1-M105 - FIFTH FLOOR.pdf

PDF 2 MB Posted

Attached to
Z2DA--Remediate Temperature Controls 539-21-108 Federal contract opportunity
Solicitation number
36C25026B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document is an architectural floor plan drawing for the Fifth Floor of the Cincinnati VA Medical Center, dated 1/9/2026. The detailed plan shows a comprehensive layout of a medical facility, including numerous specialized rooms such as exam rooms, procedure rooms, offices, staff areas, storage spaces, restrooms, waiting areas, and clinical support spaces like an IV Prep area, Narc. Vault, and Skin and Wound Care Clinic. The drawing is part of a construction document set by Heapy Engineering and Levin Porter Architects, with Kevin Henderson as the Project Manager. The project number is 539-21-108, and the drawing indicates the floor is fully sprinklered. An addendum was issued on 01-12-2026, and the drawing is scaled at 1/16" = 1'-0", providing a comprehensive view of the medical center's fifth-floor layout and room designations.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Remediate Temperature Controls 539-21-108, newest first.
File Type Posted
Sign in Sheet Remediate Temp.pdf PDF
1-M103 - THIRD FLOOR.pdf PDF
1-M110 - TENTH FLOOR PENTHOUSE.pdf PDF
2-M100 - BUILDING 2 BASEMENT.pdf PDF
15-M100 - BUILDING 15 BASEMENT.pdf PDF
M002 - JOHNSON CONTROLS ROUTER SCHEDULE.pdf PDF
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-28.pdf PDF
Updated Specs Addendum 4.pdf PDF
1-M109 - NINTH FLOOR.pdf PDF
13-M101 - BUILDING 13 FIRST FLOOR.pdf PDF
64-M100 - BUILDING 64 BASEMENT.pdf PDF
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17.pdf PDF
REVISED STATEMENT OF BID ITEMS.pdf PDF
ICRA 539.21.108 Patient Areas Level III.pdf PDF
Change Summary of Specs and Drawings.pdf PDF
1-M100 - BASEMENT.pdf PDF
64-M102 - BUILDING 64 SECOND FLOOR.pdf PDF
64-M103 - BUILDING 64 THIRD FLOOR.pdf PDF
M004 - TRIDIUM ROUTER SCHEDULE.pdf PDF
M701 - GENERAL CRITERIA HONEYWELL CONTROLS REPLNT.pdf PDF
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5.pdf PDF
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8.pdf PDF
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12.pdf PDF
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21.pdf PDF
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-29.pdf PDF
36C25026B0002 0004.pdf PDF
1-M104 - FOURTH FLOOR.pdf PDF
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4.pdf PDF
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7.pdf PDF
36C25026B0002 0003.pdf PDF
36C25026B0002 0002.pdf PDF
36C25026B0002 0001.docx DOCX document
Attachment XIV - EMR Form.pdf PDF
Attachment XII - J A - Redacted.pdf PDF
Attachment XI - RTC BID DWGS 9 2025.1023.pdf PDF
Attachment VIII - RTC BID DWGS 6 2025.1023.pdf PDF
Attachment IV - RTC BID DWGS 2 2025.1023.pdf PDF
Attachment XV - 852.219-75 LOS.docx DOCX document
Attachment XIII - RFI Form.pdf PDF
Attachment XVII - ICRA Level 2.pdf PDF
Attachment X - RTC BID DWGS 8 2025.1023.pdf PDF
Attachment V - RTC BID DWGS 3 2025.1023.pdf PDF
Attachment II - CD SPECIFICATION 2025.1023.pdf PDF
36C25026B0002.docx DOCX document
Attachment XVI - Directive 1192.01, Flu.pdf PDF
Attachment IX -RTC BID DWGS 7 2025.1023.pdf PDF
Attachment VII - RTC BID DWGS 5 2025.1023.pdf PDF
Attachment VI -RTC BID DWGS 4 2025.1023.pdf PDF
Attachment III -RTC BID DWGS 1 2025.1023.pdf PDF
Attachment I - WD OH20250082.pdf PDF
Show all 50

Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

1-AHU44

AHU-11

AHU-12

Conferece Room

B523

Bath

A521A

Bath

A520A

Stair 2

S*5*2 Clean Linen

A525

Bath

A501A

Staff Tlt

A505

HAC

A503

Stor

A545A

Supp Clos

A567A

Tlt.

A570A

Tlt.

A571A Stor.

A565A

Tlt.

A573A

Exam 2

A571

Exam 6

A567

Exam 7

A566

Exam 1

A572

Staff Physician

A573

Stor.

A563A

Office

A574

Procedure Room

A557D

Exam Room 4

A557A Surgery Office

A557B

Closet

A554A

Waiting Area

A559

Clerk

A559A

Stor.

A551B

Procedure Room

A557C

Stair 5

S*5*5 Tlt.

A553

Telesurgery Office

A554

Closet

A551A Tlt.

A549A Sig. Clos.

A546A

Adm Asst.

A541

Adm. Asst.

A540

Medical Service

B538

Db. Wtr.

A539

B537

Medical

Service Office Office

B537A

Med Svc

B501

Tlt.

B503A Office

B503

Elec.

A546

Rolling Storage

B525 Closet

B526C

Office

B511 Office

B512

Office

B513

Office

B509

Bath

A508A

Storage

B515A

Closet

B507A Storage

B506

Office

B508

Sig. Clos.

B505G

Tlt.

B505A

Stor.

B521D

S.R. Neg. Pressure

A507

S.R. Neg. Pressure

A511

S.R. Neg. Pressure

A512

Bath

A519A

Exam 4

A569

Exam 5

A568

Bath

A522A S.R.

A522

Bath

A517A Bath

A502A

D.R.

A501

D.R.

A526

Nurse Manager

A528

Elec.

A537A

HAC

A562A

B536

Dispensing

Area

Office

B516

Conference Rm.

B507

Office

B514

Nourishment

A513

D.R.

A502

D.R.

A527

Bath

A510A

Bath

A511A

Elec.

A516

Tlt

A579A

Charting

A504

Work Rm.

A549

Exam

A558

Waiting Area

A550Storage

A524

Bath

A509A

Elec.

A514

Bath

A512A

Bath

A518A

Bath

A523A

Nurse Station

A581 Office

A582

Gurney Storage

A578 Pgm. Supp. Asst.

A575

Clos.

A556

Skin and Wound Care Clinic

A551

Chief Office

B540

Office

B539

IV Prep

B526A IV Buff

B526B

Stor.

B518A

Elec.

B521B

Narc. Vault

B521A

Cart Stor.

B535

Office

B518

Office

B515

S.R. Neg. Pressure

A508

Exam 3

A570

Tele

A561Elec.

A560

Service Lobby

A536Bath

A526A

HAC

A535A

Tr. Ch.

A535

Soil

A562

Storage

B505H

Stair 3

S*5*3

Office

B535C

Exam Room 5

A555

Pain Nurse

A563

Class Rm.

A564

Stor.

A564A

D.R.

A520

D.R.

A521

S.R.

A519

HAC

B521E

Staff Tlt.

B535B

Bath

A527A

S.R.

A510

D.R.

A517

Office

B510

Office

B517

Chief

B522 Cleric

B524

Chief Med. Svc.

A542

Inpatient Therapy

A579

S.R.

A509

Omni Cell

A506

Soil. Util.

A515

HAC

A545

Toilet

A577

Stair 1

S*5*1

Office

B504

Compound Picking

B527 IV Ante-Room

B526

Elec.

B505B

Stor

A544

Dirty Equipment

A537B

A537C

Oxygen

Storage

Equipment Room

Clean Supply

A537D

Work Room

A537F

Storage

A537E

Corridor

C*5*3 Corridor

C*5*4

Corridor

C*5*2

Corridor

C*5*1

Corridor

C*5*5

Unit Dose

B535A

D.R.

A523

D.R.

A518

Bath

A507A

NAE-06

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.3

Ib.5

Ib.7

Ib.8

Ib.10 Ib.12

Ib.14

Ib.16

Ib.18

Ib.19

Ib.20

Ib.21

Ib.22

Ib.23

Ib.24

Ib.25

Ib.26

Ib.27

7a

6a

Ib.28

Ib.29

Ib.4

Ib.17

3a Ib.11Ib.6

N

Fa

K

OaPa

Eb

5TH FLOOR PENTHOUSE (MER)

S

DP

1 2 4

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/9

/2

:0

:1

P

M -2

-1

FIFTH FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M105

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

FIFTH FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE

DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-

ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A

FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW

HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

6. REPLACE BUILDING PRESSURE SENSOR WITH SELF-ZEROING STATIC PRESSURE SENSOR.

PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE SENSOR ON 11TH

FLOOR ROOF.

7. REPLACE EXISTING FAN COIL UNIT PNEUMATIC CONTROLS WITH DDC.

8. NOTE OMITTED.

9. REPLACE EIXSTING EXHAUST FAN AND ASSOCIATED DAMPER PNEUMATIC CONTROLS

WITH DDC.

10. REPLACE EXISTING ATU PNEUMATIC CONTROLS WITH DDC.

PHOTO - B1-5TH FLR PHOUSE NAE-06

# DESCRIPTION DATE

1 ADDENDUM 4 01-12-2026

Sheets
1-M100 - BASEMENT
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
15-M100 - BUILDING 15 BASEMENT
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M701 - GENERAL CRITERIA, HONEYWELL CONTROLS REPLACEMENT
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN

File details come from the government source that posted it. Updated .