04 - AF form 66.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
New Poinsett Tower Installation
Solicitation number
FA480326R0007
Issued by

About this file

This is an AF Form 66, a Schedule of Material Submittals template used to track contractor submissions throughout a construction project lifecycle. The form is referenced in solicitation F38604-99-1480 and is designed to be completed by both the project engineer and contract administrator to document, monitor, and approve required contractor deliverables.

The form establishes a comprehensive submittal tracking system covering ten line items including construction schedules, equipment submittals, operation and maintenance manuals, design drawings at various completion percentages (65% and 95%), as-built drawings, standards documentation, and DD Form 1354 submissions at interim and final project stages. Key submission deadlines include construction schedules within one week of Notice to Proceed and PDF standards copies within three weeks of NTP, with the DD Form 1354 interim submission due at the 50% project completion point. The template includes columns for certification of compliance, shop drawings, samples, color selection, manufacturer recommendations, warranties, catalog data, operating instructions, and other required submissions, along with tracking columns for submission dates, receipt dates, return suspense dates, approval status, and remarks. This form serves as the primary administrative tool for managing contractor compliance with contractual documentation requirements throughout the project duration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NCOC-A

PROJECT NUMBER :PROJECT TITLE:SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1Construction SchedulexWithin 1 week of NTP
2Equipment submittalsx
3O&M Manualsx
4SATx
565% Design Drawingsx
695% Design Drawingsx
7As-Built Drawingsx
8PDF copy of StandardsxWithin 3 Weeks of the NTP
9DD1354 InterimxAt the 50% Project point
10DD1354 FinalxWith the AS Builts
11
12
13
14
15
16
17
18
19