1-M104 - FOURTH FLOOR.pdf

PDF 8 MB Posted

Attached to
Z2DA--Remediate Temperature Controls 539-21-108 Federal contract opportunity
Solicitation number
36C25026B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document is a Fourth Floor Plan architectural drawing for the Cincinnati VA Medical Center, prepared by Heapy Engineering and Levin Porter Architects. The detailed floor plan shows a comprehensive layout of the fourth floor, including numerous medical and administrative spaces such as exam rooms, offices, laboratories, storage areas, corridors, and specialized facilities like an Oncology Pharmacy Satellite, Infectious Disease Lab, and Hazardous Compounding area. The drawing includes technical details like equipment photos of network and control systems (Tridium AX, NAE-14, NAE-19, NAE-22), grid coordinates, and project metadata including project number 539-21-108, drawing date of 1/9/2026, and an addendum dated 01-12-2026. The plan is drawn at a scale of 1/16" = 1'-0" and is marked as "Fully Sprinklered" with Kevin Henderson as the Project Manager.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Remediate Temperature Controls 539-21-108, newest first.
File Type Posted
36C25026B0002 0004.pdf PDF
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4.pdf PDF
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7.pdf PDF
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24.pdf PDF
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26.pdf PDF
PG-M101 - PARKING GARAGE 1ST FLOOR PLAN.pdf PDF
ICRA 539.21.108 Mech Rooms Level II.pdf PDF
Updated Specs Addendum 4.pdf PDF
1-M105 - FIFTH FLOOR.pdf PDF
1-M109 - NINTH FLOOR.pdf PDF
13-M101 - BUILDING 13 FIRST FLOOR.pdf PDF
64-M100 - BUILDING 64 BASEMENT.pdf PDF
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17.pdf PDF
REVISED STATEMENT OF BID ITEMS.pdf PDF
ICRA 539.21.108 Patient Areas Level III.pdf PDF
Sign in Sheet Remediate Temp.pdf PDF
1-M103 - THIRD FLOOR.pdf PDF
1-M110 - TENTH FLOOR PENTHOUSE.pdf PDF
2-M100 - BUILDING 2 BASEMENT.pdf PDF
15-M100 - BUILDING 15 BASEMENT.pdf PDF
M002 - JOHNSON CONTROLS ROUTER SCHEDULE.pdf PDF
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-28.pdf PDF
Change Summary of Specs and Drawings.pdf PDF
1-M100 - BASEMENT.pdf PDF
64-M102 - BUILDING 64 SECOND FLOOR.pdf PDF
64-M103 - BUILDING 64 THIRD FLOOR.pdf PDF
M004 - TRIDIUM ROUTER SCHEDULE.pdf PDF
M701 - GENERAL CRITERIA HONEYWELL CONTROLS REPLNT.pdf PDF
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5.pdf PDF
36C25026B0002 0003.pdf PDF
36C25026B0002 0002.pdf PDF
36C25026B0002 0001.docx DOCX document
Attachment XVI - Directive 1192.01, Flu.pdf PDF
Attachment IX -RTC BID DWGS 7 2025.1023.pdf PDF
Attachment VII - RTC BID DWGS 5 2025.1023.pdf PDF
Attachment VI -RTC BID DWGS 4 2025.1023.pdf PDF
Attachment III -RTC BID DWGS 1 2025.1023.pdf PDF
Attachment I - WD OH20250082.pdf PDF
Attachment XV - 852.219-75 LOS.docx DOCX document
Attachment XIII - RFI Form.pdf PDF
Attachment XIV - EMR Form.pdf PDF
Attachment XII - J A - Redacted.pdf PDF
Attachment XI - RTC BID DWGS 9 2025.1023.pdf PDF
Attachment VIII - RTC BID DWGS 6 2025.1023.pdf PDF
Attachment IV - RTC BID DWGS 2 2025.1023.pdf PDF
Attachment XVII - ICRA Level 2.pdf PDF
Attachment X - RTC BID DWGS 8 2025.1023.pdf PDF
Attachment V - RTC BID DWGS 3 2025.1023.pdf PDF
Attachment II - CD SPECIFICATION 2025.1023.pdf PDF
36C25026B0002.docx DOCX document
Show all 50

Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

D

D

1-AHU29

1-AHU28

1-AHU29

1-AHU28

AHU-13

AHU-9

AHU-10

AHU-24

AHU-22

AHU-32

AHU-25

AHU-23

Mech Room

A456E

Interview

A401 Reception

A400 Dr's Off.

A423A

RAM Lab.

B413B

Stair 4

S*4*4

M. Tlt.

B407

Office

B427

Associate Chief of Staff/Research

B426

CFBRE Off.

B421

Clos.

B425A

Conf.

B425

Adm. Off.

B420B

Tissue Culture

B433A

Mic Rotomy

B435

HSRD Off.

A424D

Stor.

A420

Tlt.

A413A

Tlt.

A410A

D.B.

A457D

Exam

A455

Tlt.

A449A Pharm.

A454

Stair 5

S*4*5

Elec.

A436B

Supp.

A476

Stor.

A436A

Comp. Rm.

A437C

Stor.

A404

Chemo Prep.

A425A

Interview

A402A

Tlt.

A416A Exam Rm. 3

A416

Tlt.

A407A Exam Rm. 4

A407

Med Room

A405

HSRD Office

A422

HSRD Off.

A424A

Dir. Off.

A424B

Common Area

A424C

HSRD Off.

A424G

HSRD Off.

A424F

HSRD Off.

A424E Oncology Pharmacy Sattelite

A425

Elec.

A418A

Stor.

A418

Staff Tlt.

A421

Tlt.

A414A Exam Rm. 7

A414

Exam Rm. 8

A409

Tlt.

A408A

Tlt.

A406A

Waiting

A402B

IRM Storage (Comm)

A445A

KIT.

A475

CL. Lin.

A462

Soil. Util.

A461

Exam

A474 Tlt.

A473A

Tlt.

A471A Exam 5

A471

Tlt.

A470A

Exam 9

A469

Exam 10

A468

Tlt.

A467A

Exam 6

A466

Tlt.

A465A

Exam 2

A464

Tlt.

A464A

Exam

A458C

Stor.

A460

Exam

A458B

Exam

A458A

Sub. Lab.

A453

Exam

A458

Tlt.

A457H Proc.

A457E

Tlt.

A457C

Elec.

A456

S.B.

A457B

Stor.

A457A

GCRC Corridor

A457

Res. Off.

A442

Neuro. Res.

A442A

Chief Rm.

A441

Computer Off.

A440

IRM Network Operation Center

A437

Tlt.

A439A

Staff Physician

B403A

Neuro Office

B439

Comp. Programmer Off.

A439

Office

B437

Microscope Core

B436

Corridor

B429A Sig. Clos.

B416

Electrophoresis Core

B413A

Ram Lab.

B412A

HAC

B409 F. Tlt.

B406

Cold Rm.

B415A

Office

B426A

Comp. Specialist Off.

A431

Service Lobby

A436

Trash Chute

A435

Exam 1

A473

Office

B412C

Comp. Training

A430

Regular E.E.G

B403B

E.E.G. Control & Observation

B403

Copier Room

B437A

IRM Office

A427

Toilet

A446Elec.

A445

Toilet

A446A

Exam

A463

Tlt.

A463A

Freez.

B415B

Elec.

B431

Refrig.

B430

Office

B428

Director's Office

B429B

Tlt.

A474A

Stair 2

S*4*2

Exam Rm. 11

A412

Exam Rm. 12

A411

Social Worker

A422A

Tissue Culture

B412B W. Lab.

B412

Exam Rm. 9

A413

Exam Rm. 10

A410

Exam Rm. 5

A415

Exam Rm. 6

A408

Exam Rm. 1

A417

Exam Rm. 2

A406

Elec.

A424H

HAC

A403

IRM Storage (Hdwr)

A444

HAC

A477

Elec.

A459

Exam 3

A472

Exam 4

A465

Exam 7

A470

Exam 8

A467

Stair 1

S*4*1

Evoked Potential Lab

B438

Elec.

B410

Elec.

B417

HAC

B429

Research Adm. Off.

B420

Auto-Clave / Dishwasher

B408 LAB. Procedure Rm

B411

Stor.

A444A

Corridor

C*4*3

Corridor

C*4*4

Corridor

C*4*1

Corridor

C*4*6

Waiting

A478Interview

A401A

HSRD Off.

A424I

HSRD Off.

A424

Infectious Disease Lab

B414

Office

B415

Non-Hazardous Compounding

B414D

Hazardous Compounding

B414B Ante Room

B414C

Hazardous Storage

B414A

Work Station Area

B414

Corridor

C*4*5

Lab

B432

Reception

A401B

Corridor

C*4*2

Stair 3

S*4*3

Lab.

A457G

Nurse Station

A457F Dr's Off.

A423

NAE-14

NAE-19

TRIDIUM

AX

NAE-22

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.3

Ib.5

Ib.7

Ib.8

Ib.10 Ib.12

Ib.14

Ib.16

Ib.18

Ib.19

Ib.20

Ib.21

Ib.22

Ib.23

Ib.24

Ib.25

Ib.26

Ib.27

7a

6a

Ib.28

Ib.29

Ib.4

Ib.17

3a Ib.11Ib.6

N

Fa

K

OaPa

Eb

4TH FLOOR PENTHOUSE

G5RE ROUTER BLDG. 1-AH10

4 2 1

S

DP

S

LGR25-1-4 BLD 1 ON 4TH FLR

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/9

/2

:0

:1

P

M -2

-1

FOURTH FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M104

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

FOURTH FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE

DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-

ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A

FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW

HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

6. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

7. REPLACE BUILDING PRESSURE SENSOR WITH SELF-ZEROING STATIC PRESSURE SENSOR.

PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE SENSOR ON 11TH

FLOOR ROOF.

8. REPLACE EXISTING NIAGARA AX JACE WITH NEW N4 JACE. INTEGRATE ALL EXISTING

CONTROLS INTO NEW SYSTEM.

9. PROVIDE SENSOR TO MONITOR SPACE TEMPERATURE. CRITICAL ALARM SHALL BE SENT

TO ECC IF ROOM REACHES 80 DEGREES (ADJUSTABLE).

10. REMOVE EXISTING PNEUMATIC CONTROLS COMPRESSOR AND ASSOCIATED PNEUMATIC

CONTROLS COMPONENTS ONCE VERIFIED THAT NO SYSTEMS ARE RELIANT UPON THESE

COMPONENTS. SHUT COMPRESSOR DOWN FOR 4 WEEKS PRIOR TO REMOVAL FOR

VERIFICATION. COORDINATE CLOSELY WITH COR.

11. REMOVE EXISTING HONEYWELL CONTROLS PANEL AND ALL ASSOCIATED COMPONENTS

AFTER ALL POINTS HAVE BEEN INTEGRATED INTO NEW TRIDIUM SYSTEM. THIS SCOPE

SHALL NOT BE EXECUTED UNTIL VERIFICATION THAT NO SYSTEMS ARE RELIANT UPON

THESE COMPONENTS. COORDINATE CLOSELY WITH COR. REMOVE ELECTRIC BACK TO

SOURCE.

12. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED

THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

PHOTO - B1-A436B NAE-14

PHOTO - B1-A456E G5RE ROUTER BLDG1-AH10

PHOTO - B1-A456E NAE-19

PHOTO - B1-A456E NAE-22

PHOTO - B1-A436B TRIDIUM AX

PHOTO - B1-A436B LRG25-1-4 BLD 1 4TH FLR

# DESCRIPTION DATE

1 ADDENDUM 4 01-12-2026

Sheets
1-M100 - BASEMENT
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
15-M100 - BUILDING 15 BASEMENT
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M701 - GENERAL CRITERIA, HONEYWELL CONTROLS REPLACEMENT
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN

File details come from the government source that posted it. Updated .