Attachment 3 AF Form 66 - Repair HVAC H7 H9 B32 and B127.xls.pdf
Air Force Form PDF 97 KB Posted
- Solicitation number
- W50S85-21-B-0004
About this file
This document contains a submittal schedule and material submittal requirements for a federal contract to repair HVAC systems at Selfridge Air National Guard Base. The contract is for $250,000 to $500,000 between the Department of the Army Michigan Army National Guard and small businesses. Offerors must have an approved business plan on file with the Detroit, MI District and the NAICS code is 238220. The period of performance is 365 calendar days. The submittal schedule requires the contractor to provide various documents and plans within specified timeframes after notice to proceed, including shop drawings, warranties, testing and balancing reports, operation and maintenance manuals, and project closeout documentation. Material submittals are grouped by specification section and type, such as product data, samples, or manufacturer recommendations.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
VGLZ 212011
APPROVED DISAPPROVED
1 Submittal Schedule - AF Form 66 10
2 Transfer and Acceptance of DOD Real Property - DD Form 1354 60
3 Contractor Hazardous Material Identification - SANGB Form 23 10
4 Solid Waste Recycling and Disposal Reporting Form 72 60
5 Affirmative Procurement Reporting Form 60
6 DD Form 1354 60
7 Construction Schedule AF 3064 submittals 10
8 Construction Photos 45
9 Safety Documentation as stated 10
10 Schedule of Test and Inspections 21
11 Permits, Licenses and Certificates 10
12 Quality Control Plan 10
13 Warranties 10
14 Starting System -Testing, Adjusting & Balancing Reports 60
15 O & M Data 15
Project Record Documents Close out Documantation 60
17 Instructional Training Program as applicable 60
Product Data
Common Motor Requirements for HVAC Equipment Product Data 15
18 Sleeves and Sleeve Seal for HVAC Piping 19 Product Data for General Duty Valves 15 20 Escutcheons for HVAC Piping 21 Product Data as req'd 22 Meters and Gages for HVAC Piping
Product Data for Meters and Gages as req'd
Spec Section
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair HVAC H7, H9, B32 and B127
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D
AT
IO
N
S
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY XX DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
APPROVED DISAPPROVED
Spec Section
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair HVAC H7, H9, B32 and B127
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY XX DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
Shop Drawing as req'd O & M Data as req'd Warranty as req'd
23 General-Duty Valves for HVAC Piping as req'd Product Data for General Duty Valves as req'd
Hangers & Supports for HVAC Piping & Equipment Product Data as req'd Shop Drawing as req'd O & M Data as req'd Warranty as req'd
Identifcation for HVAC Piping and Equipment Product Data as req'd Sample for ID as req'd Equipment Label Schedule / Scheme as req'd Valve Schedule as req'd
26 Testing, Adjusting, & Balancing for HVAC Qualification Data Contract Document Examination Report 60 Certified TAB Reports 60
27 HVAC Piping Insulation
Product Data on Insulation as req'd Samples of Insulation as req'd
28 Instrumentation & Control for HVAC Product Data on DDC System & Controls 15 Shop Drawing 15 Data Comm. Protocol Certificates 15
29 Control Valves Product Data 15 Shop Drawing 15 O & M Data 15 Warranty 15
30 Control Dampers Product Data as req'd Shop Drawing as req'd O & M Data as req'd Warranty as req'd
31 Sequence of Operation for HVAC DDC Control Sequences 15
33 Hydronic Piping Product Data on the following Material: 15 Air Control Devices 15
APPROVED DISAPPROVED
Spec Section
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair HVAC H7, H9, B32 and B127
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY XX DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
Hydronic Specialties 15 O & M Data 15
34 Hydronic Piping Specialities Product Data 15 Shop Drawing 15 Warranty 15 O & M Data 15
35 Hydronic Pumps Product Data 15 Shop Drawing 15 Warranty 15 O & M Data 15
Water Treatment for Closed-Loop Hydronic Systems Product Data 15 Shop Drawing 15 Warranty 15 O & M Data 15
37 Condensing Boilers Product Data 15 Shop Drawings 15 exhaust piping Concentric walll side Warranty 15 O & M Data 15
Low-Voltage Electrical Power Conductors & Cables Product Data for Each Type of Cable as req'd
Grounding & Bonding for Electrical Systems O & M Data as req'd
40 Raceway & Boxes for Electrical Systems Product Data on the following Material: as req'd Metal Conduit & Tubing as req'd Metal Wireways as req'd Surface Raceways as req'd Boxes, Enclosures, Cabinets as req'd
41 Panelboards Product Data as req'd Shop Drawings as req'd O & M Data as req'd Warranty as req'd
42 Enclosed Switches Product Data as req'd Shop Drawings as req'd
APPROVED DISAPPROVED
Spec Section
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair HVAC H7, H9, B32 and B127
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY XX DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O & M Data as req'd 43 Enclosed Controllers
Product Data as req'd Shop Drawings as req'd O & M Data as req'd
44 Roof Patching Product Data as req'd Shop Drawings as req'd O & M Data as req'd
File details come from the government source that posted it. Updated .