Attachment VIII - RTC BID DWGS 6 2025.1023.pdf

PDF 18 MB Posted

Attached to
Z2DA--Remediate Temperature Controls 539-21-108 Federal contract opportunity
Solicitation number
36C25026B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

These architectural floor plan drawings depict the Cincinnati VA Medical Center's first three floors, prepared by Heapy Engineering and Levin Porter Architects for the U.S. Department of Veterans Affairs. The project number is 539-21-108, with a drawing date of 10/23/2025. The floor plans are comprehensive, detailed schematic drawings showing room-by-room layouts for each floor, including room names, numbers, and specific functional areas such as medical examination rooms, offices, administrative spaces, surgical areas, laboratories, patient rooms, and support facilities. Each floor plan includes multiple mechanical, electrical, and circulation spaces, with notations for stairs, corridors, and specialized medical zones. The drawings are fully sprinkled and marked as construction documents, with specific project areas noted as "under construction" and associated VA project numbers referenced.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Remediate Temperature Controls 539-21-108, newest first.
File Type Posted
Sign in Sheet Remediate Temp.pdf PDF
1-M103 - THIRD FLOOR.pdf PDF
1-M110 - TENTH FLOOR PENTHOUSE.pdf PDF
2-M100 - BUILDING 2 BASEMENT.pdf PDF
15-M100 - BUILDING 15 BASEMENT.pdf PDF
M002 - JOHNSON CONTROLS ROUTER SCHEDULE.pdf PDF
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-28.pdf PDF
Updated Specs Addendum 4.pdf PDF
1-M105 - FIFTH FLOOR.pdf PDF
1-M109 - NINTH FLOOR.pdf PDF
13-M101 - BUILDING 13 FIRST FLOOR.pdf PDF
64-M100 - BUILDING 64 BASEMENT.pdf PDF
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17.pdf PDF
REVISED STATEMENT OF BID ITEMS.pdf PDF
ICRA 539.21.108 Patient Areas Level III.pdf PDF
36C25026B0002 0004.pdf PDF
1-M104 - FOURTH FLOOR.pdf PDF
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4.pdf PDF
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7.pdf PDF
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24.pdf PDF
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26.pdf PDF
PG-M101 - PARKING GARAGE 1ST FLOOR PLAN.pdf PDF
ICRA 539.21.108 Mech Rooms Level II.pdf PDF
Change Summary of Specs and Drawings.pdf PDF
1-M100 - BASEMENT.pdf PDF
64-M102 - BUILDING 64 SECOND FLOOR.pdf PDF
64-M103 - BUILDING 64 THIRD FLOOR.pdf PDF
M004 - TRIDIUM ROUTER SCHEDULE.pdf PDF
M701 - GENERAL CRITERIA HONEYWELL CONTROLS REPLNT.pdf PDF
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5.pdf PDF
36C25026B0002 0003.pdf PDF
36C25026B0002 0002.pdf PDF
36C25026B0002 0001.docx DOCX document
Attachment XIV - EMR Form.pdf PDF
Attachment XII - J A - Redacted.pdf PDF
Attachment XI - RTC BID DWGS 9 2025.1023.pdf PDF
Attachment IV - RTC BID DWGS 2 2025.1023.pdf PDF
Attachment XV - 852.219-75 LOS.docx DOCX document
Attachment XIII - RFI Form.pdf PDF
Attachment XVI - Directive 1192.01, Flu.pdf PDF
Attachment IX -RTC BID DWGS 7 2025.1023.pdf PDF
Attachment VII - RTC BID DWGS 5 2025.1023.pdf PDF
Attachment VI -RTC BID DWGS 4 2025.1023.pdf PDF
Attachment III -RTC BID DWGS 1 2025.1023.pdf PDF
Attachment I - WD OH20250082.pdf PDF
Attachment XVII - ICRA Level 2.pdf PDF
Attachment X - RTC BID DWGS 8 2025.1023.pdf PDF
Attachment V - RTC BID DWGS 3 2025.1023.pdf PDF
Attachment II - CD SPECIFICATION 2025.1023.pdf PDF
36C25026B0002.docx DOCX document
Show all 50

Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

D

D

D

D

D

AHU-36

C1E

Food Service

A128

Corridor

C*1*20

Pharmacist Counselor

C165

Care Coordination

C1013A

Pharmacist Counselor

C1034

Office

C1040

Clinical Pharm.

C1014

RN

C1015

Office

C171

RN

C194

Tlt.

C1039

Elec.

C126

Stair 2

S*1*2S.W. Off.

A118

S.W. Off.

A117

Adm. Asst.

A114A

Risk Management

A115

Sec. & Waiting

A114

Director Public Affairs Office

A113A

QA Manager

A113

Chief of Staff

A108

Adm Asst.

A112

Med Staff Coor.

A112A Clos

A102A

Chief Office

A168

F. Tlt.

A161

HAC

A160 Nursing Lounge

A158

Tlt.

A155A

Pub. Tlt.

A147B

Tlt.

A158A

Soil. Util.

A157

PCMM Coordinator

A146A

Secl.

A152 Tlt

C119EOff.

C119C

Lkrs.

C119D

Off.

C119B

Stor

C104B

Stor.

C119H Armory

C119G Evidence

C119F

Holding

C119I

Exam

C115

Off.

C116D

Holding

C119K

Exam

C110

Toilet

B111 Tele Clos

B107A

Office

B105

Elec.

B103A

Exam

B115

HAC

A133

Stor

B114A

Walk-In Ref.

A127D

Walk-In Ref.

A127C

Elec.

A126C

Off.

B131

Off.

B127

Stor.

B137A

Electrical Closet

B141

Stair 3

S*1*3

Sig

B124B

Tele.

B124A

Off.

B134

Group Rm.

B137

Closet

B163F

Chief

B163J

Chaplain

B163K

Chaplain

B163L

B143

Physical

Therapy/Occupational Therapy

Audiology

C141

SVC. Officer

B148A

SVC. Officer

B148

SVC. Officer

B149A SVC. Officer

B147

Waiting Room

B150

Stor.

B150A

Stair 7

S*1*7

Exam

C112

Entry

C151A

Exam

C1041

Exam

C1026

Stor.

C192

Tele.

C190

HAC

C188

Exam

C157

Exam

C156

Tlt.

C174 Exam

C172 Nutrition

C170

Exam

C197

Exam

C1019

Exam

C1044

Neg. Press.

C1045

Exam

C1047

Neg. Press.

C1049

Elec.

C1055 Exam

C1051Ante

C1053

Exam

C1052

Exam

C1050

Exam

C1048

Exam

C1046

Exam

C1025

Exam

C1023

Exam

C1021

Exam

C1028

Exam

C1003

Exam

C1001

Exam

C199

Storage

C195

Exam

C1030

Exam

C175

Exam

C198

Exam

C179

Exam

C177

Exam

C181

Exam

C189

Exam

C1004

Exam

C1000

Exam

C1008

Exam

C1006

Storage

C162D

Storage

C162H

Compund

C140A

Agent Cashier

C162E

Office

C121

Exam

C122C

Heart Exam 3

A150

Restroom

A149AHeart Exam 1

A148

Heart Exam 2

A149

Clos.

A140A

Eligibility Off.

A140

Signal

C128

Off.

C130A

Exam

C130B

Tele.

C127

SVC. Officer

B150B

Triage

C120

Decon Trailer

A147E

HAC

C105

Tele

A119A

Pizza Shop

A131

Stockroom

B101A

Receiving

C134G

Physician Office

A171

Alcove

C111

Corridor

C101

F. Tlt.

C146

Work Area

C169A

Work Rm.

C1013

Work Area

C1038A

Work St.

C173

Intake

C196

Storage

B132A

Office

B125A

Office

B125B

Office

C1032

Office

C1011

Off.

C134D

Off.

C134E

Procedure

C134F

Adm. Asst.

C134B

Waiting

C125

Office

C122B

Director's Office

A107

Agent Cashier

C162F

Elec.

A111A

Cl. Stor.

A147D

Stair 9

S*1*9

Office

A103

Office

A104

Clos

A105A

Associate Dir. Office

A106

HAC

A111

F. Tlt.

A125

AACOS

A124

Clos

A139 F. Tlt.

A139A Personal Health

C132A Social Work SVC

C130

Secl.

A154 Employee I.D.

C119A

Interview Room

C119J

Exam

C107

Exam

C108

PEC

C116B

Exam Room

C104

Tlt

C104A

Exam

C113

Clerk

C102

Stair 6

S*1*6

F. Tlt.

C123

Employee Health

C122AM. Tlt.

C124

Off.

C130C

Nurse Pract.

A144B

Nurse Pract.

A144C

Off.

C130D

Break Room

C151

HAC

C1043

Women's Lockers

C1033A

F. Tlt.

C1033B

Vending

A134 Office

B103

B163G

Chap. Clin.

Pastoral Education

Off.

B128 B163E

Blessed

Sacrament

Conference

B163D

Men's Lockers

C1033C

Audiology Clinic

B123 Tlt.

B124

Entry

A158B

On Call

A155

Phys.

A165

Phys.

A163

Phys.

A162

Public Affairs

A118A

Off.

B135

Exam

C178

Office

C153

Exam

C182

Tlt.

C160

Exam

C163

Office

C162

Office

C161

Agent Cashier

C162G

Off.

C129

Quality Assurance

A123

Dry Storage

A127B Service Lobby

A126HAC

A126B Trash Chute

A126A

Decedent Affairs

A144

Storage

C135A

Voluntary Service

C137A

Sec.

C137

Voluntary Service Office

B162C

F. Tlt.

B104

Mech.

B101B

Stair 5

S*1*5 Squad Stor.

A146

Quality Manager

A146B

Conference Room

C122

Waiting Room

C103

Cl. Lin.

A147C

Kit.

B152

Exam

C1029

Meds

C1027

Exam

C1007

Corridor

C*1*17

Exam

C1024

Exam

C1022

Exam

C1020

Exam

C1018

Exam

C185

Corridor

C*1*16

Meds

C183

Corridor

C*1*23

Exam

C158

Exam

C159

Exam

C191

Exam

C180

Office

C152

Voluntary Service

C147

Soiled Utility

C1063

Elec.

A143

Sig.

A141A

ATM

C150

Chief Off.

A151

Oxygen

B140

Office

C164

Waiting Area

C100

Conf. Room

A144A

Person. Hlth.

C132B

Office

C166 Info

C166A

PEC

C116A

Linen

C186

Office

C154 Exam

C155

Volunteer Office

A1038

Transport

C135

Storage

B114

Off.

B130

Off.

B129

Stor

A120

Staff Dir. Asst.

A119

Stor.

A173

Phys.

A172

M. Tlt.

A174

Pharmacy

C140B

Consult

C125A

Dispensing

C125B

Secure Dispensing

C133

Vault

C143

Corridor

C*1*14

Off.

C134A

Elec.

B155A

Elec.

B155

Storage

B153

SVC. Officer

B149

Corridor

C*1*19

Tele.

C1059

Neg. Press.

C1061 Stor.

C1057

Stor.

B127A Chancel

B163A

Mens Restroom

Clos.

C163A

Work Area

C164A

Canteen Dining

A130

Vestibule

C144

Mech.

C149

Clerical

B102A

Stair 8

S*1*8

Social Worker

C1037

Sec. Chief of Staff

A109

Adm Asst.

A110

Chief Soc. Work

A115A

Asst Chief Social Work

A116

Dir. Conference Room

A102

Phys.

A164

Nurse Manager

A166

Prog. Asst.

A169

Stair 1

S*1*1

Dry Stor.

A127A

Personnel Health

A139B

Retail Store

B101

Clerical

B102

SCI Pharmacy

B108 Office

B106

Stair 4

S*1*4

Exam

B112 Waiting Area

B118

Stor

B113

Exam

B117

Secretary

B119

Group Room

B132B

Sig.

A147A

Minor Surgery

A153

Emergency

A147 F. Tlt.

C118

M. Tlt.

C117

Elec.

C109

PEC

C116C

PEA

C106

Exam

C114

Exam

C122D

Stair 10

S*1*10

Storage

B157

Off.

C134C

Pharmacy Specialist

B156 Elec.

C184

Elec.

C176 Clinical Pharm.

C168

Vestry

B163BNave

B163

B163H

Chaplain

Assistant

Stor

B163C

PIV Registrar

B156A

Pain School

B156B

Procedure

C187

Exam

C1002

Office

C1010

Procedure

C1009

Clinicians Break Rm.

C1033

Stor.

B151L

Recreation

B151

M. Tlt.

C1033D

Procedure

C1054

Office

C1005

Office

C1005A

Blood Draw Rm.

C193

Tlt.

C1012

Reception

C167

RN

C169

PEC

C116E

PEC

C116H

Closet

C119L

PEC

C116F

Stair 11

S*1*11

Entry

C-1-10L

Corridor

C*1*11

Corridor

C*1*3

Secretary Office

A105

Corridor

C*1*9

Corridor

C*1*21

Waiting

A170

Corridor

C*1*7

Corridor

C*1*10

Corridor

C*1*13

Reception

C1036

Corridor

C*1*18

RN

C1038

Corridor

C*1*15

Adm. Asst.

B125

Corridor

C*1*12

Waiting Room

C145

Pharmacist Counselor

C145

PIV Registrar

C116G

Police

C119

RN Intake

B139

Stor.

B137B Corridor

C*1*8

Reception

B162A Storage

B161

Corridor

C*1*1

Waiting

B162

Physician/Exam

B160

Social Work

B159

NP / Exam

B158

Neuropsychology

B146

Speech Pathology

B144

Corridor

C*1*6

Speech Pathology

B145

Vestibule

A1001A

HAC

A1028

Volunteer Office

A1039Desk

A175C

Men's Restroom

A121

Water Treatment

A101B

Volunteer Storage

A1036

Volunteer Lounge

A1037

Consult/Conference

A1027

Office

A1034

Office

A1033

Office

A1026 Office

A1032

Shared Office

A1030

Office

A1031

Office

A1021

Equipment Repair

A1019

Staff Lounge

A1018

Staff Toilet

A1017

Signal Closet

A1016

Electric Room

A1015

Mens Locker

A1014

Womens Locker

A1013 Clean Supply

A1022

Corridor

A1012

Clean Linen

A1011

Soiled Holding

A1008

Meds/Nutrition

A1010

Exam Room

A1025

Patient Toilet

A1009 Patient Toilet

A1005

Isolation One

A1004 Isolation Two

A1006

SPS Storage

A1023

Staff Toilet

A1024

Volunteer

A1035

Corridor

A1020

Patient Waiting

A1002

Treatment

A1003

Nurse Station

A1007

Corridor

C*1*22

Pharmacy

C140

Waiting Room

C100D

Corridor

C*1*4

Occ. Therapy

B132

Kit. Multi-Purpose

B133

Electric Room

B013A

Electric Room

B013A

Corridor

A1001

Corridor

C*1*5

Corridor

C*1*2

Wrk. St.

C1042

Office

B110

Waiting

C116

Chief Nurse Office

A167

Exam

B107

SCI Social Worker

B109

Changing Room-MRI

C1035

Staff Dir. Asst.

A119C

Program Assistant

C1017

KIT.

A127

NAE-28

Elec.

A159

NAE-12

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.3

Ib.5

Ib.7

Ib.8

Ib.10 Ib.12

Ib.14

Ib.16

Ib.18

Ib.19

Ib.20

Ib.21

Ib.22

Ib.23

Ib.24

Ib.25

Ib.26

Ib.27

7a

6a

Ib.28

Ib.29

Ib.4

Ib.17

3a Ib.11Ib.6

N

Fa

K

OaPa

Eb

VA 1ST FLR SPINAL LGR25 1 2 4

S

DP

DP

DP 8

5 2 4

DP7 54

DP

LGR25-1-1 HEMO 1ST FLR

2 4

DP

DP 8

DP 8

DP 8

1 2 4

AREA UNDER CONSTRUCTION

VA PROJECT # 539-19-101

AREA UNDER CONSTRUCTION

VA PROJECT # 539-21-115

AREA UNDER CONSTRUCTION

VA PROJECT # 539-20-102

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:0

:3

A

M -2

-1

FIRST FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M101

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

FIRST FLOOR PLAN

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

N

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED

THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

6. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

7. REPLACE BUILDING PRESSURE SENSOR WITH SELF-ZEROING STATIC PRESSURE SENSOR.

PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE SENSOR ON 11TH

FLOOR ROOF.

8. PROVIDE SELF-ZEROING BUILDING PRESSURE SENSOR. COORDINATE EXACT LOCATION

WITH COR. PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE

SENSOR ON 11TH FLOOR ROOF.

PHOTO - B1-B107A VA LGR25 1ST FLR SPINAL

PHOTO - B1-A143 NAE-12

PHOTO - B1-A159 NAE-28

PHOTO - B1-A1016 LGR25-1-1 HEMO 1ST FLR

# DESCRIPTION DATE

AHU-15

Pat Rm. Pressure

A283

Reading Room

A258

Stair 2

S*2*2

SCI Exam

A215A

Staff Tlt.

A214 PT Storage

A215

HAC

A213

Stor.

A218A

Elec.

A212Light Box Room

A215B

Therapy Supervisor

A222

Elec.

A225B

Soil.

A278

Soiled Utility

A299

Stor.

C213

Break Rm.

C2038

Oxygen Storage

A221

Pat. Rm.

A266B Ultrasound

A265

Tlt.

A260A

Chief Radiology

A260

Adm.

A259

Off.

A262

Reading Room

A262A

Viewing

A256

Tlt.

A253B

Student Off.

A251

Off.

A267

M. Lkrs.

A270

Off.

A268

Staff Lounge

A269

Tlt.

A270A

Tlt.

A271A

Patient Toilet

A249C Off.

A298 Meds.

A277

Pat. Rm.

A291

Pat. Rm.

A290 Pat. Rm. Neg. Pressure

A289

Pat Rm. Neg. Pressure

A284

Storage

A249A

Trans.

A248B

Tlt.

A248A Elec.

A246B

Reading Room

A245

Compressor Room

A222D

Office

A230

HAC

A225C

Shower

A227

Dressing Rm.

A227B

Office

A232

Office

A231

G.P. Radiography

A242 Control

A243

Lab

B211A

Anatomic Pathology Gross Room

B215

ISO

B210D

ISO

B210E

Elec.

B206

Off.

B207A

Cytology

B216

Special Staining

B217

Histology Processing

B218

Supervisor

B219

Pathology Off.

B209

Break Room

B210

Tele.

B210A

Operatory

B225 Dental Hygeine

B230

Oral Surg.

B231

Dental X Ray Room

B232

Tele.

B221C

Off.

B233A Stor.

B233B

Lab

B234B

Chief Off.

C200C

Hot Lab

C212

Tlt.

C248

Stor.

C245 Off.

C241

Off.

C240

Off.

C242

Off.

C243

Off.

B234D

Lab

B234C

Cancer Registry

B234E

Chief

B234F

Elec.

C209

I.V. Prep Rm.

C207

Tele.

C208

Closet

C216R

Tlt.

C216Q

Vestibule

C216M

Tlt.

C214A

CT Scanner

C214B

Waiting

C218

Pat. Rm.

A292

Clean Linen

C216C

Scope Wash

C216A

Off.

C229B Clos

C229E

Stair

C229R

Exam

C2009

Exam

C2013

Exam

C2015

Exam

C2017

Exam

C2019

Soil

C2037

Tlt.

C2027

Exam

C2023

Staff Tlt.

C2035

Tlt.

C2041 Exam

C2039

Exam

C2047

Exam

C2049

Exam

C2051

Exam

C2053

Exam

C2055

Tele.

C220

Lockers

C223

Womens

C2001

Lab Lounge

C224

Elec.

C222

Women's Restroom

C223A

Stair 10

S*2*10

Office

C2059

Signal

C2057

Storage

C232

Cold Stor.

C229P

Off.

C229H

Off.

C229G

Lin

C2036

Exam

C2081

Exam

C2080

Exam

C2069

Stor.

C2014

Exam

C2074

Exam

C2072

Exam

C2076

Exam

C2016

Stor.

C2012

Exam

C2011

HAC

A254

Stor

A255

Control

A252A

Digital Radiography

A252

Ante

A235A

HAC

C2008

Equip Wash

A222B Lounge

A226

Grieve/ Consult.

A293

Pat Rm. Neg. Pressure

A285

Waiting

C201

Control Room

C204EUptake Prep Bay

C204A

Control

A246A

Control

A249B

TB/ MYC Lab

B210B

Elec.

B233C

EKG Rm.

C247

Exam

C246

Sec.

C229A

Files

C229F

Blood Draw

C230

Pat. Rm.

A288

Pat. Rm

A287

Pat. Rm. Neg. Pressure

A286

Hydrotheraphy

A216

Reading Room

A264

Tlt.

C217

Corridor

C*2*17

Off.

B207B

Equipment Storage and Testing

A228A

Histology

B220

Utility Room

B229A

Pat. Room

A281

Pat. Room

A280RN Manager

A273

Stair 9

S*2*9

Rehab Care Line

A205

Man Rehab Care Line

A206

Staff

A207

Occupational Therapy

A208

Exam

C2045

Office

A208A

EMG Lab

A209

EMG Lab

A209A

Stor.

A210A

Physical Ther. Supervisor

A218

Elec.

A217A

Dressing Rm.

A203A

Dispatch Area

A236A

Lab

B211

Cold Rm.

B211B Tele.

B222

Sig. Clos.

B221

Sec.

B224

Signal Closet

A239

Speech Pathlgy.

A204

M. Tlt.

A236

F. Lkrs.

A271

Tlt.

A276A

Tlt.

C204F

CAT Scan Room

C204

Uptake Prep Room

C204C

Uptake Area

C204B

PET/CT Scanner

C204D

HAC

C239

Sterile Supply

C216L

Break Rm.

C238

Exam

C2071

Intake

C2010

Storage

C2067

Exam

C2018

Exam

C2077

Exam

C2052

Exam

C2073

Exam

C2054

Exam

C2075

Exam

C2021

Soiled Ut.

C229O

Conference Rm.

C236

HAC

C234

Storage

C235

Off.

C237 Prep Mon

C216K

C211

Bone

Density Lab

Stor.

C216P

Gamma Camera

C210

Work Rm.

C203

Gamma Camera

C205

Elec.

A253A

Prep Rm.

C214

Control

C215

Elec.

C2004

Mechanical

C232A

Tlt.

C228B

Tele

C229L

Waiting

C206

Cath Lab

C216O

Lin.

A294

Clean Equipment

A295

Staff Tlt.

A297

Nurse Station

A279

Corridor

C*2*24

Lab Office

B235

Off.

B235A

Off.

B234G Office

B235B

Corridor

C*2*25

F. Tlt.

B203A

M. Lkrs.

B202

Service Lobby

A225

Trash Chute

A225A

Stair 5

S*2*5Clos

A243B Clos

A243C

Storage

A243A

Soil Ut.

C216B Transfer

C216E

Observ.

C216D

Gas Stor

C2029

Work Rm.

A250A

Office

A251B

Clean Supply Room

A251A

Off.

C229C

Training Room

A224

Ante Room

A223

Dental Operatory

B229

Off.

B223

Off.

B233

Office

B234A

Conf.

A272

Resident Reading Room

A263

Nuclear Med. Sec.

C200

Reading

C202

Echo Room

C252 Echo Rm

C250

Echo Room

C251

Chief Off.

C200A

Reading Rm.

C250A

Blood Bank

C231

Lkrs.

C228

Reception

C2063

Break Room

A240

Elec.

A239A

Shwr

C228A

Stair 8

S*2*8

Supply

C2033

Lin.

C2031

Stor.

C229N

Elec.

C229M Toxicology

C229K

Special Chem.

C229J Mech.

C229I

Off.

C244

Exam/Treatment / Exercise Room

A217

Micro Reading

B208

Stair 4

S*2*4

Adm. Asst.

A261

Adl. Clinic

A208A

Rehab Exam

A210

Rehab Exam

A211

Dirty Room

A222A

Digital Chest Rm.

A203

Stair 1

S*2*1

LKRS.

A227A

Tlt.

A235

File Rm.

C200B

Clean Supplies

B201

TB/ MYC. Lab

B210C

Slide Stor.

B202A

Operatory

B226

Dental Lab

B227

Stor.

B228

Reading Room

A257

Break Rm.

A253

X-Ray Room

A246

Sig. Clos.

A250

BE Fluororoom

A249

Cl. Supp.

A296

On Call

A276

G.P. Radiography

A248

HAC

A274 Elec.

A275

Pat. Room

A282

Stair 6

S*2*6

Mens

C2003

Exam

C2025

Radiology Spec Rm.

C216F

Stor.

C221

Corridor

C*2*7

Mech.

C226 Work Rm.

C2007

Exam

C2056

Exam

C2048

Exam

C2082 Exam

C2044

Blood Draw

C2005

CT Prep

A2017

CT Control

A2014

MRI EMS

A2025

MRI Room

A2001A

S.P. Control

A2009

Toilet

A2024A

Clean Supply

A2011

Storage

A2010

PACS Read

A2008

Elec.

A2006

Chage Area

A2002A

Dressing Room

A2002

CT Room #1

A2016

IR Reading

A2024

CT Office

A2019

Toilet

A2018

Special Procedures

A2015

MRI Component

A2007

Signal

A2005

Stair 11

S*2*11

Women Staff

A2003 Men Staff

A2004

Office

A2022

Storage

A2020

Storage

A2026

Adm. Equip.

A2016A

Toilet

A2002B

Stor.

A202A

Recep.

A202

Work Alcove

C2079

Waiting Alcove

C2020

Work Alcove

C2078

Ultrasound

A266

Corridor

C*2*3

Corridor

C*2*14

Corridor

C*2*15

Corridor

C*2*16

Corridor

C*2*18

Corridor

C*2*4

Corridor

C*2*2

Corridor

C*2*20

Corridor

C*2*6

Waiting

C2061

Corridor

C*2*11

Chemistry Hemotology Lab

C229

Corridor

C*2*5

F. Lkrs.

B203

HAC

B204

Dir. Off.

B205

Corridor

C*2*1

Waiting Rm.

B224A

Corridor

C*2*13

Corridor

C*2*23

Corridor

C*2*21

Imaging Recep.

A201

MRI Equipment

A2001BMRI

A2001

Equipment Storage

A2023

Corridor

C*2*9

Corridor

C*2*8

CT Room #2

A2013

S.P. Equipment

A2021

Corridor

C*2*19

Control

C216I

Equip

C216J

Hemo Stor.

C225

Cath Lab

C216H

Scrub Area

C216G

Vestibule

C216R

Cardiac Cath Lab

C216

Waiting

A2000

Soiled Receiving & Decontamination

A222E

Corridor

C*2*12

Stair 3

S*2*3

Exam

C2043

Chief Off.

C229D

NAE-34

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.3

Ib.5

Ib.7

Ib.8

Ib.10 Ib.12

Ib.14

Ib.16

Ib.18

Ib.19

Ib.20

Ib.21

Ib.22

Ib.23

Ib.24

Ib.25

Ib.26

Ib.27

7a

6a

Ib.28

Ib.29

Ib.4

Ib.17

3a Ib.11Ib.6

N

Fa

K

OaPa

Eb

S

DP

4 2 5

VA 2ND FLR PET/CT LGR250

1 2 4

AREA UNDER CONSTRUCTION

VA PROJECT # 539-20-104

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:0

:3

A

M -2

-1

SECOND FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M102

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

SECOND FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED

THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

6. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

7. REPLACE BUILDING PRESSURE SENSOR WITH SELF-ZEROING STATIC PRESSURE SENSOR.

PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE SENSOR ON 11TH

FLOOR ROOF.

PHOTO - B1-C209 VA 2ND FLR PET/CT LGR250

UP

UP

UP

UP

UP

D

D

D

D

1-AHU42

1-AHU43

1-AHU41

1-AHU40

AHU5 AHU4

Stor.

A324H

CAD/CAM

A313

Plaster

A312

Exam

A308

Adm. Asst.

A307A

Off.

A314

Office

A324C

Office

A324G

Office

A324E

Stor.

A324F

Office

B305B

HAC

B303A

Adm. Asst.

A324

Pros. Adm. Asst.

A320

Clos.

A320A

Chief PBS

A324D Elec.

A331A

HAC

A318

Stor.

A317

Stair 2

S*3*2

Stor.

A335

F. Tlt.

A306A

Elec

A338B

F. Tlt.

A341

Stor.

A344

Stor.

A344A

Stair 1

S*3*1

Sig.

A345

Db. Wtr

B302

Adm. Asst.

A352

Service Lobby

A338

Off.

B311A

Off.

B311B

Office

B310A

Conf.

B310B

Asst. Ch.

B311D

Asst. Ch.

B311E Off.

B311H

Elec

B306 Office

B305A

Work Area

B320A

Off.

B319D

Off.

B319C

Off.

B319A

F. Tlt.

B315

Eq. Stor.

B317

Stor.

B319

Sig.

B312B

Nursing Conf.

B314

Classroom

B321B

Office

B321

Elec.

B322C

Work Area

B322A

Pat. Dining

B325

Work Area

B322B

Elect.

A346

Stor.

B311M

Ante Rm/ Clean Exit

B307

Exam

A309

Storage

A310

Asst. Chief

A319

Stor.

A336 Asst. Chief Diet.

A337

Tr. Ch.

A338A

Off.

A350D

Storage

B308A Office

B305C

Pros. Off.

A332

Office

A324B Stor.

A324I

Office

A324A

Chief Off.

A321

Pros. Stor.

A330

Reception

B327

Lounge

B311C

Off.

B319B

Classroom

B320

Stor.

B320B

Stair 9

S*3*9

Wash Room

C3020

Work Rm.

C3004A Reception

C3004

Women's

C3002B

Linen Clost.

C3015

Consult.

C3005

Vestibule

C322B

Temp. Control

C3005A

Post-Op

C3040

Prep/Recovery Rm.

C3039

Sub-Waiting

C3036

Prep/Recovery Rm.

C3030

Prep/Recovery Rm.

C3029

Prep/Recovery Rm.

C3028

Prep/Recovery Rm.

C3027

Isolation Prep/Recovery Rm.

C3013

Isolation Prep/Recovery Rm.

C3012

Men's

C3002A

Lobby

C3001

HAC

C359

Storage

C358

Soil

C357

Tlt.

C302A

Consult

C301

Patient Rm.

C304N

Patient Rm.

C304O

Off.

C361

EMS

C360 Patient Rm.

C304L

Patient Rm.

C304K

Patient Rm.

C304G

Patient Rm.

C304F

Patient Tlt.

C304J Patient Rm.

C304I

Patient Rm.

C304H

Meds.

C304D

Ophthamology Optometry

C305

Tlt.

C313BTlt.

A381A

Sig.

A396

Elec.

A395

Patient Room

A387D

Patient Room

A387E

Patient Room

A387F

Shower

A387H

Equip. Stor.

A392

Patient Room

A387G

Patient Room

A387C

Patient Room

A387B

Pharm.

A386Tlt.

A382A Respiratory Therapy

A384 Female Locker

A382C

HVAC

A394

Soil Utility

A391

Office

C306

Acute Care

C307

Anaesthetics

C356

Tele

C311 Dr. Office

C315

Soc. Wrk.

A383

Family Wtng.

C310

Storage

C308

On Call

A381

Tlt.

A388

Machine

A311A

Elec.

A315

Off.

A361

Off.

A358

Off.

A357

Off.

A356

Physician Review

A355B

Off.

A355A

Clean Supply

A397

Lounge

A382

Lactation

C312

Grieve Consult

C313

Patient Advocate

A348

Off.

A350B

Off.

A350A

Vasc. Lab

A347

Tlt.

A347A

F. Locker

A340

Word Proc.

B311G

Adm. Off.

B311F

Stor.

B316

O.R. Alcove

C352B

W. Shower

C322A

Entry

C322C

Prep/Recovery Rm.

C3011

Prep/Recovery Rm.

C3010 O.R. #7

C329

Oxygen Storage

C369

Elec.

C338A

Light Rm.

C352C

O.R. 3

C351

Soiled Utility

C3032

Pat. Tlt.

C3022

Fluoro Procedure Rm.

C3023

Prep/Recovery Rm.

C3038 Patient Toilet Rm.

C3037

Break Rm.

C302

Patient Tlt.

C303

Elec.

C3036A

Supplies / Equipment

C3006

Office

C330

Office

C318

Utility

C320

Office

C323

Office

C325

Tele.

C333

Elec.

C335

HAC

C346

Anesthesia Tech.

C328

Office

C317

O.R. 6

C348

O.R. Alcove

C352A

M. Locker

A339

Patient Rm.

C304A

Diet Sec.

A303

Chief Diet.

A302

HAC

B301

Vendor Drop Off

B304

Conf Rm.

B305D Open Office

B305

Frozen Section

C316

Sterile Core

C347A

Cysto O.R. 2

C332

Linen Clos.

A389

Chief of Surgery

A355

HAC

A380

O.R. Storage

C339

Procedure Rm.

C3025

Elec.

A350

Mech.

A351

PACU

C304

Stair 5

S*3*5

Off.

A349

Electrical

C309

Patiet Rm

C304C

Patient Rm

C304B

Stair 6

S*3*6

Off.

A353

Corridor

C*3*5

Stor.

B310

Patient Rm.

C304M

M. Lock.

A382B

Off.

A360

Off.

A359

Office

C300

Nurse Off.

A390

Staff Lounge

C326

Vestibule

C324C

Men's Locker

C324B

A/C Shaft

C337A

Clean Core

C340 HAC

C3033 Signal Clos.

C3035

SPD Case Cart

C3034

Clean Supply

C3014

Ante Rm.

C3016

Stair 8

S*3*8

Isolation Procedure Rm.

C3024

Physician Work Room

C3019

Scope Storage

C3017

Cleaning Supply

C3016B

Staff Toilet

C3009A

Patient Toilet Rm.

C3008

Storage

C3007A

Staff Work Rm.

C3007

M. Tlt.

A316

Classroom

B308

Res. Stor.

B318

HAC

A378

Off.

A350C

Conf.

A354

M. Tlt.

A342

Family Waiting

B326

Elec.

B312C

Stor.

B321A

HAC

B319EStor.

B320C

Corridor

C*3*16

Procedure Rm.

C3021

Office

C321

Patient Room

A387A

Patient Room

A387K

Patient Room

A387J

Patient Room

A387I

Conference Room

A385

Office

C319

Anesthesia Work Rm.

C337

Mech.

C342

Staff Break Rm.

C3009O.R. 5

C349

O.R. 4

C350

Scope Cleaning

C3016A

Procedure Rm.

C3026

O.R. 1

C354 O.R. 2

C353

Entry

C324

O.R. Alcove

C352E

O.R. Alcove

C334

Lab

A311

Diet Off.

A305

Corridor

C*3*6

Corridor

C*3*1

Corridor

C*3*9

Corridor

C*3*17

Corridor

C*3*15

Corridor

C*3*14

Nurse Station

C3031

Corridor

C*3*12

Corridor

C*3*13

Corridor

C*3*18

Vasc. Lab

A379

Vasc. Lab

A300 Vascular Lab

A301

Cool Down Cart

B307B

Room

B307E

Room

B303B

De-Con

B303

Gowning Rm.

A341

RO DI Water

A343

De-Gown

A342

Corridor

C*3*19

HAC

B307D

Chief Nurse

B311I

Office

B311

Women's Locker

C322

Cysto O.R. 1

C347

Corridor

C*3*3

Nurse Station

A387

Corridor

C*3*7

Clean Stretcher Stor.

C355

Research Off.

B312

Off.

B312A

Steam Equip Rm.

B307A

Prep/Pack

B307C

Stair 10

S*3*10Waiting

C3002

Learning Exchange

B322

Stair 4

S*3*4

Corridor

C*3*11

Corridor

C*3*4

ICU Dir. Off.

C314

O.R. Alcove

C352

Stair 3

S*3*3

Nurse Educator

B309

Clos.

C3018

Ward Adm. Off.

A323

NAE-24

NAE-05

NAE-26

ABCDEFGHILMOPQRSTU

4a

8a

16a

16.5

17a

17b

19a

J

Lb.2

Lb.1

Kb

Jb

Ib.1

Ib.2

Hb Fb

Nb

PbQbRbSbTb

Mb Lb

16b

10a

Ga

Ib.3

Ib.5

Ib.7

Ib.8

Ib.10 Ib.12

Ib.14

Ib.16

Ib.18

Ib.19

Ib.20

Ib.21

Ib.22

Ib.23

Ib.24

Ib.25

Ib.26

Ib.27

7a

6a

Ib.28

Ib.29

Ib.4

Ib.17

3a Ib.11Ib.6

N

Fa

K

OaPa

Eb

3RD FLR MER

NAE-1364

S

DP

OPTIFLEX BACNET ROUTER 3RD FLR (G5CE)

5 2 4

1 2 4

5 2 4

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/2

/2

:5 :3

A

M -2

-1

THIRD FLOOR

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

1-M103

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

THIRD FLOOR PLAN N

PHOTO - B1-3RD FLR MER NAE-24

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. REPLACE EXISTING JOHNSON CONTROLS NAE WITH NEW JACE. ALL CONTROLS ROUTED

THRU EXISTING DEVICE SHALL BE RE-ROUTED AND FULLY INTEGRATED THRU NEW JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

6. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE

DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-

ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A

FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW

HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

7. PROVIDE SPACE TEMPERATURE AND HUMIDITY SENSOR. COORDINATE EXACT LOCATION

WITH COR.

8. PROVIDE SELF-ZEROING BUILDING PRESSURE SENSOR. COORDINATE EXACT LOCATION

WITH COR. PROVIDE TUBING TO COMMUNICATE WITH NEW REFERENCE PRESSURE

SENSOR ON 11TH FLOOR ROOF.

PHOTO - B1-A345 OPTIFLEX BACNET ROUTER 3RD FLR (G5CE)

File details come from the government source that posted it. Updated .