Attachment XI - RTC BID DWGS 9 2025.1023.pdf

PDF 6 MB Posted

Attached to
Z2DA--Remediate Temperature Controls 539-21-108 Federal contract opportunity
Solicitation number
36C25026B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

These architectural construction documents are for the Cincinnati Veterans Affairs (VA) Medical Center, showing floor plans for multiple buildings including Building 15 (third and fourth floors), Building 64 (basement, second, and third floors), and a Parking Garage first floor. The plans, prepared by Heapy Engineering and Levin Porter Architects with Kevin Henderson as the project manager, detail the spatial layouts and room configurations for various medical and administrative spaces. The project number is 2020-05099, with a state COA firm number of 539-21-108, and the drawings are dated 10/23/2025. Each floor plan is drawn at a scale of 1/8" or 1/16" = 1'-0" and indicates room types such as laboratories, offices, corridors, mechanical rooms, electrical rooms, staff areas, and support spaces. The documents are marked as fully sprinkled and include construction documents for temperature controls.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Remediate Temperature Controls 539-21-108, newest first.
File Type Posted
36C25026B0002 0004.pdf PDF
1-M104 - FOURTH FLOOR.pdf PDF
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4.pdf PDF
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7.pdf PDF
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24.pdf PDF
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26.pdf PDF
PG-M101 - PARKING GARAGE 1ST FLOOR PLAN.pdf PDF
ICRA 539.21.108 Mech Rooms Level II.pdf PDF
Change Summary of Specs and Drawings.pdf PDF
1-M100 - BASEMENT.pdf PDF
64-M102 - BUILDING 64 SECOND FLOOR.pdf PDF
64-M103 - BUILDING 64 THIRD FLOOR.pdf PDF
M004 - TRIDIUM ROUTER SCHEDULE.pdf PDF
M701 - GENERAL CRITERIA HONEYWELL CONTROLS REPLNT.pdf PDF
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5.pdf PDF
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8.pdf PDF
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12.pdf PDF
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21.pdf PDF
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-29.pdf PDF
Updated Specs Addendum 4.pdf PDF
1-M105 - FIFTH FLOOR.pdf PDF
1-M109 - NINTH FLOOR.pdf PDF
13-M101 - BUILDING 13 FIRST FLOOR.pdf PDF
64-M100 - BUILDING 64 BASEMENT.pdf PDF
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17.pdf PDF
REVISED STATEMENT OF BID ITEMS.pdf PDF
ICRA 539.21.108 Patient Areas Level III.pdf PDF
Sign in Sheet Remediate Temp.pdf PDF
1-M103 - THIRD FLOOR.pdf PDF
1-M110 - TENTH FLOOR PENTHOUSE.pdf PDF
36C25026B0002 0003.pdf PDF
36C25026B0002 0002.pdf PDF
36C25026B0002 0001.docx DOCX document
Attachment XVI - Directive 1192.01, Flu.pdf PDF
Attachment IX -RTC BID DWGS 7 2025.1023.pdf PDF
Attachment VII - RTC BID DWGS 5 2025.1023.pdf PDF
Attachment VI -RTC BID DWGS 4 2025.1023.pdf PDF
Attachment III -RTC BID DWGS 1 2025.1023.pdf PDF
Attachment I - WD OH20250082.pdf PDF
Attachment XVII - ICRA Level 2.pdf PDF
Attachment X - RTC BID DWGS 8 2025.1023.pdf PDF
Attachment V - RTC BID DWGS 3 2025.1023.pdf PDF
Attachment II - CD SPECIFICATION 2025.1023.pdf PDF
36C25026B0002.docx DOCX document
Attachment XV - 852.219-75 LOS.docx DOCX document
Attachment XIII - RFI Form.pdf PDF
Attachment XIV - EMR Form.pdf PDF
Attachment XII - J A - Redacted.pdf PDF
Attachment VIII - RTC BID DWGS 6 2025.1023.pdf PDF
Attachment IV - RTC BID DWGS 2 2025.1023.pdf PDF
Show all 50

Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D.1

B

A.1 A

D

123456789

C

Biochemistry

Control Temp. Room

Biochemistry

Biochemistry

Staff

Toilet

H.A.C.

Biochemistry

Corridor

C*3*315

Biochemistry

Control Temp Room

305A

Closet

309A

S

S

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :0

A

M -2

-1

BUILDING 15 THIRD FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

15-M103

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/8" = 1'-0"

THIRD FLOOR PLAN

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE SENSOR TO MONITOR REFRIGERATOR TEMPERATURE. CRITICAL ALARM SHALL

BE SENT TO ECC IF TEMPERATURE REACHES 38 DEGREES (ADJUSTABLE).

2. PROVIDE SENSOR TO MONITOR FREEZER TEMPERATURE. CRITICAL ALARM SHALL BE

SENT TO ECC IF TEMPERATURE REACHES 10 DEGREES (ADJUSTABLE).

N

# DESCRIPTION DATE

D.1

B

A.1 A

D

123456789

C

Bio-safety Level 2 Lab

Equipment

Staff

Controlled

Temp.

Room

Lab #2

Corridor

C*4*415

Unisex Toilet

Lab #1

Lobby

S

Electric

Elec.

H.A.C.

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :0

A

M -2

-1

BUILDING 15 FOURTH FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

15-M104

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/8" = 1'-0"

FOURTH FLOOR PLAN

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE SENSOR TO MONITOR REFRIGERATOR TEMPERATURE. CRITICAL ALARM SHALL

BE SENT TO ECC IF TEMPERATURE REACHES 38 DEGREES (ADJUSTABLE).

N

D

H I J

K

L

N

O

P

QR

1 2 3 4 5 6 78 9 10 12 13 15 16 17 18 19 20 21 22 2324 14

TELE.

SERVICE

OXYGEN

STORAGE

GROUP

RM 2

C*B*8

CORRIDOR

PAT. TLT.

S.H. EXAM

S.T. EXAM 047

S.T. DR.

S*B*4

STAIR #4

S.T. OFF.

STOR.

MEDIA

CENTER

BOILER RM.

NAE-09

NAE-30

2 4

1 2 4

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :0

A

M -2

-1

BUILDING 64 BASEMENT

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

64-M100

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

BASEMENT FLOOR PLAN

N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED

THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

K

L

N

O

P

QR

1 2 3 4 5 6 78 9 10 12 13 15 16 17 18 19 20 21 22 2324 14

ELEC.

CLOS.

231 LINEN

LAUNDRY

GROUP ROOM

STAIR #4

S*2*4CORRIDOR

C*2*14

OFFICE

228A

TLT.

228B

SIGNAL

242D

MECH.

251A

OFFICE

OFFICE

ELEC.

GROUP ROOM

OFFICE

CORRIDOR

C*2*13

SIGNAL

222WORKOUT

OFFICE

223A

COMPUTER

221A

SOC. WORK.

ELEC.

STAIR #2

S*2*2

OFFICE

LINEN

OFFICE

CORRIDOR

C*2*2

2 BEDROOM

TLT.

258C

2 BEDROOM

CORRIDOR

C*2*5

OFFICE

OFFICE

NAE-16NAE-17

NAE-18

1 2

D

1 2

D

1 2

D

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :0

A

M -2

-1

BUILDING 64 SECOND FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

64-M102

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

SECOND FLOOR PLAN

N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED

THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

K

L

N

O

P

QR

1 2 3 4 5 6 78 9 10 12 13 15 16 17 18 19 20 21 22 2324 14

NAE-32

1 2

D

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :0

A

M -2

-1

BUILDING 64 THIRD FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

64-M103

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

THIRD FLOOR PLAN

N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

# DESCRIPTION DATE

1. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED

THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

D

11.1 1.92 3 4 5 66.1 6.97'

C

B

A.3

A

42NAE-25

SIGNALS

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :2

A

M -2

-1

PARKING GARAGE FIRST FLOOR

PLAN

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

PG-M101

539-21-108

CINCINNATI, OHIO

PG

2020-05099 01528

SCALE: 1/16" = 1'-0"

FIRST FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE

DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-

ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A

FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW

HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

PHOTO - PG SIG RM NAE-25

Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29
M912 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-40
M913 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-42
M914 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-43
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN
Sheets
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
Sheets
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
Sheets
1-M099 - SUB-BASEMENT
1-M100 - BASEMENT
1-M101 - FIRST FLOOR
1-M102 - SECOND FLOOR
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M106 - SIXTH FLOOR
1-M107 - SEVENTH FLOOR
1-M108 - EIGHTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
1-M111 - ELEVENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
3-M100 - BUILDING 3 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
14-M100 - BUILDING 14 BASEMENT
15-M100 - BUILDING 15 BASEMENT
15-M101 - BUILDING 15 FIRST FLOOR
15-M103 - BUILDING 15 THIRD FLOOR
15-M104 - BUILDING 15 FOURTH FLOOR
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M001 - ABBREVIATION, INDEX, GENERAL NOTES
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M003 - AUTOMATED LOGIC ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M401 - DATA CENTER
M501 - DETAILS
M701 - HONEYWELL CONTROLS REPLACEMENT
M900 - BUILDING 1 PRESSURIZATION CONTROL
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-28
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-29

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .