M002 - JOHNSON CONTROLS ROUTER SCHEDULE.pdf
PDF 16 MB Posted
- Attached to
- Z2DA--Remediate Temperature Controls 539-21-108
- Solicitation number
- 36C25026B0002
About this file
This document is a technical drawing and routing schedule for the Cincinnati VA Medical Center, prepared by Heapy Engineering and Levin Porter Architects as the consultant architect/engineer of record. The drawing, dated January 9, 2026, is for a Johnson Controls Router Schedule project with project number 539-21-108 and specification 2020-05099. An Addendum 4 was issued on January 12, 2026. The document appears to be a construction document for fully sprinklered temperature control systems, with the project manager listed as Kevin Henderson and marked as a construction document for the U.S. Department of Veterans Affairs.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager
Cincinnati V.A Medical Center
U.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.
/9
/2
:0
:4
P
M -2
-1
JOHNSON CONTROLS ROUTER
SCHEDULE
10/23/25 GSE WJS
REMEDIATE TEMPERATURE
CONTROLS
M002
539-21-108
CINCINNATI, OHIO
ALL
2020-05099 01528
# DESCRIPTION DATE
1 ADDENDUM 4 01-12-2026
| Sheets |
| 1-M100 - BASEMENT |
| 1-M103 - THIRD FLOOR |
| 1-M104 - FOURTH FLOOR |
| 1-M105 - FIFTH FLOOR |
| 1-M109 - NINTH FLOOR |
| 1-M110 - TENTH FLOOR PENTHOUSE |
| 2-M100 - BUILDING 2 BASEMENT |
| 13-M101 - BUILDING 13 FIRST FLOOR |
| 15-M100 - BUILDING 15 BASEMENT |
| 64-M100 - BUILDING 64 BASEMENT |
| 64-M102 - BUILDING 64 SECOND FLOOR |
| 64-M103 - BUILDING 64 THIRD FLOOR |
| M002 - JOHNSON CONTROLS ROUTER SCHEDULE |
| M004 - TRIDIUM ROUTER SCHEDULE |
| M701 - GENERAL CRITERIA, HONEYWELL CONTROLS REPLACEMENT |
| PG-M101 - PARKING GARAGE FIRST FLOOR PLAN |
File details come from the government source that posted it. Updated .