Other files for this federal contract opportunity
Other files attached to Z2DA--Remediate Temperature Controls 539-21-108, newest first.
| File |
Type |
Posted |
| Updated Specs Addendum 4.pdf |
PDF |
|
| 1-M105 - FIFTH FLOOR.pdf |
PDF |
|
| 1-M109 - NINTH FLOOR.pdf |
PDF |
|
| 13-M101 - BUILDING 13 FIRST FLOOR.pdf |
PDF |
|
| 64-M100 - BUILDING 64 BASEMENT.pdf |
PDF |
|
| M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17.pdf |
PDF |
|
| REVISED STATEMENT OF BID ITEMS.pdf |
PDF |
|
| ICRA 539.21.108 Patient Areas Level III.pdf |
PDF |
|
| 36C25026B0002 0004.pdf |
PDF |
|
| 1-M104 - FOURTH FLOOR.pdf |
PDF |
|
| M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4.pdf |
PDF |
|
| M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7.pdf |
PDF |
|
| M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24.pdf |
PDF |
|
| M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26.pdf |
PDF |
|
| PG-M101 - PARKING GARAGE 1ST FLOOR PLAN.pdf |
PDF |
|
| ICRA 539.21.108 Mech Rooms Level II.pdf |
PDF |
|
| Change Summary of Specs and Drawings.pdf |
PDF |
|
| 1-M100 - BASEMENT.pdf |
PDF |
|
| 64-M102 - BUILDING 64 SECOND FLOOR.pdf |
PDF |
|
| 64-M103 - BUILDING 64 THIRD FLOOR.pdf |
PDF |
|
| M004 - TRIDIUM ROUTER SCHEDULE.pdf |
PDF |
|
| M701 - GENERAL CRITERIA HONEYWELL CONTROLS REPLNT.pdf |
PDF |
|
| M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5.pdf |
PDF |
|
| M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8.pdf |
PDF |
|
| M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12.pdf |
PDF |
|
| M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21.pdf |
PDF |
|
| M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-29.pdf |
PDF |
|
| Sign in Sheet Remediate Temp.pdf |
PDF |
|
| 1-M103 - THIRD FLOOR.pdf |
PDF |
|
| 1-M110 - TENTH FLOOR PENTHOUSE.pdf |
PDF |
|
| 36C25026B0002 0003.pdf |
PDF |
|
| 36C25026B0002 0002.pdf |
PDF |
|
| 36C25026B0002 0001.docx |
DOCX document |
|
| Attachment XV - 852.219-75 LOS.docx |
DOCX document |
|
| Attachment XIII - RFI Form.pdf |
PDF |
|
| Attachment XVI - Directive 1192.01, Flu.pdf |
PDF |
|
| Attachment IX -RTC BID DWGS 7 2025.1023.pdf |
PDF |
|
| Attachment VII - RTC BID DWGS 5 2025.1023.pdf |
PDF |
|
| Attachment III -RTC BID DWGS 1 2025.1023.pdf |
PDF |
|
| Attachment I - WD OH20250082.pdf |
PDF |
|
| Attachment XVII - ICRA Level 2.pdf |
PDF |
|
| Attachment X - RTC BID DWGS 8 2025.1023.pdf |
PDF |
|
| Attachment V - RTC BID DWGS 3 2025.1023.pdf |
PDF |
|
| Attachment II - CD SPECIFICATION 2025.1023.pdf |
PDF |
|
| 36C25026B0002.docx |
DOCX document |
|
| Attachment XIV - EMR Form.pdf |
PDF |
|
| Attachment XII - J A - Redacted.pdf |
PDF |
|
| Attachment XI - RTC BID DWGS 9 2025.1023.pdf |
PDF |
|
| Attachment VIII - RTC BID DWGS 6 2025.1023.pdf |
PDF |
|
| Attachment IV - RTC BID DWGS 2 2025.1023.pdf |
PDF |
|
Show all 50
Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .