1-M109 - NINTH FLOOR.pdf

PDF 2 MB Posted

Attached to
Z2DA--Remediate Temperature Controls 539-21-108 Federal contract opportunity
Solicitation number
36C25026B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document is a ninth floor architectural floor plan for the Cincinnati VA Medical Center, prepared by Heapy Engineering and Levin Porter Architects. The detailed blueprint shows a comprehensive layout of the floor, including numerous room types such as psychological offices, sleep rooms, administrative spaces, toilets, storage areas, break rooms, electrical closets, and corridors. The drawing includes a grid system, room labels, and technical annotations, with the project number 539-21-108 and a project date of 1/9/2026. The plan is marked as fully sprinklered and includes a small technical photograph of equipment in the bottom right corner, with an addendum noted on 01-12-2026. The floor plan is drawn to a scale of 1/16" = 1'-0" and is part of construction documents for the U.S. Department of Veterans Affairs.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Remediate Temperature Controls 539-21-108, newest first.
File Type Posted
Sign in Sheet Remediate Temp.pdf PDF
1-M103 - THIRD FLOOR.pdf PDF
1-M110 - TENTH FLOOR PENTHOUSE.pdf PDF
2-M100 - BUILDING 2 BASEMENT.pdf PDF
15-M100 - BUILDING 15 BASEMENT.pdf PDF
M002 - JOHNSON CONTROLS ROUTER SCHEDULE.pdf PDF
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-28.pdf PDF
Updated Specs Addendum 4.pdf PDF
1-M105 - FIFTH FLOOR.pdf PDF
13-M101 - BUILDING 13 FIRST FLOOR.pdf PDF
64-M100 - BUILDING 64 BASEMENT.pdf PDF
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17.pdf PDF
REVISED STATEMENT OF BID ITEMS.pdf PDF
ICRA 539.21.108 Patient Areas Level III.pdf PDF
Change Summary of Specs and Drawings.pdf PDF
1-M100 - BASEMENT.pdf PDF
64-M102 - BUILDING 64 SECOND FLOOR.pdf PDF
64-M103 - BUILDING 64 THIRD FLOOR.pdf PDF
M004 - TRIDIUM ROUTER SCHEDULE.pdf PDF
M701 - GENERAL CRITERIA HONEYWELL CONTROLS REPLNT.pdf PDF
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5.pdf PDF
M904 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-8.pdf PDF
M905 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-12.pdf PDF
M907 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-21.pdf PDF
M911 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-29.pdf PDF
36C25026B0002 0004.pdf PDF
1-M104 - FOURTH FLOOR.pdf PDF
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4.pdf PDF
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7.pdf PDF
36C25026B0002 0003.pdf PDF
36C25026B0002 0002.pdf PDF
36C25026B0002 0001.docx DOCX document
Attachment XIV - EMR Form.pdf PDF
Attachment XII - J A - Redacted.pdf PDF
Attachment XI - RTC BID DWGS 9 2025.1023.pdf PDF
Attachment VIII - RTC BID DWGS 6 2025.1023.pdf PDF
Attachment IV - RTC BID DWGS 2 2025.1023.pdf PDF
Attachment XV - 852.219-75 LOS.docx DOCX document
Attachment XIII - RFI Form.pdf PDF
Attachment XVII - ICRA Level 2.pdf PDF
Attachment X - RTC BID DWGS 8 2025.1023.pdf PDF
Attachment V - RTC BID DWGS 3 2025.1023.pdf PDF
Attachment II - CD SPECIFICATION 2025.1023.pdf PDF
36C25026B0002.docx DOCX document
Attachment XVI - Directive 1192.01, Flu.pdf PDF
Attachment IX -RTC BID DWGS 7 2025.1023.pdf PDF
Attachment VII - RTC BID DWGS 5 2025.1023.pdf PDF
Attachment VI -RTC BID DWGS 4 2025.1023.pdf PDF
Attachment III -RTC BID DWGS 1 2025.1023.pdf PDF
Attachment I - WD OH20250082.pdf PDF
Show all 50

Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

AHU-8

AHU-7

Stair 2

S*9*2

Elec.

A916D

Clos.

A919C

Adm. Asst.

A920 Psych. Off.

A919A

Psych. Off.

A919B

Clos.

A907 Clos.

A904B

Elec.

A904C

AFGE

A904

Lin.

A918

HAC

A917

Psych. Off.

A922 Chief Psych.

A921

Entry

A938

Toilet

A938B

Toilet

A938D

Sleep 5

A938A Tlt.

A937B

Tlt.

A939B

Tlt.

A937D

Sleep 2

A937C

Elec.

A941B Soiled Utility

A941A

Stair 5

S*9*5

Clean Supply

A942

Tlt.

A939D

Lead Tech./2nd Tech.

A935A

Sleep 3

A939C

Sleep 1

A937A

Break Room

A941

Shower

A939E

Crash Cart

C-9-3A

Bath

A906C

Clos.

A906B Entry

A906A AFGE

A906

AFGE

A905A

Break Room

A909

Office

A908

Vol. Serv. Office

A905

Clos.

A912A

Vol. Serv. Storage

A911

ONA Local 105

A911A Office

A914

Psych. Off.

A902

M. Tlt.

A901

Office

A915

Serv. Lobby

A916

Trash Chute

A915A

Psych. Off.

A901A

F. Tlt.

A946

Electrical Closet

A931A

Sig. Clos.

A929

Psych. Off.

A919

Adm. Asst.

A926

D. Wtr. Mech. Area

A923

Psych. Off.

B907

Clerk

A924

Psych. Off.

B906

Office

B901

Psych. Conf. Rm.

B903

Psych. Lab.

A903B

Psych. Off

A903

HAC

A915B Office

A913

Stor. Rm.

A916A

Res.

B905A

Sdm. Off.

A925

Sleep Phy.

A934

Sleep Nurses/Fellows

A935

Sleep 4

A939AControl Rm.

A940

Tlt.

A909A

Psych.

A904A Psych. Lab.

A903A

Clst.

A941C

Stor.

A918B

Stair 1

S*9*1

Chief Psych. Off.

A927

Corridor

C*8*3

Psych. Off.

B902

Copy Room

B905

Fan Rm.

B904

Stor.

A918A

Chief Office

A944

Corridor

C*9*3

Waiting

A932

Off.

A945

Dir. Off.

A946A Exam 2

A943

Corridor

C*9*2

Exam 1

A933

Corridor

C*9*1

Office

A912

Sleep 6

A938C

NAE-07

NIAGRA

AX

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.14

Ib.22

Ib.23

Ib.24

Ib.27

7a

6a

Ib.28

Ib.29

3a

N

Fa

K

OaPa

Eb

S

DP

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/9

/2

:0

:2

P

M -2

-1

NINTH FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M109

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

NINTH FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE

DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-

ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A

FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW

HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

6. REPLACE EXISTING NIAGARA AX JACE WITH NEW N4 JACE. INTEGRATE ALL EXISTING

CONTROLS INTO NEW SYSTEM.

7. PROVIDE SELF-ZEROING BUILDING PRESSURE SENSOR. COORDINATE EXACT LOCATION

WITH COR. PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE

SENSOR ON 11TH FLOOR ROOF.

8. REMOVE EXISTING HONEYWELL CONTROLS PANEL AND ALL ASSOCIATED COMPONENTS

AFTER ALL POINTS HAVE BEEN INTEGRATED INTO NEW TRIDIUM SYSTEM. THIS SCOPE

SHALL NOT BE EXECUTED UNTIL VERIFICATION THAT NO SYSTEMS ARE RELIANT UPON

THESE COMPONENTS. COORDINATE CLOSELY WITH COR. REMOVE ELECTRIC BACK TO

SOURCE.

PHOTO - B1-A916d TRIDIUM AX

# DESCRIPTION DATE

1 ADDENDUM 4 01-12-2026

Sheets
1-M100 - BASEMENT
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
15-M100 - BUILDING 15 BASEMENT
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M701 - GENERAL CRITERIA, HONEYWELL CONTROLS REPLACEMENT
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN

File details come from the government source that posted it. Updated .