407-287-3216

ERIC_5462

Blue Ribbon Cleaners (former)

$ 29,361.53 $ 29,651.03

$ 29,361.53 $ 29,651.03

07/17/2026 08/28/2026 42

1 1 1

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.09.11 09:52:02 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.09.11 08:51:27 -04'00'

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST