This is a VA contracting clause template for a Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction, effective October 2026 as a deviation. The clause applies to contracts awarded under 38 U.S.C. § 8127 to Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) or Veteran-Owned Small Businesses (VOSBs) listed in the System for Award Management (SBS). Offerors must certify compliance with subcontracting limitations based on the contract's predominant NAICS code: for services contracts (except construction), contractors may not pay more than 50% of government-paid amounts to non-SDVOSB/VOSB firms; for general construction contracts, the limit is 85%; for special trade construction contracts, the limit is 75%. Material costs are excluded from subcontracting calculations for construction contracts, and further subcontracting by SDVOSBs/VOSBs counts toward these thresholds.

The clause requires offerors to execute and return a completed certification with the bid, quotation, or proposal, with the signee's printed name, title, signature, and date. Offerors acknowledge that false or fraudulent certifications are subject to criminal, civil, and administrative penalties under 18 U.S.C. § 1001. Upon award, contractors must cooperate with VA reviews and provide documentation such as invoices, subcontracts, or task value lists to demonstrate compliance. VA may require compliance demonstrations at any time during performance or upon contract completion. Failure to provide requested documentation may result in remedial action. If VA determines that an SDVOSB/VOSB did not act in good faith, it may face referral to the VA Suspension and Debarment Committee, fines under the Small Business Act, or prosecution.

View the file

Other versions and copies of VAAR 852.219-75

File Revision Posted Attached to
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx Jan 2023 Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT
S02 852.219-75 Limitation on Subcontracting Jan 2023- Blank.docx Jan 2023 Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT
ATTACHMENT 4-VAAR 852.219-75 SDVOSB Certification-36C26227Q0062.pdf Revision not stated On-Site Document Destruction Services-Multi-Site
ATTACHMENT 4-VAAR 852.219-75 SDVOSB Certification-36C26227Q0074.pdf Revision not stated Surgical Laser Equipment Rental Services
ATTACHMENT 4-VAAR 852.219-75 SDVOSB Certification-36C26227Q0100.pdf Revision not stated Preventative Maintenance, Inspection, & Repair Services For Gov-Owned Fume Hoods/Equipment
VAAR 852.219-75.docx Revision not stated H945--Boiler Controls Inspection and Testing
ATTACHMENT II - VAAR 852.219-75.docx Revision not stated J012--Fire Suppression System Maintenance and Kitchen Exhaust Cleaning
852.219-75 VA Notice of Limitations on Subcontracting_Certificate of Compliance for Services and Construction. .docx Revision not stated Z1DA--528A8-22-814 Consolidate Primary Care Reception
852.219-75 Attachment.docx Revision not stated H399--36C242-27-AP-0524| 528-27-1-6893-0009 Elevator Inspections, VA Medical Center (VAMC) & Bath VA Medical Center (VAMC)
Attachment IV - VAAR 852.219-75.pdf Revision not stated Z1DA--Project No. 583-22-106- Replace Electrical Panels & Expand Distribution.
Attachment IV - VAAR 852.219-75.pdf Revision not stated Z1DA--Project No. 583-22-106- Replace Electrical Panels & Expand Distribution.
VAAR 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction.docx Revision not stated Radiant Heating Panel Replacement
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated F108--620-26-206 Asbestos Abatement
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated Z2NZ--Manhole Repairs at Montrose VAMC
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf Revision not stated Z1DA--528A5-27-504 Seal and Stripe Parking Lots
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf Revision not stated Z1DA--528A5-27-504 Seal and Stripe Parking Lots
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.pdf Revision not stated Z1DA--Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC
S02 852.219-75 Limitation on Subcontracting.pdf Revision not stated Y1DA--561-26-103 Upgrade Electrical and Plumbing in Building 18B
S06 0001 36C25227R0001 Att9_S02 SOL_Att09 VAAR 852.219-75 Certification 550-MATOC.docx Revision not stated Z2DA--FY27 Multiple Award Task Order Contract, SEED PROJECT NO: 550-25-108, Renovate Bathrooms in B103 PRRTP & B64/7 at the VA Illiana Health Care System (VIHCS), Danville IL.
Attachment II - VAAR 852.219-75.pdf Revision not stated H941--Chemical Hoods & HEPA PM
Show all 20

Who attaches VAAR 852.219-75

Other files

File Type Posted
Amendment 8.pdf PDF
Amendment _7.pdf PDF
4 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
1 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
7 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
6 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
5 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
3 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
2 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
Final CSD Questions 9.10.26 - Combined Rev 06.pdf PDF
Amendment 7.pdf PDF
Item 55 - Suggested Soil Boring Location to Bidders.pdf PDF
Amendment 6.pdf PDF
Part 1 of 7 Salem Stormwater Drawings_Addendum A.pdf PDF
Amendment 6.pdf PDF
Part 5 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
658-23-108 Specifications-Addendum A.pdf PDF
Part 7 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Final CSD Questions 9.10.26 - Combined Rev 05.pdf PDF
Part 2 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 6 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 4 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
Part 3 of 7 Final Design Salem Stormwater Drawings_Addendum A.pdf PDF
36C24626B0031 0005.pdf PDF
Amendment 4.pdf PDF
Amendment 3.pdf PDF
Amendment 3.pdf PDF
Amendment P0002.pdf PDF
Scanned_from_a_Lexmark_Multifunction_Product09-03-2026-135209.pdf PDF
Amendment 1.pdf PDF
Wage Determination_2.pdf PDF
658-23-108 Specifications-Correct Storm Water Drainage Combined.pdf PDF
658-23-108_Drawings.pdf PDF
Amendment 1.pdf PDF
Solicitation - 36C24626B0031.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction.

As prescribed in 819.7010, insert the following clause in full text. The Contracting Officer must select the appropriate box in paragraph (a)(1) as appropriate:

VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE

FOR SERVICES AND CONSTRUCTION (OCT 2026)(DEVIATION)

• (a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that— o (1) If awarded a contract, it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:

[Contracting Officer must select the appropriate box below based on the predominant NAICS code assigned to the instant acquisition as set forth in FAR

19.102. [Contracting officers should delete these instructions from the clause after selecting the appropriate box below.]

(i) [ ] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not listed in SBS as SDVOSBs or VOSBs. Any work that a similarly situated subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.

(ii) [ ] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified as SDVOSBs or VOSBs listed in SBS. Any work that a similarly situated SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded.

Cost of materials are excluded and not considered to be subcontracted.

(iii) [ ] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not listed in SBS as SDVOSBs/VOSBs. Any work that a similarly situated SDVOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

o (2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.

o (3) If VA determines that an SDVOSB/VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB must be subject to any or all of the following:

(i) Referral to the VA Suspension and Debarment Committee;

(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C.

645(g)(1)); and

(iii) Prosecution for violating section 1001 of title 18.

• (b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.

• (c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

• (d) This full clause (paragraphs (a) through (d)) should be returned with the offeror’s bid, quotation, or proposal and the certification provided in this paragraph (d) must be completed and executed. The Government cannot award a contract to any offeror without this completed and executed clause.

• The offeror certifies that if awarded the contract, it will comply with the limitations on subcontracting specified in this clause and in the resultant contract. The undersigned certifies that they are authorized to execute this certificate on behalf of the offeror.

o Printed Name of Signee: _________________________________________ o Printed Title of Signee: __________________________________________ o Signature: _____________________________________________________ o Date: _________________________________________________________

(End of clause)

File details come from the government source that posted it. Updated .