Attachment IX -RTC BID DWGS 7 2025.1023.pdf

PDF 17 MB Posted

Attached to
Z2DA--Remediate Temperature Controls 539-21-108 Federal contract opportunity
Solicitation number
36C25026B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

The shared document contains floor plans for the Cincinnati VA Medical Center, spanning from the 4th to 10th floors. The architectural drawings are detailed technical schematics prepared by Heapy Engineering and Levin Porter Architects, with each floor plan showing room layouts, room names, equipment locations, and mechanical systems. The plans include specific room designations such as exam rooms, offices, labs, nursing stations, medical service areas, research spaces, psychiatric units, and mechanical equipment rooms. Each floor plan is drawn to a scale of 1/16" = 1'-0" and includes grid coordinates, electrical closets, air handling units (AHUs), and accompanying photographic documentation of electrical and routing equipment. The project number is 539-21-108, with a drawing date of 10/23/2025, and the project is marked as fully sprinklered. The drawings provide a comprehensive view of the medical center's interior spatial organization across multiple floors.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Remediate Temperature Controls 539-21-108, newest first.
File Type Posted
36C25026B0002 0004.pdf PDF
1-M104 - FOURTH FLOOR.pdf PDF
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4.pdf PDF
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7.pdf PDF
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24.pdf PDF
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26.pdf PDF
PG-M101 - PARKING GARAGE 1ST FLOOR PLAN.pdf PDF
ICRA 539.21.108 Mech Rooms Level II.pdf PDF
Updated Specs Addendum 4.pdf PDF
1-M105 - FIFTH FLOOR.pdf PDF
1-M109 - NINTH FLOOR.pdf PDF
13-M101 - BUILDING 13 FIRST FLOOR.pdf PDF
64-M100 - BUILDING 64 BASEMENT.pdf PDF
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17.pdf PDF
REVISED STATEMENT OF BID ITEMS.pdf PDF
ICRA 539.21.108 Patient Areas Level III.pdf PDF
Change Summary of Specs and Drawings.pdf PDF
1-M100 - BASEMENT.pdf PDF
64-M102 - BUILDING 64 SECOND FLOOR.pdf PDF
64-M103 - BUILDING 64 THIRD FLOOR.pdf PDF
M004 - TRIDIUM ROUTER SCHEDULE.pdf PDF
M701 - GENERAL CRITERIA HONEYWELL CONTROLS REPLNT.pdf PDF
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5.pdf PDF
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8.pdf PDF
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12.pdf PDF
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21.pdf PDF
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-29.pdf PDF
Sign in Sheet Remediate Temp.pdf PDF
1-M103 - THIRD FLOOR.pdf PDF
1-M110 - TENTH FLOOR PENTHOUSE.pdf PDF
36C25026B0002 0003.pdf PDF
36C25026B0002 0002.pdf PDF
36C25026B0002 0001.docx DOCX document
Attachment XVI - Directive 1192.01, Flu.pdf PDF
Attachment VII - RTC BID DWGS 5 2025.1023.pdf PDF
Attachment VI -RTC BID DWGS 4 2025.1023.pdf PDF
Attachment III -RTC BID DWGS 1 2025.1023.pdf PDF
Attachment I - WD OH20250082.pdf PDF
Attachment XV - 852.219-75 LOS.docx DOCX document
Attachment XIII - RFI Form.pdf PDF
Attachment XVII - ICRA Level 2.pdf PDF
Attachment X - RTC BID DWGS 8 2025.1023.pdf PDF
Attachment V - RTC BID DWGS 3 2025.1023.pdf PDF
Attachment II - CD SPECIFICATION 2025.1023.pdf PDF
36C25026B0002.docx DOCX document
Attachment XIV - EMR Form.pdf PDF
Attachment XII - J A - Redacted.pdf PDF
Attachment XI - RTC BID DWGS 9 2025.1023.pdf PDF
Attachment VIII - RTC BID DWGS 6 2025.1023.pdf PDF
Attachment IV - RTC BID DWGS 2 2025.1023.pdf PDF
Show all 50

Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

D

D

D

D

1-AHU29

1-AHU28

1-AHU29

1-AHU28

AHU-13

AHU-9

AHU-10

AHU-24

AHU-22

AHU-32

AHU-25

AHU-23

4C2

Mech Room

A456E

Interview

A401 Reception

A400 Dr's Off.

A423A

RAM Lab.

B413B

Stair 4

S*4*4

M. Tlt.

B407

Office

B427

Associate Chief of Staff/Research

B426

CFBRE Off.

B421

Clos.

B425A

Conf.

B425

Adm. Off.

B420B

Tissue Culture

B433A

Mic Rotomy

B435

HSRD Off.

A424D

Stor.

A420

Tlt.

A413A

Tlt.

A410A

D.B.

A457D

Exam

A455

Tlt.

A449A Pharm.

A454

Stair 5

S*4*5

Elec.

A436B

Supp.

A476

Stor.

A436A

Comp. Rm.

A437C

Stor.

A404

Chemo Prep.

A425A

Interview

A402A

Tlt.

A416A Exam Rm. 3

A416

Tlt.

A407A Exam Rm. 4

A407

Med Room

A405

HSRD Office

A422

HSRD Off.

A424A

Dir. Off.

A424B

Common Area

A424C

HSRD Off.

A424G

HSRD Off.

A424F

HSRD Off.

A424E Oncology Pharmacy Sattelite

A425

Elec.

A418A

Stor.

A418

Staff Tlt.

A421

Tlt.

A414A Exam Rm. 7

A414

Exam Rm. 8

A409

Tlt.

A408A

Tlt.

A406A

Waiting

A402B

IRM Storage (Comm)

A445A

KIT.

A475

CL. Lin.

A462

Soil. Util.

A461

Exam

A474 Tlt.

A473A

Tlt.

A471A Exam 5

A471

Tlt.

A470A

Exam 9

A469

Exam 10

A468

Tlt.

A467A

Exam 6

A466

Tlt.

A465A

Exam 2

A464

Tlt.

A464A

Exam

A458C

Stor.

A460

Exam

A458B

Exam

A458A

Sub. Lab.

A453

Exam

A458

Tlt.

A457H Proc.

A457E

Tlt.

A457C

Elec.

A456

S.B.

A457B

Stor.

A457A

GCRC Corridor

A457

Res. Off.

A442

Neuro. Res.

A442A

Chief Rm.

A441

Computer Off.

A440

IRM Network Operation Center

A437

Tlt.

A439A

Staff Physician

B403A

Neuro Office

B439

Comp. Programmer Off.

A439

Office

B437

Microscope Core

B436

Corridor

B429A Sig. Clos.

B416

Electrophoresis Core

B413A

Ram Lab.

B412A

HAC

B409 F. Tlt.

B406

Cold Rm.

B415A

Office

B426A

Comp. Specialist Off.

A431

Service Lobby

A436

Trash Chute

A435

Exam 1

A473

Office

B412C

Comp. Training

A430

Regular E.E.G

B403B

E.E.G. Control & Observation

B403

Copier Room

B437A

IRM Office

A427

Toilet

A446Elec.

A445

Toilet

A446A

Exam

A463

Tlt.

A463A

Freez.

B415B

Elec.

B431

Refrig.

B430

Office

B428

Director's Office

B429B

Tlt.

A474A

Stair 2

S*4*2

Exam Rm. 11

A412

Exam Rm. 12

A411

Social Worker

A422A

Tissue Culture

B412B W. Lab.

B412

Exam Rm. 9

A413

Exam Rm. 10

A410

Exam Rm. 5

A415

Exam Rm. 6

A408

Exam Rm. 1

A417

Exam Rm. 2

A406

Elec.

A424H

HAC

A403

IRM Storage (Hdwr)

A444

HAC

A477

Elec.

A459

Exam 3

A472

Exam 4

A465

Exam 7

A470

Exam 8

A467

Stair 1

S*4*1

Evoked Potential Lab

B438

Elec.

B410

Elec.

B417

HAC

B429

Research Adm. Off.

B420

Auto-Clave / Dishwasher

B408 LAB. Procedure Rm

B411

Stor.

A444A

Corridor

C*4*3

Corridor

C*4*4

Corridor

C*4*1

Corridor

C*4*6

Waiting

A478Interview

A401A

HSRD Off.

A424I

HSRD Off.

A424

Infectious Disease Lab

B414

Office

B415

Non-Hazardous Compounding

B414D

Hazardous Compounding

B414B Ante Room

B414C

Hazardous Storage

B414A

Work Station Area

B414

Corridor

C*4*5

Lab

B432

Reception

A401B

Corridor

C*4*2

Stair 3

S*4*3

Lab.

A457G

Nurse Station

A457F Dr's Off.

A423

NAE-14

NAE-19

TRIDIUM

AX

NAE-22

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.3

Ib.5

Ib.7

Ib.8

Ib.10 Ib.12

Ib.14

Ib.16

Ib.18

Ib.19

Ib.20

Ib.21

Ib.22

Ib.23

Ib.24

Ib.25

Ib.26

Ib.27

7a

6a

Ib.28

Ib.29

Ib.4

Ib.17

3a Ib.11Ib.6

N

Fa

K

OaPa

Eb

4TH FLOOR PENTHOUSE

G5RE ROUTER BLDG. 1-AH10

4 2 1

S

DP

S

LGR25-1-4 BLD 1 ON 4TH FLR

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :3

A

M -2

-1

FOURTH FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M104

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

FOURTH FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE

DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-

ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A

FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW

HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

6. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

7. REPLACE BUILDING PRESSURE SENSOR WITH SELF-ZEROING STATIC PRESSURE SENSOR.

PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE SENSOR ON 11TH

FLOOR ROOF.

8. REPLACE EXISTING NIAGARA AX JACE WITH NEW N4 JACE. INTEGRATE ALL EXISTING

CONTROLS INTO NEW SYSTEM.

9. PROVIDE SENSOR TO MONITOR SPACE TEMPERATURE. CRITICAL ALARM SHALL BE SENT

TO ECC IF ROOM REACHES 80 DEGREES (ADJUSTABLE).

10. REMOVE EXISTING PNEUMATIC CONTROLS COMPRESSOR AND ASSOCIATED PNEUMATIC

CONTROLS COMPONENTS ONCE VERIFIED THAT NO SYSTEMS ARE RELIANT UPON THESE

COMPONENTS. SHUT COMPRESSOR DOWN FOR 4 WEEKS PRIOR TO REMOVAL FOR

VERIFICATION. COORDINATE CLOSELY WITH COR.

11. REMOVE EXISTING HONEYWELL CONTROLS PANEL AND ALL ASSOCIATED COMPONENTS

AFTER ALL POINTS HAVE BEEN INTEGRATED INTO NEW TRIDIUM SYSTEM. THIS SCOPE

SHALL NOT BE EXECUTED UNTIL VERIFICATION THAT NO SYSTEMS ARE RELIANT UPON

THESE COMPONENTS. COORDINATE CLOSELY WITH COR. REMOVE ELECTRIC BACK TO

SOURCE.

PHOTO - B1-A436B NAE-14

PHOTO - B1-A456E G5RE ROUTER BLDG1-AH10

PHOTO - B1-A456E NAE-19

PHOTO - B1-A456E NAE-22

PHOTO - B1-A436B TRIDIUM AX

PHOTO - B1-A436B LRG25-1-4 BLD 1 4TH FLR

# DESCRIPTION DATE

1-AHU44

AHU-11

AHU-12

Conferece Room

B523

Bath

A521A

Bath

A520A

Stair 2

S*5*2 Clean Linen

A525

Bath

A501A

Staff Tlt

A505

HAC

A503

Stor

A545A

Supp Clos

A567A

Tlt.

A570A

Tlt.

A571A Stor.

A565A

Tlt.

A573A

Exam 2

A571

Exam 6

A567

Exam 7

A566

Exam 1

A572

Staff Physician

A573

Stor.

A563A

Office

A574

Procedure Room

A557D

Exam Room 4

A557A Surgery Office

A557B

Closet

A554A

Waiting Area

A559

Clerk

A559A

Stor.

A551B

Procedure Room

A557C

Stair 5

S*5*5 Tlt.

A553

Telesurgery Office

A554

Closet

A551A Tlt.

A549A Sig. Clos.

A546A

Adm Asst.

A541

Adm. Asst.

A540

Medical Service

B538

Db. Wtr.

A539

B537

Medical

Service Office Office

B537A

Med Svc

B501

Tlt.

B503A Office

B503

Elec.

A546

Rolling Storage

B525 Closet

B526C

Office

B511 Office

B512

Office

B513

Office

B509

Bath

A508A

Storage

B515A

Closet

B507A Storage

B506

Office

B508

Sig. Clos.

B505G

Tlt.

B505A

Stor.

B521D

S.R. Neg. Pressure

A507

S.R. Neg. Pressure

A511

S.R. Neg. Pressure

A512

Bath

A519A

Exam 4

A569

Exam 5

A568

Bath

A522A S.R.

A522

Bath

A517A Bath

A502A

D.R.

A501

D.R.

A526

Nurse Manager

A528

Elec.

A537A

HAC

A562A

B536

Dispensing

Area

Office

B516

Conference Rm.

B507

Office

B514

Nourishment

A513

D.R.

A502

D.R.

A527

Bath

A510A

Bath

A511A

Elec.

A516

Tlt

A579A

Charting

A504

Work Rm.

A549

Exam

A558

Waiting Area

A550Storage

A524

Bath

A509A

Elec.

A514

Bath

A512A

Bath

A518A

Bath

A523A

Nurse Station

A581 Office

A582

Gurney Storage

A578 Pgm. Supp. Asst.

A575

Clos.

A556

Skin and Wound Care Clinic

A551

Chief Office

B540

Office

B539

IV Prep

B526A IV Buff

B526B

Stor.

B518A

Elec.

B521B

Narc. Vault

B521A

Cart Stor.

B535

Office

B518

Office

B515

S.R. Neg. Pressure

A508

Exam 3

A570

Tele

A561Elec.

A560

Service Lobby

A536Bath

A526A

HAC

A535A

Tr. Ch.

A535

Soil

A562

Storage

B505H

Stair 3

S*5*3

Office

B535C

Exam Room 5

A555

Pain Nurse

A563

Class Rm.

A564

Stor.

A564A

D.R.

A520

D.R.

A521

S.R.

A519

HAC

B521E

Staff Tlt.

B535B

Bath

A527A

S.R.

A510

D.R.

A517

Office

B510

Office

B517

Chief

B522 Cleric

B524

Chief Med. Svc.

A542

Inpatient Therapy

A579

S.R.

A509

Omni Cell

A506

Soil. Util.

A515

HAC

A545

Toilet

A577

Stair 1

S*5*1

Office

B504

Compound Picking

B527 IV Ante-Room

B526

Elec.

B505B

Stor

A544

Dirty Equipment

A537B

A537C

Oxygen

Storage

Equipment Room

Clean Supply

A537D

Work Room

A537F

Storage

A537E

Corridor

C*5*3 Corridor

C*5*4

Corridor

C*5*2

Corridor

C*5*1

Corridor

C*5*5

Unit Dose

B535A

D.R.

A523

D.R.

A518

Bath

A507A

NAE-06

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.3

Ib.5

Ib.7

Ib.8

Ib.10 Ib.12

Ib.14

Ib.16

Ib.18

Ib.19

Ib.20

Ib.21

Ib.22

Ib.23

Ib.24

Ib.25

Ib.26

Ib.27

7a

6a

Ib.28

Ib.29

Ib.4

Ib.17

3a Ib.11Ib.6

N

Fa

K

OaPa

Eb

5TH FLOOR PENTHOUSE (MER)

S

DP

1 2 4

8 8 8 8

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :4

A

M -2

-1

FIFTH FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M105

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

FIFTH FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED

THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

6. REPLACE BUILDING PRESSURE SENSOR WITH SELF-ZEROING STATIC PRESSURE SENSOR.

PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE SENSOR ON 11TH

FLOOR ROOF.

7. REPLACE EXISTING FAN COIL UNIT PNEUMATIC CONTROLS WITH DDC.

8. REPLACE EXISTING CONVECTOR PNEUMATIC CONTROLS WITH DDC.

9. REPLACE EIXSTING EXHAUST FAN AND ASSOCIATED DAMPER PNEUMATIC CONTROLS

WITH DDC.

10. REPLACE EXISTING ATU PNEUMATIC CONTROLS WITH DDC.

PHOTO - B1-5TH FLR PHOUSE NAE-06

Elec.

A617

Tlt.

A647A

Tlt.

A635

Chief Admn. Asst.

B624

Toilet

B615

Office

B611A

Exam

B612D

Exam

B612C

Tlt.

A624A

Soiled Utility

A616

Stair 2

S*6*2

HAC

A637A

Staff Tlt.

A602

Toilet

A633A

HAC

A674

Stair 5

S*6*5

Meeting Room

A634A

Medical Conf.

A634B

LKRS.

A637B

Tlt.

B605A

Soiled

B619A

Exam

B611B

Exam

B612B

Exam

B612A

Storage

A646A

Phys. Work Rm.

A632D

Conf. Rm.

A603

D.R.

A610

D.R.

A611

Tlt.

A612A

S.R.

A612

Tlt.

A611A

Tlt.

A610A

Tlt.

A609A

Tlt.

A614A Clinical Pat. Support

A613

Tlt.

A619A Elec.

A615

HAC

A606

S.R. (Neg. Pres.)

A607

Storage

A605

Tlt.

A604A

Tlt.

A607A

CL. Supp.

A608

D.R.

A619

S.R.

A620

Tlt.

A621A

Tlt.

A622A

D.R.

A622 S.R. (Neg. Pres.)

A621

D.R.

A623

S.R. (Neg. Pres.)

A624 Tlt.

A623A CL. Supp.

A625

Tlt.

A626A

D.R.

A626 D.R.

A629

Tlt.

A631A

Tlt.

A629A D.R.

A631

Nurse Man.

A601

Trash Chute

A637

Sig. Clos.

A645A Elec.

A645

CL. Lin.

A673

S.R. (Neg. Pres.)

A672

Sterile Supplies

A671

Tlt.

A670ATlt.

A669A

D.R.

A669

D.R.

A668

Tlt.

A668A

Tlt.

A667A

Nurse Man.

A664

S.R. (Neg. Pres.)

A663

Soil. Util.

A662

Elec.

A660 D.R.

A659

Tlt.

A659A

Tlt.

A658A

D.R.

A656S.R. (Neg. Pres.)

A657 Tlt.

A657A

Tlt.

A656A

D.R.

A655 Tlt.

A655A

Tlt.

A654AS.R. (Neg. Pres.)

A654Nurse Station

A653

Tlt.

A651A

D.R.

A649

Tlt.

A649A

Tlt.

A672A

Tlt.

A675A

Waiting Room

A643

HHN Off.

A641

Research Pulmonary Lab.

A640

Medical Conf.

A634C

DB. Wtr.

A639

Pulmonary Func. LAB

B636

Tlt.

B603

Sig. Clos.

B606A

Stor.

B632

Phys.

B628 Chief Phys.

B625

Phys.

B626

Clos.

B625A

Phys.

B622 Elec.

B619B

Elec.

B607A

Stair 3

S*6*3

Exam

B610

Closet

B609A

Exam

B616

Exam

B614

Toilet

B613

Exam

B617

Storage

B605

Tlt.

A620A

Oxygen Storage

A628

D.R.

A604

Off.

B601

S.R. (Neg. Pres.)

A614

Echo.

B604

B606

IV Tech.

Off.

Adm. Asst.

B620

Conf. Room

B623

Phys.

B627

D.R.

A647

S.R.

A609

CL. Lin.

A618

Service Lobby

A632 Equip. Stor.

A646 Nourish.

A648

Elec.

A661

S.R

A670

S.R.

A667

D.R.

A651

D.R.

A658

Elec.

A632E Stair 1

S*6*1

Chief Medical Res.

A642

Ward Stor.

B635

HAC

B634

Stor.

B633 Phys.

B629

Secretary

B618

Social Work Off.

B621

Corridor

C*6*3

Corridor

C*6*2

Corridor

C*6*4

Corridor

C*6*6

Corridor

C*6*1

Corridor

C*6*5

Nurse Conf. Rm.

A675

Office

A676 Nurse Station

A600

Conf. Rm.

B607

Nourish.

A630

Exam

B609

Cl. Supp.

A652

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.3

Ib.5

Ib.7

Ib.8

Ib.10 Ib.12

Ib.14

Ib.16

Ib.18

Ib.19

Ib.20

Ib.21

Ib.22

Ib.23

Ib.24

Ib.25

Ib.26

Ib.27

7a

6a

Ib.28

Ib.29

Ib.4

Ib.17

3a Ib.11Ib.6

N

Fa

K

OaPa

Eb

S

DP

G5CE ROUTER

BLDG1 6TH FLR

1 2 4

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :4

A

M -2

-1

SIXTH FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M106

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

SIXTH FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

6. PROVIDE SELF-ZEROING BUILDING PRESSURE SENSOR. COORDINATE EXACT LOCATION

WITH COR. PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE

SENSOR ON 11TH FLOOR ROOF.

PHOTO - B1-A632E G5CE ROUTER BLDG1 6TH FLR

Off.

B723

Soil. Util.

A712

Stair 2

S*7*2

Stair 5

S*7*5

Elec.

A728B

Stor.

B719

Stair 3

S*7*3

Bath

A709B

Break Room

A726

Office

A767A

Office #12

A750

S. Office #11A

A749Stor.

A724

Staff Tlt.

A736Trash Chute

A727A

Lockers

A727B

Closet

A728E Group Room

A728

DB Wtr.

A729

Storage

A728C

Soc. Worker

B702

Sensory Therapy Room

A704

Bath

A708A

T.R.

A707

Bath

A706ABath

A707A

S.R.

A706

Ante

A709

T.R.

A708

Exist. Seclusion

A711B

Obser.

A710

Tele.

A713

Bath

A711A

S.R.

A715T.L.T.

A715A

Clean Linen

A716

S.R.

A718

S.R.

A717

Bed Room

A719

Bath

A719A

Bed Room

A722

T.L.T.

A723A

T.L.T.

A722A

Q.R.

A723 Service Elev. Lobby

A727

Laundry

A728A

Bath

A702A Interview Room

A702

Nurse Off.

A701

Clos.

A772Vis. Bath

A771

Office #3

A769

Testing

A770

Staff Office

A767

Office #2

A768

Group #1 (12-20)

A766

Office #5B

A765

Office #5A

A764

Ante

A761

Office #5

A763

Office

A762

HAC

A760

Elec.

A759Elec.

A758

Staff Toilet

A761A

Office #9

A754

Tlt.

A753

Group #2 (10-12)

A751

Stor.

A747

Office #13

A744

Office #14

A743

Storage

A740Sig. Clos.

A734 Elec.

A739

O/T Off.

A731

Social Worker

A728D

Tlt.

B734A

Tlt.

A730ASoc. Worker

A730

Psych. Res.

B734

Social Worker

B733A

Nurse Man.

B703

Off.

B733B

Tlt.

B729A

Stor.

B731Waiting

B705

Signal Closet

B705F

KLT

B730 Wash Room

B728

Tlt.

B726A Off.

B726

Off.

B724 Tlt.

B723A

Tlt.

B722A

Elec.

B720

Off.

B716A

Elec

B706

Staff Tlt.

B705E

Reception

B705C

Break Room

B705D

Office

B708

Off.

B715B

Off.

B714A

Off.

B711

Off.

B714

Nurse Station

A705A

Dining/Group Room

A705

S.R.

A709A

Ex. Group

A720

Nurse Station Work/Conference

A725B

Office

B711A

B712

Tobacco &

Acohol

Research Center

Group Rm.

B713

Off.

B721 Group Room

B725

Group Room

B725B

Stair 1

S*7*1

S. Office #11A

A748

Office #7

A756

Ante

A711

Elec.

A714

Office #8

A755

Stor.

A735A

Occupational Therapy

A732

Intake Coor.

B701

Stat.

B704 Off.

B733

HAC

B732

Off.

B729 Off.

B727

Adm. Asst.

B716B

Off.

B717

HAC

A735 Nurse Station

A725

Office #18

A775

Corridor

C*7*3

Corridor

C*7*6

Corridor

C*7*1

Corridor

C*7*5

Exam Rm.

A776

Chief Nurse Off.

A700

Nurse Station Meds

A725A Office

A741

Training (6)

A746Waiting

A774

Corridor

C*7*4 Corridor

C*7*2

Reception

A773

Copy Rm.

A773A

Office

B710

Office

B709

Office

A742

Office #6

A757

Office #10

A752

Off.

B722

Off.

B715A

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.3

Ib.5

Ib.7

Ib.8

Ib.10 Ib.12

Ib.14

Ib.22

Ib.23

Ib.24

Ib.27

7a

6a

Ib.28

Ib.29

Ib.4

3a Ib.11Ib.6

N

Fa

K

OaPa

Eb

S

DP

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :4

A

M -2

-1

SEVENTH FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M107

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

SEVENTH FLOOR PLAN

N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

2. PROVIDE SELF-ZEROING BUILDING PRESSURE SENSOR. COORDINATE EXACT LOCATION

WITH COR. PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE

SENSOR ON 11TH FLOOR ROOF.

AHU-1

Research Lab

A833A

Stor.

A808

Stair 3

S*8*3

Stair 5

S*8*5

Stair 2

S*8*2

Off.

A846C

HAC

A823

Clos.

A825A

Clos.

A826A Stor.

A828

Tlt.

A811B

Off.

A807

Staff Tlt.

A800C

Stor.

A846A

Stor.

A841

HAC

A842

Off.

A832 Corridor

C*8*5

Closet

B802A

Off.

A830

Service Lobby

A829

Elec.

A845

Tlt.

A812A Tlt.

A811A

Group Rm.

A811

Tlt.

A810A

Bath

A814

Off.

A809

Tlt.

A809A

Off.

A813

Off.

A815

Lin. Chute

A816

Elec.

A818

ANT

A817

Group Room #2

A820

Counsel Off.

A819

Off.

A821B

Off.

A821A

Group Room #1

A821 Tlt.

A825B

Off.

A825

Direc. Off.

A826 Trash Chute

A829A

Tech. Off.

A829BCoor. Off.

A827

Psych. Off.

A804 Charting Room

A800B Omnicell

A857A

HAC

A860

Cl. Lin.

A861

Elec.

A858 Off.

A857

Head Nurse Office

A856

Thera. Off.

A855

Shower / Tlt.

A851

Clos.

A849

Lndry

A848 Kit.

A846D

Sig. Clos.

A844

Dermatology

A838

Stat. Off.

A831

Elec.

B818

Electric

B812

Women Bath

A867A

Elec.

A830A

Off.

A803

Exam

A802

Tlt.

A801A

Phys. Off.

A801

QI Research Director

A812

Stair 1

S*8*1 Stor.

A846B Day Room / Dining

A846 Music / Quiet Room

A852

Off.

A862

6 Bed Rm.

A864

6 Bed Rm.

A865

Hndcap S.R.

A867

Off.

A810

Off.

A806

Restroom

A869

Elec.

A859

3 Bed Room

A863

Addict. Ther.

A850

Group Room

A853

Stor.

A840

Corridor

C*8*1

Conf.

A839

Corridor

C*8*3

Corridor

C*8*2

Corridor

C*8*4

Group Room

A868

Nurses Station

A800 Stor.

A800A

Alcohol Research

A833

SPS Storage

B806A

Patient Toilet

B802

Clean Supply

B806

Reception

B803

X-Ray

B804

Soiled Utility

B808

Equipment Mech Room

B807

Locker

B809

Locker

B810 Surgery

B811 Surgery Operatory

B819

Closet

B816A

Soil Util.

B817

Storage

B815 A/O Office

B830

Chief Office

B831

Signals

B813

Open Office

B829

Staff Toilet

B814

Dental Laboratory

B832

Conference/Break Room

B833

Operatory

B828

Operatory

B827

Operatory

B826

Operatory

B825

Opteratory

B823

Operatory

B820

Operatory

B821

Operatory

B822

Waiting

B801

Corridor

C*8*3 Corridor

C*8*1

Corridor

C*8*2

Corridor

C*8*4

Corridor

C*8*5

Special Needs Operatory

B824

Thera Off.

A854

3 Bed Rm

A866

Stor.

A824

Off.

A805

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.14

Ib.22

Ib.23

Ib.24

Ib.27

7a

6a

Ib.28

Ib.29

3a

N

Fa

K

OaPa

Eb

S

DP

LGR25 8TH FLR

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :4

A

M -2

-1

EIGHTH FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M108

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

EIGHTH FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

6. REPLACE BUILDING PRESSURE SENSOR WITH SELF-ZEROING STATIC PRESSURE SENSOR.

PROVIDE WIRING TO COMMUNICATE WITH NEW REFERENCE PRESSURE SENSOR ON 11TH

FLOOR ROOF.

PHOTO - B1-A830A LGR25 8TH FLR

AHU-8

AHU-7

Stair 2

S*9*2

Elec.

A916D

Clos.

A919C

Adm. Asst.

A920 Psych. Off.

A919A

Psych. Off.

A919B

Clos.

A907 Clos.

A904B

Elec.

A904C

AFGE

A904

Lin.

A918

HAC

A917

Psych. Off.

A922 Chief Psych.

A921

Entry

A938

Toilet

A938B

Toilet

A938D

Sleep 5

A938A Tlt.

A937B

Tlt.

A939B

Tlt.

A937D

Sleep 2

A937C

Elec.

A941B Soiled Utility

A941A

Stair 5

S*9*5

Clean Supply

A942

Tlt.

A939D

Lead Tech./2nd Tech.

A935A

Sleep 3

A939C

Sleep 1

A937A

Break Room

A941

Shower

A939E

Crash Cart

C-9-3A

Bath

A906C

Clos.

A906B Entry

A906A AFGE

A906

AFGE

A905A

Break Room

A909

Office

A908

Vol. Serv. Office

A905

Clos.

A912A

Vol. Serv. Storage

A911

ONA Local 105

A911A Office

A914

Psych. Off.

A902

M. Tlt.

A901

Office

A915

Serv. Lobby

A916

Trash Chute

A915A

Psych. Off.

A901A

F. Tlt.

A946

Electrical Closet

A931A

Sig. Clos.

A929

Psych. Off.

A919

Adm. Asst.

A926

D. Wtr. Mech. Area

A923

Psych. Off.

B907

Clerk

A924

Psych. Off.

B906

Office

B901

Psych. Conf. Rm.

B903

Psych. Lab.

A903B

Psych. Off

A903

HAC

A915B Office

A913

Stor. Rm.

A916A

Res.

B905A

Sdm. Off.

A925

Sleep Phy.

A934

Sleep Nurses/Fellows

A935

Sleep 4

A939AControl Rm.

A940

Tlt.

A909A

Psych.

A904A Psych. Lab.

A903A

Clst.

A941C

Stor.

A918B

Stair 1

S*9*1

Chief Psych. Off.

A927

Corridor

C*8*3

Psych. Off.

B902

Copy Room

B905

Fan Rm.

B904

Stor.

A918A

Chief Office

A944

Corridor

C*9*3

Waiting

A932

Off.

A945

Dir. Off.

A946A Exam 2

A943

Corridor

C*9*2

Exam 1

A933

Corridor

C*9*1

Office

A912

Sleep 6

A938C

NAE-07

NIAGRA

AX

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.14

Ib.22

Ib.23

Ib.24

Ib.27

7a

6a

Ib.28

Ib.29

3a

N

Fa

K

OaPa

Eb

S

DP

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :5

A

M -2

-1

NINTH FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M109

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

NINTH FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED

THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

6. REPLACE EXISTING NIAGARA AX JACE WITH NEW N4 JACE. INTEGRATE ALL EXISTING

CONTROLS INTO NEW SYSTEM.

7. PROVIDE SELF-ZEROING BUILDING PRESSURE SENSOR. COORDINATE EXACT LOCATION

WITH COR. PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE

SENSOR ON 11TH FLOOR ROOF.

8. REMOVE EXISTING HONEYWELL CONTROLS PANEL AND ALL ASSOCIATED COMPONENTS

AFTER ALL POINTS HAVE BEEN INTEGRATED INTO NEW TRIDIUM SYSTEM. THIS SCOPE

SHALL NOT BE EXECUTED UNTIL VERIFICATION THAT NO SYSTEMS ARE RELIANT UPON

THESE COMPONENTS. COORDINATE CLOSELY WITH COR. REMOVE ELECTRIC BACK TO

SOURCE.

PHOTO - B1-A916d TRIDIUM AX

AHU-3 AHU-2

Room

A10002

Stair 1

S*10*1

Fan Room

A10001

NAE-20

NAE-21

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.14

Ib.22

Ib.23

Ib.24

Ib.27

7a

6a

Ib.28

Ib.29

3a

N

Fa

K

OaPa

Eb

1 4

210TH FLR MER

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :5

A

M -2

-1

TENTH FLOOR PENTHOUSE

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M110

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

TENTH FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE

DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-

ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A

FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW

HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. REMOVE EXISTING PNEUMATIC CONTROLS COMPRESSOR AND ASSOCIATED PNEUMATIC

CONTROLS COMPONENTS ONCE VERIFIED THAT NO SYSTEMS ARE RELIANT UPON THESE

COMPONENTS. SHUT COMPRESSOR DOWN FOR 4 WEEKS PRIOR TO REMOVAL FOR

VERIFICATION. COORDINATE CLOSELY WITH COR.

6. REMOVE EXISTING HONEYWELL CONTROLS PANEL AND ALL ASSOCIATED COMPONENTS

AFTER ALL POINTS HAVE BEEN INTEGRATED INTO NEW TRIDIUM SYSTEM. THIS SCOPE

SHALL NOT BE EXECUTED UNTIL VERIFICATION THAT NO SYSTEMS ARE RELIANT UPON

THESE COMPONENTS. COORDINATE CLOSELY WITH COR. REMOVE ELECTRIC BACK TO

SOURCE.

File details come from the government source that posted it. Updated .