The document is an Air Force Form 66 (AF Form 66) Schedule of Material Submittals for Project No. EEPZ246823, detailing a roof repair project for Base Ops Building 847. The submittal schedule covers multiple disciplines including general, environmental, architectural, civil, mechanical, electrical, special systems, and miscellaneous categories, with specific documentation requirements for the roofing project.

Key submittal requirements include project schedules, demolition plans, drawing submittals at 15%, 35%, 95%, and 100% completion stages, metal roof panel details, mechanical fasteners, insulation, and shop drawings. Environmental submittals include safety data sheets, hazardous waste and material reports, storm water pollution prevention plan, state licensing documentation for asbestos work, and disposal manifests. Additional unique requirements include an airfield waiver with detailed site plan, equipment type, maximum height, and work schedule information. The project is part of a Department of the Air Force Air Education and Training Command solicitation (FA302225R0003) with a project value between $500,000 and $1,000,000, scheduled for roof replacement to eliminate water leaks in Building 847.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General

Project No:Project Title:Date:
EEPZ246823Repair Base Ops Standing Seam Roof, B84725-Feb-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
1Schedule of Material Submittals (AF Form 66)SOWx
2Project ScheduleSOWx
3Demolition PlanSOWx
415% Drawing SubmittalSOWx
535% Drawing SubmittalSOWx
695% Drawing SubmittalSOWx
7100% Drawing SubmittalSOWx
8Metal Roof PanalsSOWxxxx
9Mechanical FastenersSOWxxx
10InsulationSOWxxx
11Sheathering Material and Fabrication Shop DrawingsSOWx
12Blocking Material, Installation and Shop DrawingsSOWx
13Superintendent's Qualifications and ExperienceSOWx
14QC Manager's Qualifications and ExperienceSOWx
15Contractor Project Manager's Qualifications and ExperienceSOWx
16Completed DD Form 1354SOWx
17As-Built DrawingsSOWx
18Guarantees and WarrantiesSOWx

AF Form 66 (Substitute) GENERAL Page&Pof&N

SCHEDULE OF MATERIAL SUBMITTALS

Environmental

Project No:Project Title:Date:
EEPZ246823Repair Base Ops Standing Seam Roof, B84725-Feb-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
7Appropriate SDSBASIC
8Hazardous waste reportBASIC
9Hazardous Material Report (AF Form 3000)BASIC
10Recycled Material Report/Construction Debris reportBASIC
11Storm Water Pollution Prevention Plan with Best Management Practices IdentifiedBASIC
12Weekly Inspection Reports for ProjectsBASIC
13State Licenses for workers and supervisors (Asbestos)BASIC
14State license for the firm (Asbestos)BASIC
1510 Day Notification (Demolition and Asbestos)BASIC
16Work PlanBASIC
17Copy of ACM DisposalManifestBASIC

AF Form 66 (Substitute) Environmental Page&Pof &N

SCHEDULE OF MATERIAL SUBMITTALS

Architectural

Project No:Project Title:Date:
EEPZ246823Repair Base Ops Standing Seam Roof, B84725-Feb-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
14NONE

AF Form 66 (Substitute) Architectural Page&Pof&N

Civil

Project No:Project Title:Date:
EEPZ246823Repair Base Ops Standing Seam Roof, B84725-Feb-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
NONE

AF Form 66 (Substitute) CIVIL Page&Pof &N

Mechanical

Project No:Project Title:Date:
EEPZ246823Repair Base Ops Standing Seam Roof, B84725-Feb-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
17NONE

AF Form 66 (Substitute) Mechanical Page&Pof&N

Electrical

Project No:Project Title:Date:
EEPZ246823Repair Base Ops Standing Seam Roof, B84725-Feb-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
NONE

AF Form 66 (Substitute) Electrical Page&Pof &N

Special Systems

Project No:Project Title:Date:
EEPZ246823Repair Base Ops Standing Seam Roof, B84725-Feb-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
26NONE

AF Form 66 (Substitute) Special Systems Page&Pof &N

Other&Misc

Project No:Project Title:Date:
EEPZ246823Repair Base Ops Standing Seam Roof, B84725-Feb-25
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
26Airfield Waiver
Prepared by CE but contractor must supply:
1. Site Plan/Area of Work
2. Type of Equipment to be used
3. Maximum height of equipment
4. Work Hours (24/7, nights, non-flying, etc).
5. Work Schedule

27 Height of equipment on the airfield

AF Form 66 (Substitute) Other and Misc Page&Pof &N