This document set consists of Task Assignment Change Order (TACO) #2 and associated materials for Contract HW689 between the State of Florida Department of Environmental Protection (FDEP) and APTIM Environmental & Infrastructure, LLC. The TACO amends the original Task Assignment DC024C for environmental site assessment work at the former Southgate Cleaners facility located at 5317 U.S. Highway 19 in New Port Richey, Pasco County, Florida (ERIC_5228, Facility No. 519500354). The primary parties are the FDEP (represented by Project Manager Nicole Knutson) and APTIM (represented by Project Manager Eric Kramer), with subcontractors including GW Protection, Survtech Solutions, Site Lines, Atlantic Supply, and Erwin Remediation.
The scope of work includes Modified Active Gas (MAGS) sampling, soil sampling, Direct Push Technology (DPT) groundwater sampling, well installations, and site assessment reporting. TACO #2 reduces the total task value from $103,952.56 to $87,048.45, representing a cost reduction of $16,904.11, primarily due to site access limitations at Pet Supermarket, reduced well monitoring locations per FDEP request, field conditions including shallow water table and limestone layer, and adjustments to actual subcontracted costs. The contract spans six subtasks: Project Management, Preliminary Site Activities and MAGS, Soil and Groundwater Field Activities, Final Well Installations, Reporting, and PFAS Additional Groundwater Sampling. The task completion date was extended from July 18, 2025 to September 19, 2025 (63 days extension) to allow for disposal activities and FDEP review. Invoice milestones are tied to FDEP approval of deliverables including field notes, boring logs, and the final Site Assessment Report.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC024C 2 HW689
Nicole Knutson 850-245-8763 APTIM Environmental & Infrastructure, LLC
Eric Kramer 407 287 3216
ERIC_5228
Southgate Cleaners (former)
$ 87,048.45 $ 103,952.56
$ 87,048.45 $ 103,952.56
07/18/2025 09/19/2025 63
1 1 2
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.06.13 11:25:51 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.06.12 15:47:12 -04'00'
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert Secretary
Memorandum
TO: ERIC_5228
Southgate Cleaners
FROM: Nicole Knutson, Project Manager
SUBJECT: Negotiation Summary
HW689 DC024C-2
DATE: June 9, 2025
This Change Order reduces labor hours, drilling costs, and sampling costs. One MAGS well location was removed from the SOW due to site access issues with Pet Supermarket. Additionally, the final number of monitoring wells was reduced per DEP’s request. While in the field, samplers encountered a shallow water table which prevented soil samples from being collected at depth. Further, DPT groundwater sampling was limited due to the presence of a shallow unit of limestone.
PFAS-related costs were moved from Subtask 4 to Subtask 6.
Negotiations between APTIM and The Department resulted in a cost reduction of ($3,360.07). The total number of labor hours was reduced from 495 to 453.
Total task amount has reduced by ($16,904.11). The amount of the previous TACO was $103,952.56, and the amended price is $87,048.45. APTIM’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date has been extended from May 15, 2025 to June 6, 2025.
Task completion date has been extended from July 18, 2025 to September 19, 2025.
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE : Southgate Cleaners (Former)
SUBTASK:
DATE: June 05, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard
Engineer/Scientist 2 K. McDonald
Engineer/Scientist 1 W. Kesterson
Engineer/Scientist 1 R. Kelley
Engineer/Scientist 1 B. Blount Engineer Scientist 1 R. Lindsay
Engineering Technician 1 W. Jahns
Designer 2 S. Ferianc Technical Publications Speciali H. Vining Technical Publications Speciali M. Comins 3
TOTAL LABOR 176
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 4 $480.00
Van or Truck $480.00 Week 2 $960.00
TOTAL VEHICLE $1,440.00
PER DIEM STAFF DESCRIPTION RATE UNIT USEAGE ACTUAL TOTALS
Hotel 2 McDonald, Lindsey $150.00 Day 2 524.16 $524.16 Hotel 2 Howard, Blount $150.00 Day 2 606.16 $606.16 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 2 McDonald, Lindsey $30.00 Day 1 $60.00 Day 1-Leave between 6 - Noon 2 Howard, Blount $30.00 Day 1 $60.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 2 McDonald, Lindsey $36.00 Day 2 $144.00 Day 2 Howard, Blount $36.00 Day 2 $144.00
TOTAL PER DIEM $1,538.32
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE ACTUAL TOTALS
Survtech Solutions Survey and Benchmark Placement $2,750.00 LS 1 $2,750.00 $2,750.00 Site Lines Utility Locate Services $900.00 LS 1 $900.00 $900.00 Atlantic Supply MAGS Well Supplies (Casing, Screen, Sand) $883.31 LS 1 $1,097.80 $883.31
TOTAL $4,533.31
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 11 0 $2,200.00
EPA Method 8260 (Full List) Soil $150.00 34 0 $5,100.00
EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 0 0 Contingency $0.00
EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00 EPA Method 8260 (Full List) Well $150.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 4 $440.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $7,740.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 7 $280.00
Soil Sampling Kit (concrete) $235.00 Day 2 $470.00 MAGS Investigation Kit $500.00 Day 1 $500.00 Tedlar Bags $20.00 bag 9 $180.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 Encore Sampler $16.00 each 34 $544.00 55 Gallon Drums $100.00 each 1 $100.00
TOTAL EQUIPMENT $2,074.00
2-SiteMeeting, MAGS
MAGS Analytical Data and Graph Reviews for Reporting to FDEP (2 hrs)
Research and Prepare Site Access Agreement for Adjacent Property to east and ROW of Leisure Lane to the west (4 hrs), Site Work Notifications, Submit Sunshine One Markout Requests (2 hrs), Summarize MAGS and MAGS Soil Data for Preliminary Reporting to FDEP (3 hrs).
MAGS Testing and Soil Sampling Mobilization and Field Event Preparation (2 hrs), Travel Round Trip for MAGS Well Installations (6 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Installation and Construction of 12 MAGS Testing Wells, including coring (12 hrs), Installation of 4 Vapor Monitoring Point Locations, including coring (3 hrs), Perform MAGS Tests at 12 locations and collection of 12 Vapor Samples (14 hrs), Surface and Site Restoration (2 hrs). Reduction in Labor for eliminating interior MAGS Well and testing (-2 hrs) Round Trip Travel for MAGS Testing (4 hrs), Perform MAGS Tests at 12 locations and collection of 12 Vapor Samples (14 hrs), Surface and Site Restoration, Equipment Demobilization (3 hrs), Reduction in Labor for removing interior MAGS Well testing (-1 hr)
Onsite Meeting with Property Owner/Property Manager/tenant and perform Utility White-lines for Markouts including travel (10 hrs), Oversight of GPR Utility Subcontract Survey (10 hrs), Oversight of Professional Site Survey (10 hrs), MAGS Testing and Soil Sampling Mobilization and Field Event Preparation (2 hrs), Round Trip Travel for three days to site for MAGS Soil Sampling and MAGS Installations (6 hrs), Perform Onsite H&S and Scoping meetings (1 hr), Advancement of 12 MAGS Soil Borings for the collection of 48 soil samples at depths of 6", 2', 4, and 6' (12 hrs), Assistance with Installation and Construction of 12 MAGS Testing Wells (12 hrs), Assistance with Installation of 4 Vapor Monitoring Point Locations, including coring (3 hrs), Preparation of Soil Boring Logs and MAGS Well Constuction Logs (3 hrs), Reduction in Labor for eliminating interior MAGS Location Soil Sampling (-2 hrs)
Note: Air Analysis by TO-15, Soil Samples by VOCs by EPA Method 8260 (Full List)
Round Trip Travel for three days to site for MAGS Soil Sampling and Testing (6 hrs), Attend Onsite H&S and Scoping meetings (1 hr), Assist with Collection of 12 MAGS Soil Boring Location Samples, for the collection of 48 soil samples at depths of 6", 2', 4 and 6' (12 hrs), Assistance with Installation and Construction of 12 MAGS Testing Wells (12 hrs), Assistance with Installation of 4 Vapor Monitoring Point Locations (3 hrs), Surface and Site Restoration, Drum Handling and Demobilization (3 hrs), Daily Soil Sample Deliveries to Laboratory (2 hrs), Reduction in Labor for eliminating interior MAGS Location Soil Sampling (-2 hrs)
Preparation of Site Specific Health and Safety Plan (3 hrs)
2-Total Page 3 of 15 HW689 DC024C TACO #2 (Southgate Cleaners) Revised (002)
SUBTASK:
DATE: June 05, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 W. Kesterson
Engineer/Scientist 1 R. Kelley
Engineer/Scientist 1 B. Blount Engineer Scientist 1 R. Lindsay
Engineering Technician 1 W. Jahns
Designer 2 S. Ferianc Technical Publications Specialis H. Vining Technical Publications Specialis M. Comins
TOTAL LABOR 99
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
Van or Truck $480.00 Week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF DESCRIPTION RATE UNIT USEAGE TOTALS
Hotel 1 Howard $150.00 Day 0 $0.00
Hotel 1 Blount $150.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 1 Howard $30.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 1 Blount $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 1 Howard $36.00 Day 0 $0.00
Day 1 Blount $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
GW Protection DPT Drilling $8,332.00 Lump 1 $8,332.00
TOTAL $8,332.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00
EPA Method 8260 (Full List) Soil $150.00 15 0 $2,250.00
EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 0 0 Contingency $0.00
EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00
EPA Method 8260 (Full List) DPT Groundwater $150.00 9 0 $1,350.00
EPA Method 8260 (Full List) Well/Piezometers $150.00 3 0 $450.00
EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00
EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 0 0 $0.00
EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Solid $55.00 0 0 $0.00
EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals)-Solid $45.00 0 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $4,050.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 5 $200.00
Soil Sampling Kit (concrete) $235.00 Day 1 $235.00
Monitor Well Installation Kit $325.00 Day 1 $325.00
Total Survey Station $50.00 Day 1 $50.00
Shallow GW Sampling Kit $290.00 Day 2 $580.00
Encore Sampler $16.00 each 15 $240.00
55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $1,630.00
3-Soil and Groundwater Field Activities
Remaining Soil Sampling Field Event Preparation and Mobilization (2 hrs), Round Trip Travel to site (2 hrs), Collect Remaining Soil Samples at 6 locations including, Coring, Collection of 24 Soil Samples (12 hrs), DPT Drilling Field Event Preparation and Mobilization (2 hrs), Travel to Site over 4 days (8 hrs), Installation of one DPT Macrocore to 60 ft bls, installation of 3 Piezometers, DPT Groundwater Sampling at 9 locations (48 hrs), Survey Piezometers (1 hr), Daily DPT Groundwater Sample Chain of Custody preparation, Sample Packaging (3 hrs), Preparation of Soil Boring and Well Construction Logs (4 hrs), Preparation of Summary Tables and Figures of Groundwater Sampling Results for Preliminary Reporting to FDEP (6 hrs). Reduction in Labor for eliminating interior soil boring (-2 hrs), Reduction in Travel for DPT Drilling (-2 hrs), Reduction in Labor for DPT Macrocore and Groundwater Sampling due to shallow refusal due to rock (-23 hrs)
Finalize Proposed DPT Locations (1 hr), Finalize Proposed Piezometer Locations (1 hr).
Contacting Property Owner, Property Manager, Tenant and/or Offsite Property Owner of Proposed Sampling Schedule and Confirming Access (2 hrs), Compilation of Field Soil Analytical Data, Preparation of Soil Summary Maps for FDEP (3 hrs), Preparation and Review of Cross Section from DPT Core for Recommendations of Proposed GW Sampling Depths with FDEP (3 hrs), Calculation of Well and Watertable Elevations for Flow Direction (2 hrs.), Preparation of Groundwater Flow Map for FDEP (3 hrs), Prepare Map of Final Proposed DPT Locations (1 hr).
Soil and Groundwater Samples by VOCs by EPA Method 8260 (Full List)
Collect Remaining Soil Samples at 6 locations including Travel, Coring, Collection of Soil Samples (12 hrs), Site Restoration (2 hrs), Soil Sample Packaging, Chain of Custody and Sample Delivery to Laboratory (2 hrs), Groundwater Sampling and Survey Piezometers with Travel (8 hrs). Reduction in Labor for eliminating interior soil boring (-2 hrs)
3-Total Page 4 of 15 HW689 DC024C TACO #2 (Southgate Cleaners) Revised (002)
SUBTASK:
DATE: June 05, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 2
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 W. Kesterson
Engineer/Scientist 1 R. Kelley
Engineer/Scientist 1 B. Blount Engineer Scientist 1 R. Lindsay
Engineering Technician 1 W. Jahns
Designer 2 S. Ferianc Technical Publications Specialis H. Vining Technical Publications Specialis M. Comins
TOTAL LABOR 46
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 4 $480.00
Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $480.00
PER DIEM STAFF DESCRIPTION RATE UNIT USEAGE TOTALS
Hotel 1 Howard $150.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 1 Howard $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 1 Howard $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
GW Protection Well Installations $2,656.00 LS 1 $2,656.00
Erwin Remediation IDW T&D Soil Drums $110.00 LS 3 $330.00
Erwin Remediation IDW T&D Liquid Drums $125.00 LS 1 $125.00
TOTAL $3,111.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00
EPA Method 8260 (Full List) Soil $150.00 0 0 $0.00
EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 0 0 Contingency $0.00
EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00
EPA Method 8260 (Full List) Wells $150.00 4 0 $600.00
EPA Method 8260 (Full List) IDW $150.00 2 0 $300.00
EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 2 0 $104.00
EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $55.00 1 0 $55.00
EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 1 0 $45.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $1,104.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 4 $160.00
Soil Sampling Kit (concrete) $235.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 1 $325.00
Total Survey Station $50.00 Day 1 $50.00
Shallow GW Sampling Kit $290.00 Day 2 $580.00
Encore Sampler $16.00 each 0 $0.00
55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $1,115.00
4-Final Well Installations
Prepare Recommendations for Final Well Locations (2 hrs)
Property Owner, Property Manager, Tenant Site Work Notifications (1 hr), Prepare Proposed Well Location Maps and Recommendations (3 hrs), Preparation of PFAS Well Recommendations for FDEP and Order Kit from FDEP Laboratory (2 hrs), Characterization and Waste Profile for Transportation and Disposal of IDW Drums (2 hours). Remove PFAS to New Tab: Preparation of PFAS Well Recommendations for FDEP and Order Kit from FDEP Laboratory (-2 hrs)
Round Trip Travel to the Site (4 hrs), Installation of final well network of 3 shallow/1 deep (20 hrs).
Collection of Final Groundwater Samples from 7 wells with travel and Survey Wells (9 hrs), Deliver final samples to laboratory (2 hrs), Preparation of Well Construction Logs (2 hrs). Reduction in Labor for Reduced Drilling (-9 hrs)
Collection of Final Groundwater Samples from 7 wells, with Travel, Survey Wells, Site Restoration (9 hrs), Collection of PFAS Groundwater Samples (4-5 wells) and IDW Samples, with Travel, Drum Handling (8 hrs), Chain of Custody Completion and Packaging (1 hr) and Delivery of FDEP PFAS Samples to Shipper (2 hrs), Remove PFAS to New Tab: Additional Collection of PFAS Groundwater Samples (4 wells) and IDW Samples, with Travel, Drum Handling (-8 hrs) and Delivery of FDEP PFAS Samples to Shipper (-2 hrs)
Groundwater Samples by VOCs by EPA Method 8260 (Full List)
4-Total Page 5 of 15 HW689 DC024C TACO #2 (Southgate Cleaners) Revised (002)
SITE :
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts
Engineer/Scientist 4 S. Flynn
Engineer/Scientist 2 K. Howard
Engineer/Scientist 2 K. McDonald
Engineer/Scientist 1 W. Kesterson Engineer/Scientist 1 R. Kelley Engineer/Scientist 1 B. Blount Engineer Scientist 1 R. Lindsay Engineering Technician 1 W. Jahns Designer 2 S. Ferianc 8
Technical Publications Specia H. Vining
Technical Publications Specia M. Comins
TOTAL LABOR 94
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
$0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 8270 (PAHs) Soil $110.00 0 0 $0.00 EPA Method 8290 (Dioxins&Furans) Soil $950.00 0 0 $0.00 EPA Method 6010 (Total Arsenic) Soil $13.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Global Positioning System (Handheld G $175.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
Compilation of Logs and Prepartion of SAR Cross Sections, Preparation of Physiography, Regional Geology and Regional Hydrogeology Sections, Preparation of Conceptual Model based on Findings, Preparation of Laboratory QA/QC Summary and Data Recommendations, Preparation of Site Assessment Conclusions, Recommendations for Assessment (24 hrs).
Southgate Cleaners (Former)
Preparation of MAGS Assessment Findings text (4 hrs), Revise and Provide Edits to Site Assessment Report (5 hrs), Preparation of Deliverable Email and Submittal of Report (1 hr)
Preparation of SAR text including, Operational History, Previous Investigations, Site Specific Soil and Groundwater Site Characterization, Preparation of Tables, Preparation of Draft Soil, Groundwater Flow and Analytical Summary Figures, Preparation of Assessment Findings (lithologic borings, soil borings, DPT Sampling, Piezometer and Monitoring Well Installations, Groundwater Sampling) (40 hrs).
5-Reporting 3/18/2025
Vapor Data Tabulation (3 hrs), Step Test and Radius of Influence calculations and graphs (3 hrs)
General Report Drafting
Report Document Production, Formating Tables and Text, Compilation into Adobe Format for Submittal
SUBTASK:
DATE: June 05, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts 2 Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 W. Kesterson Engineer/Scientist 1 R. Kelley Engineer/Scientist 1 B. Blount Engineer Scientist 1 R. Lindsay
Engineering Technician 1 W. Jahns
Designer 2 S. Ferianc Technical Publications Specialis H. Vining Technical Publications Specialis M. Comins
TOTAL LABOR 8
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF DESCRIPTION RATE UNIT USEAGE TOTALS
Hotel 0 $150.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
GW Protection Well Installations $4,642.00 LS 0 $0.00
Erwin Remediation IDW T&D Soil Drums $110.00 LS 0 $0.00
Erwin Remediation IDW T&D Liquid Drums $125.00 LS 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 8260 (VOHs) GW $73.00 0 0 $0.00
State Laboratory DEP SOP: LC-001-3 (PFAS) GW $0.00 3 1 Fld Regent Blk $0.00
EPA Method 8260 (VOHs) IDW $73.00 0 0 $0.00
State Laboratory DEP SOP: LC-001-3 (PFAS) IDW $0.00 0 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Soil Sampling Kit (concrete) $235.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Total Survey Station $50.00 Day 0 $0.00
Shallow GW Sampling Kit $290.00 Day 0 $0.00
Encore Sampler $16.00 each 0 $0.00
55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
6-PFAS Additional GW Sampling
Preparation of PFAS Well Recommendations for FDEP and Order Kit from FDEP Laboratory (2 hrs)
Additional Collection of PFAS Groundwater Samples (3 wells) (3 hrs), Chain of Custody Completion and Packaging (1 hr) and Delivery of FDEP PFAS Samples to Shipper (2 hrs)
Notes: Proposed PFAS Samples by DEP SOP: LC-001-3 (FDEP Laboratory)
6-Total Page 7 of 15HW689 DC024C TACO #2 (Southgate Cleaners) Revised (002)
SUBTASK:
DATE: June 05, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald -2 Engineer/Scientist 1 W. Kesterson -1 Engineer/Scientist 1 R. Kelley -2 Engineer/Scientist 1 B. Blount Engineer Scientist 1 R. Lindsay Engineering Technician 1 W. Jahns -2 Designer 2 S. Ferianc Technical Publications Specialis H. Vining Technical Publications Specialis M. Comins
TOTAL LABOR -7
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF DESCRIPTION RATE UNIT USEAGE ACTUAL TOTALS
Hotel 2 McDonald, Lindsey $150.00 Day 0 524.16 ($75.84)
Hotel 2 Howard, Blount $150.00 Day -2 606.16 ($593.84)
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 2 McDonald, Lindsey $30.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 2 Howard, Blount $30.00 Day -1 ($60.00)
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 2 McDonald, Lindsey $36.00 Day 0 $0.00
Day 2 Howard, Blount $36.00 Day -2 ($144.00)
TOTAL PER DIEM ($873.68)
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE ACTUAL TOTALS
Survtech Solutions Survey and Benchmark Placement $2,750.00 LS 0 $2,750.00 $0.00
Site Lines Utility Locate Services $900.00 LS 0 $900.00 $0.00
Atlantic Supply MAGS Well Supplies (Casing, Screen, Sand) $883.31 LS 0 $1,097.80 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 -1 0 ($200.00)
EPA Method 8260 (Full List) Soil $150.00 -14 0 ($2,100.00)
EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 0 0 Contingency $0.00
EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00
EPA Method 8260 (Full List) Well $150.00 0 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB ($2,300.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Soil Sampling Kit (concrete) $235.00 Day 0 $0.00
MAGS Investigation Kit $500.00 Day 0 $0.00
Tedlar Bags $20.00 bag 0 $0.00
Shallow GW Sampling Kit $290.00 Day 0 $0.00
Encore Sampler $16.00 each -14 ($224.00)
55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT ($224.00)
2-SiteMeeting, MAGS
Reduction in Labor for eliminating interior MAGS Well and testing (-2 hrs)
Reduction in Labor for removing interior MAGS Well testing (-1 hr)
Reduction in Labor for eliminating interior MAGS Location Soil Sampling (-2 hrs)
Reduction in Labor for eliminating interior MAGS Location Soil Sampling (-2 hrs)
2-Delta Page 10 of 15HW689 DC024C TACO #2 (Southgate Cleaners) Revised (002)
SUBTASK:
DATE: June 05, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 W. Kesterson
Engineer/Scientist 1 R. Kelley -27
Engineer/Scientist 1 B. Blount Engineer Scientist 1 R. Lindsay Engineering Technician 1 W. Jahns -2 Designer 2 S. Ferianc Technical Publications Specialis H. Vining Technical Publications Specialis M. Comins
TOTAL LABOR -29
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day -1 ($120.00)
Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE ($120.00)
PER DIEM STAFF DESCRIPTION RATE UNIT USEAGE ACTUAL TOTALS
Hotel 1 Howard $150.00 Day -3 ($450.00)
Hotel 1 Blount $150.00 Day -3 ($450.00)
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 1 Howard $30.00 Day -1 ($30.00)
Day 1-Leave between 6 - Noon 1 Blount $30.00 Day -2 ($60.00)
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 1 Howard $36.00 Day -3 ($108.00)
Day 1 Blount $36.00 Day -2 ($72.00)
TOTAL PER DIEM ($1,170.00)
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE ACTUAL TOTALS
GW Protection DPT Drilling $8,616.00 Lump 1 $8,332.00 ($284.00)
TOTAL ($284.00)
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00
EPA Method 8260 (Full List) Soil $150.00 -9 0 ($1,350.00)
EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 0 0 Contingency $0.00
EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00
EPA Method 8260 (Full List) DPT Groundwater $150.00 -18 0 ($2,700.00)
EPA Method 8260 (Full List) Well/Piezometers $150.00 0 0 $0.00
EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00
EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 0 0 $0.00
EPA Method 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Solid $55.00 0 0 $0.00
EPA Method 1311 TCLP Extraction (Bottle Extraction for Metals)-Solid $45.00 0 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB ($4,050.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Soil Sampling Kit (concrete) $235.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Total Survey Station $50.00 Day 0 $0.00
Shallow GW Sampling Kit $290.00 Day 0 $0.00
Encore Sampler $16.00 each -9 ($144.00)
55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT ($144.00)
3-Soil and Groundwater Field Activities
Reduction in Labor for eliminating interior soil boring (-2 hrs), Reduction in Travel for DPT Drilling (-2 hrs), Reduction in Labor for DPT Macrocore and Groundwater Sampling due to shallow refusal due to rock (-23 hrs)
Reduction in Labor for eliminating interior soil boring (-2 hrs)
3-Delta Page 11 of 15HW689 DC024C TACO #2 (Southgate Cleaners) Revised (002)
SUBTASK:
DATE: June 05, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer
Engineer/Scientist 5 G. Roberts -2
Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 W. Kesterson Engineer/Scientist 1 R. Kelley -9 Engineer/Scientist 1 B. Blount Engineer Scientist 1 R. Lindsay
Engineering Technician 1 W. Jahns -10
Designer 2 S. Ferianc Technical Publications Specialis H. Vining Technical Publications Specialis M. Comins
TOTAL LABOR -21
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF DESCRIPTION RATE UNIT USEAGE TOTALS
Hotel 1 Howard $150.00 Day -1 ($150.00)
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 1 Howard $30.00 Day -1 ($30.00)
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 1 Howard $36.00 Day -1 ($36.00)
TOTAL PER DIEM ($216.00)
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE ACTUAL TOTALS
GW Protection Well Installations $4,642.00 LS 0 $2,656.00 ($1,986.00)
Erwin Remediation IDW T&D Soil Drums $110.00 LS 0 $0.00
Erwin Remediation IDW T&D Liquid Drums $125.00 LS -3 ($375.00)
TOTAL ($2,361.00)
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00
EPA Method 8260 (Full List) Soil $150.00 0 0 $0.00
EPA Method 1312 SPLP Extraction (Zero Headspace Method) Soil $55.00 0 0 Contingency $0.00
EPA Method 8260 (VOHs) Leachate $73.00 0 0 Contingency $0.00
EPA Method 8260 (Full List) Wells $150.00 -3 0 ($450.00)
EPA Method 8260 (Full List) IDW $150.00 0 0 $0.00
EPA Method 6010 (As, Cd, Cr and Pb) IDW $52.00 0 0 $0.00
EPA 1311 TCLP Extraction (Zero Headspace Method/VOCs)-Soil IDW $55.00 0 0 $0.00
EPA 1311 TCLP Extraction (Bottle Extraction/Metals)-Soil IDW $45.00 0 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB ($450.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day -1 ($40.00)
Soil Sampling Kit (concrete) $235.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day -1 ($325.00)
Total Survey Station $50.00 Day 0 $0.00
Shallow GW Sampling Kit $290.00 Day 0 $0.00
Encore Sampler $16.00 each 0 $0.00
55 Gallon Drums $100.00 each -1 ($100.00)
TOTAL EQUIPMENT ($465.00)
4-Final Well Installations
Remove PFAS to New Tab: Preparation of PFAS Well Recommendations for FDEP and Order Kit from FDEP Laboratory (-2 hrs)
Reduction in Labor for Reduced Drilling (-9 hrs)
Remove PFAS to New Tab: Additional Collection of PFAS Groundwater Samples (4 wells) and IDW Samples, with Travel, Drum Handling (-8 hrs) and Delivery of FDEP PFAS Samples to Shipper (-2 hrs)
4-Delta Page 12 of 15HW689 DC024C TACO #2 (Southgate Cleaners) Revised (002)
SUBTASK:
DATE: June 05, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts 2 Engineer/Scientist 4 S. Flynn Engineer/Scientist 2 K. Howard Engineer/Scientist 2 K. McDonald Engineer/Scientist 1 W. Kesterson Engineer/Scientist 1 R. Kelley Engineer/Scientist 1 B. Blount Engineer Scientist 1 R. Lindsay
Engineering Technician 1 W. Jahns
Designer 2 S. Ferianc Technical Publications Specialis H. Vining Technical Publications Specialis M. Comins
TOTAL LABOR 8
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00
Van or Truck $120.00 Day 0 $0.00
Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF DESCRIPTION RATE UNIT USEAGE TOTALS
Hotel 0 $150.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIT USEAGE TOTALS
GW Protection Well Installations $4,642.00 LS 0 $0.00
Erwin Remediation IDW T&D Soil Drums $110.00 LS 0 $0.00
Erwin Remediation IDW T&D Liquid Drums $125.00 LS 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 8260 (VOHs) GW $73.00 0 0 $0.00
State Laboratory DEP SOP: LC-001-3 (PFAS) GW $0.00 3 1 Fld Regent Blk $0.00
EPA Method 8260 (VOHs) IDW $73.00 0 0 $0.00
State Laboratory DEP SOP: LC-001-3 (PFAS) IDW $0.00 0 0 $0.00
Sample Shipping (Small cooler) $110.00 0 $0.00
Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00
Soil Sampling Kit (concrete) $235.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Total Survey Station $50.00 Day 0 $0.00
Shallow GW Sampling Kit $290.00 Day 0 $0.00
Encore Sampler $16.00 each 0 $0.00
55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
6-PFAS Additional GW Sampling
Preparation of PFAS Well Recommendations for FDEP and Order Kit from FDEP Laboratory (2 hrs)
Additional Collection of PFAS Groundwater Samples (3 wells) (3 hrs), Chain of Custody Completion and Packaging (1 hr) and Delivery of FDEP PFAS Samples to Shipper (2 hrs)
Notes: Proposed PFAS Samples by DEP SOP: LC-001-3 (FDEP Laboratory)
6-Delta Page 13 of 15HW689 DC024C TACO #2 (Southgate Cleaners) Revised (002)
Proposed Scope of Work Southgate Cleaners (Former) 5317 U.S. Highway 19 (Currently 5325 U.S. Hwy 19) New Port Richey, Pasco County, FL 34652 Site Assessment and Reporting Task Assignment DC024C TACO #2 ERIC_5228 (Former Facility No. 519500354) Aptim Environmental & Infrastructure, LLC June 5, 2025
The following proposed scope of work for DC024C TACO #1 is to reconcile the SAR Task Assignment (TA) for the former Southgate Cleaners site located in New Port Richey, Pasco County, Florida.
Subtask 1-Project Management Project management hours are calculated based on the labor hours proposed in the scope of work.
Subtask 2-Preliminary Site Activities and Modified Active Gas Sampling Subtask 2 reduces the number of soil analytical samples collected during the MAGS testing, as the water table was encountered shallower than the proposed sample depths. In addition, one MAGS location, which would have been located within the Pet Supermarket store was not installed because access to the interior of the store was not granted by corporate Pet Supermarket. The MAGS vapor sample associated with the location not installed has also been removed. Labor associated with the collection of the MAGS soil samples, well installation and testing have also been removed. In addition, expenses for hotel and per diem were reduced to the actual costs for the travel. The number of Encore Samplers collected were also reduced to the actual number used.
Subtask 3-Soil Sampling & GW DPT Sampling Field Activities Subtask 3 reduces the number of DPT groundwater samples collected. During the DPT groundwater sampling activities, a shallow continuous limestone was encountered across the site that limited the depths groundwater samples could be collected. This Subtask removes soil samples that were not collected, either due to the shallow depth to groundwater, or because the soil boring sample location was proposed within the building. The associated Encore Samplers used were also reduced. Labor associated with the collection of the boring soil samples and DPT groundwater samples have also been removed. In addition, Subtask 3 removes hotel and per diem costs that were not required during the scope of work. Lastly, the drilling costs were adjusted slightly to the actual subcontracted costs.
Subtask 4-Well Installations At the request of the FDEP, the final number of wells installed was reduced, and drilling activities were reduced from two to one day onsite. Labor, travel costs, and equipment for the second day have been removed. The costs associated with the vehicle was not reduced as the weekly rate is the same as 4 vehicles, therefore the cost does not change. The groundwater samples for the wells not installed have been removed from the Subtask. Purge groundwater was placed into the drilling decon drum onsite, therefore an additional drum for the sampling IDW was not required and has been removed. Lastly, the drilling costs have been adjusted to the actual subcontracted costs, and the number of IDW drums generated have been adjusted to the actual number staged for disposal.
Additionally, costs associated with the collection of PFAS samples at the site were removed from Subtask 4 to a new Subtask (Subtask 6) to separate the charges.
Subtask 5-Reporting: No Changes
Subtask 6-Additional PFAS Groundwater Sampling Subtask 6 was created to separate the costs associated with the collection of PFAS samples from the conventional sampling for drycleaning solvents. Additionally, the costs associated with the collection of PFAS samples were reduced, since the samples were able to be collected during the volatile sampling effort.
The current Task Completion date is currently July 18, 2025. To allow for IDW pickup and disposal, and reporting for the PFAS samples also collected (not received, to date), a 60-day extension is requested, placing the completion date to September 19, 2025. The extension would also allow for FDEP review and approval of the report.
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC and Florida Department of Environmental Protection No. HW689. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.
If you have any questions, please contact us for clarification.
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW689
DC024C April 11, 2025
APTIM will complete Modified Active Gas Sampling, soil sampling, DPT groundwater sampling, and well installations in accordance with the Site Assessment Work Plan for the former Southgate Cleaners
Nicole Knutson 850-245-8763 Aptim Environmental & Infrastructure, LLC
Aptim Environmental & Infrastructure, LLC
Eric Kramer 407-287-3216
ERIC_5228
5317 US Highway 19, New Port Richey, Pasco County
Southgate Cleaners (former)
$ 100,556.56
$ 100,556.56
Scope of Work
Date: 2024.06.20 14:20:59 -04'00'
Teresa Booeshaghi
Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2024.06.19 16:07:17 -04'00'
6/19/2024
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST