64-M103 - BUILDING 64 THIRD FLOOR.pdf
PDF 865 KB Posted
- Attached to
- Z2DA--Remediate Temperature Controls 539-21-108 Federal contract opportunity
- Solicitation number
- 36C25026B0002
About this file
This document is a third-floor architectural plan for Building 64 at the Cincinnati VA Medical Center. The blueprint is a detailed construction document prepared by Heapy Engineering and Levin Porter Architects, with Kevin Henderson as the project manager. The plan is dated January 9, 2026, with project number 539-21-108 and drawing number 2020-05099 01528, and includes an addendum dated January 12, 2026. The drawing is scaled at 1/16" = 1'-0" and indicates the floor is fully sprinklered. The complex floor plan shows an intricate layout of rooms and spaces, with multiple grid lines and detailed mechanical and architectural elements typical of a medical facility renovation or construction project.
View the file
Other files for this federal contract opportunity
Show all 50
Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H I J
K
L
N
O
P
QR
1 2 3 4 5 6 78 9 10 12 13 15 16 17 18 19 20 21 22 2324 14
NAE-31
1 2
D
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager
Cincinnati V.A Medical Center
U.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.
/9
/2
:0
:3
P
M -2
-1
BUILDING 64 THIRD FLOOR
10/23/25 GSE WJS
REMEDIATE TEMPERATURE
CONTROLS
64-M103
539-21-108
CINCINNATI, OHIO
2020-05099 01528
SCALE: 1/16" = 1'-0"
THIRD FLOOR PLAN
N
PLAN NOTES
GENERAL NOTES
A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
# DESCRIPTION DATE
1 ADDENDUM 4 01-12-2026
1. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED
THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.
REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.
2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.
3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW
JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,
WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.
| Sheets |
| 1-M100 - BASEMENT |
| 1-M103 - THIRD FLOOR |
| 1-M104 - FOURTH FLOOR |
| 1-M105 - FIFTH FLOOR |
| 1-M109 - NINTH FLOOR |
| 1-M110 - TENTH FLOOR PENTHOUSE |
| 2-M100 - BUILDING 2 BASEMENT |
| 13-M101 - BUILDING 13 FIRST FLOOR |
| 15-M100 - BUILDING 15 BASEMENT |
| 64-M100 - BUILDING 64 BASEMENT |
| 64-M102 - BUILDING 64 SECOND FLOOR |
| 64-M103 - BUILDING 64 THIRD FLOOR |
| M002 - JOHNSON CONTROLS ROUTER SCHEDULE |
| M004 - TRIDIUM ROUTER SCHEDULE |
| M701 - GENERAL CRITERIA, HONEYWELL CONTROLS REPLACEMENT |
| PG-M101 - PARKING GARAGE FIRST FLOOR PLAN |
File details come from the government source that posted it. Updated .