About this file

This document is an architectural floor plan drawing for the Cincinnati VA Medical Center's basement level, prepared by Heapy Engineering and Levin Porter Architects. The detailed floor plan shows a comprehensive layout of the basement, with numerous labeled rooms and spaces including mechanical rooms, storage areas, electrical rooms, medical storage spaces, restrooms, offices, and various specialized areas such as a Pharmacy Storage, BioMed Work Area, Controlled Substance Program Manager office, and EMS offices. The drawing is dated 1/9/2026, with Project No. 539-21-108, and includes multiple photographic details of electrical equipment and control panels. The plan is fully sprinklered and includes grid coordinates, room designations, and specific notations for mechanical and electrical infrastructure. An addendum was issued on 01-12-2026, indicating potential recent modifications to the original plan.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Remediate Temperature Controls 539-21-108, newest first.
File Type Posted
Updated Specs Addendum 4.pdf PDF
1-M105 - FIFTH FLOOR.pdf PDF
1-M109 - NINTH FLOOR.pdf PDF
13-M101 - BUILDING 13 FIRST FLOOR.pdf PDF
64-M100 - BUILDING 64 BASEMENT.pdf PDF
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17.pdf PDF
REVISED STATEMENT OF BID ITEMS.pdf PDF
ICRA 539.21.108 Patient Areas Level III.pdf PDF
36C25026B0002 0004.pdf PDF
1-M104 - FOURTH FLOOR.pdf PDF
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4.pdf PDF
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7.pdf PDF
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24.pdf PDF
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26.pdf PDF
PG-M101 - PARKING GARAGE 1ST FLOOR PLAN.pdf PDF
ICRA 539.21.108 Mech Rooms Level II.pdf PDF
Change Summary of Specs and Drawings.pdf PDF
64-M102 - BUILDING 64 SECOND FLOOR.pdf PDF
64-M103 - BUILDING 64 THIRD FLOOR.pdf PDF
M004 - TRIDIUM ROUTER SCHEDULE.pdf PDF
M701 - GENERAL CRITERIA HONEYWELL CONTROLS REPLNT.pdf PDF
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5.pdf PDF
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8.pdf PDF
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12.pdf PDF
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21.pdf PDF
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-29.pdf PDF
Sign in Sheet Remediate Temp.pdf PDF
1-M103 - THIRD FLOOR.pdf PDF
1-M110 - TENTH FLOOR PENTHOUSE.pdf PDF
36C25026B0002 0003.pdf PDF
36C25026B0002 0002.pdf PDF
36C25026B0002 0001.docx DOCX document
Attachment XV - 852.219-75 LOS.docx DOCX document
Attachment XIII - RFI Form.pdf PDF
Attachment XVI - Directive 1192.01, Flu.pdf PDF
Attachment IX -RTC BID DWGS 7 2025.1023.pdf PDF
Attachment VII - RTC BID DWGS 5 2025.1023.pdf PDF
Attachment VI -RTC BID DWGS 4 2025.1023.pdf PDF
Attachment III -RTC BID DWGS 1 2025.1023.pdf PDF
Attachment I - WD OH20250082.pdf PDF
Attachment XVII - ICRA Level 2.pdf PDF
Attachment X - RTC BID DWGS 8 2025.1023.pdf PDF
Attachment V - RTC BID DWGS 3 2025.1023.pdf PDF
Attachment II - CD SPECIFICATION 2025.1023.pdf PDF
36C25026B0002.docx DOCX document
Attachment XIV - EMR Form.pdf PDF
Attachment XII - J A - Redacted.pdf PDF
Attachment XI - RTC BID DWGS 9 2025.1023.pdf PDF
Attachment VIII - RTC BID DWGS 6 2025.1023.pdf PDF
Attachment IV - RTC BID DWGS 2 2025.1023.pdf PDF
Show all 50

Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

D

D

D

AHU-21

AHU-27

AHU-26

AHU-17

AHU-19

Office

A0022

Freezer

A0010

Mech. Room

A005D

Pest Control

A005C

Gas Stor.

A005B

Gas Stor.

A005A

HAC

A004DM. Tlt.

A004C

Narc. Vault

A001C

Gross Specimen Storage

A004G

Chief Office

A0017A

Office

A0013

Freezer

A0015

Freezer

A0007

Freezer

A0008

Office

A0016

Hazard Chem. Stor.

A007B

Soil Linen

A002

Off.

A045A

Chief Police Service

A046A

Storage

A042

Coding Department

A045

Clerk Office

B022A

Authoriz. Clerk

B007A

Elec. Office

B001A

Elec.

B001D

Elec.

A019

Ref. Eq.

B020

C&P

B012

Library

B015

Soil. Linen

B016

Elec.

B016A

Engineering Office

B018

Stair

A017A

Eng. Stor.

B019

M. Tlt.

C006

F. Tlt.

C007

Tlt.

A025

F. Tlt.

A026B

Off.

C005C

Hrng Aid Repair

C031

Exam

C024

Toilet

C016

Office

C036

Ent. Minor

C022

Speech

C030

Aud Booth

C039

Aud Booth

C039a Aud Booth

C037a

Aud Booth

C037

Aud Booth

C038

Aud. booth

C038a

Aud Booth

C040a

Aud Booth

C040

Exam

C025

Clean Supplies

C026

Exam

C027

Off.

C033

Office

C035

F. Tlt.

A004E

Corridor

C*B*13

Mech. Rm

A013B

Mech. Stor.

A013

Office

C041

Comp. & Pension

B014

BioMed Stor.

B006A

Storage

B017B

Storage

B017A

Lock smith

B021A Elec. Shop

B001B

Stor.

B007B Lead, Voucher C&P Clerks

B007

Elec.

A022A

Fitness Center

B011

Eng. Stor.

A023A

Office

A0001

Stair 1

S*B*1

Office

C002C

Office

C043 Office

C042

Library

B017

A/C

B014A

Office

A022B

Toilet

C017

Off.

A040

Storage

A041

EMS Super Off.

A031C

Chief EMS Off.

A031B

A031E

Controlled

Substance

Program Manager

Tele.

A025A

Non-Res. Lounge

A026

HAC

A027

Locker Room

A026A

Viewing Room

A004 Alc. Vault

A001B

Storage

A004F

Service Lobby

A010

Ref. Equip. Rm.

A013A

A021

Receiving &

Breakout

Stor.

A007A

Elec.

A001D

Drug Stor.

A001A

Shred Rm.

A011Forms Rm.

A013D

PM&R Stor.

A018

Stor.

A016

Elec.

A003

Tele. Equip. Rm.

A035

Fire Alarm Control

B019A

Subsistence

A022

A020

Supply

Storage

A014C

Canteen

Stor.Office

A014B

Locksmith

B021

Mail Rm.

B022

Elec. Shop

B001

Super. Fee Service

B006B

Tele.

B008C

Sig

B008B

Corridor

C*B*6

Stair 7

S*B*7

BIOMED STORAGE

B010

Fan Rm.

A028

Pharmacy Stor.

C005

Elevator Equipment Room

C010A

Storage

C019

Exam

C023

Stor.

C028

Hrng Aid Fitting

C032

Exam

C029

Stair 9

S*B*9

Adm. Asst.

A046

Elec.

A032E

Clothing Rm.

A033B

Elec.

A032F

Tlt.

A044

Canteen Stor.

A030

Soil Lin

A032G

Office

A033J

Office

A033D

Break Room

A032A

Biomedical Eng.

B005A

BioMed Work Area

B006

Office

A047B

Asst.

A047A

Off.

A031F

Case Man.

A031D

Chief

A047C

Office

C014

M&R Stor.

B008A

F. Tlt.

B008

IRM Storage

A034

Supply Warehouse

A033C

Storage

A033G

Office

A047F

Office

A047E

PBS Storage

C009A

Office

A033H

Chief EMS Office

A031

EMS Storage

A032

Mechanical Room

C015

Stor.

A022C Stor.

A021A

Elev. Mech. Rm

A043

Stair 6

S*B*6

Medical Record Stor.

C002

Pharm Cache Rm.

C009

EMS Off.

A031A

Stair 5

S*B*5

EMS Cart Rm.

A033E

Dry Goods/Paper Storage

A036

Transformer Room

A023

Autopsy

A004B

Stair 4

S*B*4

Stair 2

S*B*2

Stair 3

S*B*3

Office

C002A

Mechanical Room

A001f

Supply Warehouse

A001

Mechanical Room

C003

Ground Crew

B023

Supply

B023A Ground Crew Ofice

B024A

Ground Crew

B024

Electric Switchgear

C003A

Mech. Stor

C010

Mech.

C013

Nurse

C018

Workroom

C020

Sig.

C034

Silver Rcvry.

C004

Off.

C005B

Telephone Triage

C002B

Canteen Storage

C009B

Elec. Rm.

C008

Corridor

C*B*3

Mechanical Room

C003B

Health Information Management

A047

Loading Dock

A017

Electrical Closet

A0004

Stair 11

S*B*11

Dietetics Kitchen

A0011

Electric Closet

A0005

Gen. Stor.

A033

Distribution

A014

Nuclear Stor.

A015

Corridor

C*B*2

Crawl Space

CS*B*026

Crawl Space

CS*B*025

Closet

C010B Warehouse Receiving&Check-in

A014A

Corridor

C*B*8

Corridor

C*B*1

Emergency Generator

B013

Corridor

C*B*9

Audiology Waiting

C011

BioMed Rep. Shop

B004

Stair 4

S*B*4

Biomedical Engineering

B005

M. Tlt.

B010

BioMed Chief

B001C

Electric Room

B013A

Transformer Room B013B

NAE-23

NAE-29

NAE-02

NAE-03

NAE-04

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.3

Ib.5

Ib.7

Ib.8

Ib.10 Ib.12

Ib.14

Ib.16

Ib.18

Ib.19

Ib.20

Ib.21

Ib.22

Ib.23

Ib.24

Ib.25

Ib.26

Ib.27

7a

6a

Ib.28

Ib.29

Ib.4

Ib.17

3a Ib.11Ib.6

N

Fa

K

OaPa

Eb

NAE-01

(STACKED)

VA MEDICAL CENTER LGE

2 14

AHU-35

AHU-20

S

DP

(STACKED)

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/9

/2

:0

:0

P

M -2

-1

BASEMENT

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M100

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

BASEMENT FLOOR PLAN

PLAN NOTES

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED

THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

6. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE

DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-

ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A

FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW

HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

7. REMOVE EXISTING PNEUMATIC CONTROLS COMPRESSOR AND ASSOCIATED PNEUMATIC

CONTROLS COMPONENTS ONCE VERIFIED THAT NO SYSTEMS ARE RELIANT UPON THESE

COMPONENTS. SHUT COMPRESSOR DOWN FOR 4 WEEKS PRIOR TO REMOVAL FOR

VERIFICATION. COORDINATE CLOSELY WITH COR.

8. REMOVE EXISTING HONEYWELL CONTROLS PANEL AND ALL ASSOCIATED COMPONENTS

AFTER ALL POINTS HAVE BEEN INTEGRATED INTO NEW TRIDIUM SYSTEM. THIS SCOPE

SHALL NOT BE EXECUTED UNTIL VERIFICATION THAT NO SYSTEMS ARE RELIANT UPON

THESE COMPONENTS. COORDINATE CLOSELY WITH COR. REMOVE ELECTRIC BACK TO

SOURCE.

9. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

10. PROVIDE SELF-ZEROING BUILDING PRESSURE SENSOR. COORDINATE EXACT LOCATION

WITH COR. PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE

SENSOR ON 11TH FLOOR ROOF.

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

N

PHOTO - B1-B019A NAE-1

PHOTO - B1-B019A NAE-2

PHOTO - B1-B019A NAE-3

PHOTO - B1-C003 NAE-4

PHOTO - B1-B013B NAE-23

6 PHOTO - B1-C015 NAE-29

PHOTO - B1-C013 VA MEDICAL CENTER LGE

# DESCRIPTION DATE

1 ADDENDUM 4 01-12-2026

Sheets
1-M100 - BASEMENT
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
15-M100 - BUILDING 15 BASEMENT
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M701 - GENERAL CRITERIA, HONEYWELL CONTROLS REPLACEMENT
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN

File details come from the government source that posted it. Updated .