2-M100 - BUILDING 2 BASEMENT.pdf

PDF 4 MB Posted

Attached to
Z2DA--Remediate Temperature Controls 539-21-108 Federal contract opportunity
Solicitation number
36C25026B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This architectural floor plan is for Building 2 Basement at the Cincinnati VA Medical Center, drawn by Heapy Engineering and Levin Porter Architects. The detailed basement floor plan shows multiple specialized rooms including patient care areas (PMR Exam/Treatment, Women's and Men's Patient Rooms), therapy spaces (Horticulture Therapy, Activities for Daily Living), support areas (Clean/Soiled Linen, Storage, Pharmacy Work Room), and infrastructure spaces (Mechanical, Electrical, Elevator Rooms). The drawing is dated January 9, 2026, with Project No. 539-21-108 and is marked as fully sprinklered. The plan includes grid coordinates, room numbers, and three side photographs of electrical equipment/routing panels. The document represents a construction document for a VA medical facility renovation or new construction project.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Remediate Temperature Controls 539-21-108, newest first.
File Type Posted
Updated Specs Addendum 4.pdf PDF
1-M105 - FIFTH FLOOR.pdf PDF
1-M109 - NINTH FLOOR.pdf PDF
13-M101 - BUILDING 13 FIRST FLOOR.pdf PDF
64-M100 - BUILDING 64 BASEMENT.pdf PDF
M906 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-17.pdf PDF
REVISED STATEMENT OF BID ITEMS.pdf PDF
ICRA 539.21.108 Patient Areas Level III.pdf PDF
36C25026B0002 0004.pdf PDF
1-M104 - FOURTH FLOOR.pdf PDF
M901 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-4.pdf PDF
M903 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-7.pdf PDF
M908 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-24.pdf PDF
M909 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-26.pdf PDF
PG-M101 - PARKING GARAGE 1ST FLOOR PLAN.pdf PDF
ICRA 539.21.108 Mech Rooms Level II.pdf PDF
Sign in Sheet Remediate Temp.pdf PDF
1-M103 - THIRD FLOOR.pdf PDF
1-M110 - TENTH FLOOR PENTHOUSE.pdf PDF
15-M100 - BUILDING 15 BASEMENT.pdf PDF
M002 - JOHNSON CONTROLS ROUTER SCHEDULE.pdf PDF
M910 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES AHU-28.pdf PDF
Change Summary of Specs and Drawings.pdf PDF
1-M100 - BASEMENT.pdf PDF
64-M102 - BUILDING 64 SECOND FLOOR.pdf PDF
64-M103 - BUILDING 64 THIRD FLOOR.pdf PDF
M004 - TRIDIUM ROUTER SCHEDULE.pdf PDF
M701 - GENERAL CRITERIA HONEYWELL CONTROLS REPLNT.pdf PDF
M902 - BUILDING 1 PRESSURIZATION CONTROL SEQUENCES - AHU-5.pdf PDF
36C25026B0002 0003.pdf PDF
36C25026B0002 0002.pdf PDF
36C25026B0002 0001.docx DOCX document
Attachment XV - 852.219-75 LOS.docx DOCX document
Attachment XIII - RFI Form.pdf PDF
Attachment XVI - Directive 1192.01, Flu.pdf PDF
Attachment IX -RTC BID DWGS 7 2025.1023.pdf PDF
Attachment VII - RTC BID DWGS 5 2025.1023.pdf PDF
Attachment VI -RTC BID DWGS 4 2025.1023.pdf PDF
Attachment III -RTC BID DWGS 1 2025.1023.pdf PDF
Attachment I - WD OH20250082.pdf PDF
Attachment XIV - EMR Form.pdf PDF
Attachment XII - J A - Redacted.pdf PDF
Attachment XI - RTC BID DWGS 9 2025.1023.pdf PDF
Attachment VIII - RTC BID DWGS 6 2025.1023.pdf PDF
Attachment IV - RTC BID DWGS 2 2025.1023.pdf PDF
Attachment XVII - ICRA Level 2.pdf PDF
Attachment X - RTC BID DWGS 8 2025.1023.pdf PDF
Attachment V - RTC BID DWGS 3 2025.1023.pdf PDF
Attachment II - CD SPECIFICATION 2025.1023.pdf PDF
36C25026B0002.docx DOCX document
Show all 50

Z2DA--Remediate Temperature Controls 539-21-108 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

D

AA.0

AA.1

AB.0

AB.1

AB.2

AC.0

AC.2

AD.0

AE.0

AF.0

DA.0

DB.0

D2.0 D3.0 D4.0 A1.0

BB.0

BD.0

B0.0 B1.0

B2.0

B2.1

B3.0

B4.0

BD.1

A7.0 A7.1

A8.0 B6.1 B7.0

B7.1

B7.2

A1.1 A2.0 A3.0 A3.1 A4.0 A4.1 A5.0 A5.1 A5.2 A6.0

AC.1

CE.0

AD.1

BA.0

BA.1

BB.1

BB.2

BC.1

AG.0

AG.1

AH.0

CA.0

C1.1 C2.1

B6.0

B5.0

BB.3

E0.1

E1.0

F1.0

F2.0

F2.1 F3.0

F4.0

F5.0

F5.1

F6.0

FC.0

FB.0

FA.3

EF.0

EE.0

ED.0

EC.2

EC.0

EB.2

EB.1

EB.0

EE.1

EA.0

E1.1

E2.0 E3.0 E3.1 E4.0 E4.1 E5.0 E5.1

E5.2

E6.0

EC.1

FA.0

FA.1

FA.2

AHU-52 AHU-51

AHU-53

AC.0

AC.2

AD.0

A1.0

B3.0

A1.1 A2.0 A3.0 A3.1

BA.0

2 5

PMR EXAM/TREATMENT

PMR

EXAM/TREATMENT

PATIENT CARE STORAGE

HOUSEKEEPING CLOSET

STAFF TOILET

PMR

EXAM/TREATMENT0113

TELEHEALTH

/ PMR

EXAM/TREATMENT

ELECTRICAL GEAR

STORAGE

ELEV. MACH. ROOM

TECH CLOSET

PIPE ROOM

DISH MACHINE

HORTICULTURE

THERAPY

OT OFFICE

KILN ROOM

MEDIA

CENTER

RT OFFICE

ACTIVITIES FOR DAILY LIVING - BATH

0117B

0117A

ACTIVITIES

FOR DAILY

LIVING -

KITCHEN

PATIENT WOMEN'S

RCL OFFICE

CLEAN LINEN

RECREATION

GROUP

ROOM

EXERCISE

MAT / PRIVATE RM

PATIENT MEN'S

SOILED LINEN

TECH. (EXISTING)

RCL OFFICE

PT OFFICE

STAIR (EXISTING)

S1.0

PMR EXAM/TREATMENT

PMR EXAM/TREATMENT

ELECTRICAL (EXISTING)

PMR EXAM/TREATMENT

THERAPY SPACE

CORRIDOR

CHANGING / LOCKERS

CORRIDOR

C*B*4

RESIDENT STORAGE

ELEVATOR EQUIP. ROOM

CLOSET

0024A

NURSE EDUC.

EMS LOCKERS

HAC

CORRIDOR

C*B*1

WOMEN

BREAK ROOM

NURSE EDUC.

PHARMACY WORK ROOM

STAIR 2

S*B*2

MECHANICAL VESTIBULE

EMS WORK LEADER

ELEVATOR LOBBY

C*B*5

NFS STORAGE

0018 MEN

CORRIDOR

C*B*3

ELECTRICAL

MECHANICAL

STAIR 1

S*B*1

Corridor-3

C*B*2-3

RT STORAGE

MECHANICAL (EXISTING)

NAE-33

NAE-15

5 2 4

G5RE ROUTER B2 BSMT

4 3

AHU-54

1 2 4

P ro je ct

N o.

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Manager

Cincinnati V.A Medical Center

U.S. Department of Veterans Affairs

F

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDKEVIN HENDERSONPROJECT NO. STATE COA FIRM NO.

/9

/2

:0

:2

P

M -2

-1

BUILDING 2 BASEMENT

10/23/25 GSE WJS

REMEDIATE TEMPERATURE

CONTROLS

2-M100

539-21-108

CINCINNATI, OHIO

2020-05099 01528

SCALE: 1/16" = 1'-0"

BASEMENT FLOOR PLAN N

PLAN NOTES

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.

1. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING AUTOMATED LOGIC ROUTER.

FULLY INTEGRATE ALL EXISTING ROUTER POINTS INTO NEW HEAD END THRU JACE.

REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

2. EXTEND 120V ELECTRIC FROM EXISTING PANEL TO NEW PANEL.

3. PROVIDE CVAMC STANDARD DUAL DATA DROP IN SURFACE MOUNT OUTLET FOR NEW

JACE. PROVIDE NEW PATCH PANEL IN THE CLOSEST EXISTING RACK WITH CAPACITY,

WITHIN DISTANCE LIMITS, TERMINATE NEW DATA CABLING. COORDINATE WITH OIT.

4. REPLACE LOCK IN EXISTING PANEL. ALL PANELS SHALL BE KEYED ALIKE.

5. PROVIDE NEW JACE BACNET ROUTER NEXT TO EXISTING JOHNSON CONTROLS NCE/NIE

DEVICE. ALL CONTROLS ROUTED THRU EXISTING DEVICE SHALL BE REMOVED, RE-

ROUTED AND FULLY INTEGRATED THRU NEW JACE. NCE/NIE DEVICE SHALL REMAIN AS A

FIELD CONTROLLER. FULLY INTEGRATE ALL EXISTING CONTROLLER POINTS INTO NEW

HEAD END THRU JACE. REFER TO M00 SERIES SHEETS FOR APPROXIMATE QUANTITIES.

PHOTO - B2-0012 NAE-15

PHOTO - B2-0125 G5RE ROUTER B2 BSMT

PHOTO - B2-0125 NAE-33

# DESCRIPTION DATE

1 ADDENDUM 4 01-12-2026

Sheets
1-M100 - BASEMENT
1-M103 - THIRD FLOOR
1-M104 - FOURTH FLOOR
1-M105 - FIFTH FLOOR
1-M109 - NINTH FLOOR
1-M110 - TENTH FLOOR PENTHOUSE
2-M100 - BUILDING 2 BASEMENT
13-M101 - BUILDING 13 FIRST FLOOR
15-M100 - BUILDING 15 BASEMENT
64-M100 - BUILDING 64 BASEMENT
64-M102 - BUILDING 64 SECOND FLOOR
64-M103 - BUILDING 64 THIRD FLOOR
M002 - JOHNSON CONTROLS ROUTER SCHEDULE
M004 - TRIDIUM ROUTER SCHEDULE
M701 - GENERAL CRITERIA, HONEYWELL CONTROLS REPLACEMENT
PG-M101 - PARKING GARAGE FIRST FLOOR PLAN

File details come from the government source that posted it. Updated .