64-M100 - BUILDING 64 BASEMENT.pdf
PDF 733 KB Posted
- Attached to
- Z2DA--Remediate Temperature Controls 539-21-108 Federal contract opportunity
- Solicitation number
- 36C25026B0002
About this file
This document is an architectural floor plan for Building 64's basement at the Cincinnati VA Medical Center. The detailed blueprint is for a construction project, dated January 9, 2026, with Project No. 539-21-108 and Drawing No. 2020-05099. The basement floor plan is drawn at a scale of 1/16" = 1'-0" and shows a comprehensive layout of various rooms and spaces, including service areas such as telephone service, oxygen storage, patient toilets, exam rooms, offices, and a boiler room. The plan is fully sprinklered and was prepared by Heapy Engineering with Levin Porter Architects as the consulting architect/engineer of record, with Kevin Henderson listed as the project manager. An addendum was issued on January 12, 2026, indicating ongoing modifications to the original design.
View the file
Other files for this federal contract opportunity
Show all 50
Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
H I J
K
L
N
O
P
QR
1 2 3 4 5 6 78 9 10 12 13 15 16 17 18 19 20 21 22 2324 14
TELE.
SERVICE
OXYGEN
STORAGE
GROUP
RM 2
C*B*8
CORRIDOR
PAT. TLT.
S.H. EXAM
S.T. EXAM 047
S.T. DR.
S*B*4
STAIR #4
S.T. OFF.
STOR.
MEDIA
CENTER
BOILER RM.
NAE-09
NAE-30
2 5
1 2 4
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager
Cincinnati V.A Medical Center
U.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.
/9
/2
:0
:3
P
M -2
-1
BUILDING 64 BASEMENT
10/23/25 GSE WJS
REMEDIATE TEMPERATURE
CONTROLS
64-M100
539-21-108
CINCINNATI, OHIO
2020-05099 01528
SCALE: 1/16" = 1'-0"
BASEMENT FLOOR PLAN
N
PLAN NOTES
GENERAL NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
1. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED
THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.
REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.
2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.
3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW
JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,
WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.
4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.
5. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE
DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-
ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A
FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW
HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES
# DESCRIPTION DATE
1 ADDENDUM 4 01-12-2026
| Sheets |
| 1-M100 - BASEMENT |
| 1-M103 - THIRD FLOOR |
| 1-M104 - FOURTH FLOOR |
| 1-M105 - FIFTH FLOOR |
| 1-M109 - NINTH FLOOR |
| 1-M110 - TENTH FLOOR PENTHOUSE |
| 2-M100 - BUILDING 2 BASEMENT |
| 13-M101 - BUILDING 13 FIRST FLOOR |
| 15-M100 - BUILDING 15 BASEMENT |
| 64-M100 - BUILDING 64 BASEMENT |
| 64-M102 - BUILDING 64 SECOND FLOOR |
| 64-M103 - BUILDING 64 THIRD FLOOR |
| M002 - JOHNSON CONTROLS ROUTER SCHEDULE |
| M004 - TRIDIUM ROUTER SCHEDULE |
| M701 - GENERAL CRITERIA, HONEYWELL CONTROLS REPLACEMENT |
| PG-M101 - PARKING GARAGE FIRST FLOOR PLAN |
File details come from the government source that posted it. Updated .