The shared document contains floor plans for the Cincinnati VA Medical Center, spanning from the 4th to 10th floors. The architectural drawings are detailed technical schematics prepared by Heapy Engineering and Levin Porter Architects, with each floor plan showing room layouts, room names, equipment locations, and mechanical systems. The plans include specific room designations such as exam rooms, offices, labs, nursing stations, medical service areas, research spaces, psychiatric units, and mechanical equipment rooms. Each floor plan is drawn to a scale of 1/16" = 1'-0" and includes grid coordinates, electrical closets, air handling units (AHUs), and accompanying photographic documentation of electrical and routing equipment. The project number is 539-21-108, with a drawing date of 10/23/2025, and the project is marked as fully sprinklered. The drawings provide a comprehensive view of the medical center's interior spatial organization across multiple floors.
View the file
Other files for this federal contract opportunity
Show all 50
Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
D
D
D
D
1-AHU29
1-AHU28
1-AHU29
1-AHU28
AHU-13
AHU-9
AHU-10
AHU-24
AHU-22
AHU-32
AHU-25
AHU-23
4C2
Mech Room
A456E
Interview
A401 Reception
A400 Dr's Off.
A423A
RAM Lab.
B413B
Stair 4
S*4*4
M. Tlt.
B407
Office
B427
Associate Chief of Staff/Research
B426
CFBRE Off.
B421
Clos.
B425A
Conf.
B425
Adm. Off.
B420B
Tissue Culture
B433A
Mic Rotomy
B435
HSRD Off.
A424D
Stor.
A420
Tlt.
A413A
Tlt.
A410A
D.B.
A457D
Exam
A455
Tlt.
A449A Pharm.
A454
Stair 5
S*4*5
Elec.
A436B
Supp.
A476
Stor.
A436A
Comp. Rm.
A437C
Stor.
A404
Chemo Prep.
A425A
Interview
A402A
Tlt.
A416A Exam Rm. 3
A416
Tlt.
A407A Exam Rm. 4
A407
Med Room
A405
HSRD Office
A422
HSRD Off.
A424A
Dir. Off.
A424B
Common Area
A424C
HSRD Off.
A424G
HSRD Off.
A424F
HSRD Off.
A424E Oncology Pharmacy Sattelite
A425
Elec.
A418A
Stor.
A418
Staff Tlt.
A421
Tlt.
A414A Exam Rm. 7
A414
Exam Rm. 8
A409
Tlt.
A408A
Tlt.
A406A
Waiting
A402B
IRM Storage (Comm)
A445A
KIT.
A475
CL. Lin.
A462
Soil. Util.
A461
Exam
A474 Tlt.
A473A
Tlt.
A471A Exam 5
A471
Tlt.
A470A
Exam 9
A469
Exam 10
A468
Tlt.
A467A
Exam 6
A466
Tlt.
A465A
Exam 2
A464
Tlt.
A464A
Exam
A458C
Stor.
A460
Exam
A458B
Exam
A458A
Sub. Lab.
A453
Exam
A458
Tlt.
A457H Proc.
A457E
Tlt.
A457C
Elec.
A456
S.B.
A457B
Stor.
A457A
GCRC Corridor
A457
Res. Off.
A442
Neuro. Res.
A442A
Chief Rm.
A441
Computer Off.
A440
IRM Network Operation Center
A437
Tlt.
A439A
Staff Physician
B403A
Neuro Office
B439
Comp. Programmer Off.
A439
Office
B437
Microscope Core
B436
Corridor
B429A Sig. Clos.
B416
Electrophoresis Core
B413A
Ram Lab.
B412A
HAC
B409 F. Tlt.
B406
Cold Rm.
B415A
Office
B426A
Comp. Specialist Off.
A431
Service Lobby
A436
Trash Chute
A435
Exam 1
A473
Office
B412C
Comp. Training
A430
Regular E.E.G
B403B
E.E.G. Control & Observation
B403
Copier Room
B437A
IRM Office
A427
Toilet
A446Elec.
A445
Toilet
A446A
Exam
A463
Tlt.
A463A
Freez.
B415B
Elec.
B431
Refrig.
B430
Office
B428
Director's Office
B429B
Tlt.
A474A
Stair 2
S*4*2
Exam Rm. 11
A412
Exam Rm. 12
A411
Social Worker
A422A
Tissue Culture
B412B W. Lab.
B412
Exam Rm. 9
A413
Exam Rm. 10
A410
Exam Rm. 5
A415
Exam Rm. 6
A408
Exam Rm. 1
A417
Exam Rm. 2
A406
Elec.
A424H
HAC
A403
IRM Storage (Hdwr)
A444
HAC
A477
Elec.
A459
Exam 3
A472
Exam 4
A465
Exam 7
A470
Exam 8
A467
Stair 1
S*4*1
Evoked Potential Lab
B438
Elec.
B410
Elec.
B417
HAC
B429
Research Adm. Off.
B420
Auto-Clave / Dishwasher
B408 LAB. Procedure Rm
B411
Stor.
A444A
Corridor
C*4*3
Corridor
C*4*4
Corridor
C*4*1
Corridor
C*4*6
Waiting
A478Interview
A401A
HSRD Off.
A424I
HSRD Off.
A424
Infectious Disease Lab
B414
Office
B415
Non-Hazardous Compounding
B414D
Hazardous Compounding
B414B Ante Room
B414C
Hazardous Storage
B414A
Work Station Area
B414
Corridor
C*4*5
Lab
B432
Reception
A401B
Corridor
C*4*2
Stair 3
S*4*3
Lab.
A457G
Nurse Station
A457F Dr's Off.
A423
NAE-14
NAE-19
TRIDIUM
AX
NAE-22
ABCDEFGHILMOPQRSTU
4a
8a
16a
16.5
17a
17b
19a
J
Lb.2
Lb.1
Kb
Jb
Ib.1
Ib.2
Hb Fb
Nb
PbQbRbSbTb
Mb Lb
16b
10a
Ga
Ib.3
Ib.5
Ib.7
Ib.8
Ib.10 Ib.12
Ib.14
Ib.16
Ib.18
Ib.19
Ib.20
Ib.21
Ib.22
Ib.23
Ib.24
Ib.25
Ib.26
Ib.27
7a
6a
Ib.28
Ib.29
Ib.4
Ib.17
3a Ib.11Ib.6
N
Fa
K
OaPa
Eb
4TH FLOOR PENTHOUSE
G5RE ROUTER BLDG. 1-AH10
4 2 1
S
DP
S
LGR25-1-4 BLD 1 ON 4TH FLR
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager
Cincinnati V.A Medical Center
U.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.
/2
/2
:5 :3
A
M -2
-1
FOURTH FLOOR
10/23/25 GSE WJS
REMEDIATE TEMPERATURE
CONTROLS
1-M104
539-21-108
CINCINNATI, OHIO
2020-05099 01528
SCALE: 1/16" = 1'-0"
FOURTH FLOOR PLAN N
PLAN NOTES
GENERAL NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.
FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.
REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.
2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.
3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW
JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,
WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.
4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.
5. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE
DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-
ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A
FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW
HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.
6. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION
WITH COR.
7. REPLACE BUILDING PRESSURE SENSOR WITH SELF-ZEROING STATIC PRESSURE SENSOR.
PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE SENSOR ON 11TH
FLOOR ROOF.
8. REPLACE EXISTING NIAGARA AX JACE WITH NEW N4 JACE. INTEGRATE ALL EXISTING
CONTROLS INTO NEW SYSTEM.
9. PROVIDE SENSOR TO MONITOR SPACE TEMPERATURE. CRITICAL ALARM SHALL BE SENT
TO ECC IF ROOM REACHES 80 DEGREES (ADJUSTABLE).
10. REMOVE EXISTING PNEUMATIC CONTROLS COMPRESSOR AND ASSOCIATED PNEUMATIC
CONTROLS COMPONENTS ONCE VERIFIED THAT NO SYSTEMS ARE RELIANT UPON THESE
COMPONENTS. SHUT COMPRESSOR DOWN FOR 4 WEEKS PRIOR TO REMOVAL FOR
VERIFICATION. COORDINATE CLOSELY WITH COR.
11. REMOVE EXISTING HONEYWELL CONTROLS PANEL AND ALL ASSOCIATED COMPONENTS
AFTER ALL POINTS HAVE BEEN INTEGRATED INTO NEW TRIDIUM SYSTEM. THIS SCOPE
SHALL NOT BE EXECUTED UNTIL VERIFICATION THAT NO SYSTEMS ARE RELIANT UPON
THESE COMPONENTS. COORDINATE CLOSELY WITH COR. REMOVE ELECTRIC BACK TO
SOURCE.
PHOTO - B1-A436B NAE-14
PHOTO - B1-A456E G5RE ROUTER BLDG1-AH10
PHOTO - B1-A456E NAE-19
PHOTO - B1-A456E NAE-22
PHOTO - B1-A436B TRIDIUM AX
PHOTO - B1-A436B LRG25-1-4 BLD 1 4TH FLR
# DESCRIPTION DATE
1-AHU44
AHU-11
AHU-12
Conferece Room
B523
Bath
A521A
Bath
A520A
Stair 2
S*5*2 Clean Linen
A525
Bath
A501A
Staff Tlt
A505
HAC
A503
Stor
A545A
Supp Clos
A567A
Tlt.
A570A
Tlt.
A571A Stor.
A565A
Tlt.
A573A
Exam 2
A571
Exam 6
A567
Exam 7
A566
Exam 1
A572
Staff Physician
A573
Stor.
A563A
Office
A574
Procedure Room
A557D
Exam Room 4
A557A Surgery Office
A557B
Closet
A554A
Waiting Area
A559
Clerk
A559A
Stor.
A551B
Procedure Room
A557C
Stair 5
S*5*5 Tlt.
A553
Telesurgery Office
A554
Closet
A551A Tlt.
A549A Sig. Clos.
A546A
Adm Asst.
A541
Adm. Asst.
A540
Medical Service
B538
Db. Wtr.
A539
B537
Medical
Service Office Office
B537A
Med Svc
B501
Tlt.
B503A Office
B503
Elec.
A546
Rolling Storage
B525 Closet
B526C
Office
B511 Office
B512
Office
B513
Office
B509
Bath
A508A
Storage
B515A
Closet
B507A Storage
B506
Office
B508
Sig. Clos.
B505G
Tlt.
B505A
Stor.
B521D
S.R. Neg. Pressure
A507
S.R. Neg. Pressure
A511
S.R. Neg. Pressure
A512
Bath
A519A
Exam 4
A569
Exam 5
A568
Bath
A522A S.R.
A522
Bath
A517A Bath
A502A
D.R.
A501
D.R.
A526
Nurse Manager
A528
Elec.
A537A
HAC
A562A
B536
Dispensing
Area
Office
B516
Conference Rm.
B507
Office
B514
Nourishment
A513
D.R.
A502
D.R.
A527
Bath
A510A
Bath
A511A
Elec.
A516
Tlt
A579A
Charting
A504
Work Rm.
A549
Exam
A558
Waiting Area
A550Storage
A524
Bath
A509A
Elec.
A514
Bath
A512A
Bath
A518A
Bath
A523A
Nurse Station
A581 Office
A582
Gurney Storage
A578 Pgm. Supp. Asst.
A575
Clos.
A556
Skin and Wound Care Clinic
A551
Chief Office
B540
Office
B539
IV Prep
B526A IV Buff
B526B
Stor.
B518A
Elec.
B521B
Narc. Vault
B521A
Cart Stor.
B535
Office
B518
Office
B515
S.R. Neg. Pressure
A508
Exam 3
A570
Tele
A561Elec.
A560
Service Lobby
A536Bath
A526A
HAC
A535A
Tr. Ch.
A535
Soil
A562
Storage
B505H
Stair 3
S*5*3
Office
B535C
Exam Room 5
A555
Pain Nurse
A563
Class Rm.
A564
Stor.
A564A
D.R.
A520
D.R.
A521
S.R.
A519
HAC
B521E
Staff Tlt.
B535B
Bath
A527A
S.R.
A510
D.R.
A517
Office
B510
Office
B517
Chief
B522 Cleric
B524
Chief Med. Svc.
A542
Inpatient Therapy
A579
S.R.
A509
Omni Cell
A506
Soil. Util.
A515
HAC
A545
Toilet
A577
Stair 1
S*5*1
Office
B504
Compound Picking
B527 IV Ante-Room
B526
Elec.
B505B
Stor
A544
Dirty Equipment
A537B
A537C
Oxygen
Storage
Equipment Room
Clean Supply
A537D
Work Room
A537F
Storage
A537E
Corridor
C*5*3 Corridor
C*5*4
Corridor
C*5*2
Corridor
C*5*1
Corridor
C*5*5
Unit Dose
B535A
D.R.
A523
D.R.
A518
Bath
A507A
NAE-06
ABCDEFGHILMOPQRSTU
4a
8a
16a
16.5
17a
17b
19a
J
Lb.2
Lb.1
Kb
Jb
Ib.1
Ib.2
Hb Fb
Nb
PbQbRbSbTb
Mb Lb
16b
10a
Ga
Ib.3
Ib.5
Ib.7
Ib.8
Ib.10 Ib.12
Ib.14
Ib.16
Ib.18
Ib.19
Ib.20
Ib.21
Ib.22
Ib.23
Ib.24
Ib.25
Ib.26
Ib.27
7a
6a
Ib.28
Ib.29
Ib.4
Ib.17
3a Ib.11Ib.6
N
Fa
K
OaPa
Eb
5TH FLOOR PENTHOUSE (MER)
S
DP
1 2 4
8 8 8 8
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager
Cincinnati V.A Medical Center
U.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.
/2
/2
:5 :4
A
M -2
-1
FIFTH FLOOR
10/23/25 GSE WJS
REMEDIATE TEMPERATURE
CONTROLS
1-M105
539-21-108
CINCINNATI, OHIO
2020-05099 01528
SCALE: 1/16" = 1'-0"
FIFTH FLOOR PLAN N
PLAN NOTES
GENERAL NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
1. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED
THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.
REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.
2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.
3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW
JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,
WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.
4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.
5. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION
WITH COR.
6. REPLACE BUILDING PRESSURE SENSOR WITH SELF-ZEROING STATIC PRESSURE SENSOR.
PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE SENSOR ON 11TH
FLOOR ROOF.
7. REPLACE EXISTING FAN COIL UNIT PNEUMATIC CONTROLS WITH DDC.
8. REPLACE EXISTING CONVECTOR PNEUMATIC CONTROLS WITH DDC.
9. REPLACE EIXSTING EXHAUST FAN AND ASSOCIATED DAMPER PNEUMATIC CONTROLS
WITH DDC.
10. REPLACE EXISTING ATU PNEUMATIC CONTROLS WITH DDC.
PHOTO - B1-5TH FLR PHOUSE NAE-06
Elec.
A617
Tlt.
A647A
Tlt.
A635
Chief Admn. Asst.
B624
Toilet
B615
Office
B611A
Exam
B612D
Exam
B612C
Tlt.
A624A
Soiled Utility
A616
Stair 2
S*6*2
HAC
A637A
Staff Tlt.
A602
Toilet
A633A
HAC
A674
Stair 5
S*6*5
Meeting Room
A634A
Medical Conf.
A634B
LKRS.
A637B
Tlt.
B605A
Soiled
B619A
Exam
B611B
Exam
B612B
Exam
B612A
Storage
A646A
Phys. Work Rm.
A632D
Conf. Rm.
A603
D.R.
A610
D.R.
A611
Tlt.
A612A
S.R.
A612
Tlt.
A611A
Tlt.
A610A
Tlt.
A609A
Tlt.
A614A Clinical Pat. Support
A613
Tlt.
A619A Elec.
A615
HAC
A606
S.R. (Neg. Pres.)
A607
Storage
A605
Tlt.
A604A
Tlt.
A607A
CL. Supp.
A608
D.R.
A619
S.R.
A620
Tlt.
A621A
Tlt.
A622A
D.R.
A622 S.R. (Neg. Pres.)
A621
D.R.
A623
S.R. (Neg. Pres.)
A624 Tlt.
A623A CL. Supp.
A625
Tlt.
A626A
D.R.
A626 D.R.
A629
Tlt.
A631A
Tlt.
A629A D.R.
A631
Nurse Man.
A601
Trash Chute
A637
Sig. Clos.
A645A Elec.
A645
CL. Lin.
A673
S.R. (Neg. Pres.)
A672
Sterile Supplies
A671
Tlt.
A670ATlt.
A669A
D.R.
A669
D.R.
A668
Tlt.
A668A
Tlt.
A667A
Nurse Man.
A664
S.R. (Neg. Pres.)
A663
Soil. Util.
A662
Elec.
A660 D.R.
A659
Tlt.
A659A
Tlt.
A658A
D.R.
A656S.R. (Neg. Pres.)
A657 Tlt.
A657A
Tlt.
A656A
D.R.
A655 Tlt.
A655A
Tlt.
A654AS.R. (Neg. Pres.)
A654Nurse Station
A653
Tlt.
A651A
D.R.
A649
Tlt.
A649A
Tlt.
A672A
Tlt.
A675A
Waiting Room
A643
HHN Off.
A641
Research Pulmonary Lab.
A640
Medical Conf.
A634C
DB. Wtr.
A639
Pulmonary Func. LAB
B636
Tlt.
B603
Sig. Clos.
B606A
Stor.
B632
Phys.
B628 Chief Phys.
B625
Phys.
B626
Clos.
B625A
Phys.
B622 Elec.
B619B
Elec.
B607A
Stair 3
S*6*3
Exam
B610
Closet
B609A
Exam
B616
Exam
B614
Toilet
B613
Exam
B617
Storage
B605
Tlt.
A620A
Oxygen Storage
A628
D.R.
A604
Off.
B601
S.R. (Neg. Pres.)
A614
Echo.
B604
B606
IV Tech.
Off.
Adm. Asst.
B620
Conf. Room
B623
Phys.
B627
D.R.
A647
S.R.
A609
CL. Lin.
A618
Service Lobby
A632 Equip. Stor.
A646 Nourish.
A648
Elec.
A661
S.R
A670
S.R.
A667
D.R.
A651
D.R.
A658
Elec.
A632E Stair 1
S*6*1
Chief Medical Res.
A642
Ward Stor.
B635
HAC
B634
Stor.
B633 Phys.
B629
Secretary
B618
Social Work Off.
B621
Corridor
C*6*3
Corridor
C*6*2
Corridor
C*6*4
Corridor
C*6*6
Corridor
C*6*1
Corridor
C*6*5
Nurse Conf. Rm.
A675
Office
A676 Nurse Station
A600
Conf. Rm.
B607
Nourish.
A630
Exam
B609
Cl. Supp.
A652
ABCDEFGHILMOPQRSTU
4a
8a
16a
16.5
17a
17b
19a
J
Lb.2
Lb.1
Kb
Jb
Ib.1
Ib.2
Hb Fb
Nb
PbQbRbSbTb
Mb Lb
16b
10a
Ga
Ib.3
Ib.5
Ib.7
Ib.8
Ib.10 Ib.12
Ib.14
Ib.16
Ib.18
Ib.19
Ib.20
Ib.21
Ib.22
Ib.23
Ib.24
Ib.25
Ib.26
Ib.27
7a
6a
Ib.28
Ib.29
Ib.4
Ib.17
3a Ib.11Ib.6
N
Fa
K
OaPa
Eb
S
DP
G5CE ROUTER
BLDG1 6TH FLR
1 2 4
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager
Cincinnati V.A Medical Center
U.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.
/2
/2
:5 :4
A
M -2
-1
SIXTH FLOOR
10/23/25 GSE WJS
REMEDIATE TEMPERATURE
CONTROLS
1-M106
539-21-108
CINCINNATI, OHIO
2020-05099 01528
SCALE: 1/16" = 1'-0"
SIXTH FLOOR PLAN N
PLAN NOTES
GENERAL NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.
FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.
REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.
2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.
3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW
JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,
WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.
4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.
5. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION
WITH COR.
6. PROVIDE SELF-ZEROING BUILDING PRESSURE SENSOR. COORDINATE EXACT LOCATION
WITH COR. PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE
SENSOR ON 11TH FLOOR ROOF.
PHOTO - B1-A632E G5CE ROUTER BLDG1 6TH FLR
Off.
B723
Soil. Util.
A712
Stair 2
S*7*2
Stair 5
S*7*5
Elec.
A728B
Stor.
B719
Stair 3
S*7*3
Bath
A709B
Break Room
A726
Office
A767A
Office #12
A750
S. Office #11A
A749Stor.
A724
Staff Tlt.
A736Trash Chute
A727A
Lockers
A727B
Closet
A728E Group Room
A728
DB Wtr.
A729
Storage
A728C
Soc. Worker
B702
Sensory Therapy Room
A704
Bath
A708A
T.R.
A707
Bath
A706ABath
A707A
S.R.
A706
Ante
A709
T.R.
A708
Exist. Seclusion
A711B
Obser.
A710
Tele.
A713
Bath
A711A
S.R.
A715T.L.T.
A715A
Clean Linen
A716
S.R.
A718
S.R.
A717
Bed Room
A719
Bath
A719A
Bed Room
A722
T.L.T.
A723A
T.L.T.
A722A
Q.R.
A723 Service Elev. Lobby
A727
Laundry
A728A
Bath
A702A Interview Room
A702
Nurse Off.
A701
Clos.
A772Vis. Bath
A771
Office #3
A769
Testing
A770
Staff Office
A767
Office #2
A768
Group #1 (12-20)
A766
Office #5B
A765
Office #5A
A764
Ante
A761
Office #5
A763
Office
A762
HAC
A760
Elec.
A759Elec.
A758
Staff Toilet
A761A
Office #9
A754
Tlt.
A753
Group #2 (10-12)
A751
Stor.
A747
Office #13
A744
Office #14
A743
Storage
A740Sig. Clos.
A734 Elec.
A739
O/T Off.
A731
Social Worker
A728D
Tlt.
B734A
Tlt.
A730ASoc. Worker
A730
Psych. Res.
B734
Social Worker
B733A
Nurse Man.
B703
Off.
B733B
Tlt.
B729A
Stor.
B731Waiting
B705
Signal Closet
B705F
KLT
B730 Wash Room
B728
Tlt.
B726A Off.
B726
Off.
B724 Tlt.
B723A
Tlt.
B722A
Elec.
B720
Off.
B716A
Elec
B706
Staff Tlt.
B705E
Reception
B705C
Break Room
B705D
Office
B708
Off.
B715B
Off.
B714A
Off.
B711
Off.
B714
Nurse Station
A705A
Dining/Group Room
A705
S.R.
A709A
Ex. Group
A720
Nurse Station Work/Conference
A725B
Office
B711A
B712
Tobacco &
Acohol
Research Center
Group Rm.
B713
Off.
B721 Group Room
B725
Group Room
B725B
Stair 1
S*7*1
S. Office #11A
A748
Office #7
A756
Ante
A711
Elec.
A714
Office #8
A755
Stor.
A735A
Occupational Therapy
A732
Intake Coor.
B701
Stat.
B704 Off.
B733
HAC
B732
Off.
B729 Off.
B727
Adm. Asst.
B716B
Off.
B717
HAC
A735 Nurse Station
A725
Office #18
A775
Corridor
C*7*3
Corridor
C*7*6
Corridor
C*7*1
Corridor
C*7*5
Exam Rm.
A776
Chief Nurse Off.
A700
Nurse Station Meds
A725A Office
A741
Training (6)
A746Waiting
A774
Corridor
C*7*4 Corridor
C*7*2
Reception
A773
Copy Rm.
A773A
Office
B710
Office
B709
Office
A742
Office #6
A757
Office #10
A752
Off.
B722
Off.
B715A
ABCDEFGHILMOPQRSTU
4a
8a
16a
16.5
17a
17b
19a
J
Lb.2
Lb.1
Kb
Jb
Ib.1
Ib.2
Hb Fb
Nb
PbQbRbSbTb
Mb Lb
16b
10a
Ga
Ib.3
Ib.5
Ib.7
Ib.8
Ib.10 Ib.12
Ib.14
Ib.22
Ib.23
Ib.24
Ib.27
7a
6a
Ib.28
Ib.29
Ib.4
3a Ib.11Ib.6
N
Fa
K
OaPa
Eb
S
DP
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager
Cincinnati V.A Medical Center
U.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.
/2
/2
:5 :4
A
M -2
-1
SEVENTH FLOOR
10/23/25 GSE WJS
REMEDIATE TEMPERATURE
CONTROLS
1-M107
539-21-108
CINCINNATI, OHIO
2020-05099 01528
SCALE: 1/16" = 1'-0"
SEVENTH FLOOR PLAN
N
PLAN NOTES
GENERAL NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
1. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION
WITH COR.
2. PROVIDE SELF-ZEROING BUILDING PRESSURE SENSOR. COORDINATE EXACT LOCATION
WITH COR. PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE
SENSOR ON 11TH FLOOR ROOF.
AHU-1
Research Lab
A833A
Stor.
A808
Stair 3
S*8*3
Stair 5
S*8*5
Stair 2
S*8*2
Off.
A846C
HAC
A823
Clos.
A825A
Clos.
A826A Stor.
A828
Tlt.
A811B
Off.
A807
Staff Tlt.
A800C
Stor.
A846A
Stor.
A841
HAC
A842
Off.
A832 Corridor
C*8*5
Closet
B802A
Off.
A830
Service Lobby
A829
Elec.
A845
Tlt.
A812A Tlt.
A811A
Group Rm.
A811
Tlt.
A810A
Bath
A814
Off.
A809
Tlt.
A809A
Off.
A813
Off.
A815
Lin. Chute
A816
Elec.
A818
ANT
A817
Group Room #2
A820
Counsel Off.
A819
Off.
A821B
Off.
A821A
Group Room #1
A821 Tlt.
A825B
Off.
A825
Direc. Off.
A826 Trash Chute
A829A
Tech. Off.
A829BCoor. Off.
A827
Psych. Off.
A804 Charting Room
A800B Omnicell
A857A
HAC
A860
Cl. Lin.
A861
Elec.
A858 Off.
A857
Head Nurse Office
A856
Thera. Off.
A855
Shower / Tlt.
A851
Clos.
A849
Lndry
A848 Kit.
A846D
Sig. Clos.
A844
Dermatology
A838
Stat. Off.
A831
Elec.
B818
Electric
B812
Women Bath
A867A
Elec.
A830A
Off.
A803
Exam
A802
Tlt.
A801A
Phys. Off.
A801
QI Research Director
A812
Stair 1
S*8*1 Stor.
A846B Day Room / Dining
A846 Music / Quiet Room
A852
Off.
A862
6 Bed Rm.
A864
6 Bed Rm.
A865
Hndcap S.R.
A867
Off.
A810
Off.
A806
Restroom
A869
Elec.
A859
3 Bed Room
A863
Addict. Ther.
A850
Group Room
A853
Stor.
A840
Corridor
C*8*1
Conf.
A839
Corridor
C*8*3
Corridor
C*8*2
Corridor
C*8*4
Group Room
A868
Nurses Station
A800 Stor.
A800A
Alcohol Research
A833
SPS Storage
B806A
Patient Toilet
B802
Clean Supply
B806
Reception
B803
X-Ray
B804
Soiled Utility
B808
Equipment Mech Room
B807
Locker
B809
Locker
B810 Surgery
B811 Surgery Operatory
B819
Closet
B816A
Soil Util.
B817
Storage
B815 A/O Office
B830
Chief Office
B831
Signals
B813
Open Office
B829
Staff Toilet
B814
Dental Laboratory
B832
Conference/Break Room
B833
Operatory
B828
Operatory
B827
Operatory
B826
Operatory
B825
Opteratory
B823
Operatory
B820
Operatory
B821
Operatory
B822
Waiting
B801
Corridor
C*8*3 Corridor
C*8*1
Corridor
C*8*2
Corridor
C*8*4
Corridor
C*8*5
Special Needs Operatory
B824
Thera Off.
A854
3 Bed Rm
A866
Stor.
A824
Off.
A805
ABCDEFGHILMOPQRSTU
4a
8a
16a
16.5
17a
17b
19a
J
Lb.2
Lb.1
Kb
Jb
Ib.1
Ib.2
Hb Fb
Nb
PbQbRbSbTb
Mb Lb
16b
10a
Ga
Ib.14
Ib.22
Ib.23
Ib.24
Ib.27
7a
6a
Ib.28
Ib.29
3a
N
Fa
K
OaPa
Eb
S
DP
LGR25 8TH FLR
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager
Cincinnati V.A Medical Center
U.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.
/2
/2
:5 :4
A
M -2
-1
EIGHTH FLOOR
10/23/25 GSE WJS
REMEDIATE TEMPERATURE
CONTROLS
1-M108
539-21-108
CINCINNATI, OHIO
2020-05099 01528
SCALE: 1/16" = 1'-0"
EIGHTH FLOOR PLAN N
PLAN NOTES
GENERAL NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.
FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.
REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.
2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.
3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW
JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,
WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.
4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.
5. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION
WITH COR.
6. REPLACE BUILDING PRESSURE SENSOR WITH SELF-ZEROING STATIC PRESSURE SENSOR.
PROVIDE WIRING TO COMMUNICATE WITH NEW REFERENCE PRESSURE SENSOR ON 11TH
FLOOR ROOF.
PHOTO - B1-A830A LGR25 8TH FLR
AHU-8
AHU-7
Stair 2
S*9*2
Elec.
A916D
Clos.
A919C
Adm. Asst.
A920 Psych. Off.
A919A
Psych. Off.
A919B
Clos.
A907 Clos.
A904B
Elec.
A904C
AFGE
A904
Lin.
A918
HAC
A917
Psych. Off.
A922 Chief Psych.
A921
Entry
A938
Toilet
A938B
Toilet
A938D
Sleep 5
A938A Tlt.
A937B
Tlt.
A939B
Tlt.
A937D
Sleep 2
A937C
Elec.
A941B Soiled Utility
A941A
Stair 5
S*9*5
Clean Supply
A942
Tlt.
A939D
Lead Tech./2nd Tech.
A935A
Sleep 3
A939C
Sleep 1
A937A
Break Room
A941
Shower
A939E
Crash Cart
C-9-3A
Bath
A906C
Clos.
A906B Entry
A906A AFGE
A906
AFGE
A905A
Break Room
A909
Office
A908
Vol. Serv. Office
A905
Clos.
A912A
Vol. Serv. Storage
A911
ONA Local 105
A911A Office
A914
Psych. Off.
A902
M. Tlt.
A901
Office
A915
Serv. Lobby
A916
Trash Chute
A915A
Psych. Off.
A901A
F. Tlt.
A946
Electrical Closet
A931A
Sig. Clos.
A929
Psych. Off.
A919
Adm. Asst.
A926
D. Wtr. Mech. Area
A923
Psych. Off.
B907
Clerk
A924
Psych. Off.
B906
Office
B901
Psych. Conf. Rm.
B903
Psych. Lab.
A903B
Psych. Off
A903
HAC
A915B Office
A913
Stor. Rm.
A916A
Res.
B905A
Sdm. Off.
A925
Sleep Phy.
A934
Sleep Nurses/Fellows
A935
Sleep 4
A939AControl Rm.
A940
Tlt.
A909A
Psych.
A904A Psych. Lab.
A903A
Clst.
A941C
Stor.
A918B
Stair 1
S*9*1
Chief Psych. Off.
A927
Corridor
C*8*3
Psych. Off.
B902
Copy Room
B905
Fan Rm.
B904
Stor.
A918A
Chief Office
A944
Corridor
C*9*3
Waiting
A932
Off.
A945
Dir. Off.
A946A Exam 2
A943
Corridor
C*9*2
Exam 1
A933
Corridor
C*9*1
Office
A912
Sleep 6
A938C
NAE-07
NIAGRA
AX
ABCDEFGHILMOPQRSTU
4a
8a
16a
16.5
17a
17b
19a
J
Lb.2
Lb.1
Kb
Jb
Ib.1
Ib.2
Hb Fb
Nb
PbQbRbSbTb
Mb Lb
16b
10a
Ga
Ib.14
Ib.22
Ib.23
Ib.24
Ib.27
7a
6a
Ib.28
Ib.29
3a
N
Fa
K
OaPa
Eb
S
DP
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager
Cincinnati V.A Medical Center
U.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.
/2
/2
:5 :5
A
M -2
-1
NINTH FLOOR
10/23/25 GSE WJS
REMEDIATE TEMPERATURE
CONTROLS
1-M109
539-21-108
CINCINNATI, OHIO
2020-05099 01528
SCALE: 1/16" = 1'-0"
NINTH FLOOR PLAN N
PLAN NOTES
GENERAL NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
1. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED
THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.
REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.
2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.
3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW
JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,
WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.
4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.
5. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION
WITH COR.
6. REPLACE EXISTING NIAGARA AX JACE WITH NEW N4 JACE. INTEGRATE ALL EXISTING
CONTROLS INTO NEW SYSTEM.
7. PROVIDE SELF-ZEROING BUILDING PRESSURE SENSOR. COORDINATE EXACT LOCATION
WITH COR. PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE
SENSOR ON 11TH FLOOR ROOF.
8. REMOVE EXISTING HONEYWELL CONTROLS PANEL AND ALL ASSOCIATED COMPONENTS
AFTER ALL POINTS HAVE BEEN INTEGRATED INTO NEW TRIDIUM SYSTEM. THIS SCOPE
SHALL NOT BE EXECUTED UNTIL VERIFICATION THAT NO SYSTEMS ARE RELIANT UPON
THESE COMPONENTS. COORDINATE CLOSELY WITH COR. REMOVE ELECTRIC BACK TO
SOURCE.
PHOTO - B1-A916d TRIDIUM AX
AHU-3 AHU-2
Room
A10002
Stair 1
S*10*1
Fan Room
A10001
NAE-20
NAE-21
ABCDEFGHILMOPQRSTU
4a
8a
16a
16.5
17a
17b
19a
J
Lb.2
Lb.1
Kb
Jb
Ib.1
Ib.2
Hb Fb
Nb
PbQbRbSbTb
Mb Lb
16b
10a
Ga
Ib.14
Ib.22
Ib.23
Ib.24
Ib.27
7a
6a
Ib.28
Ib.29
3a
N
Fa
K
OaPa
Eb
1 4
210TH FLR MER
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager
Cincinnati V.A Medical Center
U.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.
/2
/2
:5 :5
A
M -2
-1
TENTH FLOOR PENTHOUSE
10/23/25 GSE WJS
REMEDIATE TEMPERATURE
CONTROLS
1-M110
539-21-108
CINCINNATI, OHIO
2020-05099 01528
SCALE: 1/16" = 1'-0"
TENTH FLOOR PLAN N
PLAN NOTES
GENERAL NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE
DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-
ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A
FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW
HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.
2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.
3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW
JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,
WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.
4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.
5. REMOVE EXISTING PNEUMATIC CONTROLS COMPRESSOR AND ASSOCIATED PNEUMATIC
CONTROLS COMPONENTS ONCE VERIFIED THAT NO SYSTEMS ARE RELIANT UPON THESE
COMPONENTS. SHUT COMPRESSOR DOWN FOR 4 WEEKS PRIOR TO REMOVAL FOR
VERIFICATION. COORDINATE CLOSELY WITH COR.
6. REMOVE EXISTING HONEYWELL CONTROLS PANEL AND ALL ASSOCIATED COMPONENTS
AFTER ALL POINTS HAVE BEEN INTEGRATED INTO NEW TRIDIUM SYSTEM. THIS SCOPE
SHALL NOT BE EXECUTED UNTIL VERIFICATION THAT NO SYSTEMS ARE RELIANT UPON
THESE COMPONENTS. COORDINATE CLOSELY WITH COR. REMOVE ELECTRIC BACK TO
SOURCE.
File details come from the government source that posted it. Updated .