M004 - TRIDIUM ROUTER SCHEDULE.pdf
PDF 4 MB Posted
- Attached to
- Z2DA--Remediate Temperature Controls 539-21-108 Federal contract opportunity
- Solicitation number
- 36C25026B0002
About this file
This document is a construction drawing for a Tridium Router Schedule at the Cincinnati VA Medical Center, prepared by Heapy Engineering and Levin Porter Architects. The project (No. 539-21-108) involves VA construction documents for temperature controls, specifically a fully sprinkled system. The drawing was issued with Addendum 4 on 01-12-2026, and the project manager is noted as Kevin Henderson. The document includes a revision schedule table showing multiple technical specification modifications, indicating ongoing design updates for the VA facility's router and control system infrastructure.
View the file
Other files for this federal contract opportunity
Show all 50
Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P ro je ct
N o.
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager
Cincinnati V.A Medical Center
U.S. Department of Veterans Affairs
F
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.
/9
/2
:0
:4
P
M -2
-1
TRIDIUM ROUTER SCHEDULE
10/23/25 GSE WJS
REMEDIATE TEMPERATURE
CONTROLS
M004
539-21-108
CINCINNATI, OHIO
ALL
2020-05099 01528
# DESCRIPTION DATE
1 ADDENDUM 4 01-12-2026
| Sheets |
| 1-M100 - BASEMENT |
| 1-M103 - THIRD FLOOR |
| 1-M104 - FOURTH FLOOR |
| 1-M105 - FIFTH FLOOR |
| 1-M109 - NINTH FLOOR |
| 1-M110 - TENTH FLOOR PENTHOUSE |
| 2-M100 - BUILDING 2 BASEMENT |
| 13-M101 - BUILDING 13 FIRST FLOOR |
| 15-M100 - BUILDING 15 BASEMENT |
| 64-M100 - BUILDING 64 BASEMENT |
| 64-M102 - BUILDING 64 SECOND FLOOR |
| 64-M103 - BUILDING 64 THIRD FLOOR |
| M002 - JOHNSON CONTROLS ROUTER SCHEDULE |
| M004 - TRIDIUM ROUTER SCHEDULE |
| M701 - GENERAL CRITERIA, HONEYWELL CONTROLS REPLACEMENT |
| PG-M101 - PARKING GARAGE FIRST FLOOR PLAN |
File details come from the government source that posted it. Updated .