Attachment 7 - AF Form 66.pdf
Air Force Form PDF 639 KB Posted
- Attached to
- HJZH 21-4003, Repair Piping & HVAC B750
- Solicitation number
- FA500021R0040
About this file
This document is an AF Form 66 schedule of material submittals for solicitation number FA500021R0040 to repair piping and HVAC at building B750. The schedule lists required submittals for the project design, architectural, mechanical, electrical, and closeout phases including 35%, 65%, 95%, and 100% design drawings due at various dates from NTP +30 to NTP +90. Submittals for items like doors, ductwork, controls, boilers, and as-built drawings are also due at dates ranging from NTP +30 to installation +7. The opportunity was issued by the Department of the Air Force Pacific Air Forces for JBER HJZH 21-4003.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LI
N
E N
U M
B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.
C
ER
TI
F.
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
TU
R
U R
'S R
EC
O
M M
EN
D
AT
IO
N
C
AT
AL
O
G D
AT
A
O &M
R
EC
O M
M
EN
D
AT
IO
N
S
C
AL
C U
LA
TI
O N
S
W
AR
R
AN
TY
D R
AW
IN
G S
R
EP
O R
T
TE
ST
R
ES
U
LT
S
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E
TO
C O
N
TR
AC
TI
N G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
AP
PR
O
VE
D
D
IS
AP
PR
O
VE
D
C O
N
TR
AC
TO
R S
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
GENERAL
Project Specific Form 66 X NTP + 30 Construction Schedule X NTP + 30 Contractor's Health, Safety, and Environment Plan X NTP + 30 Contractor's QA/QC Plan X NTP + 30 Copy of Engineering License(s) of person or consultancy responsible for design X Design
DESIGN
All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 35% design, at a minimum, shall be a Scope of Work narrative:
X NTP + 30
(35%)
All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 65% Design Drawings to include:
X NTP + 60
(65%)
All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 95% Design Drawings to include:
X NTP + 75
(95%)
All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 100% Design Drawings, shall be stamped by a Professional registered in the State of Alaska, Design Drawings to include:
X NTP + 90
(100%) Design and Stamped Required
Floor Plan, Elevations, Sections, Schedules, and Details X NTP + 60
Lighting Plan X NTP + 60 Boiler Replacement Plan X X X X X X NTP + 60
ARCHITECTURAL
Doors and Frames X X X X X NTP + 30
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER
HJZH 21-4003 Repair Piping & HVAC B750
AF FORM 66, OCT 99 Previous Edition Will Be Used
FA500021R0040
HJZH 21-4003 Repair Piping and HVAC B750
Attachment 7 - AF Form 66
E N
U M
B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.
C
ER
TI
F.
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
TU
R
U R
'S R
EC
O
M M
EN
D
AT
IO
N
C
AT
AL
O
G D
AT
A
O &M
R
EC
O M
M
EN
D
AT
IO
N
S
C
AL
C U
LA
TI
O N
S
W
AR
R
AN
TY
D R
AW
IN
G S
R
EP
O R
T
TE
ST
R
ES
U
LT
S
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E
TO
C O
N
TR
AC
TI
N G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
AP
PR
O
VE
D
D
IS
AP
PR
O
VE
D
C O
N
TR
AC
TO
R S
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER
HJZH 21-4003 Repair Piping & HVAC B750
Door Hardware X X NTP + 30 Gypsum Board-All Types Used X NTP + 30 Rubber Base X X NTP + 30 Interior Paint X X NTP + 30 Exterior Paint X X NTP + 30
MECHANICAL
Ventilation Unit X X X X X X NTP + 45 Exhaust Fans X X X X X X NTP + 45 Registers X X X X X NTP + 45 Dampers X X X X X NTP + 45 Ductwork X X X X X X NTP + 45 Controls X X X X X NTP + 90 Piping X X X X X X NTP + 45 Heaters X X X X X X NTP + 45 Valves X X X X X X NTP + 45 Pumps X X X X X X NTP + 45 Strainers X X X X X NTP + 45 Thermal Insulation X X X X X X NTP + 45 Heat Exchanger X X X X X X NTP + 45 Expansion Tank X X X X X X NTP + 45 Instrumentation X X X X X X NTP + 45 Glycol Make-up System X X X X X NTP + 45 Gas Meter X X X X X X NTP + 45 Gas Regulator X X X X X X NTP + 45 Gas Piping X X X X X X NTP + 45 Boilers X X X X X X NTP + 45 Test and Balance Report X X X NTP + 120
ELECTRICAL
Cables(electrical,comm,fire alarm) X NTP + 45 Swtches X NTP + 45 Receptacles X NTP + 45 Provide Updated Electrical one-line Diagram, x x NTP + 45 Panels X NTP + 45 Provide Updated "Printed" Panel Scheduals x x NTP + 45 Breakers X NTP + 45 Conduits X NTP + 45 Lighting Fixtures X NTP + 45
CLOSEOUT
AF FORM 66, OCT 99 Previous Edition Will Be Used
FA500021R0040
HJZH 21-4003 Repair Piping and HVAC B750
E N
U M
B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.
C
ER
TI
F.
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
TU
R
U R
'S R
EC
O
M M
EN
D
AT
IO
N
C
AT
AL
O
G D
AT
A
O &M
R
EC
O M
M
EN
D
AT
IO
N
S
C
AL
C U
LA
TI
O N
S
W
AR
R
AN
TY
D R
AW
IN
G S
R
EP
O R
T
TE
ST
R
ES
U
LT
S
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E
TO
C O
N
TR
AC
TI
N G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
AP
PR
O
VE
D
D
IS
AP
PR
O
VE
D
C O
N
TR
AC
TO
R S
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER
HJZH 21-4003 Repair Piping & HVAC B750
O&M maint data and maint manuals & Manufacturer's Warranty for Fire Alarm Equipment
X X Install + 4
Factory and Field Test Certificates, Logs and Test Results X X Before
Acceptance
DD Form 1354 X Before Acceptance
As Builts (see REVISED JBER CAD STANDARD) X Install + 7
AF FORM 66, OCT 99 Previous Edition Will Be Used
FA500021R0040
HJZH 21-4003 Repair Piping and HVAC B750
File details come from the government source that posted it. Updated .