REVISED STATEMENT OF BID ITEMS.pdf

PDF 85 KB Posted

Attached to
Z2DA--Remediate Temperature Controls 539-21-108 Federal contract opportunity
Solicitation number
36C25026B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document is a Statement of Bid Items for a temperature controls remediation project at the Department of Veterans Affairs Medical Center in Cincinnati, Ohio. The solicitation includes five bid items with progressive complexity and integration options for temperature control systems. Bid Item 1 is the base bid for complete remediation work, which includes electrical work and must be completed within 730 calendar days after receiving the Notice to Proceed. Subsequent bid items (2-5) offer alternative configurations by selectively removing integration requirements for Automated Logic Routers and Metasys Routers with the new Tridium system, allowing flexibility in system integration and potential cost adjustments based on available funding. The government intends to award the contract on Bid Item 1, but may select alternative bid items if funding constraints exist, with a predetermined priority order for bid item selection.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Remediate Temperature Controls 539-21-108, newest first.
File Type Posted
Sign in Sheet Remediate Temp.pdf PDF
1-M103 - THIRD FLOOR.pdf PDF
1-M110 - TENTH FLOOR PENTHOUSE.pdf PDF
2-M100 - BUILDING 2 BASEMENT.pdf PDF
15-M100 - BUILDING 15 BASEMENT.pdf PDF
M002 - JOHNSON CONTROLS ROUTER SCHEDULE.pdf PDF
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-28.pdf PDF
Updated Specs Addendum 4.pdf PDF
1-M105 - FIFTH FLOOR.pdf PDF
1-M109 - NINTH FLOOR.pdf PDF
13-M101 - BUILDING 13 FIRST FLOOR.pdf PDF
64-M100 - BUILDING 64 BASEMENT.pdf PDF
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17.pdf PDF
ICRA 539.21.108 Patient Areas Level III.pdf PDF
Change Summary of Specs and Drawings.pdf PDF
1-M100 - BASEMENT.pdf PDF
64-M102 - BUILDING 64 SECOND FLOOR.pdf PDF
64-M103 - BUILDING 64 THIRD FLOOR.pdf PDF
M004 - TRIDIUM ROUTER SCHEDULE.pdf PDF
M701 - GENERAL CRITERIA HONEYWELL CONTROLS REPLNT.pdf PDF
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5.pdf PDF
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8.pdf PDF
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12.pdf PDF
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21.pdf PDF
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-29.pdf PDF
36C25026B0002 0004.pdf PDF
1-M104 - FOURTH FLOOR.pdf PDF
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4.pdf PDF
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7.pdf PDF
36C25026B0002 0003.pdf PDF
36C25026B0002 0002.pdf PDF
36C25026B0002 0001.docx DOCX document
Attachment XIV - EMR Form.pdf PDF
Attachment XII - J A - Redacted.pdf PDF
Attachment XI - RTC BID DWGS 9 2025.1023.pdf PDF
Attachment VIII - RTC BID DWGS 6 2025.1023.pdf PDF
Attachment IV - RTC BID DWGS 2 2025.1023.pdf PDF
Attachment XV - 852.219-75 LOS.docx DOCX document
Attachment XIII - RFI Form.pdf PDF
Attachment XVII - ICRA Level 2.pdf PDF
Attachment X - RTC BID DWGS 8 2025.1023.pdf PDF
Attachment V - RTC BID DWGS 3 2025.1023.pdf PDF
Attachment II - CD SPECIFICATION 2025.1023.pdf PDF
36C25026B0002.docx DOCX document
Attachment XVI - Directive 1192.01, Flu.pdf PDF
Attachment IX -RTC BID DWGS 7 2025.1023.pdf PDF
Attachment VII - RTC BID DWGS 5 2025.1023.pdf PDF
Attachment VI -RTC BID DWGS 4 2025.1023.pdf PDF
Attachment III -RTC BID DWGS 1 2025.1023.pdf PDF
Attachment I - WD OH20250082.pdf PDF
Show all 50

Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF BID ITEM(S)

A. BID ITEM 1, BASE BID ALL WORK: Work shall include all labor, materials, equipment and supervision required to complete the project REMEDIATE TEMPERATURE CONTROLS in the Hospital, at the

Department of Veterans Affairs Medical Center, 3200 Vine Street, Cincinnati, Ohio. Work includes electrical work, as described on the technical specifications and drawings.

It is the intent of the Government that award will be made on BID ITEM 1 (BASE BID); however, should the bids exceed the funds available, award may be made on BID ITEM 2, 3, 4 or 5 in that order of priority, based on available funding. Bidders should bid on each item listed.

All phases of work including close out documents shall be complete within 730 calendar days after receipt of

Notice to Proceed.

Total Bid Item No. 1: $_________________________ (Lump Sum)

B. BID ITEM 2: All work in BID ITEM 1, BASE BID, except DELETE all labor and materials associated with integrating Automated Logic Routers into the new Tridium system thru JACEs. In lieu of using JACEs, the Automated Logic Routers shall be integrated via over IP.

All phases of work including close out documents shall be complete within 730 calendar days after receipt of

Total Bid Item No. 2: $_________________________ (Lump Sum)

C. BID ITEM 3: All work in BID ITEM 2, except DELETE all labor and materials associated with integrating Metasys Routers into the new Tridium system thru JACEs. In lieu of using JACEs, the

Metasys Routers shall be integrated via over IP.

All phases of work including close out documents shall be complete within 730 calendar days after receipt of

Total Bid Item No. 3: $_________________________ (Lump Sum)

D. BID ITEM 4: All work in BID ITEM 3, except DELETE all labor and materials associated with integrating

Automated Logic Routers into the new Tridium system. ALC system shall stand-alone under this alternate.

All phases of work including close out documents shall be complete within 730 calendar days after receipt of

Total Bid Item No. 4: $_________________________ (Lump Sum)

E. BID ITEM 5: All work in BID ITEM 4, except DELETE all labor and materials associated with integrating Metasys Routers into the new Tridium system. Metasys system shall stand alone under this alternate.

All phases of work including close out documents shall be complete within 730 calendar days after receipt of Notice to Proceed.

Total Bid Item No. 5: $_________________________ (Lump Sum)

File details come from the government source that posted it. Updated .