This document is an AF Form 66 schedule of material submittals for solicitation number FA500021R0040 to repair piping and HVAC at building B750. The schedule lists required submittals for the project design, architectural, mechanical, electrical, and closeout phases including 35%, 65%, 95%, and 100% design drawings due at various dates from NTP +30 to NTP +90. Submittals for items like doors, ductwork, controls, boilers, and as-built drawings are also due at dates ranging from NTP +30 to installation +7. The opportunity was issued by the Department of the Air Force Pacific Air Forces for JBER HJZH 21-4003.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LI

N

E N

U M

B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

GENERAL

Project Specific Form 66 X NTP + 30 Construction Schedule X NTP + 30 Contractor's Health, Safety, and Environment Plan X NTP + 30 Contractor's QA/QC Plan X NTP + 30 Copy of Engineering License(s) of person or consultancy responsible for design X Design

DESIGN

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 35% design, at a minimum, shall be a Scope of Work narrative:

X NTP + 30

(35%)

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 65% Design Drawings to include:

X NTP + 60

(65%)

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 95% Design Drawings to include:

X NTP + 75

(95%)

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 100% Design Drawings, shall be stamped by a Professional registered in the State of Alaska, Design Drawings to include:

X NTP + 90

(100%) Design and Stamped Required

Floor Plan, Elevations, Sections, Schedules, and Details X NTP + 60

Lighting Plan X NTP + 60 Boiler Replacement Plan X X X X X X NTP + 60

ARCHITECTURAL

Doors and Frames X X X X X NTP + 30

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

HJZH 21-4003 Repair Piping & HVAC B750

AF FORM 66, OCT 99 Previous Edition Will Be Used

FA500021R0040

HJZH 21-4003 Repair Piping and HVAC B750

Attachment 7 - AF Form 66

E N

U M

B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

HJZH 21-4003 Repair Piping & HVAC B750

Door Hardware X X NTP + 30 Gypsum Board-All Types Used X NTP + 30 Rubber Base X X NTP + 30 Interior Paint X X NTP + 30 Exterior Paint X X NTP + 30

MECHANICAL

Ventilation Unit X X X X X X NTP + 45 Exhaust Fans X X X X X X NTP + 45 Registers X X X X X NTP + 45 Dampers X X X X X NTP + 45 Ductwork X X X X X X NTP + 45 Controls X X X X X NTP + 90 Piping X X X X X X NTP + 45 Heaters X X X X X X NTP + 45 Valves X X X X X X NTP + 45 Pumps X X X X X X NTP + 45 Strainers X X X X X NTP + 45 Thermal Insulation X X X X X X NTP + 45 Heat Exchanger X X X X X X NTP + 45 Expansion Tank X X X X X X NTP + 45 Instrumentation X X X X X X NTP + 45 Glycol Make-up System X X X X X NTP + 45 Gas Meter X X X X X X NTP + 45 Gas Regulator X X X X X X NTP + 45 Gas Piping X X X X X X NTP + 45 Boilers X X X X X X NTP + 45 Test and Balance Report X X X NTP + 120

ELECTRICAL

Cables(electrical,comm,fire alarm) X NTP + 45 Swtches X NTP + 45 Receptacles X NTP + 45 Provide Updated Electrical one-line Diagram, x x NTP + 45 Panels X NTP + 45 Provide Updated "Printed" Panel Scheduals x x NTP + 45 Breakers X NTP + 45 Conduits X NTP + 45 Lighting Fixtures X NTP + 45

CLOSEOUT

AF FORM 66, OCT 99 Previous Edition Will Be Used

FA500021R0040

HJZH 21-4003 Repair Piping and HVAC B750

E N

U M

B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

HJZH 21-4003 Repair Piping & HVAC B750

O&M maint data and maint manuals & Manufacturer's Warranty for Fire Alarm Equipment

X X Install + 4

Factory and Field Test Certificates, Logs and Test Results X X Before

Acceptance

DD Form 1354 X Before Acceptance

As Builts (see REVISED JBER CAD STANDARD) X Install + 7

AF FORM 66, OCT 99 Previous Edition Will Be Used

FA500021R0040

HJZH 21-4003 Repair Piping and HVAC B750

File details come from the government source that posted it. Updated .