This document is an Addendum (No. 4) for a VA Cincinnati Project (No. 539-21-108) to Remediate Temperature Controls, issued by Heapy (Project No. 2020-05099) on 01/12/2026. The addendum includes multiple specification and drawing modifications, primarily focused on HVAC and temperature control system updates.
Key changes include revisions to technical specifications across multiple sections, updates to infection control requirements, clarification on commissioning agent responsibilities (to be hired by the prime contractor), and numerous drawing modifications affecting Network Area Engine (NAE) devices. Specific drawing changes involve reusing or replacing various NAE components, adding a Tridium Building Control Router, modifying network VLAN assignments, revising scope of work notes, and eliminating certain equipment replacement requirements like air compressors and convector pneumatic controls. The addendum comprehensively addresses technical details for temperature control remediation at the VA Cincinnati facility.
View the file
Other files for this federal contract opportunity
Show all 50
Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cleveland • Columbus • Dayton • Findlay • Indianapolis • Raleigh
1400 W Dorothy Lane
Dayton, OH 45409
(937) 224-0861 www.heapy.com
An ISO 9001-2015 Certified Company FS 98575 © Heapy All Rights Reserved
2020-05099_Addendum #4.doc 1/12/2026 11:27 AM
VA CINCINNATI PROJECT NO. 539-21-108
REMEDIATE TEMPERATURE CONTROLS
ADDENDUM NO. #4
HEAPY PROJECT NO. 2020-05099
01/12/2026
GENERAL
ITEM NO. 1 Specifications
A. New PDF of Technical Specifications is included with
B. Revisions to document are bolded
C. Revised project # header to 539-21-108 for all specifications
ITEM NO. 2 Section 013526
A. Revised section 1.12 infection control
1) Added ICRA level and category for project
ITEM NO. 3 Add New Section 014500
ITEM NO. 4 Section 019100
A. Section 1.1 A-clarification that the Commissioning agent shall be paid by the prime contractor
B. Section 1.8 Members appointed by Contractor – add #3 commissioning agent.
Revised 1.8 C members appointed by VA
1) Section 1.10 added item A.
a. Commissioning agent shall be hired by the prime contractor.
HVAC
SPECIFICATIONS
ITEM NO. 5 Section 23 08 00
A. Delete paragraph 1.1(C).
1) Commissioning agent shall be hired by the prime contractor.
ITEM NO. 6 All Division 23 Specifications re-issued with the correct project number in the header.
Cincinnati • Cleveland • Columbus • Dayton • Indianapolis • Pittsburgh • Raleigh • Tampa
An ISO 9001-2015 Certified Company FS 98575
DRAWINGS
ITEM NO. 1 Drawing No. M002 (Revised sheet attached):
A. Revised NAE-31.
ITEM NO. 2 Drawing No. M004 (Revised sheet attached):
A. Added a Tridium Building Control Router.
ITEM NO. 3 Drawing No. M701 (Revised sheet attached):
A. Revised sheet title.
B. Modified notes on Miscellaneous Honeywell Points List Schedule.
C. Added “MISCELLANEOUS CONTROLS REQUIREMENTS”
1) Meter Dashboard.
2) Move JCI Metasys and ALC Supervisory Controllers along with BACnet over IP components such as meters and routers from VLAN 76 to VLAN 39.
ITEM NO. 4 Drawing No. M901, 902, 903, 904, 905, 906, 907, 908, 909, 910, & 911.
A. Revise SCOPE OF WORK note to only report worn damper seals and malfunctioning actuators, not replace.
ITEM NO. 5 Drawing No. 1-M100 (Revised sheet attached):
A. NAE-03 to be re-used instead of replaced.
B. NAE-04 to be re-used instead of replaced.
C. NAE-23 to be replaced instead of re-used.
D. NAE-29 to be replaced instead of re-used.
ITEM NO. 6 Drawing No. 1-M103 (Revised sheet attached):
A. NAE-05 to be re-used instead of replaced.
B. NAE-13 to be replaced instead of re-used.
C. NAE-26 to be re-used instead of replaced.
ITEM NO. 7 Drawing No. 1-M104 (Revised sheet attached):
A. NAE-14 to be replaced instead of re-used.
ITEM NO. 8 Drawing No. 1-M105 (Revised sheet attached):
A. Eliminated convector pneumatic controls replacements.
Cincinnati • Cleveland • Columbus • Dayton • Indianapolis • Pittsburgh • Raleigh • Tampa
An ISO 9001-2015 Certified Company FS 98575
B. NAE-06 to be re-used instead of replaced.
ITEM NO. 9 Drawing No. 1-M109 (Revised sheet attached):
A. NAE-07 to be re-used instead of replaced.
ITEM NO. 10 Drawing No. 1-M110 (Revised sheet attached):
A. Eliminated requirement to remove air compressor.
ITEM NO. 11 Drawing No. 2-M100 (Revised sheet attached):
A. NAE-15 to be re-used instead of replaced.
B. NAE-33 to be re-used instead of replaced.
ITEM NO. 12 Drawing No. 13-M101 (Revised sheet attached):
A. NAE-11 to be replaced instead of re-used.
ITEM NO. 13 Drawing No. 15-M100 (Revised sheet attached):
A. NAE-08 to be re-used instead of replaced.
B. NAE-27 to be re-used instead of replaced.
ITEM NO. 14 Drawing No. 64-M100 (Revised sheet attached):
A. NAE-09 to be re-used instead of replaced.
ITEM NO. 15 Drawing No. 64-M102 (Revised sheet attached):
A. NAE-16 to be re-used instead of replaced.
B. NAE-17 to be re-used instead of replaced.
C. NAE-18 to be re-used instead of replaced.
ITEM NO. 16 Drawing No. 64-M103 (Revised sheet attached):
A. Renamed NAE-32 to NAE-31.
ITEM NO. 17 Drawing No. PG-M101 (Revised sheet attached):
A. NAE-25 to be replaced instead of re-used.