Attachment 3- AF Form 66.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
B940 CDC Sunshades Federal contract opportunity
Solicitation number
FA302223R0018
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains a schedule of material submittals required for the Repair CDC Sunshades Playground, B940 federal contract opportunity issued by the Department of the Air Force Air Education and Training Command. The contractor must submit a schedule of material submittals, work/construction plan, safety plan, DD Form 1354, list of equipment, specifications for rubber and shade materials, concrete material specifications and mix design, concrete break testing data, 95% and 100% design submittals, and as-built drawings. The contractor must also provide a work schedule. Key submittal dates include dates for when the contractor requires approval, dates items are received by the government, dates for resubmittals if needed, and the final approval receipt date.

The solicitation number for the Repair CDC Sunshades Playground, B940 opportunity is FA302223R0018. The schedule of material submittals document provides details on the types of documents and information the contractor must provide to the government over the course of the project.

View the file

Other files for this federal contract opportunity

Other files attached to B940 CDC Sunshades, newest first.
File Type Posted
B940 RFIs 20230807.pdf PDF
B940 RFIs 20230802.pdf PDF
CDC_AF Form 66_20230726.xlsx XLSX spreadsheet
Design Build SOW_20230726.pdf PDF
Amendment 1 FA302223R00180001 .pdf PDF
Attachment 5- Form DD1354.pdf PDF
Attachment 4- Proof of Insurance.pdf PDF
Attachment 1- Statement of Work.pdf PDF
Attachment 2- Wage Determination.pdf PDF
Solicitation - FA302223R0018.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Project No: EEPZ223515 Project Title: Repair CDC Sunshades Playground, B940 Date: 24-May-23

LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
1Schedule of Material Submittals (AF Form 66 - mod)RFPX
2Work/Construction PlanRFPX
3Safety PlanRFPX
4Completed DD Form 1354RFPX
5List of EquipmentRFPX
6Rubber Material SpecificationsRFPXXXXX
7Shade Design Specifications and MaterialRFPXXXXX
8Concrete Material Specifications & Mix DesignRFPX
9Concrete Break Testing DataRFPX
1095% & 100% Design SubmittalsRFPX
11As-Built DrawingsRFPX
12Work ScheduleRFPX

AF Form 66 (Substitute) GENERAL Page&Pof&N