Attachment XV - 852.219-75 LOS.docx

VAAR Clause DOCX document 18 KB Posted

Attached to
Z2DA--Remediate Temperature Controls 539-21-108
Solicitation number
36C25026B0002
Issued by

About this file

This document is a VA Notice of Limitations on Subcontracting (VAAR 852.219-75) for a federal contract opportunity involving temperature control remediation. The document specifically addresses subcontracting restrictions for service and construction contracts, with a focus on Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and Veteran-Owned Small Businesses (VOSBs).

The file outlines strict subcontracting limitations: for services, contractors cannot pay more than 50% to non-certified firms; for general construction, the limit is 85%; and for special trade construction contractors, the limit is 75%. The document emphasizes compliance requirements, with potential penalties including referral to suspension and debarment committees, fines, and possible prosecution for non-compliance. The contract opportunity is with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10, specifically for a project identified as "Remediate Temperature Controls 539-21-108" under solicitation number 36C25026B0002.

View the file

Other versions and copies of VAAR 852.219-75

File Revision Posted Attached to
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx Jan 2023 Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx Jan 2023 Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT
VAAR 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction.docx Revision not stated Radiant Heating Panel Replacement
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated F108--620-26-206 Asbestos Abatement
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated Z2NZ--Manhole Repairs at Montrose VAMC
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf Revision not stated Z1DA--528A5-27-504 Seal and Stripe Parking Lots
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf Revision not stated Z1DA--528A5-27-504 Seal and Stripe Parking Lots
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf Revision not stated Z1DA--Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC
S02 852.219-75 Limitation on Subcontracting.pdf Revision not stated Y1DA--561-26-103 Upgrade Electrical and Plumbing in Building 18B
S06 0001 36C25227R0001 Att9_S02 SOL_Att09 VAAR 852.219-75 Certification 550-MATOC.docx Revision not stated Z2DA--FY27 Multiple Award Task Order Contract, SEED PROJECT NO: 550-25-108, Renovate Bathrooms in B103 PRRTP & B64/7 at the VA Illiana Health Care System (VIHCS), Danville IL.
Attachment II - VAAR 852.219-75.pdf Revision not stated H941--Chemical Hoods & HEPA PM
FAR 852.219-75-Limitation on Subcontracting.pdf Revision not stated W038--Rental & Support Services for Wheeled Loaders w/3yard bucket
VAAR 852.219-75 VA Notice of Limitations on Subcontracting_Certificate.docx Revision not stated R706--FCC Medical Cache Maintenance
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated Z2DA--561-26-104 Repair Operating Room (OR) & Bathroom Leaks
852.219-75 VA NOTICE OF LIMIT ON SUBCONTRACTING.pdf Revision not stated J012-- Fire Alarm Suppression Maintenance & Repair Services
REVISED 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx Revision not stated 657-24-111JC FCA-Renovate Ambassador Suite & Main Lobby B1
S02 Atch E VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance - 2 pages.pdf Revision not stated Replace Operating Room 5 Flooring
Attachment 2 - VAAR 852.219-75.pdf Revision not stated Y1DA | 521-24-102 | Renovate Wards 2K and 2B for Optometry/Ophthalmology Clinical Use
S02 - ATT E - VAAR 852.219-75_REQUIRED.pdf Revision not stated Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295
VAAR 852.219-75 corrected.docx Revision not stated Z1DA--VANJHCS Demolition and Abatement IDIQ East Orange and Lyons
Show all 20

Who attaches VAAR 852.219-75

Other files

File Type Posted
Change Summary of Specs and Drawings.pdf PDF
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8.pdf PDF
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7.pdf PDF
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24.pdf PDF
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4.pdf PDF
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26.pdf PDF
15-M100 - BUILDING 15 BASEMENT.pdf PDF
Sign in Sheet Remediate Temp.pdf PDF
M002 - JOHNSON CONTROLS ROUTER SCHEDULE.pdf PDF
1-M109 - NINTH FLOOR.pdf PDF
13-M101 - BUILDING 13 FIRST FLOOR.pdf PDF
ICRA 539.21.108 Mech Rooms Level II.pdf PDF
PG-M101 - PARKING GARAGE 1ST FLOOR PLAN.pdf PDF
ICRA 539.21.108 Patient Areas Level III.pdf PDF
36C25026B0002 0004.pdf PDF
Updated Specs Addendum 4.pdf PDF
1-M103 - THIRD FLOOR.pdf PDF
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17.pdf PDF
64-M100 - BUILDING 64 BASEMENT.pdf PDF
REVISED STATEMENT OF BID ITEMS.pdf PDF
1-M105 - FIFTH FLOOR.pdf PDF
2-M100 - BUILDING 2 BASEMENT.pdf PDF
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-28.pdf PDF
1-M110 - TENTH FLOOR PENTHOUSE.pdf PDF
1-M104 - FOURTH FLOOR.pdf PDF
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21.pdf PDF
64-M103 - BUILDING 64 THIRD FLOOR.pdf PDF
1-M100 - BASEMENT.pdf PDF
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-29.pdf PDF
M004 - TRIDIUM ROUTER SCHEDULE.pdf PDF
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12.pdf PDF
64-M102 - BUILDING 64 SECOND FLOOR.pdf PDF
M701 - GENERAL CRITERIA HONEYWELL CONTROLS REPLNT.pdf PDF
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5.pdf PDF
36C25026B0002 0003.pdf PDF
36C25026B0002 0002.pdf PDF
36C25026B0002 0001.docx DOCX document
Attachment XVI - Directive 1192.01, Flu.pdf PDF
Attachment IX -RTC BID DWGS 7 2025.1023.pdf PDF
Attachment VI -RTC BID DWGS 4 2025.1023.pdf PDF
Attachment IV - RTC BID DWGS 2 2025.1023.pdf PDF
Attachment XI - RTC BID DWGS 9 2025.1023.pdf PDF
Attachment XIV - EMR Form.pdf PDF
Attachment I - WD OH20250082.pdf PDF
Attachment VIII - RTC BID DWGS 6 2025.1023.pdf PDF
Attachment VII - RTC BID DWGS 5 2025.1023.pdf PDF
Attachment XIII - RFI Form.pdf PDF
Attachment III -RTC BID DWGS 1 2025.1023.pdf PDF
Attachment XII - J A - Redacted.pdf PDF
Attachment II - CD SPECIFICATION 2025.1023.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)

(a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that—

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:

(i) [ ] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.

(ii) [ ] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(iii) [ X ] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.

(3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:

(i) Referral to the VA Suspension and Debarment Committee;

(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and

(iii) Prosecution for violating 18 U.S.C. 1001.

(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.

(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.

Certification I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].

Printed Name of Signee: ___________ Printed Title of Signee: _____________ Signature: ____________ Date: ______________ Company Name and Address: _______________

(END-OF-CLAUSE)

File details come from the government source that posted it. Updated .