04 - AF form 66.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- New Poinsett Tower Installation
- Solicitation number
- FA480326R0007
About this file
This is an AF Form 66, a Schedule of Material Submittals template used to track contractor submissions throughout a construction project lifecycle. The form is referenced in solicitation F38604-99-1480 and is designed to be completed by both the project engineer and contract administrator to document, monitor, and approve required contractor deliverables.
The form establishes a comprehensive submittal tracking system covering ten line items including construction schedules, equipment submittals, operation and maintenance manuals, design drawings at various completion percentages (65% and 95%), as-built drawings, standards documentation, and DD Form 1354 submissions at interim and final project stages. Key submission deadlines include construction schedules within one week of Notice to Proceed and PDF standards copies within three weeks of NTP, with the DD Form 1354 interim submission due at the 50% project completion point. The template includes columns for certification of compliance, shop drawings, samples, color selection, manufacturer recommendations, warranties, catalog data, operating instructions, and other required submissions, along with tracking columns for submission dates, receipt dates, return suspense dates, approval status, and remarks. This form serves as the primary administrative tool for managing contractor compliance with contractual documentation requirements throughout the project duration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCOC-A
| PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | |
| SCHEDULE OF MATERIAL SUBMITTALS | |||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | |||||||||||||||||||
| 1 | Construction Schedule | x | Within 1 week of NTP | |||||||||||||||||
| 2 | Equipment submittals | x | ||||||||||||||||||
| 3 | O&M Manuals | x | ||||||||||||||||||
| 4 | SAT | x | ||||||||||||||||||
| 5 | 65% Design Drawings | x | ||||||||||||||||||
| 6 | 95% Design Drawings | x | ||||||||||||||||||
| 7 | As-Built Drawings | x | ||||||||||||||||||
| 8 | PDF copy of Standards | x | Within 3 Weeks of the NTP | |||||||||||||||||
| 9 | DD1354 Interim | x | At the 50% Project point | |||||||||||||||||
| 10 | DD1354 Final | x | With the AS Builts | |||||||||||||||||
| 11 | ||||||||||||||||||||
| 12 | ||||||||||||||||||||
| 13 | ||||||||||||||||||||
| 14 | ||||||||||||||||||||
| 15 | ||||||||||||||||||||
| 16 | ||||||||||||||||||||
| 17 | ||||||||||||||||||||
| 18 | ||||||||||||||||||||
| 19 |