CN-370000-HW689-DC16CCO2.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|HW689|a751b87398beb5bfc7861f19a403533e
Contract number
HW689
Issued by
Florida

About this file

This document is a Task Assignment Change Order (TACO #2) executed between the State of Florida Department of Environmental Protection and APTIM Environmental & Infrastructure, LLC (APTIM) for environmental remediation services at the Former Brantley Cleaners site (ERIC_5454) located at 924 West State Road 436, Altamonte Springs, Seminole County, Florida. The task assignment is issued under Contract HW689, with Nicole Knutson serving as the Department's Project Manager and Eric Kramer representing APTIM.

The change order modifies the original task assignment to provide cost reconciliation for a new soil vapor extraction (SVE) remedial system and authorizes additional vapor sample collection and analysis. Specifically, TACO #2 reconciles equipment costs where the actual invoice from ESD Waste 2 Water, Inc. for the new SVE system was $130,394.04 against an estimated cost of $131,541.38, resulting in a cost reduction of $1,147.34. However, the change order increases overall labor and analytical costs by $1,699.62 to account for six additional vapor samples in the first and second quarters using EPA Method TO-15 analysis. The amended total task value is $225,165.95, compared to the prior value of $223,466.33. The task assignment completion date remains February 27, 2026, with final deliverable deadlines including a Semi-Annual O&M Report due December 12, 2025. Utilities costs for electrical service through Duke Power remain at $10,170.00 for Quarters 1 and 2, and $9,720.00 for Quarters 3 and 4.

View the file

Other files

File Type Posted
CN-370000-HW689-BF01A.pdf.crdownload CRDOWNLOAD file
CN-370000-HW689-BF01D.pdf PDF
CN-370000-HW689-BIL01G.pdf PDF
CN-370000-HW689-BIL1BCO1.pdf PDF
CN-370000-HW689-BIL1BCO3.pdf PDF
CN-370000-HW689-DC001A.pdf PDF
CN-370000-HW689-DC001B.pdf PDF
CN-370000-HW689-DC001C.pdf PDF
CN-370000-HW689-DC001D.pdf PDF
CN-370000-HW689-DC002A.pdf PDF
CN-370000-HW689-DC003B.pdf PDF
CN-370000-HW689-DC004A.pdf PDF
CN-370000-HW689-DC004B.pdf PDF
CN-370000-HW689-DC005C.pdf PDF
CN-370000-HW689-DC006A.pdf PDF
CN-370000-HW689-DC008B.pdf PDF
CN-370000-HW689-DC010B.pdf PDF
CN-370000-HW689-DC011B.pdf PDF
CN-370000-HW689-DC011D.pdf PDF
CN-370000-HW689-DC012A.pdf PDF
CN-370000-HW689-DC013B.pdf PDF
CN-370000-HW689-DC014B.pdf PDF
CN-370000-HW689-DC015E.pdf PDF
CN-370000-HW689-DC019A.pdf PDF
CN-370000-HW689-DC019B.pdf PDF
CN-370000-HW689-DC024A.pdf PDF
CN-370000-HW689-DC025A.pdf PDF
CN-370000-HW689-DC028A.pdf PDF
CN-370000-HW689-DC029A.pdf PDF
CN-370000-HW689-DC02ACO1.pdf PDF
CN-370000-HW689-DC031A.pdf PDF
CN-370000-HW689-DC034A.pdf PDF
CN-370000-HW689-DC035A.pdf PDF
CN-370000-HW689-DC037A.pdf PDF
CN-370000-HW689-DC03ACO1.pdf PDF
CN-370000-HW689-DC03ACO2.pdf PDF
CN-370000-HW689-DC03CC01.pdf PDF
CN-370000-HW689-DC03DCO1.pdf PDF
CN-370000-HW689-DC05CCO1.pdf PDF
CN-370000-HW689-DC05DCO1.pdf PDF
CN-370000-HW689-DC08CCO1.pdf PDF
CN-370000-HW689-DC08CCO2.pdf PDF
CN-370000-HW689-DC08CCO3.pdf PDF
CN-370000-HW689-DC11CCO5.pdf PDF
CN-370000-HW689-DC11CCO6.pdf PDF
CN-370000-HW689-DC12BCO4.pdf PDF
CN-370000-HW689-DC13BCO2.pdf PDF
CN-370000-HW689-DC13BCO4.pdf PDF
CN-370000-HW689-DC13BCO7.pdf PDF
CN-370000-HW689-DC16CCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

DC016C 2 HW689

Nicole Knutson 850-245-8763 APTIM Environmental & Infrastructure, LLC (APTIM)

Eric Kramer 813-205-4703

ERIC_5454

Former Brantley Cleaners

$ 205,965.95 $ 204,266.33

$ 19,200.00 $ 19,200.00

$ 225,165.95 $ 223,466.33

02/27/2026 02/27/2026 0

1 1 2

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.01.27 09:09:34 -05'00'

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2025.01.27 08:55:27 -05'00'

1/27/2025

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Alexis A. Lambert Secretary

Memorandum

TO: ERIC_5454

Former Brantley Cleaners

FROM: Nicole Knutson, Project Manager

SUBJECT: Negotiation Summary

HW689 DC016C-2

DATE: January 24, 2025

This Change Order reduces remedial system equipment costs and increases labor and analytical costs to account for the collection of additional vapor samples. The bid from ESD Waste 2 Water, Inc for fabrication and transportation of the remedial system was higher than the actual cost. The difference between the bid and the actual cost is $1,147.34.

The total task amount has increased by $1,699.62. The price prior to this Change Order was $223,466.33 and the Amended Price is $225,165.95. Aptim’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date remains December 12, 2025. Task completion date remains February 27, 2026.

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : Brantley Cleaners

SUBTASK:

DATE: January 31, 2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 3

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 R. Lindsay Engineering Technician 3 B. Skipper Designer 2 S. Ferianc 3 Technical Pub Specialist 3 H. Vining 2

TOTAL LABOR 56

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

Erwin Remediation IDW T&D $545.00 LS 1 $545.00

TOTAL $545.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00

EPA Method 8260 (Halos Only) $73.00 11 0 $803.00

EPA Method 8260 (Halos Only/IDW) $73.00 1 $73.00

Sample Shipping (Small cooler) $110.00 0 $0.00

Sample Shipping (large cooler) $150.00 1 $150.00

TOTAL LAB $1,026.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 2 $80.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Deep Groundwater Sampling Kit $415.00 Day 1 $415.00 Diffusion Sampler (2" well) $36.00 Day 7 $252.00 55-gallon Drum $100.00 each 1 $100.00

TOTAL EQUIPMENT $847.00

Annual Groundwater Sampling

Technical evaluation of groundwater analytical data with respect to currect remedial strategy and screening of potential remedial strategies to hasten site cleanup.

Ordering Replacement Passive Sampling Bags and Laboratory Sampling Kits (2 hrs), Preparation of shallow and intermediate GW Flow Maps, Analytical Summry and Result Plume Maps (3 hrs).

Update of GW Elevation, Analytical Summary Tables (3 hrs), Letter Report Text and Preparation of Recommendations and conclusions (18 hrs).

Notes: Proposed PDB Deployment into Monitoring Wells MW001, MW004, MW006, MW009, MW012, MW013 & MW016 and conventional sampling of MW005, MW007, MW010 and MW011.

Gauge 16 MW's.

Travel Preparation and Mobilization (1 hr), Round trip travel to site (3 hrs). Collect Depth to Groundwater Measurements from all wells (3 hrs). Retrieve PDB's and collect 7 samples (5 hrs).

Deploy new PDBs in each of the seven wells (2 hrs). Conventional sampling of four wells using down hole pump (4 hrs.), Sample preparation, Chain of custody preparation, Sample Packaging and Delivery to Laboratory (2 hrs). Collection of Drum purge Water IDW Sample (1 hr), Site Restoration and Cleanup (1 hr).

Drafting GW Flow and Analytical Results Maps Report Document Production

2-GW Sampling Page 3 of 13 DC016C TACO #1 est

SUBTASK:

DATE: January 15, 2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 7

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 R. Lindsay

Engineering Technician 3 B. Skipper 40

Designer 2 S. Ferianc 2

Technical Pub Specialist 3 H. Vining 1

TOTAL LABOR 140

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00

Van or Truck 3 person, 2 trucks $120.00 Day 10 $1,200.00

TOTAL VEHICLE $1,200.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00

Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00

Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00

Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00

Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

Dominion Metal Recycling Trailer Disposal $0.00 No charge 1 No charge

JH Ham Electrical/Permitting $3,725.00 Lump Sum 1 $3,725.00

ESD W2W Replacement system $130,394.04 Lump Sum 1 $130,394.04

Carbon Services Vapor Carbon Drum $1,728.05 Lump Sum 1 $1,728.05

Sunbelt telehandler $712.00 monthly 1 $712.00

TOTAL $136,559.09

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 7 0 $1,400.00

EPA Method 8260 (Halos Only) $73.00 0 0 $0.00

EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00

Sample Shipping (Small cooler) $110.00 0 $0.00

Sample Shipping (large cooler) $150.00 1 $150.00

TOTAL LAB $1,550.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 5 $200.00

Shallow GW Sampling Kit $290.00 Day 0 $0.00

Construction/O&M Supplies $75.00 Day 5 $375.00

Construction/O&M/Pilot Test $360.00 Day 5 $1,800.00

MAGS Investigation Kit $500.00 Day 0 $0.00

Tedlar Bags $20.00 Each 0 $0.00

55-gallon Drum $100.00 Each 0 $0.00

TOTAL EQUIPMENT $2,375.00

Amend HASP for construction work (2 hrs), Engineering review of final shop drawings and O&M manual (2 hrs), Review and complete necessary permitting for new system install (2 hrs), Mob to site for old system disconnection and transport to disposal/recycling facility, prepare necessary documentation of salvaged unit (10 hrs), Mob to site to place new skid mounted remedial system, install tie-downs, oversee electrician connect system, piping connection, commence startup testing, collect vapor sampling (30 hrs), Document startup and operation with photolog (4 hrs)

Remedial System Replacement

Engineering review of shop drawings, equipment adherance to specifications (3 hrs), Onsite engineering support for piping connection, alignment and sequencing operation (4 hrs)

Report formatting and finalizing

Mobilization and Shop load out for site work (2 hrs), Travel to site for old system disconnection and transport to disposal/recycling facility, (8 hrs), Mob to site to assist with placement of new skid mounted remedial system, install tie-downs, assist with electrical connection of system, piping connection, commence startup testing, collect vapor sampling (30 hrs.)

Mobilization and Shop load out for site work (2 hrs), Mob to site for old system disconnection and transport to disposal/recycling facility, (8 hrs), Mob to site to assist with placement of new skid mounted remedial system, install tie-downs, assist with electrical connection of system, piping connection, commence startup testing, collect vapor sampling (30 hrs)

Prepare figures for report documentation

3-Total Page 3 of 12 DC016C TACO #2 est (003)

SITE :

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 9

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 R. Lindsay 59

Engineering Technician 3 B. Skipper Designer 2 S. Ferianc 3 Technical Pub Specialist 3 H. Vining 3

TOTAL LABOR 116

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00

Van or Truck $120.00 Day 6 $720.00

TOTAL VEHICLE $720.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00

Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00

Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00

Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00

Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

Lump 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 10 0 $2,000.00

EPA Method 8260 (Halos Only) $73.00 0 0 $0.00

EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00

Sample Shipping (Small cooler) $110.00 2 $220.00

Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $2,220.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 6 $240.00

Construction/O&M Kit $360.00 Day 6 $2,160.00

Construction O&M Supplies $75.00 Day 6 $450.00

Tedlar Bags $20.00 Each 0 $0.00

55-gallon Drum $100.00 Each 0 $0.00

TOTAL EQUIPMENT $2,850.00

Brantley Cleaners

Semi-Annual O&M Reporting January 15, 2025

PE Review of monthly data, direct staff engineer for system adjustments (6 hrs), Provide Comment and PE Seal of Semi-Annual O&M report, data summary, Prepare Recommendations and Conclusions (3 hrs)

Semi-Annual O&M Report (Drafting)

Semi-Annual O&M Report (Document Production)

Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 6 months = 18 hrs). SVE performance evaluation and system optimization (6 hrs).

Preparation of Semi-Annual O&M Report (18 hrs) which includes preparation of SVE operational tables, calculations, figures, O&M site visit summary, SVE system operation & performance).

Monthly Base Work - {Mob (1 hr), Travel Round Trip (2 hrs), SVE O&M (5 hrs) {total = 8 hrs x 6 mo = 48 hrs}. Additional work (each quarter) includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs). Additional Q1 for sampling of Influent and Effluent from three SVE Zones, sufficient operation of each zone for characteristic Vapor Sampling (4 hrs), Additional Q2 Vapor sampling of Influent from all three zones, collection of one Effluent from highest previous SVE Zone, allow for sufficient operation of each zone for characteristic Vapor Sampling (3 hrs)

4-Total Page 4 of 12 DC016C TACO #2 est (003)

SUBTASK: Utilities Quarter 1&2 DATE: January 31, 2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 R. Lindsay

Engineering Technician 3 B. Skipper Designer 2 S. Ferianc

Technical Pub Specialist 3 H. Vining

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00

Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00

Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00

Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00

Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00

Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

Duke Power Set up fee $450.00 LS 1 $450.00

Duke Power electrical service $1,600.00 monthly 6 $9,600.00

Handling fee monthly $20.00 monthly 6 $120.00

TOTAL $10,170.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00

EPA Method 8260 (Halos Only) $73.00 0 0 $0.00

EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00

Sample Shipping (Small cooler) $110.00 0 $0.00

Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00

Shallow GW Sampling Kit $290.00 Day 0 $0.00

MAGS Investigation Kit $500.00 Day 0 $0.00

Tedlar Bags $20.00 Each 0 $0.00

55-gallon Drum $100.00 Each 0 $0.00

TOTAL EQUIPMENT $0.00

Brantley Cleaners

5-Q1&2 Utilities Page 6 of 13 DC016C TACO #1 est

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 11

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 R. Lindsay 58

Engineering Technician 3 B. Skipper Designer 2 S. Ferianc 3 Technical Pub Specialist 3 H. Vining 2

TOTAL LABOR 116

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00

Van or Truck $120.00 Day 6 $720.00

TOTAL VEHICLE $720.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00

Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00

Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00

Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00

Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

$0.00 Lump 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 8 0 $1,600.00

EPA Method 8260 (Halos Only) $73.00 0 0 $0.00

EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00

Sample Shipping (Small cooler) $110.00 2 $220.00

Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $1,820.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 6 $240.00

Construction/O&M Kit $360.00 Day 6 $2,160.00

Construction O&M Supplies $75.00 Day 6 $450.00

55-gallon Drum $100.00 Each 0 $0.00

TOTAL EQUIPMENT $2,850.00

Semi-Annual O&M Report (Drafting)

Semi-Annual O&M Report (Document Production)

Daily telemetry checks to verify the SVE system is operating as scheduled (3 hrs per month x 6 months = 18 hrs). SVE performance evaluation and system optimization (6 hrs).

Preparation of Semi-Annual O&M Report (18 hrs which includes preparation of SVE operational tables, calculations, figures, O&M site visit summary, SVE system operation & performance).

Monthly Base Work - {Mob (1 hr), Travel Round Trip (2 hrs), SVE O&M (5 hrs) {total = 8 hrs x 6 mo = 48 hrs}. Additional work (each quarter) includes SVE Vacuum Readings and collection of VOC Vapor Sample (total 4 hrs). Additional Q3 for sampling of Influent and Effluent from three SVE Zones, sufficient operation of each zone for characteristic Vapor Sampling (3 hrs) Additional Q4 Vapor sampling of Influent from all three zones collection of

Brantley Cleaners

Annual O&M Reporting January 15, 2025

PE Review of monthly data, direct staff engineer for system adjustments (6 hrs), Provide Comment and PE Seal of Semi-Annual O&M report, data summary, Prepare Annual Report Recommendations and Conclusions (5 hrs)

6-Total Page 5 of 12 DC016C TACO #2 est (003)

SUBTASK: Utilities Quarters 3&4 DATE: January 31, 2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 R. Lindsay

Engineering Technician 3 B. Skipper Designer 2 S. Ferianc

Technical Pub Specialist 3 H. Vining

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00

Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00

Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00

Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00

Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00

Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

Duke Power electrical service $1,600.00 monthly 6 $9,600.00

Handling fee monthly $20.00 monthly 6 $120.00

TOTAL $9,720.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00

EPA Method 8260 (Halos Only) $73.00 0 0 $0.00

EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00

Sample Shipping (Small cooler) $110.00 0 $0.00

Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00

Shallow GW Sampling Kit $290.00 Day 0 $0.00

MAGS Investigation Kit $500.00 Day 0 $0.00

Tedlar Bags $20.00 Each 0 $0.00

55-gallon Drum $100.00 Each 0 $0.00

TOTAL EQUIPMENT $0.00

Brantley Cleaners

7-Q3&4 Utilities Page 8 of 13 DC016C TACO #1 est

SUBTASK:

DATE: January 15, 2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 R. Lindsay

Engineering Technician 3 B. Skipper

Designer 2 S. Ferianc

Technical Pub Specialist 3 H. Vining

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00

Van or Truck 3 person, 2 trucks $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00

Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00

Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00

Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00

Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE ACTUAL TOTALS

Dominion Metal Recycling Trailer Disposal $0.00 No charge 0 No charge

JH Ham Electrical/Permitting $1,645.00 Lump Sum 0 $0.00

ESD W2W Replacement system $131,541.38 Lump Sum 1 $130,394.04 ($1,147.34)

Carbon Services Vapor Carbon Drum $1,728.05 Lump Sum 0 $0.00

Sunbelt telehandler $712.00 monthly 0 $0.00

TOTAL ($1,147.34)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00

EPA Method 8260 (Halos Only) $73.00 0 0 $0.00

EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00

Sample Shipping (Small cooler) $110.00 0 $0.00

Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00

Shallow GW Sampling Kit $290.00 Day 0 $0.00

Construction/O&M Supplies $75.00 Day 0 $0.00

Construction/O&M/Pilot Test $360.00 Day 0 $0.00

MAGS Investigation Kit $500.00 Day 0 $0.00

Tedlar Bags $20.00 Each 0 $0.00

55-gallon Drum $100.00 Each 0 $0.00

TOTAL EQUIPMENT $0.00

Remedial System Replacement

3-Delta Page 8 of 12 DC016C TACO #2 est (003)

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 R. Lindsay 7

Engineering Technician 3 B. Skipper Designer 2 S. Ferianc

Technical Pub Specialist 3 H. Vining

TOTAL LABOR 7

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00

Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00

Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00

Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00

Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00

Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

Lump 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 6 0 $1,200.00

EPA Method 8260 (Halos Only) $73.00 0 0 $0.00

EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00

Sample Shipping (Small cooler) $110.00 0 $0.00

Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $1,200.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00

Construction/O&M Kit $360.00 Day 0 $0.00

Construction O&M Supplies $75.00 Day 0 $0.00

Tedlar Bags $20.00 Each 0 $0.00

55-gallon Drum $100.00 Each 0 $0.00

TOTAL EQUIPMENT $0.00

Brantley Cleaners

Semi-Annual O&M Reporting January 15, 2025

Additional Q1 for sampling of Influent and Effluent from three SVE Zones, sufficient operation of each zone for characteristic Vapor Sampling (4 hrs), Additional Q2 Vapor sampling of Influent from all three zones, collection of one Effluent from highest previous SVE Zone, allow for sufficient operation of each zone for characteristic Vapor Sampling (3 hrs)

4-Delta Page 9 of 12 DC016C TACO #2 est (003)

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts

Engineer/Scientist 2 K. Howard

Engineer/Scientist 2 K. McDonald

Engineer/Scientist 1 R. Lindsay 6

Engineering Technician 3 B. Skipper Designer 2 S. Ferianc

Technical Pub Specialist 3 H. Vining

TOTAL LABOR 6

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00

Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00

Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00

Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00

Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00

Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

$0.00 Lump 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method TO-15 (VOC Soil Vapor) $200.00 4 0 $800.00

EPA Method 8260 (Halos Only) $73.00 0 0 $0.00

EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00

Sample Shipping (Small cooler) $110.00 0 $0.00

Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $800.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00

Construction/O&M Kit $360.00 Day 0 $0.00

Construction O&M Supplies $75.00 Day 0 $0.00

55-gallon Drum $100.00 Each 0 $0.00

TOTAL EQUIPMENT $0.00

Additional Q3 for sampling of Influent and Effluent from three SVE Zones, sufficient operation of each zone for characteristic Vapor Sampling (3 hrs), Additional Q4 Vapor sampling of Influent from all three zones, collection of one Effluent from highest previous SVE Zone, allow for sufficient operation of each zone for characteristic Vapor Sampling (3 hrs)

Brantley Cleaners

Annual O&M Reporting January 15, 2025

6-Delta Page 10 of 12 DC016C TACO #2 est (003)

Proposed Scope of Work

Former Brantley Cleaners

Task Assignment DC016C TACO #2

ERIC_5454 (Former Facility ID No. 599500158)

Aptim Environmental & Infrastructure, LLC (APTIM)

January 15, 2025

The following proposed Task Assignment Change Order (TACO) #2 for the former Brantley Cleaners facility provides modification of the scope of work authorized by DC016C, which funded procurement of a new remedial system, groundwater sampling and one year of Operation and

Maintenance (O&M) and reporting. This TACO provides for a cost reconciliation for the new remedial system and adds additional vapor sample collection and analysis.

Subtask 1 - Project Management This task includes project management activities associated with the completion of the remaining Subtasks and are automatically adjusted to scope revisions in accordance with Contract HW689.

Subtask 2 - Annual Groundwater Sampling

No changes proposed for this Subtask. The scope of work was completed in its entirety and invoiced.

Subtask 3 – Remedial System Replacement

Subtask 3 requires a cost reconciliation for the purchase of the SVE/AAI remedial system.

The bid estimate from ESD Waste 2 Water, Inc. (ESD W2W) for the new system (including fabrication, transportation, On-Site Startup Support and 7% sales tax) was $131,541.38.

However, the cumulative invoice amount provided by ESD W2W was $130,394.04 because ESD W2W charged a tax rate lower than 7%. The difference between the proposed cost and actual invoiced is $1,147.34.

No other scope or cost adjustments are proposed for this subtask.

Subtask 4 – Semi-Annual O&M Services and Reporting

As requested by the FDEP, APTIM is revising the vapor sampling to add six additional vapor sample analysis using modified TO15. The first quarter will collect one influent and effluent sample from each of the three zones for a total of six air samples. The purpose of collecting the effluent samples is because this site previously recovered significant contaminant vapor mass to be classified as a hazardous waste. Therefore, APTIM wants to ensure breakthrough of the granular activated carbon does not occur. At the end of the second quarter APTIM will collect influent vapor samples from each of the three zones and one effluent sample from the zone with the highest reported concentration from last quarter for a total of four samples.

Subtask 5: Utilities Quarter 1 & 2

This subtask is ongoing and no modifications to the scope of cost budget are proposed at this time.

Subtask 6 – 2nd Semi-Annual O&M Services and Reporting

Subtask 6 is being revised to add four additional vapor sample analysis using modified TO15. The third and fourth quarters will collect an influent sample from each of the three zones and one effluent sample from the zone previously reporting the highest concentration. The purpose of collecting the effluent samples is to ensure breakthrough of the granular activated carbon does not occur.

No further changes to this subtask are proposed.

Subtask 7: Utilities Quarter 3 & 4

This subtask has not been performed but no modifications to the scope of cost budget are proposed at this time.

Deliverable Submittals and Proposed Schedule: Due to the delayed delivery of the new remedial system APTIM proposes the revised schedule for project deliverables. Based on the proposed schedule Task Assignment DC016C will need to be extended too.

Description Due Date

Collection of GW Samples and Deployment of PDBs 3/29/24

Completed

Annual Groundwater Sampling Report 5/17/24

Completed

Remedial system installation & startup 10/30/24

Completed

Semi Annual Report #1 (Startup through April 2025) 6/13/25

Semi Annual Report #2 (May through October 2025) 12/12/25

Task Expiration Date 2/27/26

APTIM proposes to perform this scope of work in accordance with the terms and conditions of contract No. HW689 that was executed on December 21, 2021, between Florida Department of Environmental Protection and APTIM Environmental & Infrastructure, LLC. APTIM has an existing Access Agreement in place from the current site owner dated 11/18/14. If you have any questions, please contact us for clarification.

PO 221848 PJ 631023220

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department�s Project Manager: Department�s Project Manager Phone:

Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

DC016C 1 HW689

Nicole Knutson 850-245-8763 Contractor Aptim Environmental & Infrastructure, LLC (APTIM) Contractor

Contractor Eric Kramer Contractor 813-205-4703

ERIC_5454

Former Brantley Cleaners

$ 204,266.33 $ 201,673.63

$ 19,200.00 $ 19,200.00

$ 223,466.33 $ 220,873.63

Completion Completion 08/15/2025 02/27/2026 196

1 1 1

Contractor

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2024.12.10 10:04:27 -05'00'

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2024.12.10 09:27:58 -05'00'

12/10/2024

This Change Order reconciles WCD #1 and extends the TA Completion date due to delays in the delivery of the remedial system.

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW689

DC016C

$ 223,466.33

Subtask 2 - Annual Groundwater Sampling Report

Subtask 3 - Remedial System Installation Documentation, including old Remedial System disposal documentation, field photo logs, SVE Startup Test

Subtask 4 - First Semi-Annual O&M Report

Subtask 5 - Utilities Quarter 1 & 2

Subtask 6 & 1 - Second Semi-Annual O&M Services and Reporting; Project Management

Subtask 7 - Utilities Quarter 3 & 4

Subtask 2 - Submittal and DEP approval of Annual Groundwater Sampling Report

Subtask 4 - Submittal and DEP approval of 1st Semi-Annual O&M Report including monthly O&M Report Forms

Subtask 5 - Submittal and DEP approval of Quarter 1 & 2 Utility Invoices Utilities (Cost Plus Fixed Fee) not to exceed $9,600.00 Utilities Handling Fee: $570.00

Subtask 7 - Submittal and DEP approval of Quarter 3 & 4 Utility Invoices Utilities (Cost Plus Fixed Fee) not to exceed $9,600.00 Utilities Handling Fee: $120.00

Subtask 6 & 1 - Submittal and DEP approval of 2nd Semi-Annual O&M Report including monthly O&M Report Forms; Project Management

Subtask 3 - Submittal and DEP approval of Remedial System Installation Documentation, including old Remedial System disposal documentation, field photo logs, SVE Startup Test

05/17/2024

10/30/2024

06/13/2025

06/13/2025

12/12/2025

12/12/2025

$ 158,549.31

$ 10,327.25

$ 14,572.43

$ 10,170.00

$ 20,127.34

$ 9,720.00

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW689

DC016C Completion August 15, 2025

This Task Assignment authorizes APTIM to remove and replace an SVE Remedial System at the Former Brantley Cleaners Site and conduct 12 months of O&M. All work is to be completed in accordance with the January 31, 2024 Scope of Work, Cost Estimate, and Bid Documentation.

Patrick McGrane 850-245-8899 Contractor Aptim Environmental & Infrastructure, LLC (APTIM) Contractor

Contractor Eric Kramer Contractor 813-205-4703

ERIC_5454

924 W State Road 436, Altamonte Springs, Seminole County

Former Brantley Cleaners

Contractor Contractor

$ 201,673.63

$ 19,200.00

$ 220,873.63

Scope of Work

Aptim Environmental & Infrastructure, LLC (APTIM Contractor

Eric Kramer Digitally signed by Eric Kramer Date: 2024.02.08 11:32:40 -05'00'

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2024.02.08 11:04:46 -05'00'

2/8/2024

N/A

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2 - Annual Groundwater Sampling Report 05/17/2024

Subtask 3 - Remedial System Replacement 05/17/2024

Subtask 4 - Semi-Annual O&M Services and Reporting 10/25/2024

Subtask 5 - Utilities Quarter 1 & 2 10/25/2024

Subtask 6 & 1 - Second Semi-Annual O&M Services and Reporting; Project Management 04/25/2025

Subtask 7 - Utilities Quarter 3 & 4 04/25/2025

Subtask 2 - Submittal and FDEP approval of Annual Groundwater Sampling Report $ 10,327.25

Subtask 3 - Submittal and FDEP approval of old Remedial System disposal documentation, field photo logs, SVE Startup Test $ 155,956.61

Subtask 4 - Submittal and FDEP approval of 1st Semi-Annual O&M Report including monthly O&M Report Forms $ 14,572.43

Subtask 5 - Submittal and FDEP approval of Quarter 1 & 2 Utility Invoices Utilities (Cost Plus Fixed Fee) not to exceed $9,600.00 Utilities Handling Fee: $570.00

$ 10,170.00

Subtask 6 & 1 - Submittal and FDEP approval of 2nd Semi-Annual O&M Report including monthly O&M Report Forms; Project Management $ 20,127.34

Subtask 7 - Submittal and FDEP approval of Quarter 3 & 4 Utility Invoices Utilities (Cost Plus Fixed Fee) not to exceed $9,600.00 Utilities Handling Fee: $120.00

$ 9,720.00

$ 220,873.63

HW689

DC016C

File details come from the government source that posted it. Updated .